TABLE OF CONTENTS
INTRODUCTION.....................................................................................................................................3
QUALITY MANAGEMENT APPROACH........................................................................................................3
QUALITY REQUIREMENTS / STANDARDS...................................................................................................4
QUALITY ASSURANCE............................................................................................................................5
QUALITY CONTROL...............................................................................................................................7
QUALITY CONTROL MEASUREMENTS.......................................................................................................8
2
ProjectManagementDocs.com
INTRODUCTION
The Quality Management Plan is an integral part of any project management plan. The purpose
of the Quality Management Plan is to describe how quality will be managed throughout the
lifecycle of the project. It also includes the processes and procedures for ensuring quality
planning, assurance, and control are all conducted. All stakeholders should be familiar with how
quality will be planned, assured, and controlled.
1a:
The Quality Management Plan for the project “developing a telecommunication application”
in software services organization which will establish the activities, processes, and procedures
for ensuring a quality product upon the conclusion of the project. The purpose of this plan is
to:
2. Manage Quality
The process of translating the quality management plan into executable quality
activities that incorporate the organization’s quality policies in to the project.
3. Control Quality
The process of monitoring and recording the results of executing the quality
management activities to asses performance and ensure the project outputs are
complete, correct and meet customer expectations.
3
ProjectManagementDocs.com
The quality management approach for the LTFC project will ensure quality is planned for both
the product and processes. In order to be successful, this project will meet its quality objectives
by utilizing an integrated quality approach to define quality standards, measure quality and
continuously improve quality.
Product quality for the LTFC project will be defined by the company’s current standards and
criteria for its fiber optic cable family. The focus is on the project’s deliverable and the
standards and criteria being used will ensure the product meets established quality standards
and customer satisfaction.
Process quality for the LTFC project will focus on the processes by which the project deliverable
will be manufactured. Establishing process quality standards will ensure that all activities
conform to an organizational standard which results in the successful delivery of the product.
The project team will work with the Quality Group to define and document all organizational
and project specific quality standards for both product and processes. All quality
documentation will become part of the LTFC Project Plan and will be transitioned to operations
upon the successful completion of the project.
Metrics will be established and used to measure quality throughout the project life cycle for the
product and processes. The Quality Group Manager will be responsible for working with the
project team to define these metrics, conduct measurements, and analyze results. These
product and process measurements will be used as one criterion in determining the success of
the project and must be reviewed by the project sponsor. Metrics will include:
Schedule
Resources
Cost
4
ProjectManagementDocs.com
Process performance
o Manufacturing line utilization
o Material waste
Product performance
o Attenuation
o Tensile strength
Customer Satisfaction (as a result of field trials)
Product Quality:
The product quality standards and requirements will be determined by the project team and
quality group. These standards will primarily be based on the company’s documented
standards for all “Telecommunication Software”. There may be product-specific quality
standards identified that are not currently part of the documented organizational standards. In
this case, the quality group will review these newly identified standards and incorporate them
into organizational documentation if approved.
As trial products are measured at pre-determined intervals, we will know that the product is
compliant with quality standards once we achieve ten consecutive trial runs resulting of
application which is 100% within acceptable quality control margins.
Process Quality:
The process quality standards and requirements will be determined by the project team and
quality group. Many of these standards will be based on existing company process standards.
However, it is anticipated that there will be several unique steps in the development of the
Telecommunication Application which will require new quality standards.
As trial , the process metrics will be measured and analyzed to determine the quality of the
process. Once the Telecommunication Application meets quality compliance and all process
metrics fall within acceptable quality assurance margins, we will achieve process compliance for
the Telecommunication Application.
5
ProjectManagementDocs.com
QUALITY ASSURANCE
This section should explain how you will define and document the process for auditing the
quality requirements and results from quality control measurements in order to ensure that
quality standards and operational definitions are used. This section should also document the
actual quality assurance metrics used for this project.
1 B:
The quality assurance of the Telecommunication Application focuses on the processes used in
the development of the Telecommunication Application. In order to ensure quality, an iterative
quality process will be used throughout the project life cycle. This iterative process includes
measuring process metrics, analyzing process data, and continuously improving the processes.
The Telecommunication Application Manager and the project team will perform assessments at
planned intervals throughout the project to ensure all processes are being correctly
implemented and executed. Key performance metrics for the development of the
Telecommunication Application include polyethylene (PE) waste, fiber waste, and time per
cable run for each phase of cable creation (buffering, stranding, and jacketing). The established
project tolerances for these metrics are the organizational standards for all other cable
products. The table below provides the key quality assurance metrics for the LTFC Project.
Answer: Where can we use these data representation techniques. Write few words
Frontend Screen
Performance < 20 sec for search Realize – IT1 Daily or per run
Application speed < No lag Realize – IT1 Daily or per run
6
ProjectManagementDocs.com
Output Data Accuracy 5 % tolerance Realize – IT1 Daily or per run
Defects <5 Realize – IT1 Daily or per run
Documentation Minimal errors Realize – IT1 Daily or per run
Frontend Screen
Performance < 20 sec for search Realize – IT2 Daily or per run
Application speed < No lag Realize – IT2 Daily or per run
Output Data Accuracy 2 % tolerance Realize – IT2 Daily or per run
Defects < 2 Realize – IT2 Daily or per run
Documentation Minimal errors Realize – IT2 Daily or per run
Frontend Screen
Performance < 20 sec for search Realize – IT3 Daily or per run
Application speed < No lag Realize – IT3 Daily or per run
Output Data Accuracy 0 % tolerance Realize – IT3 Daily or per run
Defects No defects Realize – IT3 Daily or per run
Documentation No errors Realize – IT3 Daily or per run
The quality manager will provide day to day quality management and conduct process audits on
a weekly basis, monitor process performance metrics, and assure all processes comply with
project and organizational standards. If discrepancies are found, the quality manager will meet
with the Project Manager and review the identified discrepancies.
The Project Manager will schedule regularly occurring project, management, and document
reviews. In these reviews, an agenda item will include a review of project processes, any
discrepancies and/or audit findings from the quality manager, and a discussion on process
improvement initiatives.
QUALITY CONTROL
This section describes how you will define and document the process for monitoring and
recording the results of executing the quality activities to assess performance and recommend
necessary changes. Quality control applies to the project’s product as opposed to its processes.
It should include what the acceptable standards and/or performance are for the product and
how these measurements will be conducted.
7
ProjectManagementDocs.com
Sample Data:
Lack of monitoring
New methodology Network issues
Huge number of
defects in test
cycle
2. Scatter diagram
a scatter diagram is, “a graph that shows the relationship between two variables.
Scatter diagrams can show a relationship between any element of a process,
environment, or activity on one axis and a quality defect on the other axis.”
Data Sample 1
8
ProjectManagementDocs.com
3. Histogram
A histogram is a graphical display of data using bars of different heights. In a
histogram, each bar groups numbers into ranges. Taller bars show that more
data falls in that range. A histogram displays the shape and spread of continuous
sample data
Sample data
1 1 100
2 2 98
3 3 96
4 4 94
5 5 92
6 6 90
7 7 88
8 8 86
9 9 84
10 10 82
9
ProjectManagementDocs.com
11 11 80
12 12 78
13 13 76
14 14 74
15 15 72
16 16 70
17 17 68
18 18 66
19 19 64
20 20 62
21 21 60
22 22 58
23 23 56
24 24 54
25 25 52
26 26 50
27 27 48
28 28 46
29 29 44
30 30 42
31 31 40
32 32 38
33 33 36
34 34 34
35 35 32
36 36 30
37 37 28
38 38 26
39 39 24
40 40 22
10
ProjectManagementDocs.com
4. Control Charts
The control chart is a graph used to study how a process changes over time. Data
are plotted in time order. A control chart always has a central line for the
average, an upper line for the upper control limit, and a lower line for the lower
control limit. These lines are determined from historical data.
Sample:
The quality control of the LTFC project focuses primarily on the LTFC product and the
acceptable standards and performance. The quality performance standards for the LTFC
Project are in accordance with the organizational standards of performance of all fiber optic
cable products. However, there are several project-specific quality standards which were
established specifically for the LTFC Product. All trial cables which are produced will be
11
ProjectManagementDocs.com
submitted to the characterization group for standard loose tube cable performance testing.
Additionally, all physical measurements will conducted on each produced cable to ensure
compliance with established quality standards. The table below illustrates all performance and
physical quality standards for the LTFC Product:
42-188 fiber loose 1.5” +/- 0.01” Lab and field testing Per produced cable
tube cable diameter length
> 450 N/m2 Tensile
strength
< 5% attenuation at
625nm wavelength
194-288 fiber loose 2.25” +/- 0.001” Lab and field testing Per produced cable
tube cable diameter length
> 600 N/m2 Tensile
strength
< 5% attenuation at
625nm wavelength
The project team will perform all physical measurements on their trial cables. The
characterization group will perform attenuation testing and will provide the results back to the
project team within 3 business days after the test sample is submitted. The quality group will
ensure all physical and performance standards are met for each trial cable, perform audits, and
assist the project team with creating or updating all documentation related to product quality.
The Project Manager will schedule regularly occurring project, management, and document
reviews. In these reviews, an agenda item will include a review of products, any discrepancies
and/or audit findings from the quality manager, and a discussion on product improvement
initiatives.
12
ProjectManagementDocs.com
It is imperative to the success of the project that all of the established physical and
performance standards are met. By doing so, the LTFC Project Team will ensure that the
product achieves the high level of customer satisfaction anticipated and that future operational
cable production will be in line with budget and resource allocations.
3 . Control Chart:
All LTFC Project products and processes must be measured and fall within the established
standards and tolerances. The below logs will be used by the project and quality teams in
conducting these measurements and will be maintained for use as supporting documentation
for the project’s acceptance.
14
ProjectManagementDocs.com
SPONSOR ACCEPTANCE
___________________________________________ Date:____________________
<Project Sponsor>
<Project Sponsor Title>
15