Bar Bending Schedule (BBS) : Penulangan Pondasi F1/1A - F1/5C
Bar Bending Schedule (BBS) : Penulangan Pondasi F1/1A - F1/5C
Bar Bending Schedule (BBS) : Penulangan Pondasi F1/1A - F1/5C
Floor : -
Item of Work : PONDASI
Type :
Quantity :
Main Cont. : Bbs Code :
Drawing ref. :
Length Spacing Q'Ty/ Q'Ty Weight Total Volume Q'Ty/pcs Reused Waste
No. Dia Sketch Remarks
Q'ty
(m) (mm) Type (Unit) (SNI) Cutting Kg 12m Length (m) Q'ty (pcs) Length (m) Volume (kg) Length (m) Q'ty (pcs) Volume (kg)
(pcs)
Bottom Arah X
1347
1 D 13 1 250 250 1.847 150 10 15 1.042 150 288.686 25 - - - - - 0.918 25 23.914
Bottom Arah Y
1373
2 D 13 2 250 250 1.873 150 10 15 1.042 150 292.750 25 - - - - - 0.762 25 19.850
Top Arah X
1347
3 D 13 1 250 250 1.847 150 10 15 1.042 150 288.686 25 - - - - - 0.918 25 23.914
Top Arah Y
1373
4 D 13 2 250 250 1.873 150 10 15 1.042 150 292.750 25 - - - - - 0.762 25 19.850
Stek Pedestal/kolom
5 D 16 456 516 1.423 - 12 11 1.578 132 296.405 17 - - 6.31 1.0 9.95 0.616 16 15.553
350 101
Stirrups
500
6 D 13 300 156 1.912 100 13 11 1.042 143 284.899 24 - - 2.44 1.0 2.54 0.528 23 12.654
200
Ties
500
7 D 13 156 156 1.624 100 13 11 1.042 143 241.986 21 - - 7.13 1.0 7.43 0.632 20 13.171
200
Stek Pedestal/kolom
Stirrups
500
2 D 13 300 156 1.912 100 13 4 1.042 52 103.600 9 - - 4.35 1.0 4.53 0.528 8 4.401
200
Ties
1 Of 2 D:\001. DATA ERMADI\Proyek Sekolah SDIT Gedung C\BBS
Length Spacing Q'Ty/ Q'Ty Weight Total Volume Q'Ty/pcs Reused Waste
No. Dia Sketch Remarks
Q'ty
(m) (mm) Type (Unit) (SNI) Cutting Kg 12m Length (m) Q'ty (pcs) Length (m) Volume (kg) Length (m) Q'ty (pcs) Volume (kg)
(pcs)
500
3 D 13 156 156 1.624 100 13 4 1.042 52 87.995 8 - - 7.13 1.0 7.43 0.632 7 4.610