BAR BENDING SCHEDULE (BBS)

Floor : -
Item of Work : PONDASI
Type :
Quantity :
Main Cont. : Bbs Code :
Drawing ref. :

BBS Drawing ref. :

Length Spacing Q'Ty/ Q'Ty Weight Total Volume Q'Ty/pcs Reused Waste
No. Dia Sketch Remarks
Q'ty
(m) (mm) Type (Unit) (SNI) Cutting Kg 12m Length (m) Q'ty (pcs) Length (m) Volume (kg) Length (m) Q'ty (pcs) Volume (kg)
(pcs)

1 PENULANGAN PONDASI F1/1A - F1/5C

Bottom Arah X
1347
1 D 13 1 250 250 1.847 150 10 15 1.042 150 288.686 25 - - - - - 0.918 25 23.914

Bottom Arah Y
1373
2 D 13 2 250 250 1.873 150 10 15 1.042 150 292.750 25 - - - - - 0.762 25 19.850

Top Arah X
1347
3 D 13 1 250 250 1.847 150 10 15 1.042 150 288.686 25 - - - - - 0.918 25 23.914

Top Arah Y
1373
4 D 13 2 250 250 1.873 150 10 15 1.042 150 292.750 25 - - - - - 0.762 25 19.850

Stek Pedestal/kolom

5 D 16 456 516 1.423 - 12 11 1.578 132 296.405 17 - - 6.31 1.0 9.95 0.616 16 15.553
350 101

Stirrups
500
6 D 13 300 156 1.912 100 13 11 1.042 143 284.899 24 - - 2.44 1.0 2.54 0.528 23 12.654
200

Ties
500
7 D 13 156 156 1.624 100 13 11 1.042 143 241.986 21 - - 7.13 1.0 7.43 0.632 20 13.171
200

Stek Pedestal/kolom

1 D 19 456 516 1.423 - 12 4 2.226 48 152.045 6 - - - - - 0.616 6 8.227


350 101

Stirrups
500
2 D 13 300 156 1.912 100 13 4 1.042 52 103.600 9 - - 4.35 1.0 4.53 0.528 8 4.401
200

Ties
1 Of 2 D:\001. DATA ERMADI\Proyek Sekolah SDIT Gedung C\BBS
Length Spacing Q'Ty/ Q'Ty Weight Total Volume Q'Ty/pcs Reused Waste
No. Dia Sketch Remarks
Q'ty
(m) (mm) Type (Unit) (SNI) Cutting Kg 12m Length (m) Q'ty (pcs) Length (m) Volume (kg) Length (m) Q'ty (pcs) Volume (kg)
(pcs)
500
3 D 13 156 156 1.624 100 13 4 1.042 52 87.995 8 - - 7.13 1.0 7.43 0.632 7 4.610
200

Diameter Ø6 Ø8 Ø10 D 10 D 13 D 16 D 19 D 22 D 25 D 29 D 32 Total Beton (M3) Rasio(kg/M3)


Volume (BBS Fixed) - - - - 1,881.352 296.405 152.045 - - - - 2,329.802
Length 12m Required - - - - 162.000 17.000 6.000 - - - -
Volume (length 12m) Required - - - - 2,025.648 321.912 160.272 - - - - 2,507.832
Stock Reused - - - - 21.932 9.954 - - - - - 31.886