3G Site SWAP
Solution
www.huawei.com
Footprint Regions
Swap Regions
Swap
Proposed Cabinets:
1) Huawei APM 30 (DBS 3900 BBU, 2G)
2) Huawei APM 30 (DBS 3900 BBU, 2G & 3G)
Locations/Regions:
Karachi & Hyderabad
3U
HUAWEI TECHNOLOGIES CO., LTD. Page 6
Main equipment – BBU3900
Specifications of BBU3900 Board Description
442 mm x 310 mmx86 mm WBBP WCDMA BaseBand Processing
unit(3G)
7~12 kg UBRI Universal BaseBand Radio
Interface board(2G )
2U Height, 8 slots A single BBU: Max 24 cells Max CE UMPT Universal Main Processing &
UL: 3072 DL: 4608 Transmission unit(2G/3G/4G co-
Processing unit)
Typical Power consumption: 200W
UPEU Universal Power and
Maximal Power consumption: 325W
Environment interface Unit
Standard 19 inch cabinet 2 FE/GE + 4 E1; Max 12 E1 (able to
UEIU Universal Environment Interface
share transmission with 2G)
Unit
86.1 mm
UEIU
GSM/UMTS
Multi-mode BBU CPRI (Optical Fiber)
•Team Viewer
•Get your Smartphone
•WeChat
•Add your contact in advance.
•WhatsApp
•Line •Take and send pictures to show
others.
•Huawei APP
HUAWEI TECHNOLOGIES CO., LTD. Page 9
BTS Swap IT/Mobile Tools Team Viewer:
http://www.teamviewer.com/
Specific
Feeder (macro) CPRI(macro) MIX (Feeder + CPRI) (macro) Micro
Scenario
Hot SWAP Hot SWAP Hot SWAP Cold Swap / Hot Swap
Dismantle E/// BTS, Dismantle E/// RRU first ,then Dismantle E/// RRU first ,then DAS part remain same .
Loop test install Huawei RRU during install Huawei RRU during Dismantle E/// RRU first ,then install
Ping test, SWAP. SWAP. Huawei RRU during SWAP.
Install Huawei Loop test Loop test Loop test
BTS,Integration Ping test, Ping test, Ping test
Install Huawei RRU\RRU Reuse exiting RCU. Reuse exiting Feeder if no Reuse exiting CPRI(if possible)
( 2G + 3G ) power cable and CPRI fiber Reuse exiting CPRI(if possible) space available for RRU. Reuse exiting RRU power Cable(If
SWAP, Reuse exiting RRU power Reuse exiting RCU. possible ).
Reuse exiting RCU. Cable(If possible ). Reuse exiting CPRI(if
Reuse exiting DBC. possible)
Reuse exiting RRU power
Cable(If possible ).Install
Jumper with feeder to RRU
HUAWEI TECHNOLOGIES CO., LTD. Page 13
Overview of E/// Existing Site——Indoor Site
Reuse:
• existing DC power ;
•existing jumpers, antenna
and DBC;
New:
•Power & GND cable
•Transmission FE cable
(New port if E1 2G IP 3G )
• External Alarm cable
BBU
ESN
Before After
Overall view of site before swapping Overall view of site after swapping
AC Alarm Box
ATS ACDB
Alarm Box Grounding Bar Grounding
ATS Bar
DG
APM 30
DG 19 inch rack
GSM GSM BT
900 1800 2G&3G
Existing share
HW-MW
MW BBU
Scenario description :
Before After
Overall view of site before swapping Overall view of site after swapping
AC Alarm Box
ATS ACDB
Alarm Box Grounding Bar Grounding
ATS Bar
DG
APM 30
DG
GSM GSM BT
900 1800
IDU HW-MW
Existing
MW
Grounding Bar Grounding Bar
Scenario description : In door to Indoor with IDU will be installed in DBS 3900 cab.
Before After
DG DG
Existing
MW CPRI
Cable
Existing BBU
MW
APM 30
Scenario description : Feeder is installed in existing scenario, we will remove the feeder , install RRU on Tower.
Before After
Overall view of site 2G/ 3G / 2G+3G Overall view of site after 2G & 3G
DG CPRI DG
Cable CPRI
Existing Cable
MW
Existing BBU
MW
APM 30
Scenario description : Reuse of existing CPRI & RRU Power cable, Reuse of RCU.
Before After
Overall view of site 2G/ 3G / 2G+3G Overall view of site after 2G & 3G
DG DG
CPRI
CPRI Existing Cable
MW
Cable
Existing BBU
MW
APM 30 RRU ion tower leg if
no space on tower
Grounding Bar Grounding Bar
Scenario description : Reuse of existing CPRI & RRU Power cable, Reuse of RCU Install RRU on shed Leg in cross for load balance.
Steps:
1. Install HW Temporary
APM30 & DBS3900;
5 2. Connect grounding and
Power cables
2 3. Power on HW DBS3900
4 cabinet;
7 4. Lay FE cables
5. Install RRU if space
2 available
6 RBS E// Cab 6. Lay RF jumpers
3 7. Lay External Alarm
IDU connection
*NOTE : Connect FE cable from BBU FE0 to IDU for Future use
HUAWEI TECHNOLOGIES CO., LTD. Page 25
RRU Connectivity for 2G Dual Band (6+ RRU)
A B C
4 5
Note : To install 3 Blade RRU with using only 1 Bracket. 6
Priority1:
Install RRUs on back of Antenna using same Antenna
Mounts,
Priority2:
a.Install RRUs on tower Platform in case of
railing tower or on Ring poles
incase of monopole tower,
Priority3:
Install RRU on Tower leg,
3G RCU
2G Antenna
3G
20P 10 U space
6P 3 U Space
E/// Node-B
is connected. This Port will
be used for pre-
testing.
E/// Node-B
is connected.
SPO1410 13
SPO1460 38
BBU Box
BBU Box
● O O
Conclusion of activity failure due to Other Vendor equipment
●
Decision of roll back
O O
O ● O
Perform Rollback