Data Hitung Bangunan

Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

No Nama Barang Satuan Volume

PEKERJAAN TAHAP I
I Pekerjaan Persiapan
1 Pek.Land Clearing lst 1
2 Pek.Bowplang m2 157,7
Sub Total
II Pekerjaan Pondasi
1 Galian Tanah Pondasi m3 16,90
2 Urugan Pasir Bawah Pondasi m3 1,40
3 Pek.Aanstamping m3 2,79
4 Pek.Batu Kali
- Batu Kali m3 13,11
- Semen Holcim zak 15,12
- Pasir Pasang m3 2,02
5 Urugan Tanah Kembali m3 3,51
Sub Total
III Pekerjaan Beton

1 Pek.Sloof 15/20 m3 -
- Kayu Albasiah 2/20 m3 0,13
- Paku 5 - 7 cm kg 2,79
- Besi Ø 10 btg 16,67
- Besi Ø 6 btg 16,25
- Kawat Beton kg 2,10
- Semen Holcim zak 8,94
- Pasir Beton m3 0,75
- Split 2/3 m3 1,16
Sub Total
2 Pek.Ring Balk 15/20 m3 -
- Kayu Albasiah 2/20 m3 0,13
- Paku 5 - 7 cm kg 2,79
- Besi Ø 10 btg 16,67
- Besi Ø 6 btg 16,25
- Kawat Beton kg 2,10
- Semen Holcim zak 8,94
- Pasir Beton m3 0,75
- Split 2/3 m3 1,16
Sub Total
3 Pek.Balok di atas Kusen 10/10
- Kayu Albasiah 2/20 m3 0,04
- Paku 5 - 7 cm kg 0,22
- Besi Ø 10 btg 9,00
- Besi Ø 6 btg 7,88
- Kawat Beton kg 0,17
- Semen Holcim zak 0,70
- Pasir Beton kg 0,06
- Split 2/3 m3 0,09
Sub Total
4 Pek. Kolom 15/15
- Kayu Albasiah 2/20 m3 0,47
- Paku 5 - 7 cm kg 2,83
- Besi Ø 10 btg 36,67
- Besi Ø 6 btg 32,08
- Kawat Beton kg 2,12
- Semen Holcim zak 9,04
- Pasir Beton m3 0,76
- Split 2/3 m3 1,17
Sub Total
5 Pek.Kolom Luar 15/20 m3 0
- Kayu Albasiah 2/20 m3 0,08
- Paku 5 - 7 cm kg 0,46
- Besi Ø 10 btg 4,00
- Besi Ø 6 btg 3,50
- Kawat Beton kg 0,34
- Semen Holcim zak 1,46
- Pasir Beton kg 0,12
- Split 2/3 m3 0,19
Sub Total
6 Pek. Balok Lintel m3 0,11
- Kayu Albasiah 2/20 m3 0,07
- Paku 5 - 7 cm kg 0,41
- Besi Ø 10 btg 4,00
- Besi Ø 6 btg 3,50
- Kawat Beton kg 0,30
- Semen Holcim zak 1,30
- Pasir Beton m3 0,11
- Split 2/3 m3 0,17
Sub Total
7 Plat Beton 10 cm m3 0
- Kayu Alba 2/20 m3 0,23
- Kayu Alba 4/6 m3 0,02
- Paku 5 - 7 kg 1,75
- Besi Ø 10 btg 6,00
- Besi Ø 8 btg 0,00
- Kawat Beton kg 2,46
- Semen Holcim zak 4,48
- Split 2/3 m3 0,38
- Pasir Cor m3 0,58
Sub Total
No Nama Barang Satuan Volume
PEKERJAAN TAHAP II
1 Pek.Pas Bata Merah m2
- Bata Merah bh 11200
- Semen zak 28,8
- Pasir Pasang m3 6,4
Sub Total

2 Pekerjaan Atap
- Rangka Baja Zyngalum m2 60
- Aluminium foil 1 muka 2 mm (l : 1 m) m2 60
- Pas. Atap Genteng Karang Pilang m2 60
Sub Total

2 Pek.Plesteran & Acian


- Semen zak 44,80
- Pasir Pasang m3 6,08
Sub Total

3 Pek.Rangka Plafond
- Kayu Kelas 1 5/7 m3 0,77
- Kayu Kelas 5/10 m3 0,1925
- Paku 5-7 cm kg 1,1
Sub Total

4 Pek.Penutup Plafond
- Gypsum Elephant lbr 19,80
- Paku Jalusi kg 2,75
Sub Total

5 Pek.Pengecatan Plafond
- Cat tembok skls Propaint kg 9,10
- Dempul Tembok Skls Sanlex kg 4,55
- Rol cat bh 1,00
- Ampelas lbr 22,75
- Steger works ls 1,00
Sub Total
6 Pek.Pengecatan Dinding Dalam
- Cat tembok skls Vinilex kg 49
- Cat Dasar kg 44,8
- Rol cat bh 2
- Ampelas lbr 46,67
- Steger works ls 1
Sub Total

6 Pek.Pengecatan Dinding Luar


- Cat tembok skls Vinilex kg 21,00
- Cat dasar kg 19,20
- Rol cat bh 1,20
- Ampelas lbr 60,00
- Steger works ls 1,00
Sub Total

8 Pengecatan List Plang GRC 1x


- Meni kayu kg 0,835
- Plamir kayu kg 0,415
- Cat kayu sekelas Seiv kg 1
- Ampelas kayu lbr 2
- Minyak cat terpentin ltr 0,75
- Kwas 3 " bh 1
Sub Total

9 Pek.Pas Keramik 40/40 41,20


- Keramik 40 x 40 dus 43,36
- Semen Holcim zak 16,48
- Semen Warna kg 0,5
- Pasir Pasang m3 1,85
Sub Total

10 Pek.Pas Keramik Wc/km 20/20


- Keramik 20 x 20 dus 1,575
- Semen Holcim zak 0,45
- Pasir Pasang m3 0,0675
- Semen Warna zak 0,0195
Sub Total

11 Pek.Pas Keramik Dinding 20/25


- Keramik 20 x 25 dus 7,875
- Semen Holcim zak 2,25
- Semen Warna m3 0,3375
- Pasir Pasang zak 0,0975
Sub Total
No Nama Barang Satuan Volume
PEKERJAAN TAHAP III
12 Pek.Pas Kusen Pintu & Jendela
- Kusen P1 bh 5
- Kusen J1 bh 2
- Kusen J2 bh 5
- Kusen J3 bh 1
- Daun Pintu Double Teakwood bh 5
- Daun Jendela bh 5
- Kusen Bouven Almunium m' 10
Sub Total

13 Pekerjaan Plumbing
- Pipa PVC 4" m' 8,00
- Kni 4'' bh 3,00
- Pipa 3" m' 15,00
- Kni 3'' bh 3,00
- T 3'' bh 2,00
- Pipa PVC Wapin 2" m' 20,00
- Kni 2'' bh 4,00
- Pipa PVC wapin 1/2 '' m' 50,00
- Kni drat kuningan bh 2,00
- Kni 1/2'' bh 10,00
- T 1/2'' bh 10,00
- Sok 1/2" bh 10,00
- Lem PVC + solasi set 1,00
Sub Total

14 Pekerjaan Sanitair
- Closet Duduk American Standard bh 1,00
- Bak Mandi fiber bh 1,00
- Pintu Fiber Kamar Mandi bh 1,00
- Kran Mandi American Standard bh 1,00
- Floor Drain American Standard bh 1,00
- Kitchen Zink royal bh 1,00
- Septictank Bioseptic set 1,00
Sub Total

15 Pekerjaan Gantungan & Kunci


- Kunci 2 slag + Handle Pintu ( decson/setara ) bh 3,00
- Kunci geser + rel + asesories KP2 + hendle set 1,00
- Engsel Pintu + Kunci Sloot bh 3,00
- Engsel Jendela + Kunci Sloot bh 3,00
- Kaca Bening 5 mm m2 15,18
Sub Total
16 pekerjaan Mekanical Electrikal
- Instalasi Titik + Lampu TL 11 Watt , Philip) bh 8,00
- Instalai titik + stop kontak ( Panasonic) ttk 10,00
- Saklar double Panasonic bh 3,00
- Saklar engkel Panasonic bh 9,00
- Outlet Tlp bh 1,00
- Outlet TV bh 1,00
- MCB + Ground bh 1,00
- Kabel Eterna 3 X 1.5 Roll 1,00
Sub Total

17 pekerjaan Tambahan
a.Pas.Batu Muka
- Batu Muka m2 10,50
- Semen Holcim zak 4,00
- Pasir Pasang m3 0,29
Sub Total

b.Pas.List atas Kusen


- Semen Holcim zak 2,10
- Pasir Pasang m3 0,29
Sub Total

You might also like