BILL OF MATERIALS AND ESTIMATES

ITEM NO. ITEM OF WORK QTY UNIT Material Cost Total Cost

I EARTHWORKS
1.1 Excavation 7.56 m3 139.77 1,056.66
Sub Total 1,056.66
II MASONRY WORKS
2.1 100mm THK CHB Wall 119.70 m2 449.33 53,784.80
2.3 10mm diameter Deformed Bar, Grade 40 251.86 kg 41.55 10,464.98
2.4 12mm diameter Deformed Bar, Grade 40 272.16 kg 41.55 11,308.33
2.5 Cement Plastering, Smooth Finish on Concrete 239.40 m2 34.90 8,355.06
2.6 #16 Tie Wire 15.72 kg 75.00 1,179.06
Sub Total 85,092.23
III STRUCTURAL WORKS
3.1 Structural Concrete, 3000 psi, 4" Slump, 3/4 aggregate 9.11 m3 4,290.00 39,090.48
3.2 100mm x 50mm x 6mm THK C-purlins 24.00 lengths 339.56 8,149.44
3.3 2" Wire Mesh 331.86 m2 400.00 132,744.00
Sub Total 179,983.92
IV PAINT
4.1 Epoxy Primer 8.24 gal 1,000.00 8,240.00
4.2 Enamel Paint Semi-Gloss Finish (yellow) 8.24 gal 1,000.00 8,240.00
Sub Total 16,480.00
Total Amount 282,612.81

Prepared By: Owner:


` `
Leona Bonghanoy Yuko
Subject : Proposed Perimeter Fence
Location : Purok Antolihaw, Brgy. Balud San Fernando, Cebu
Owner : Leona Bonghanoy Yuko

BILL OF MATERIALS AND ESTIMATES

ITEM NO. ITEM OF WORK QTY UNIT Material Cost Total Cost

I EARTHWORKS
1.1 Excavation 7.56 m3 139.77 1,056.66
Sub Total 1,056.66
II MASONRY WORKS
2.1 100mm THK CHB Wall 119.70 m2 449.33 53,784.80
2.2 10mm diameter Deformed Bar, Grade 40 251.86 kg 41.55 10,464.98
2.3 12mm diameter Deformed Bar, Grade 40 272.16 kg 41.55 11,308.33
2.4 #16 Tie Wire 15.72 kg 75.00 1,179.06
Sub Total 76,737.17
III STRUCTURAL WORKS
3.1 cement 125 bags 200.00 25,020.00
3.2 sand 6.95 m3 250.00 1,737.50
3.3 gravel 9.11 m3 350.00 3,189.20
3.4 100mm x 50mm x 6mm THK C-purlins 24.00 lengths 339.56 8,149.44
3.5 2" Wire Mesh 331.86 m2 400.00 132,744.00
Sub Total 170,840.14
IV PAINT
4.1 Epoxy Primer 8.24 gal 1,000.00 8,240.00
4.2 Enamel Paint Semi-Gloss Finish (yellow) 8.24 gal 1,000.00 8,240.00
Sub Total 16,480.00
V CONSUMABLES 1.00 lot 5,000.00 5,000.00
Sub Total 5,000.00
Total Amount 270,113.97

` `
Engr. Raymund John J. Jusayan Leona Bonghanoy Yuko
ENGINEER OWNER
Client : Leona Bonghanoy Yuko
Project : Proposed Perimeter Fence

1 SPECIFICATIONS:

1.01 Structural Concrete Specifications:


1.01.01 Concrete footing and columns shall be Class A.
1.01.03 All reinforcing bars 12mmØ and below shall be Grade 40 (PNS 49).
1.01.04 All reinforcing bars 20mmØ and above shall be Grade 60 (PNS 49).
1.02 Masonry Specifications:
1.02.01 Concrete hollow block (CHB) 4" shall be non-load bearing, 500psi (3.5Mpa).
1.03 Structural Steel Specification:
1.03.01 All rolled steel members and steel plates shall be ASTM A36.
1.04 Architectural Specification:
1.04.01 C - Purlins and welded wire mesh shall be painted with epoxy primer for rust resistance.
1.05 Earthworks Specification:
1.05.01 Gravel bedding shall be 3/4"Ø gravel and 100mm thick.

2 SCOPE OF WORKS (refer to drawings)

2.01 Wire Mesh Perimeter Fence


2.01 Excavation up to 0.50 meter depth for 70 wire mesh post and footing.
2.02 Layout of 166 linear meter x 2 meter wire mesh perimeter fence.
2.03 Provide 0.30 x 0.30 footing to 100mm x 50mm x 6mm THK C-Purlin post with a total of 70 posts.
2.04 Provide welded 2m high steel matting in between posts.
2.05 Provide base epoxy primer painting for rust protection.
2.06 Provide top coat enamel paint.

2.02 Concrete Perimeter Fence


2.01 Excavation up to 0.70 meter depth for 20 columns and wall footing.
2.02 Layout of 57.7 linear meter x 2 meter CHB perimeter wall.
2.03 Provide 0.60 x 0.25 footing, 0.30 x 0.20 wall footing tie beam to 0.20 x 0.20 column with a total of 20 columns.
2.04 Layout of 2m x 57.7m CHB perimeter wall with minimal joint plastering both ends.

Engr. Raymund John J. Jusayan Leona Bonghanoy Yuko


ENGINEER OWNER
`
excavation
backfilling

100mm THK CHb

10 mm reinf. bars
masonry wall

concrete fence column

ties

12mm reinf. bars


column main bars

footing (concrete fence) main bars

footing ( wire mesh fence) vertical bars

horizontal bars

#16 tie wire

Cement Plastering

cement
sand
Structural Concrete
concrete fence column
concrete fence footing

concrete fence wall footing


wire mesh footing

cement
sand
gravel

total;
cement
sand
gravel

steel matting W
2.4

C-purlins

PAINT
PURLINS

wire mesh
m3 per mesh footing no. of posts total m3 for mesh footing
0.036 70 2.52

L H Area
3 2 6
2.8 2.25 6.3

L W H
3 2

0.2 0.2 2

0.12 0.12 2.56

L W H
2.56

0.6 0.6 0.25

0.3 0.3 0.4

qty
15.7208 kg

L H Thickness
2.8 2.25 0.02

43.092 bags 180


2.394 m3 250
L W H
0.2 0.2 2
0.6 0.6 0.25

2.8 0.3 0.2


0.3 0.3 0.4

82.008 bags
4.556 m3
9.112 m3

125.1 bags
6.95 m3
9.112 m3

H TOTAL PERIMETER QTY


2 165.93 331.86

H NO. OF POST COMM. LENGTH


2 70 6

AREA (EACH post) TOTAL AREA


2 m2 140
no. of wall mesh say no. of full wall for paint
55.31 55 13.75
m3 per concrete fence footing no. of columns total m3 for concrete footing
0.252 20 5.04

total perimeter No. of Walls Say


57.7 19.2333333333333 19
57.7 20.6071428571429 19

bend spacing vertical spacing horizontal


0.4 0.6

TIE SPACING length per tie


0.1 0.2 0.58

bend NO. OF MAIN BARS total length


0.1 4 10.64

NO. OF MAIN BARS (bothways) covering


0.05 5 0.075

mesh width fence height total perimeter


2.4 2 165.93

faces no. of walls qty


2 19 239.4
cost

7756.56
598.5
8355.06 34.9
NO. OF COLUMN QTY
20 1.6 m3
1.8 m3
NO. OF WALL
19 3.192 m3
70 2.52 m3
total qty 9.112 m3

m2

POST PER LENGTH QTY SAY


3 23.3333333333333 24

coverage per gal (m2) QTY


25 5.6 gal
TOTAL AREA QTY
66 2.64 gal
TOTAL QTY: 8.24 gal
qty
7.56 m3
7.56 m3

Total Area
114 m2
119.7 m2

# of vertical # of horizontal total length unit wt. Qty per wall


8.5 4.33333333333333 12.8333333333333 0.62 7.95666666666667

no. of ties SAY (TIES) TOTAL LENGTH QTY PER COLUMN


13.8 14 8.12 5.0344

unit wt. Qty per COLUMN unit no. of columnsQTY


0.89 9.4696 kg 20 189.392

total length
4.5 4.005 kg 80.1

no. of posts say (posts) (pcs) bend total length of vertical bars
70.1375 70 0.05 1.2
no. of layers total length of horizontal bars
3 1.8
TOTAL QTY.

total rebar qty:

volume per wall total volume total area


m2 0.252 4.788 239.4
LENGTH
unit no. of walls QTY
kg 19 151.17667 kg

NO. OF COLUMNS SAY QTY


KG 20.2333333333333 20 100.688 KG

total qty: 251.86467 kg

kg

kg

qty
1.068 kg

1.602 kg
272.162 KG

524.02666667 kg