Mega Asset Management Co., Ltd.

DEFECT LIST Canadia Tower, 10F, No.315, Ang Duong Street


(corner of Monivong Blvd), Phnom Penh, Cambodia

PROJECT NAME: Cambodia China Polytechnic University (CCPU)


LOCATION: Chroy Chongvar Satellite City, Phnom Penh, Cambodia
PREPARED BY: Chhem Sophea (Mr.)
PHONE / EMAIL: 010 384 758/ [email protected]
REFERENCE NUMBER: CCPU-DFL-006
DATE: December 14, 2018
ATTENTION: DIBP/KPCC
CC: Mega Asset Management Co., Ltd.

ID COMMENTS/ DESCRIPTION ACTION STATUS


A Concrete for bored pile P1B
DIBP &
1 Concrete mixed with a solid block of brick Disapprove
KPBP

B Concrete for bored pile P1E


2 Concrete casting has passed the initial setting time KPBP Disapprove

Please refer the ID in the table to the ID in Photo Report below:

Additional Comments (if any)

P1B : Issue with concrete quality still happened same as previous time. DIBP should improve and

solve this problem. KPBP should not have used this concrete to place in bored hole.

P1E : Casting concrete until reach the initial setting time, spent more than 4 hours and 20 minutes,

is not acceptable. The paste of concrete has already lost it plasticity.

ID LOCATION ON DRAWING (RED ZONE) PHOTO DESCRIPTION ON SITE

Mega Asset Management Co.,Ltd.


Mega Asset Management Co., Ltd.
Canadia Tower, 10F, No.315, Ang Duong Street
(corner of Monivong Blvd), Phnom Penh, Cambodia

A block of brick found on pumping-truck’s sleive

Concrete delivery’s slip CM-42 as reference


 Element: Bored pile P1B
 Location: Gridlines 1 - B

Mega Asset Management Co.,Ltd.


Mega Asset Management Co., Ltd.
Canadia Tower, 10F, No.315, Ang Duong Street
(corner of Monivong Blvd), Phnom Penh, Cambodia

 Issue: Ready mixed concrete which supplied by DIBP contained a block of solid brick.
 Date: 14.December.2018
2

Concrete casting supplied by CM-17


(4 hours 10mn concrete duration spent at site)

Cleared concrete from concrete mixer truck CM-


17 but not yet finish concreting bored hole
(4 hours 20mn of conrete duration spent at site)

Concrete delivery’s slip CM-17 as reference


 Element: Bored pile P1E
 Location: Gridlines 1 - E
 Issue: Concrete has already reached initial setting time; bored pile contractor has spent more than 4 hours
and 20mn to complete casting concrete supplied by concrete mixer truck CM-17.

Mega Asset Management Co.,Ltd.


Mega Asset Management Co., Ltd.
Canadia Tower, 10F, No.315, Ang Duong Street
(corner of Monivong Blvd), Phnom Penh, Cambodia
(Concrete batching plant was at Koh Pich while the average delivery duration is about 1 hour and 30mn to
reach site)
 Date: 14.December.2018

Mega Asset Management Co.,Ltd.