CL Accreditation of Tesco Certified QC Process and Note v1 PDF
CL Accreditation of Tesco Certified QC Process and Note v1 PDF
Process Map
Process Name CL_Production_ Accreditation of Tesco Certified Quality Controller Process
Prepared by: Winnie Tsang Endorsed by: Ross Jones Reviewed & Approved by: Colin Synnot Version no. : v1.0
Department: Operations Department: CL- TL & T Department: Operations Effective Date: 30-May-12
Date: 30-May-12 Date: 30-May-12 Date: 30-May-12 Page no. 1 of 2
19
18
Request the Quality
Inform the Quality
Manager (Supplier) to
Manager (Supplier) that Go to
nominate another
the Tesco Certified Box 1
candidate for the “Tesco
Quality Controller is
Certified Quality Control”
disqualified
award
IS Technical
Manager
(Production)
By quarterly
20
16 Update the List of
Y End
Periodical review the Tesco Certified
17 Quality Controller
performance of the
From Disqualify the
Tesco Certified Quality
Box 15 Tesco Certified Quality
Controller by assessing
Controller?
their inspection ability at
factory
IS
Production N
Technologist
SOP – Clothing – Accreditation of Tesco Certified Quality Controller
in International Sourcing
`
Objectives
The purpose of the Accreditation of “Tesco Certified Quality Controller” Process is to accredit supplier’s nominated inspectors who have demonstrated their competence in conducting Pre-production
Meeting and ensuring the good quality product produced on behalf of IS Production Technologist/ IS Technical Manager (Production)
To be eligible for the “Tesco Certified Quality Controller” Award, the candidate must:-
Attend the Tesco Quality Controller Training Program which comprises the following components:
Pass the assessment conducted by IS Production Technologist/ IS Technical Manager (Production) at factory
Pass the written examination
Required Inputs
A supplier’s inspector nominated by the Quality Manager (Supplier). This nominated inspector must have ability to read, speak, write, and understand English & the local languages
Please refer to the Accreditation of Tesco Certified Quality Controller Process Map to accompany this
Ground Rules of Accreditation of Tesco Certified Quality Controller
Each factory is required to have at least one inspector to be accredited as “Tesco Certified Quality Controller”
The inspector nominated by the Quality Manager (Supplier) as the candidate for “Tesco Certified Quality Controller” Award needs to have the ability to read, speak, write, and understand English & the
local languages
To be eligible for the “Tesco Certified Quality Controller” Award, the candidate must:-
Attend the “Tesco Certified Quality Controller” Training Program which comprises the following components:
Pass the assessment conducted by IS Production Technologist/ IS Technical Manager (Production) at factory within 3 months after completing the Tesco Quality Controller Training Program
Pass the written examination which is marked by the IS Technical Manager (Production)
If the candidate fails the written examination at the first time, he is allowed to sit for the examination one more time only.
All examination papers are reviewed & marked by the IS Technical Manager (Production)
The certificates of “Tesco Certified Quality Controller” award are issued by IS Technical Manager (Production)
IS Technical Manager (Production) is responsible for approving the candidates for “Tesco Certified Quality Controller” award
{IS Category Technical Manager (Production) is accountable for the approval}
IS Technical Manager (Production) is required to maintain the latest List of Tesco Certified Quality Controller
Process Details
The inspector nominated by the Quality Manager (Supplier) as the candidate for “Tesco Certified Quality Controller” award
needs to have the ability to read, speak, write, and understand English & the local languages
Stage 2: Arrange Tesco Certified Quality Controller Training Program
from Supplier Self-inspection
# Description Who Method #When
(see #Remark on the
last page)
2 Arrange “Tesco Certified Quality Controller” Training Program for the candidate IS Technical Manager Manual On a monthly basis
(Production)
Remark:
The “Tesco Certified Quality Controller” Training Program is conducted at 3rd Party Training Centres or IS offices
Stage 3: Attend Tesco Certified Quality Controller Training Program
4 Attend the Tesco Quality Auditor Training Program (5 days) which comprises the following components: The candidate Manual On a monthly basis
(suppliers’ nominated
• Induction on Technical Ways of Working Inspector)
• Sealing Process & Measuring Guide
• UK & CE Clothing Technical Manual
• Childrenswear safety awareness/ risk assessment
• Product Safety Requirements
• UK & CE Packaging Manual
• Legal requirement/ metal contamination
• AQL/ DCL
• Factory basic compliance
• Testing
• Machine setting, thread & seam
5 Assess the candidate’s ability to inspect garments at factory IS Production Manual On a monthly basis
Technologist/
IS Technical
Remark:
Manager (Production)
The assessment needs to be completed within 3 months after the candidate attended the Tesco Quality Controller Training
Program
Stage 4: Accredit inspector as Tesco Certified Quality Controller
Controller Training Program
# Description Who Method #When
(see #Remark on
the last page)
6 Nominate the candidate to attend the Tesco Certified Quality Controller Examination IS Production Email On a monthly basis
Technologist/
IS Technical
Manager (Production)
7 Attend the “Tesco Certified Quality Controller” Examination The candidate Manual After the candidate is
(suppliers’ nominated nominated by IS
Inspector) Production
Remark: Technologist/ IS
The examination is held at IS offices Technical Manager
(Production)
8 Review & mark the examination paper IS Technical Manual After the examination
Manager (Production)
Remark:
The examination paper is marked based on the marking scheme defined by the IS Technical Manager (Production)
9 Determine the examination result is pass or fail IS Technical Manual After the examination
Manager (Production)
Remark:
It’s based on the marking scheme defined by the IS Technical Manager (Production)
Remark:
The candidate is allowed to attend the examination no more than 2 times. Otherwise, IS Technical Manager will inform the
Quality Manager (supplier) to nominate another candidate for the “Tesco Certified Quality Controller” award
Go to Step 1
If less than 2 times, go to Step 7
If the examination result is pass:
12 Approve the candidate for “Tesco Certified Quality Controller” award IS Technical Manual After the examination
Manager (Production) provided that the
Remark: candidate passed the
IS Category Technical Manager (Production) is accountable for the approval examination
13 Issue the certificate of “Tesco Certified Quality Controller” award to the candidate IS Technical Email or in After the examination
Manager (Production) person provided that the
candidate passed the
Remark: examination
The certificate of “Tesco Certified Quality Controller” award will only be given to the candidate who pass the examination
14 Receive the certificate of “Tesco Certified Quality Controller” award Candidate (suppliers’ Email After the examination
nominated inspector) provided that the
candidate passed the
examination
15 Update the List of Tesco Certified Quality Controller IS Technical Excel After marking the
Manager (Production) examination
Remark:
IS Technical Manager (Production) is responsible to update the List of Tesco Certified Quality Controller
Stage 5: Periodical performance review of the Tesco Certified Quality Controller
17 Disqualify the Tesco Certified Quality Controller? IS Production Manual Every quarter
Technologist/ IS
Technical Manager
(Production)
If yes, go to step 18
18 Inform the Quality Manager (Supplier) that the Tesco Certified Quality Controller is disqualified IS Technical Email Every quarter
Manager (Production)
19 Request the Quality Manager (Supplier) to nominate another candidate for the “Tesco Certified Quality IS Technical Email Every quarter
Controller” award Manager (Production)
20 Update the List of Tesco Certified Quality Controller IS Technical Manual Every quarter
Manager (Production)
Remark:
IS Technical Manager (Production) deletes the name of the disqualified “Tesco Certified Quality Controller” from the List of
Tesco Certified Quality Controller
If no, go to step 16
Outputs
At the end of the Accreditation of Tesco Certified Quality Controller Process, the following item should be delivered:
The “Tesco Certified Quality Controller” award given to the inspector (supplier)
The latest List of Tesco Certified Quality Controller
What’s Next
The inspector nominated by the Quality Manager (supplier) as the candidate for the “Tesco Certified Quality Controller” award has the ability to read, write, speak and understand English & the local
languages
The candidate completes the “Tesco Certified Quality Controller” Training Program
The candidate pass the inspection assessment conducted by IS Technologist & the written examination
IS Technical Manager (Production) officially approves the candidates for “Tesco Certified Quality Controller” award & issue the certificate of the award
{IS Category Technical Manager (Production) is accountable for this}
The performance of the “Tesco Certified Quality Controller” is monitored periodically by the IS Production Technologist / IS Technical Manager (Production)
# Remark: Different categories/ products follow their agreed specific critical path.
The CP dates among different categories/ products might be slightly different.