Project:: CGD Station Works at Sasaram & Aurangabad Project
Project:: CGD Station Works at Sasaram & Aurangabad Project
Project:: CGD Station Works at Sasaram & Aurangabad Project
PROJECT :
QUALITY PLAN FOR SIGNAL.CABLES
SHEET NO. 1 OF 5
CORDS CABLE INDUSTRIES LTD.
CLIENT : M/s. INDIAN OIL CORPORATION LTD. DOC. NO.: 0478
PMC : M/s. TRACTEBEL ENGINEERING PVT. LTD. REV.: 00
CONTRACTOR : M/s. RAMBARAN SINGH APEX PVT. LTD.
SUB CONTRACTOR: M/s ALPHA ISNTRUMENTATION & ALLIED
SERVICES Please check
DATE: 20.08.2020
AGENCY
TYPE / METHOD REF. ACCEPTANCE FORMAT OF
SL. NO. COMPONENT CHARACTERISTICS CATEGORY EXTENT OF CHECK Vendor TPIA Gail/Mecon REMARKS
OF CHECK DOCUMENTS NORMS RECORDS
01 RAW MATERIAL
a) PVC/PE Compound 1. Physical properties MA Physical Sample As per relevant standards F/QA/05 P R R
2 Make, Type & Batch -do- Visual 100% As per relevant standard / -do- P R R
approved datasheets
b) Copper 1. Physical properties -do- Physical Sample/ Batch As per relevant standards F/QA/01 P R R
c) Galvanised Steel round wire / 1. Physical -do- Physical -do- As per relevant standards F/QA/06 P R R
strip
2. Dimension -do- Measurement -do- ------------------do----------------- -do- P R R
3. Uniformity of Zinc coating -do- Chemical -do- ------------------do----------------- -do- P R R
Adarsh Sahu
07.10.2020
PROJECT :
CORDS CABLE INDUSTRIES LTD. SHEET NO. 2 OF 5
CLIENT : M/S INDIAN OIL CORPORATION LTD. QUALITY PLAN FOR SIGNAL_CABLES DOC. NO.: 0478
PMC : M/S TRACTEBEL ENGINEERING PVT. LTD. REV.: 00
CONTRACTOR : M/S RAMBARAN SINGH APEX PVT. LTD.
SUB- CONTRACTOR:- M/S ALPHA INSTRUMENTATION AND ALLIED
SERVICES
DATE: 20.08.2020
AGENCY
TYPE / METHOD REF. ACCEPTANCE FORMAT OF Vendor TPIA Gail/Mecon
SL. NO. COMPONENT CHARACTERISTICS CATEGORY EXTENT OF CHECK REMARKS
OF CHECK DOCUMENTS NORMS RECORDS
02 INPROCESS
a) Conductor bunching 1. No. of strands MA Counting 100% spools As per relevant standard / F/QA/14 P R R
approved datasheets
2. Size of wire (Before stranding) -do- Measurement -do- ------------------do----------------- -do- P R R
c) Pairt /Triad twisting/ Core 1. Colour sequence -do- Visual Each setting / process ------------------do----------------- F/QA/17 P R R
laying
2. Core/Pair/Triad identification -do- -do- -do- ------------------do----------------- -do- P R R
SHEET NO. 3 OF 5
CLIENT : M/S INDIAN OIL CORPORATION LTD. CORDS CABLE INDUSTRIES LTD. DOC. NO.: 0478
PMC : M/S TRACTEBEL ENGINEERING PVT. LTD. REV.: 00
CONTRACTOR : M/S RAMBARAN SINGH APEX PVT. LTD.
SUB-CONTRACTOR:- M/S ALPHA INSTRUMENTATION AND ALLIED
SERVICES
DATE: 20.08.2020
AGENCY
TYPE / METHOD REF. ACCEPTANCE FORMAT OF Vendor TPIA Gail/Mecon
SL. NO. COMPONENT CHARACTERISTICS CATEGORY EXTENT OF CHECK REMARKS
OF CHECK DOCUMENTS NORMS RECORDS
d) Screening (overall and 1. Coverage/Tape Overlap MA Measurement Each setting / process As per relevant standard / F/QA/17 & P R R
individual & overall screened as approved datasheets F/QA/19
and where applicable)
03 FINAL TESTING
a) Routine Test 1. High Voltage as per BS-5308 Part
-do-2. Electrical 100% ------------------do----------------- F/FI/06 P R R
2. Conductor resistance -do- -do- 100% ------------------do----------------- -do- P R R
*3. Insulation resistance -do- Electrical -do- ------------------do----------------- -do- P R R * Where applicable
*4 Mutual Capacitance/ -do- Electrical -do- ------------------do----------------- -do- P R R
Capacitance between core to
screen
SHEET NO. 4 OF 5
CLIENT : M/S INDIAN OIL CORPORATION LTD. DOC. NO.: 0478
PMC : M/S TRACTEBEL ENGINEERING PVT. LTD. REV.: 00
CONTRACTOR : M/S RAMBARAN SINGH APEX PVT. LTD.
SUB-CONTRACTOR .:- M/S ALPHA INSTRUMENTATION AND ALLIED
SERVICES
DATE: 20.10.2020
AGENCY
TYPE / METHOD REF. ACCEPTANCE FORMAT OF
SL. NO. COMPONENT CHARACTERISTICS CATEGORY EXTENT OF CHECK REMARKS
OF CHECK DOCUMENTS NORMS RECORDS Vendor TPIA Gail/Mecon
b) Type Test 1. Annealing test copper (Before MA Physical One Sample of any As per relevant standard / F/FI/02 P R R
stranding) one item once only approved datasheets
irrespective of size &
type.
3. Test for armour wire / strip -do- Physical -do- ------------------do----------------- -do- P R R
R
6. Tensile strength and %
elongation of insulation and -do- Physical -do- ------------------do----------------- -do- P R
sheath
*7. Ageing in air oven -do- Thermal -do- ------------------do----------------- -do- P R R
*9. Hot deformation -do- Thermal -do- ------------------do----------------- -do- P R R *for PVC only
as applicable
12 Electrostatic Noise Rejection
-do- Electrical -do- ------------------do----------------- -do- P R R
Ratio
13. Oxygen Index test As per relevant standard / -do- P R R
One Sample of any
approved datasheets
one item once only
CR Chemical
irrespective of size &
type.
16. HCL Gas Emission Test -do- Chemical -do- ------------------do----------------- -do- P R R
17. Flammability Test MA Thermal -do- As per IEC-60332-1-2 & IEC- -do- P R R * refer note below
60332-3 cat-A*
c) Acceptance 1. Cable dimension (inner/Outer CR Measurement Sampling plan of As per relevant standard / F/FI/04 P W W/R
sheath, drain wire/overall IS: 1554-1/88 or 10% approved datasheets
dia/color coding etc) whichever is for each
type of cable
4. T.S. & Elongation of insulation -do- Physical -do- ------------------do----------------- -do- P W W/R
& sheath
*5. Insulation resistance/Voume -do- Electrical -do- ------------------do----------------- -do- P W W/R * Where applicable
resistivity
*12. Hot deformation -do- Thermal one sample per each ------------------do----------------- -do- P W W/R
size
*13 Heath shock test -do- Electrical -do- ------------------do----------------- -do- P W W/R
FOR PVC ONLY
*14 Heat shrikage test -do- Thermal -do- ------------------do----------------- -do- P W W/R
18. HCL Gas Emission Test -do- Chemical -do- ------------------do----------------- -do- P W W/R
19. Flammability Test MA Thermal one composite As per IEC-60332-1-2 & IEC- -do- P W W/R * refer note below
sample of all items 60332-3 cat-A*
per order
*20 Test for uniformity of Zinc -do- Chemical ------------------do----------------- -do- P W W/R
One sample/Lot
coating (galvanization)
21.Rodent & termite repulsion -do- Presence of lead shall be W W/R
MA Chemical -do- P
test confirmed (Black Precipitate)
CR - CRITICAL P - PERFORM
MI - MINOR R - REVIEW OF DOCUMENTS
MA - MAJOR W - WITNESS
IMI - INCOMING MATERIAL INSPECTION TPIA - THIRD PARTY INSPECTION AGENCY
*The flammability test as per IEC-60332-3 cat-A & Electrostatic noise rejection ratio test can be reviewed from our type test certificate. However, if these tests are required to be witnessed during final inspection, the quantity
consumed during testing shall be to "RBS" account as quantity consumed during testing is considerable. Also, any short length/non standard length produced due to these test shall be accepted by "RBS"