Rectification Order: Project Name: Cambodia China Polytechnic University (CPPU)

Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

Mega Asset Management Co., Ltd.

Canadia Tower, 10F, No.315, Ang Duong Street


(corner of Monivong Blvd), Phnom Penh, Cambodia
RECTIFICATION ORDER
PROJECT NAME: Cambodia China Polytechnic University (CPPU)
LOCATION: Phnom Penh Cambodia
PREPARED BY: CHHEM Sophea (Mr.)
PHONE / EMAIL: 010 384 758/ [email protected]
REFERENCE NUMBER: CCPU-REO-002
DATE: December-28-2018
ATTENTION: Koh Pich Construction Company Co., Ltd.
CC: Mega Asset Management Co., Ltd.

SUBJECTED TO INSPECTION: Pile’s Heads Inspection

INSPECT TYPE: Steel


Concrete
MEP
Architectural
Other:
PHOTO

ID LOCATION ON DRAWING (RED ZONE) PHOTO DESCRIPTION ON SITE

Diameter: 675 mm

Concrete cover: 35 mm

Mega Asset Management Co.,Ltd.


Mega Asset Management Co., Ltd.
Canadia Tower, 10F, No.315, Ang Duong Street
(corner of Monivong Blvd), Phnom Penh, Cambodia

 Element: Pile’s head P6AF


 Location: Tower-crane’s base
 Issue: Concrete cover is not sufficient regarding design 75 mm; 35 mm as actual after pile’s head breaking.
 Date: December 28, 2018
 MAM’s Instruction: To be well prepare for pile cap work, contractor needs to provide enough concrete cover by
repairing the broken edge with new dropped down cut off level or by grouting. KPCC site engineer should
inform technical team in order to have formal review with design.

Mud with concrete cover

 Element: Pile’s head P6AF


 Location: Tower-crane’s base
 Issue: Concrete at cut off level contains mud/soil.
 Date: December 28, 2018
 MAM’s Instruction: Seeing that issue, KPCC need to break any surface which contains mud/soil in order to
make pile’s head clean with good quality. Repairing procedure should be put in method statement.

Mega Asset Management Co.,Ltd.


Mega Asset Management Co., Ltd.
Canadia Tower, 10F, No.315, Ang Duong Street
(corner of Monivong Blvd), Phnom Penh, Cambodia

Mud with concrete cover

 Element: Pile’s head P6BF


 Location: Tower-crane’s base
 Issue: Concrete at cut off level contains mud/soil.
 Date: December 28, 2018
 MAM’s Instruction: Seeing that issue, KPCC need to break any surface which contains mud/soil in order to
make pile’s head clean with good quality and finally repair it.

Mega Asset Management Co.,Ltd.


Mega Asset Management Co., Ltd.
Canadia Tower, 10F, No.315, Ang Duong Street
(corner of Monivong Blvd), Phnom Penh, Cambodia

Lap length: 700 mm


(Rebar DB20)

 Element: Pile’s head P6CF


 Location: Tower-crane’s base
 Issue: Lap length of rebar doesn’t meet the design.
 Date: December 28, 2018
 MAM’s Instruction: KPCC need to provide enough lap length for pile cap work, and the technical team need to
review the design with the any structural changes due to the error at site.

Chipped edge: 35 mm

 Element: Pile’s head P6CF


 Location: Tower-crane’s base
 Issue: Concrete cover is chipped at the edge after pile’s head breaking.
 Date: December 28, 2018
 MAM’s Instruction: KPCC need to repair the chipped edge before rebar/formwork installation for pile cap.

Mega Asset Management Co.,Ltd.


Mega Asset Management Co., Ltd.
Canadia Tower, 10F, No.315, Ang Duong Street
(corner of Monivong Blvd), Phnom Penh, Cambodia

Chipped edge: 100 mm

 Element: Pile’s head P6DF


 Location: Tower-crane’s base
 Issue: Concrete cover is chipped at the edge after pile’s head breaking.
 Date: December 28, 2018
 MAM’s Instruction: KPCC need to repair the chipped edge before rebar/formwork installation for pile cap.

Additional Comments (if any)

To make it as formal rectifying, contractor need to repair those structural elements which have
mentioned above with report.
Technical or design team should prepare method statement and submit to relevant parties in order
to have correct repairing procedure at site with good result.

Mega Asset Management Co.,Ltd.

You might also like