BLOCK PROVING AXLE COUNTER
RDSO/SPN/177/2005
Introduction
The axle counter equipment is working on high frequency and using amplitude modulation or phase
modulation for detection of presence of wheel. The equipment described in this notes is Phase modulation
type for the detection of presence of wheel. In the Phase modulation type track device, the detection of
presence of wheel is with the phase reversal of 180 out of phase, which enables this system to be more
healthy and safe.
AXLE COUNTER
CLASSIFICATON
3
2014 Mar/STTC/S.Rly/PTJ
DEFICIENCIES IN ANALOG AXLE COUNTERS .
PARTS AND FUCTIONS OF SINGLE SECTION DIGITAL AXLE COUNTER ( SSDAC) – SYSTEM (CEL – MAKE)
LEGEND
SCC 1 & 2 : SIGNAL CONDITIONER CARD
MLB 1 & 2 : MICROCONTROLLER LOGIC BLOCK
4
2014 Mar/STTC/S.Rly/PTJ
AXLE DETECTORS
SSDAC UNIT
5
2014 Mar/STTC/S.Rly/PTJ
SSDAC COUNTING UNIT – CONSTIUENTS (CEL – MAKE)
6
2014 Mar/STTC/S.Rly/PTJ
CARD 1 SCC-1 SIGNAL CONDITIONING CARD FOR 21 KHz
CARD 2 SCC-2 SIGNAL CONDITIONING CARD FOR 23 KHz
CARD 3 MLB - 1 MICRO CONTROLLER LOGIC & ERROR DISPLAY CARD
CARD 4 MLB - 2 MICRO CONTROLLER LOGIC & ERROR DISPLAY CARD
CARD 5 EVENT LOGGER CARD(OPTIONAL)
CARD 6 MODEM CARD
CARD 7 RELAY DRIVER CARD
CARD 8 DC-DC CONVERTOR CARD
• It provides signal conversion from digital to analog and vice-versa as per CCITT v.21 standard.
• It is used for communication between two counting units which is in the form of data packets
• Data packets consists of count change information, count update information, power on/reset information &
error information if any.
• It interfaces with serial RS232C port of both micro controller logic cards.
• Multiplex RS232C inputs & selects one channels
• 5V ON PRESENCE OF 5V
• 12V ON PRESENCE OF 12V
• 24V ON PRESENCE OF 24V
• 15V ON PRESENCE OF 15V
• It is required to make the system normal in case axle counter has failed/switching on power supply.
• It is done with the help of sm’s reset box. (preparatory reset)
• As per safety requirement, to normalize the axle counter, the first train shall be piloted in the section after
resetting to register balance of counts in the system
9
2014 Mar/STTC/S.Rly/PTJ
FIG: Special earth RDSO/SPN/197/2005
FIG: VITAL RELAY & PREPARATORY RELAY
Note: This BPAC system shall be provided with maintenance free earth
of RDSO/Spn/197/2005 to achieve less than 1 ohm earth resistance.
In this system conventional Double line Block Instruments are used at the either station
of the block section with SSDAC/UAC for each block section on double line. The contacts of
SSDAC/UAC Axle counter as VR/BPACZR relay contacts are used in the Indication circuit, the LSS
circuit, the Block clearance circuits, the other circuits like Bell circuit & also the Operations of Block
Instrument remain as it is in the regular Double line block instrument working.
(ii) BPAC with F.M. Handle type Tokenless Block Instruments on Single line.
10
2014 Mar/STTC/S.Rly/PTJ
In this system, conventional F.M. Handle type token less block instrument are used at the
either station of the block section with SSDAC/UAC for block section on single line. The contacts of
SSDAC/UAC Axle counter as VR/ACPR relay contacts are used in the PBPR circuit, TAR circuit &
ASR circuit.
(iii) BPAC with Push Button Tokenless Block Instruments on Single line.
In this system conventional Push button token less block instrument are used at the
either station of the block section with SSDAC/UAC for block section on single line. The contacts of
SSDAC/UAC Axle counter as VR/ACPR relay contacts are used in the SNR circuit, TAR circuit &
ASCR circuit.
Example: LEDs 1 & 3 of LSB : Value=1+4=5 , LEDs 5 & 6 of MSB: Value=10+20=30, Add LSB+MSB=Error code 35
=Negative count error.
STATION STATION
A B
BLOCK SECTION
TYPICAL 10 - 20 KM
AS
4 4 4 4
11
2014 Mar/STTC/S.Rly/PTJ
DO’s & DON’Ts
1. Do’s
• Follow specified interconnection drawings for connecting the TX and RX Coils.
• Ensure that RX and TX coil cables have been laid in different pipes.
• Ensure that both the TX coils and RX coils are having proper alignment on Rail.
• Ensure that packing of sleepers with ballast on both sides of Axle detector is proper.
Check that metal sheaths of the outdoor cable are connected to earth at both ends.
• The recommended cables for wiring of the system at site should be used.
• The steady battery voltage 24 V should be maintained.
• The cable connections should not be connected loosely.
• The MS Coupler connectors of SSDAC System are checked and maintained firmly.
• Check that the SSDAC unit and Reset box are provided with sealing arrangement
• Resetting should be done only after ensuring that there is no train in the Section.
• It is recommended that heat resisting paint to be used on the apparatus case so that the temperature inside apparatus
case is maintained lower in comparison to other normal paints.
• Caution Board has to be placed near the SSDAC Axle Detectors to avoid damaging of coils from packing machines.
• Deflector Plates must be mounted near the SSDAC Axle Detectors to avoid damaging of coils.
• Usage of Spoken Trolley wheel is desirable as it reduces the SSDAC system entering the Error mode. The straight
movements or passing of Motor Trolley or Push Trolley with solid mass wheel may create error sometimes.
2. Don’ts
• Don’t install the Axle detectors near the rail joint. (Not less than 6 sleepers away).
• Don’t install the Axle detectors where the rail is badly worn out
• Don’t cut or join the Transmitter / Receiver cables supplied along with the coil. It would result in change of
input Receiver signal.
• Don’t remove the modules from SSDAC System under Power ON condition.
• Always remove the modules if necessary after switching OFF the power to the SSDAC System.
• Address settings of the SSDAC System should not be changed at the field.
• When Section is in Occupied / Preparatory Mode, Motor Trolley wheel, Push Trolley with solid mass wheel
and Material Trolley wheel must not be allowed to Enter / Exit the Section to avoid SSDAC System going to
Error condition.
Troubleshooting
13
2014 Mar/STTC/S.Rly/PTJ
VR,VPR,PR,PPR CIRCUIT:
14
2014 Mar/STTC/S.Rly/PTJ
LSS CIRCUIT AT SENDING STATION:
1. Two sets of Tx / Rx coils are required at one detection point to establish the direction of traffic. ( )
2. Transmitter coils are always connected inside the rail. ( )
3. Preparatory reset prepares to reset the axle counter and ensures that the SM/ASM pilot the train. ( )
4. In preparatory reset, after resetting, axle counter continues to show occupied until one train movement in
the section carries out correct balancing of track section. ( )
5. In UAC, both the Transmitter coils are connected in Series. ( )
6. In analog type, the receiver output signal due to passage of train is an amplitude modulated signal. ( )
7. In axle counter for each axle passing over detection point causes a ‘dip’ in the receiver signal. ( )
8. In Universal Axle counter, the transmitter signal frequency is 5 KHz. ( )
9. Transmitter & Receiver cables should be put in HDPE pipe for safety and laid at a depth of >1 meter
from bottom of rail. ( )
10. In CEL single section digital axle counters, event logger card is optional with each set of axle counters
used for monitoring the one track section. ( )
11. Phase reversal modulation technique is used in digital axle counters to avoid the trolley suppression
track circuit. ( )
12. In SSDAC of CEL make, SCC-1 generates the frequencies of 21KHz carrier signals, which is transmitted to
1ST set of Tx coils. ( )
13. In SSDAC of CEL make, SCC-2 generates the frequencies of 21KHz carrier signals, which is transmitted to
2nd set of Tx coils. ( )
15
2014 Mar/STTC/S.Rly/PTJ
14. In SSDAC of CEL make, when the train wheel passes over the axle detectors, the Rx signal gets phase
modulated. ( )
15. In SSDAC of CEL make, the SCC conditions the modulated signal and demodulates it to generate valid train
pulses. ( )
9. In SSDAC of CEL make, DC-DC converter output voltages are ____, _____ & _______ ( )
A) +5 V, +12V, +12V(ISO) B) +5 V, -12V, +12V(ISO)
C) +5 V, +12V,24V +15V (ISO) D) +5 V, -10V,12V, +10V(ISO)
10. Preparatory reset can be used in case of the __________sections provided with axle counters. ( )
A) Main line B) Section between Advance starter and IBS
C) BPAC D) all of these
FILL IN THE BLANKS:
6. In SSDAC of CEL make, the error code LED indication provided in ____________ card.
16
2014 Mar/STTC/S.Rly/PTJ
7. Track devices at entry & exit points of the section, should be fixed on the ________ rail.
9. SSDAC of CEL units are provided with8-way DIP switch on __________board for address setting.
12. In Double line Block instrument VPR, BPACZR proved in 1._______ 2.________ 3.______ circuit.
13. In single line F.M Block instrument VPR,ACPR proved in 1._______ 2.________ 3.______ circuit.
14. In single line P.B Block instrument VPR, ACPR proved in 1._______ 2.________ 3.______ circuit.
©©Ń©©©Ṽ©©©Ť©©
17
2014 Mar/STTC/S.Rly/PTJ