P01 BH Plot

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

BOR LOG BO1

P0 1
COCHIN
PAGE 1 OF 2

CLIENT MBITS PROJECT NAME PO1 PROJECT NUMBER PO1

DATE STARTED 8/7/14 GROUND ELEVATION 0 m MSL HOLE SIZE 70 mm

COMPLETED 12/7/14
AT TIME OF DRILLING ---
DRILLING METHOD AT END OF DRILLING 0.00 ft / Elev 0.00 ft Approx. 0.3 m from GL
GROUND WATER LEVELS: AFTER DRILLING ---

SPT N VALUE

SAMPLE TYPE

DRY UNIT WT.


RECOVERY %

POCKET PEN.
20 40 60 80

(N VALUE)
GRAPHIC

NUMBER

COUNTS
DEPTH

BLOW
(RQD)
PL MC LL
LOG

(pcf)
(tsf)
(ft)

MATERIAL DESCRIPTION
20 40 60 80
FINES CONTENT (%)
0 20 40 60 80
Filled soil SPT 14-17-19
Medium to fine sand 1 (36)
SPT 13-18-20
2 (38) 18
SPT 13-14-17
3 (31)
SPT 10-12-15
4 (27)
10 Clay with sand and shel dust SPT 6-7-8
5 (15)
SPT 1-0-1 7 101
6 (1)
SPT 1-0-0
7 (0)
SPT 1-0-0
GEOTECH BH PLOTS - GINT STD US LAB.GDT - 1/18/15 19:40 - C:\USERS\PUBLIC\DOCUMENTS\BENTLEY\GINT\PROJECTS\PO1.GPJ

8 (0)
SPT 1-0-0
Loose clay 9 (0)
20 SPT 1-0-1 102
7
10 (1)
SPT 1-0-1
11 (1)
SPT 1-0-0
12 (0)
SPT 1-0-0
Laterite clay 13 (0)
SPT 1-0-1
14 (1)
30 SPT 1-0-0
15 (0)
SPT 8-10-14
16 (24) 10
SPT 7-9-12
17 (21)
SPT 8-11-9
18 (20)
SPT 7-8-9
40 Stiff clay with decayed wood 19 (17)
SPT 6-8-8
20 (16)
SPT 6-7-10
21 (17)
15
SPT 7-9-10
22 (19)

Clayey sand
50 SPT 16-24-26
23 (50)
SPT 18-29-21
24 (50)
Decayed wood SPT 14-21-25 15
25 (46)
Charconic clay with sand SPT 20-31-19 15
26 (50)
SPT 22-28-22 18
Medium sand 27 (50)
60 Laterite clay
(Continued Next Page)
GEOTECH BH PLOTS - GINT STD US LAB.GDT - 1/18/15 19:40 - C:\USERS\PUBLIC\DOCUMENTS\BENTLEY\GINT\PROJECTS\PO1.GPJ

P0 1
COCHIN
DEPTH
(ft)
GRAPHIC
LOG CLIENT MBITS

MATERIAL DESCRIPTION
PROJECT NAME PO1

SAMPLE TYPE
NUMBER
28
SPT

RECOVERY %
(RQD)

BLOW
COUNTS
(50)

(N VALUE)
25-33-17

POCKET PEN.
(tsf)
DRY UNIT WT.
18

(pcf)
PROJECT NUMBER PO1

20
20
20
PL

40
40
40
MC

60
60
60
SPT N VALUE

LL

80
80
80

FINES CONTENT (%)


PAGE 2 OF 2
BOR LOG BO1

You might also like