MINISTRY OF ELECTRICITY ENERGY

PUBLIC ELECTRICITY CORPORATION


MARIB GAS POWER GENERATION STATION
PLANNING DEPARTMENT

CORRECTIVE MAINTENANCEPERMIT TO WORK (CM)

1- WORK REQUEST:
CM Request No. Requested Date Requested By System / Equipment

WR-124/20 12-September-2020 AFIF INTERBUS TRANS#1

TO Check and repair the marshling box because ther are abnormal sound. _____and also as PM To_clean and tight
Details of Defects marshling box ,,_ tight all connection bolts on TRANS ,,_Clean and tight breakers and connection,,_ check the TRANS Protection
( MECH AND ELEC WORKSSHOULD BE DONE TOGHETHER)
2- WORK PERMIT:
Urgency System/Equipment GT(s) Main Assistance
CM Permit No. Issued Date Prepared By Unit
Level Shutdown Shutdown Department Department
CM-ELEC-61/20 12-September-2020 MORISY 10 1 NO NO ELEC ELEC

KKS 00BCT01

Maintenance
Remarks

3- WORK CONDITIONS & SAFETY PRECAUTIONS:


Condition Type BC TC IC BC / TC Certificate No. (If Applicable)
Engineer Requirements
De-Energized Earthing Connection Cooled Down De-Pressurized Drained / Vented
YES NO YES NO YES NO YES NO YES NO
Safety Engineer
Remarks

4- OPERATION & MAINTENANCE APPROVALS:


OPERATION MANAGER APPROVAL MAINTENANCE MANAGER APPROVAL
Name: Name:
Date: Date:
Signature: Signature:
Status Date Time Department Name Signature
Under IC Condition Operation
Work in Progress Maintenance
End of Work Maintenance
Back to Normal Operation Operation

5- JOB FEED BACK:


Started Date Finished Date Work Period (Hrs) Operation Hours (Before) Operation Hours (After) Prepared By

1- 2- 3-
Work Team
Names
4- 5- 6-

Performed
Job

Engineer
Remarks
No Description Part No. Qty
1

2
Used
3
Material
4

6
MAINTENANCE ENGINEER MAINTENANCE MANAGER
Name: Name:
Date: Date:
Signature: Signature:
MINISTRY OF ELECTRICITY ENERGY
PUBLIC ELECTRICITY CORPORATION
MARIB GAS POWER GENERATION STATION
PLANNING DEPARTMENT

CORRECTIVE MAINTENANCEPERMIT TO WORK (CM)

1- WORK REQUEST:
CM Request No. Requested Date Requested By System / Equipment

WR-139/20 12-October-2020 Abdulah Monif 33KV INTERBUS TRANS#1,#2

Details of Defects To check and chang the slica jel as need and add oil as need also .

2- WORK PERMIT:
Urgency System/Equipment GT(s) Main Assistance
CM Permit No. Issued Date Prepared By Unit
Level Shutdown Shutdown Department Department
CM-ELEC-73/20 12-October-2020 MORISY 0 0 NO NO ELEC ELEC

KKS 00BCT01,00BCT02

Maintenance
Remarks

3- WORK CONDITIONS & SAFETY PRECAUTIONS:


Condition Type BC TC IC BC / TC Certificate No. (If Applicable)
Engineer Requirements
De-Energized Earthing Connection Cooled Down De-Pressurized Drained / Vented
YES NO YES NO YES NO YES NO YES NO
Safety Engineer
Remarks

4- OPERATION & MAINTENANCE APPROVALS:


OPERATION MANAGER APPROVAL MAINTENANCE MANAGER APPROVAL
Name: Name:
Date: Date:
Signature: Signature:
Status Date Time Department Name Signature
Under IC Condition Operation
Work in Progress Maintenance
End of Work Maintenance
Back to Normal Operation Operation

5- JOB FEED BACK:


Started Date Finished Date Work Period (Hrs) Operation Hours (Before) Operation Hours (After) Prepared By

1- 2- 3-
Work Team
Names
4- 5- 6-

Performed
Job

Engineer
Remarks
No Description Part No. Qty
1

2
Used
3
Material
4

6
MAINTENANCE ENGINEER MAINTENANCE MANAGER
Name: Name:
Date: Date:
Signature: Signature: