0% found this document useful (0 votes)
115 views1 page

Mombasa - Mariakani (A109) Highway Project Lot 1: Mombasa - Kwa Jomvu Section

This document summarizes test results for a prime coat sprayed on a highway project in Mombasa, Kenya. The test measured the spray rate of MC 30 prime coating applied between km 0+060 and km 0+980 on the left service road. Samples were taken at various points along the section and weighed to determine the spray rate, which averaged 1.10 L/m2. This rate fell within the specified range of 0.8-1.2 L/m2 for MC 30 prime according to the project standards. The coating was applied using a spray bar at a height of 0.3m and speed of 15km/hr.

Uploaded by

Julius Waruingi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
115 views1 page

Mombasa - Mariakani (A109) Highway Project Lot 1: Mombasa - Kwa Jomvu Section

This document summarizes test results for a prime coat sprayed on a highway project in Mombasa, Kenya. The test measured the spray rate of MC 30 prime coating applied between km 0+060 and km 0+980 on the left service road. Samples were taken at various points along the section and weighed to determine the spray rate, which averaged 1.10 L/m2. This rate fell within the specified range of 0.8-1.2 L/m2 for MC 30 prime according to the project standards. The coating was applied using a spray bar at a height of 0.3m and speed of 15km/hr.

Uploaded by

Julius Waruingi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

MOMBASA - MARIAKANI (A109) HIGHWAY PROJECT

LOT 1: MOMBASA - KWA JOMVU SECTION


TEST METHOD: ASTM D 2028/AASTHO M81
PRIME MC 30
AREA OF TRAY (F) 0.09 M2 REQUEST No.: 17793
0
SECTION: MOMBASA - KWA JOMVU LOT 1 A109 ROAD SPRAY TEMP: C o 60.0 C VOLUME OF BIT. BEFORE: 8000 Lts
LOCATION: Km 0+060-km 0+980 MIKINDANI LHS SERVICE ROAD SPRAY SPECIFIC GRAVITY (G): 0.91 g/cc VOLUME OF BIT. AFTER: 200 Lts
BITUMEN TYPE: PRIME MC 30 HEIGHT OF SPRAY BAR: 0.30 M BITUMEN USED 7800 Lts
0
SPEED: 15Km/hr SURFACE TEMPERATURE: oC 28.0 C DATE TESTED: 20/07/2020

APPROX AREA SPRAYED: M2 7098 MEAN SPRAY RATE: L/M2 L/M2 PRESSURE: Kpa 22

A B C D E F G

Sampling Off set Tray Wt. of tray Wt. of Wt. of Vol of Area of Spray
2 Average (l/m2) Remarks
Bitumen (g) Bitumen (l) = tray (m )
chainage (Km) from Retaining No. and Bitumen (g) tray (g)
= (B-C) D/(G*1000) rate (l/m2) = A/F
=F
Km0+100LHS 2.0m Z 978.0 888.0 90.0 0.099 0.09 1.10

Km0+200RHS 2.5m Q 1012.0 925.0 87.0 0.096 0.09 1.06

Km0+300CL 3.5m R 971.0 882.0 89.0 0.098 0.09 1.09

Km0+400LHS 2.0m F 1013.0 922.0 91.0 0.100 0.09 1.11

Km0+500RHS 2.0m H 1001.0 912.0 89.0 0.098 0.09 1.09


1.09
Km0+600CL 3.5m Y 1712.0 1623.0 89.0 0.098 0.09 1.09

Km0+700LHS 2.0m D 934.0 845.0 89.0 0.098 0.09 1.09

Km0+800RHS 1.5m K 1723.0 1634.0 89.0 0.098 0.09 1.09

Km0+900CL 1.5m L 1009.0 916.0 93.0 0.102 0.09 1.14

AVERAGE MC 30 PRIME SPRAY RATE FROM THE DISTRIBUTOR 1.10L/M

AVERAGE MC 30 PRIME SPRAY RATE ON TRAY 1.10L/M

DETERMINED AS PER RDM PART III (Clause 7.4.1) OF SPECIFIED MC 30 PRIME SPRAY RATE 0.8-1.2L/M2

TESTED BY VERIFIED BY APPROVED/NOT APPROVED

LAB. TECHNICIAN MAT. TECHNOLOGIST MATERIAL ENGINEER RESIDENT ENGINEER

SAI/CAS SAI/CAS SAI/CAS SAI/CAS