Ground Floor Beam - Gb1: Project Owner Description

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 104
At a glance
Powered by AI
The document discusses design calculations for different types of beams used in residential building projects.

The different types of beams designed include roof beams (RB1, RB2, RB3) and stair beam (STB1).

The steps involved in beam design calculation are determining the loads, calculating moments and shears, selecting steel grade and concrete grade, calculating reinforcement, checking capacity and reserve.

PROJECT Residential Building Date

OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

GROUND FLOOR BEAM - GB1

0.4 d = 0.368 m

0.25
Negative Moment 38.09 kn-m
Posetive Moment 30.00 kn-m
Shear 32.07 kn

Calculate Reinforcement

Concrete - Grade C-25 Steel


Fck 20,000 kpa [EBCS 2 Table 2.3] Fyk 300,000 kpa
Fctk 1,500 kpa [EBCS 2 Table 2.4] PS 1.15
PS Factor 1.5 [EBCS 2 Table 3.1] Fyd 260,870 kpa
Fcd 11333.3333 kpa Es 200,000 kpa
Fctd 1,000 kpa r (min) = 0.002
Ecm 29,000 kpa [EBCS 2 Table 2.5] r (max) = 0.0165

f Mu
ρreq =
1
m [ √
1− 1−

Neagtive Reinforcement
2 mR n
f yd ] m=
f cd
yd

Posetive Reinforcement
Rn =
bd 2

m = 23.02 m = 23.02
Rn = 1124.91375 Rn = 886.10586
r = 0.0046 = 0.0035411
As = 0.00042 As = 0.00033
f = 14 f = 12
No = 2 No = 2
f = 14 f = 12
No = 1 No = 1
As prvd = 0.00046181 As prvd = 0.0003
Capacity = 41.77 Capacity = 31.19
Reserve = 9.68% Reserve = 3.97%

Shear Capacity of Concrete Design Shear Reinforcement

V c =0 . 25 f ctd k 1 k 2 b w d A v df yd
s= Vs =
Vs 0.00
k1 = 1.251
k2 = 1.232 Use Dia 8 Av = 0.00010053
s = 0.20 m

GB1
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

Vc = 35.45 kn Max S = 0.180 m Use 0.180

GB1
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

GROUND FLOOR BEAM - GB2

0.4 d = 0.369 m

0.25
Negative Moment 25.00 kn-m
Posetive Moment 20.00 kn-m
Shear 33.44 kn
Calculate Reinforcement

Concrete - Grade C-25 Steel


Fck 20,000 kpa [EBCS 2 Table 2.3] Fyk 300,000 kpa
Fctk 1,500 kpa [EBCS 2 Table 2.4] PS 1.15
PS Factor 1.5 [EBCS 2 Table 3.1] Fyd 260,870 kpa
Fcd 11333.3333 kpa Es 200,000 kpa
Fctd 1,000 kpa r (min) = 0.002
Ecm 29,000 kpa [EBCS 2 Table 2.5] r (max) = 0.0165

f Mu
ρreq =
1
m [ √
1− 1−

Neagtive Reinforcement
2 mR n
f yd ] m=
f cd
yd

Posetive Reinforcement
Rn =
bd 2

m = 23.02 m = 23.02
Rn = 734.424688 Rn = 587.5397507
r = 0.0029 = 0.002313854
As = 0.00027 As = 0.00021
f = 12 f = 12
No = 2 No = 2
f = 12 f = 12
No = 1 No = 0
As prvd = 0.00033929 As prvd = 0.0002
Capacity = 31.28 Capacity = 21.16
Reserve = 25.11% Reserve = 5.80%

Shear Capacity of Concrete Design Shear Reinforcement


A v df yd
V c =0 . 25 f ctd k 1 k 2 b w d s= Vs =
Vs 0.00
k1 = 1.184
k2 = 1.231 Use Dia 8 Av = 0.00010053
s = 0.20 m

GB2
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

Vc = 33.61 kn Max S = 0.180 m Use 0.180

GB2
PROJECT Residential Building Date April,2006
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

GROUND FLOOR BEAM - GB3

0.4 d = 0.369 m

0.25
Negative Moment 31.00 kn-m
Posetive Moment 23.94 kn-m
Shear 44.55 kn

Calculate Reinforcement

Concrete - Grade C-25 Steel


Fck 20,000 kpa [EBCS 2 Table 2.3] Fyk 300,000 kpa
Fctk 1,500 kpa [EBCS 2 Table 2.4] PS 1.15
PS Factor 1.5 [EBCS 2 Table 3.1] Fyd 260,870 kpa
Fcd 11333.3333 kpa Es 200,000 kpa
Fctd 1,000 kpa r (min) = 0.002
Ecm 29,000 kpa [EBCS 2 Table 2.5] r (max) = 0.0165

f Mu
ρreq =
1
m [ √
1− 1−

Neagtive Reinforcement
2 mR n
f yd ] m=
f cd
yd

Posetive Reinforcement
Rn =
bd 2

m = 23.02 m = 23.02
Rn = 910.686614 Rn = 703.1675737
r = 0.0036 = 0.002784724
As = 0.00034 As = 0.00026
f = 12 f = 12
No = 2 No = 2
f = 12 f = 12
No = 1 No = 1
As prvd = 0.00033929 As prvd = 0.0003
Capacity = 31.28 Capacity = 31.28
Reserve = 0.90% Reserve = 30.67%

Shear Capacity of Concrete Design Shear Reinforcement

V c =0 . 25 f ctd k 1 k 2 b w d A v df yd
s= Vs =
Vs 10.94
k1 = 1.184
k2 = 1.231 Use Dia 8 Av = 0.00010053
s = 0.88 m

GB3
PROJECT Residential Building Date April,2006
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

Vc = 33.61 kn Max S = 0.180 m Use 0.180

GB3
PROJECT Residential Building Date April,2006
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

GROUND FLOOR BEAM - GB4

0.4 d = 0.369 m

0.25
Negative Moment 31.00 kn-m
Posetive Moment 15.00 kn-m
Shear 35.85 kn

Calculate Reinforcement

Concrete - Grade C-25 Steel


Fck 20,000 kpa [EBCS 2 Table 2.3] Fyk 300,000 kpa
Fctk 1,500 kpa [EBCS 2 Table 2.4] PS 1.15
PS Factor 1.5 [EBCS 2 Table 3.1] Fyd 260,870 kpa
Fcd 11333.3333 kpa Es 200,000 kpa
Fctd 1,000 kpa r (min) = 0.002
Ecm 29,000 kpa [EBCS 2 Table 2.5] r (max) = 0.0165

f Mu
ρreq =
1
m [ √
1− 1−

Neagtive Reinforcement
2 mR n
f yd ] m=
f cd
yd

Posetive Reinforcement
Rn =
bd 2

m = 23.02 m = 23.02
Rn = 910.686614 Rn = 440.6548131
r = 0.0036 = 0.001723358
As = 0.00034 As = 0.00000
f = 12 f = 12
No = 2 No = 2
f = 12 f = 12
No = 1 No = -2
As prvd = 0.00033929 As prvd = 0.0000
Capacity = 31.28 Capacity = 0.00
Reserve = 0.90% Reserve = -100.00%

Shear Capacity of Concrete Design Shear Reinforcement

V c =0 . 25 f ctd k 1 k 2 b w d A v df yd
s= Vs =
Vs 2.24
k1 = 1.184
k2 = 1.231 Use Dia 8 Av = 0.00010053
s = 4.32 m
Vc = 33.61 kn Max S = 0.180 m Use 0.180

GB4
PROJECT Residential Building Date April,2006
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

GROUND FLOOR BEAM - GB5

0.4 d = 0.367 m

0.25
Negative Moment 42.00 kn-m
Posetive Moment 28.00 kn-m
Shear 48.00 kn

Calculate Reinforcement

Concrete - Grade C-25 Steel


Fck 20,000 kpa [EBCS 2 Table 2.3] Fyk 300,000 kpa
Fctk 1,500 kpa [EBCS 2 Table 2.4] PS 1.15
PS Factor 1.5 [EBCS 2 Table 3.1] Fyd 260,870 kpa
Fcd 11333.3333 kpa Es 200,000 kpa
Fctd 1,000 kpa r (min) = 0.002
Ecm 29,000 kpa [EBCS 2 Table 2.5] r (max) = 0.0165

f Mu
ρreq =
1
m [ √
1− 1−

Neagtive Reinforcement
2 mR n
f yd ] m=
f cd
yd

Posetive Reinforcement
Rn =
bd 2

m = 23.02 m = 23.02
Rn = 1247.3179 Rn = 831.5452635
r = 0.0051 = 0.003313987
As = 0.00047 As = 0.00030
f = 16 f = 12
No = 2 No = 2
f = 14 f = 12
No = 1 No = 1
As prvd = 0.00055606 As prvd = 0.0003
Capacity = 49.52 Capacity = 31.10
Reserve = 17.91% Reserve = 11.08%

Shear Capacity of Concrete Design Shear Reinforcement

V c =0 . 25 f ctd k 1 k 2 b w d A v df yd
s= Vs =
Vs 11.15
k1 = 1.303
k2 = 1.233 Use Dia 8 Av = 0.00010053
s = 0.86 m

GB5
PROJECT Residential Building Date April,2006
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

Vc = 36.85 kn Max S = 0.180 m Use 0.180

GB5
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

GROUND FLOOR BEAM - GB5

0.4 d = 0.367 m

0.25
Negative Moment 43.00 kn-m
Posetive Moment 28.00 kn-m
Shear 48.00 kn

Calculate Reinforcement

Concrete - Grade C-25 Steel


Fck 20,000 kpa [EBCS 2 Table 2.3] Fyk 300,000 kpa
Fctk 1,500 kpa [EBCS 2 Table 2.4] PS 1.15
PS Factor 1.5 [EBCS 2 Table 3.1] Fyd 260,870 kpa
Fcd 11333.3333 kpa Es 200,000 kpa
Fctd 1,000 kpa r (min) = 0.002
Ecm 29,000 kpa [EBCS 2 Table 2.5] r (max) = 0.0165

f Mu
ρreq =
1
m [ √
1− 1−

Neagtive Reinforcement
2 mR n
f yd ] m=
f cd
yd

Posetive Reinforcement
Rn =
bd 2

m = 23.02 m = 23.02
Rn = 1277.01594 Rn = 831.5452635
r = 0.0052 = 0.003313987
As = 0.00048 As = 0.00030
f = 16 f = 12
No = 2 No = 2
f = 16 f = 12
No = 1 No = 1
As prvd = 0.00060319 As prvd = 0.0003
Capacity = 53.38 Capacity = 31.10
Reserve = 24.14% Reserve = 11.08%

Shear Capacity of Concrete Design Shear Reinforcement

V c =0 . 25 f ctd k 1 k 2 b w d A v df yd
s= Vs =
Vs 10.42
k1 = 1.329
k2 = 1.233 Use Dia 8 Av = 0.00010053
s = 0.92 m

GB6
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

Vc = 37.58 kn Max S = 0.180 m Use 0.180

GB6
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

GROUND FLOOR BEAM - GB5

0.4 d = 0.367 m

0.25
Negative Moment 50.00 kn-m
Posetive Moment 30.00 kn-m
Shear 48.00 kn

Calculate Reinforcement

Concrete - Grade C-25 Steel


Fck 20,000 kpa [EBCS 2 Table 2.3] Fyk 300,000 kpa
Fctk 1,500 kpa [EBCS 2 Table 2.4] PS 1.15
PS Factor 1.5 [EBCS 2 Table 3.1] Fyd 260,870 kpa
Fcd 11333.3333 kpa Es 200,000 kpa
Fctd 1,000 kpa r (min) = 0.002
Ecm 29,000 kpa [EBCS 2 Table 2.5] r (max) = 0.0165

f Mu
ρreq =
1
m [ √
1− 1−

Neagtive Reinforcement
2 mR n
f yd ] m=
f cd
yd

Posetive Reinforcement
Rn =
bd 2

m = 23.02 m = 23.02
Rn = 1484.90226 Rn = 890.9413538
r = 0.0061 = 0.003561236
As = 0.00056 As = 0.00033
f = 16 f = 12
No = 2 No = 2
f = 16 f = 12
No = 1 No = 1
As prvd = 0.00060319 As prvd = 0.0003
Capacity = 53.38 Capacity = 31.10
Reserve = 6.76% Reserve = 3.67%

Shear Capacity of Concrete Design Shear Reinforcement

V c =0 . 25 f ctd k 1 k 2 b w d A v df yd
s= Vs =
Vs 10.42
k1 = 1.329
k2 = 1.233 Use Dia 8 Av = 0.00010053
s = 0.92 m

GB7
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

Vc = 37.58 kn Max S = 0.180 m Use 0.180

GB7
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

GROUND FLOOR BEAM - GB5

0.4 d = 0.368 m

0.25
Negative Moment 36.00 kn-m
Posetive Moment 24.00 kn-m
Shear 40.00 kn

Calculate Reinforcement

Concrete - Grade C-25 Steel


Fck 20,000 kpa [EBCS 2 Table 2.3] Fyk 300,000 kpa
Fctk 1,500 kpa [EBCS 2 Table 2.4] PS 1.15
PS Factor 1.5 [EBCS 2 Table 3.1] Fyd 260,870 kpa
Fcd 11333.3333 kpa Es 200,000 kpa
Fctd 1,000 kpa r (min) = 0.002
Ecm 29,000 kpa [EBCS 2 Table 2.5] r (max) = 0.0165

f Mu
ρreq =
1
m [ √
1− 1−

Neagtive Reinforcement
2 mR n
f yd ] m=
f cd
yd

Posetive Reinforcement
Rn =
bd 2

m = 23.02 m = 23.02
Rn = 1063.32703 Rn = 708.8846881
r = 0.0043 = 0.002808147
As = 0.00039 As = 0.00026
f = 14 f = 12
No = 2 No = 2
f = 14 f = 12
No = 1 No = 1
As prvd = 0.00046181 As prvd = 0.0003
Capacity = 41.77 Capacity = 31.19
Reserve = 16.04% Reserve = 29.96%

Shear Capacity of Concrete Design Shear Reinforcement

V c =0 . 25 f ctd k 1 k 2 b w d A v df yd
s= Vs =
Vs 4.55
k1 = 1.251
k2 = 1.232 Use Dia 8 Av = 0.00010053
s = 2.12 m

GB8
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

Vc = 35.45 kn Max S = 0.180 m Use 0.180

GB8
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

GROUND FLOOR BEAM - GB5

0.4 d = 0.367 m

0.25
Negative Moment 48.00 kn-m
Posetive Moment 27.00 kn-m
Shear 40.00 kn

Calculate Reinforcement

Concrete - Grade C-25 Steel


Fck 20,000 kpa [EBCS 2 Table 2.3] Fyk 300,000 kpa
Fctk 1,500 kpa [EBCS 2 Table 2.4] PS 1.15
PS Factor 1.5 [EBCS 2 Table 3.1] Fyd 260,870 kpa
Fcd 11333.3333 kpa Es 200,000 kpa
Fctd 1,000 kpa r (min) = 0.002
Ecm 29,000 kpa [EBCS 2 Table 2.5] r (max) = 0.0165

f Mu
ρreq =
1
m [ √
1− 1−

Neagtive Reinforcement
2 mR n
f yd ] m=
f cd
yd

Posetive Reinforcement
Rn =
bd 2

m = 23.02 m = 23.02
Rn = 1425.50617 Rn = 801.8472184
r = 0.0059 = 0.003190932
As = 0.00054 As = 0.00029
f = 16 f = 12
No = 2 No = 2
f = 16 f = 12
No = 1 No = 1
As prvd = 0.00060319 As prvd = 0.0003
Capacity = 53.38 Capacity = 31.10
Reserve = 11.21% Reserve = 15.19%

Shear Capacity of Concrete Design Shear Reinforcement

V c =0 . 25 f ctd k 1 k 2 b w d A v df yd
s= Vs =
Vs 2.42
k1 = 1.329
k2 = 1.233 Use Dia 8 Av = 0.00010053
s = 3.97 m

GB8 9
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

Vc = 37.58 kn Max S = 0.180 m Use 0.180

GB8 9
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

GROUND FLOOR BEAM - GB5

0.4 d = 0.368 m

0.25
Negative Moment 35.00 kn-m
Posetive Moment 27.00 kn-m
Shear 48.00 kn

Calculate Reinforcement

Concrete - Grade C-25 Steel


Fck 20,000 kpa [EBCS 2 Table 2.3] Fyk 300,000 kpa
Fctk 1,500 kpa [EBCS 2 Table 2.4] PS 1.15
PS Factor 1.5 [EBCS 2 Table 3.1] Fyd 260,870 kpa
Fcd 11333.3333 kpa Es 200,000 kpa
Fctd 1,000 kpa r (min) = 0.002
Ecm 29,000 kpa [EBCS 2 Table 2.5] r (max) = 0.0165

f Mu
ρreq =
1
m [ √
1− 1−

Neagtive Reinforcement
2 mR n
f yd ] m=
f cd
yd

Posetive Reinforcement
Rn =
bd 2

m = 23.02 m = 23.02
Rn = 1033.79017 Rn = 797.4952741
r = 0.0042 = 0.003172932
As = 0.00038 As = 0.00029
f = 14 f = 12
No = 2 No = 2
f = 14 f = 12
No = 1 No = 1
As prvd = 0.00046181 As prvd = 0.0003
Capacity = 41.77 Capacity = 31.19
Reserve = 19.35% Reserve = 15.52%

Shear Capacity of Concrete Design Shear Reinforcement

V c =0 . 25 f ctd k 1 k 2 b w d A v df yd
s= Vs =
Vs 12.55
k1 = 1.251
k2 = 1.232 Use Dia 8 Av = 0.00010053
s = 0.77 m

GB8 10
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

Vc = 35.45 kn Max S = 0.180 m Use 0.180

GB8 10
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

GROUND FLOOR BEAM - GB5

0.4 d = 0.367 m

0.25
Negative Moment 55.00 kn-m
Posetive Moment 28.00 kn-m
Shear 48.00 kn

Calculate Reinforcement

Concrete - Grade C-25 Steel


Fck 20,000 kpa [EBCS 2 Table 2.3] Fyk 300,000 kpa
Fctk 1,500 kpa [EBCS 2 Table 2.4] PS 1.15
PS Factor 1.5 [EBCS 2 Table 3.1] Fyd 260,870 kpa
Fcd 11333.3333 kpa Es 200,000 kpa
Fctd 1,000 kpa r (min) = 0.002
Ecm 29,000 kpa [EBCS 2 Table 2.5] r (max) = 0.0165

f Mu
ρreq =
1
m [ √
1− 1−

Neagtive Reinforcement
2 mR n
f yd ] m=
f cd
yd

Posetive Reinforcement
Rn =
bd 2

m = 23.02 m = 23.02
Rn = 1633.39248 Rn = 831.5452635
r = 0.0068 = 0.003313987
As = 0.00062 As = 0.00030
f = 16 f = 12
No = 2 No = 2
f = 16 f = 12
No = 2 No = 1
As prvd = 0.00080425 As prvd = 0.0003
Capacity = 69.23 Capacity = 31.10
Reserve = 25.87% Reserve = 11.08%

Shear Capacity of Concrete Design Shear Reinforcement

V c =0 . 25 f ctd k 1 k 2 b w d A v df yd
s= Vs =
Vs 7.32
k1 = 1.438
k2 = 1.233 Use Dia 8 Av = 0.00010053
s = 1.31 m

GB8 12-16
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

Vc = 40.68 kn Max S = 0.180 m Use 0.180

GB8 12-16
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

GROUND FLOOR BEAM - GB5

0.4 d = 0.368 m

0.25
Negative Moment 35.00 kn-m
Posetive Moment 27.00 kn-m
Shear 48.00 kn

Calculate Reinforcement

Concrete - Grade C-25 Steel


Fck 20,000 kpa [EBCS 2 Table 2.3] Fyk 300,000 kpa
Fctk 1,500 kpa [EBCS 2 Table 2.4] PS 1.15
PS Factor 1.5 [EBCS 2 Table 3.1] Fyd 260,870 kpa
Fcd 11333.3333 kpa Es 200,000 kpa
Fctd 1,000 kpa r (min) = 0.002
Ecm 29,000 kpa [EBCS 2 Table 2.5] r (max) = 0.0165

f Mu
ρreq =
1
m [ √
1− 1−

Neagtive Reinforcement
2 mR n
f yd ] m=
f cd
yd

Posetive Reinforcement
Rn =
bd 2

m = 23.02 m = 23.02
Rn = 1033.79017 Rn = 797.4952741
r = 0.0042 = 0.003172932
As = 0.00038 As = 0.00029
f = 14 f = 12
No = 2 No = 2
f = 14 f = 12
No = 1 No = 1
As prvd = 0.00046181 As prvd = 0.0003
Capacity = 41.77 Capacity = 31.19
Reserve = 19.35% Reserve = 15.52%

Shear Capacity of Concrete Design Shear Reinforcement

V c =0 . 25 f ctd k 1 k 2 b w d A v df yd
s= Vs =
Vs 12.55
k1 = 1.251
k2 = 1.232 Use Dia 8 Av = 0.00010053
s = 0.77 m

GB8 11
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

Vc = 35.45 kn Max S = 0.180 m Use 0.180

GB8 11
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

GROUND FLOOR BEAM - GB5

0.4 d = 0.367 m

0.25
Negative Moment 46.00 kn-m
Posetive Moment 33.00 kn-m
Shear 48.00 kn

Calculate Reinforcement

Concrete - Grade C-25 Steel


Fck 20,000 kpa [EBCS 2 Table 2.3] Fyk 300,000 kpa
Fctk 1,500 kpa [EBCS 2 Table 2.4] PS 1.15
PS Factor 1.5 [EBCS 2 Table 3.1] Fyd 260,870 kpa
Fcd 11333.3333 kpa Es 200,000 kpa
Fctd 1,000 kpa r (min) = 0.002
Ecm 29,000 kpa [EBCS 2 Table 2.5] r (max) = 0.0165

f Mu
ρreq =
1
m [ √
1− 1−

Neagtive Reinforcement
2 mR n
f yd ] m=
f cd
yd

Posetive Reinforcement
Rn =
bd 2

m = 23.02 m = 23.02
Rn = 1366.11008 Rn = 980.0354892
r = 0.0056 = 0.003935011
As = 0.00051 As = 0.00036
f = 16 f = 14
No = 2 No = 2
f = 16 f = 14
No = 1 No = 1
As prvd = 0.00060319 As prvd = 0.0005
Capacity = 53.38 Capacity = 41.65
Reserve = 16.04% Reserve = 26.22%

Shear Capacity of Concrete Design Shear Reinforcement

V c =0 . 25 f ctd k 1 k 2 b w d A v df yd
s= Vs =
Vs 10.42
k1 = 1.329
k2 = 1.233 Use Dia 8 Av = 0.00010053
s = 0.92 m

GB8 17
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

Vc = 37.58 kn Max S = 0.180 m Use 0.180

GB8 17
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

FIRST FLOOR BEAM - FFB1

0.4 d = 0.367 m

0.25
Negative Moment 42.00 kn-m
Posetive Moment 30.00 kn-m
Shear 66.00 kn

Calculate Reinforcement

Concrete - Grade C-25 Steel


Fck 20,000 kpa [EBCS 2 Table 2.3] Fyk 300,000 kpa
Fctk 1,500 kpa [EBCS 2 Table 2.4] PS 1.15
PS Factor 1.5 [EBCS 2 Table 3.1] Fyd 260,870 kpa
Fcd 11333.3333 kpa Es 200,000 kpa
Fctd 1,000 kpa r (min) = 0.002
Ecm 29,000 kpa [EBCS 2 Table 2.5] r (max) = 0.0165

f Mu
ρreq =
1
m [ √
1− 1−

Neagtive Reinforcement
2 mR n
f yd ] m=
f cd
yd

Posetive Reinforcement
Rn =
bd 2

m = 23.02 m = 23.02
Rn = 1247.3179 Rn = 890.9413538
r = 0.0051 = 0.003561236
As = 0.00047 As = 0.00033
f = 16 f = 14
No = 2 No = 2
f = 16 f = 14
No = 1 No = 1
As prvd = 0.00060319 As prvd = 0.0005
Capacity = 53.38 Capacity = 41.65
Reserve = 27.09% Reserve = 38.84%

Shear Capacity of Concrete Design Shear Reinforcement

V c =0 . 25 f ctd k 1 k 2 b w d A v df yd
s= Vs =
Vs 28.42
k1 = 1.329
k2 = 1.233 Use Dia 8 Av = 0.00010053
s = 0.34 m

FFB1
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

Vc = 37.58 kn Max S = 0.110 m Use 0.110

FFB1
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

FIRST FLOOR BEAM - FFB2

0.4 d = 0.367 m

0.25
Negative Moment 48.00 kn-m
Posetive Moment 26.00 kn-m
Shear 51.00 kn

Calculate Reinforcement

Concrete - Grade C-25 Steel


Fck 20,000 kpa [EBCS 2 Table 2.3] Fyk 300,000 kpa
Fctk 1,500 kpa [EBCS 2 Table 2.4] PS 1.15
PS Factor 1.5 [EBCS 2 Table 3.1] Fyd 260,870 kpa
Fcd 11333.3333 kpa Es 200,000 kpa
Fctd 1,000 kpa r (min) = 0.002
Ecm 29,000 kpa [EBCS 2 Table 2.5] r (max) = 0.0165

f Mu
ρreq =
1
m [ √
1− 1−

Neagtive Reinforcement
2 mR n
f yd ] m=
f cd
yd

Posetive Reinforcement
Rn =
bd 2

m = 23.02 m = 23.02
Rn = 1425.50617 Rn = 772.1491733
r = 0.0059 = 0.003068252
As = 0.00054 As = 0.00028
f = 16 f = 14
No = 2 No = 2
f = 16 f = 14
No = 1 No = 0
As prvd = 0.00060319 As prvd = 0.0003
Capacity = 53.38 Capacity = 28.34
Reserve = 11.21% Reserve = 8.99%

Shear Capacity of Concrete Design Shear Reinforcement

V c =0 . 25 f ctd k 1 k 2 b w d A v df yd
s= Vs =
Vs 13.42
k1 = 1.329
k2 = 1.233 Use Dia 8 Av = 0.00010053
s = 0.72 m

FFB2
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

Vc = 37.58 kn Max S = 0.180 m Use 0.180

FFB2
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

FIRST FLOOR BEAM - FFB3

0.4 d = 0.365 m

0.25
Negative Moment 87.00 kn-m
Posetive Moment 25.00 kn-m
Shear 90.00 kn

Calculate Reinforcement

Concrete - Grade C-25 Steel


Fck 20,000 kpa [EBCS 2 Table 2.3] Fyk 300,000 kpa
Fctk 1,500 kpa [EBCS 2 Table 2.4] PS 1.15
PS Factor 1.5 [EBCS 2 Table 3.1] Fyd 260,870 kpa
Fcd 11333.3333 kpa Es 200,000 kpa
Fctd 1,000 kpa r (min) = 0.002
Ecm 29,000 kpa [EBCS 2 Table 2.5] r (max) = 0.0165

f Mu
ρreq =
1
m [ √
1− 1−

Neagtive Reinforcement
2 mR n
f yd ] m=
f cd
yd

Posetive Reinforcement
Rn =
bd 2

m = 23.02 m = 23.02
Rn = 2612.12235 Rn = 750.6098705
r = 0.0115 = 0.002979508
As = 0.00105 As = 0.00027
f = 20 f = 14
No = 2 No = 2
f = 20 f = 16
No = 2 No = 0
As prvd = 0.00125664 As prvd = 0.0003
Capacity = 100.69 Capacity = 28.18
Reserve = 15.73% Reserve = 12.71%

Shear Capacity of Concrete Design Shear Reinforcement

V c =0 . 25 f ctd k 1 k 2 b w d A v df yd
s= Vs =
Vs 42.43
k1 = 1.689
k2 = 1.235 Use Dia 8 Av = 0.00010053
s = 0.23 m

FFB3
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

Vc = 47.57 kn Max S = 0.100 m Use 0.100

FFB3
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

FIRST FLOOR BEAM - FFB3(span-2 on axis C)

0.45 d = 0.415 m

0.3
Negative Moment 149.80 kn-m
Posetive Moment 108.11 kn-m
Shear 182.27 kn
Torsion 17.64 kn
Calculate Reinforcement

Concrete - Grade C-25 Steel


Fck 20,000 kpa [EBCS 2 Table 2.3] Fyk 300,000 kpa
Fctk 1,500 kpa [EBCS 2 Table 2.4] PS 1.15
PS Factor 1.5 [EBCS 2 Table 3.1] Fyd 260,870 kpa
Fcd 11333.33 kpa Es 200,000 kpa
Fctd 1,000 kpa r (min) = 0.002
Ecm 29,000 kpa [EBCS 2 Table 2.5] r (max) = 0.0165

f Mu
ρreq =
1
m [ √
1− 1−
2 mR n
f yd ] m=
f cd
yd
Rn =
bd 2

Negative Reinforcement Posetive Reinforcement


m = 23.02 m = 23.02
Rn = 2899.2384 Rn = 2092.48754
r = 0.0131 r = 0.00894131
As = 0.00163 As = 0.00111
f = 20 f = 20
No = 2 No = 2
f = 20 f = 20
No = 4 No = 2
As prvd = 0.001885 As prvd = 0.0013
Capacity = 168.51 Capacity = 120.24
Reserve = 12.49% Reserve = 11.22%
Shear Capacity of Concrete

V c =0 . 25f ctd k 1 k 2 b w d
k1 = 1.757
k2 = 1.185

Vc = 64.80 KN

FFB3+TORSION
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

Check for torsional resistance of the beam


A = 135000 mm
U = 1500 mm
hef = 90.00 mm
Tsd = 17.64 KN-m
Uef = 1140.00
TRD=0.8*fcd*Aef*hef (EBCS 2,4.6.3,1995)
VRD=0.25*fcd*bw*d (EBCS 2 ,4.5.2,1995)
Aef = 75600.00 mm 2

TRD = 61.69 KN-m VRd = 352.75 KN

Torsional resistance of concrete


TC=1.2*fctd*Aef*hef
TC = 8.16
Both shear & torsion acts at the same time.
Therefore,reduction factor has to be used as per on EBCS 2

bt= 1 (EBCS 2,4.6.3,1995)


( (1+(Vsd/VRd)/(TRd/TSd)2)

TRd/TSd= 3.50
Vsd = 182.27
VRd = 352.75
Vsd/VRd= 0.52
bt= 0.989

bv= 1 (EBCS 2,4.6.3,1995)


( (1+(Tsd/TRd)/(Vsd/VRd)2)

Tsd/TRd= 0.29
Vsd = 182.27
VRd = 352.75
Vsd/VRd= 0.52
bv= 0.875

btc= 1 (EBCS 2,4.6.3,1995)


( (1+(Vsd/Vc)/(Tsd/Tc)2)

Tsd/Tc= 2.16
Vsd = 182.27
Vc = 64.80
Vsd/Vc= 2.81266305
btc= 0.609

FFB3+TORSION
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

btc= 1 (EBCS 2,4.6.6.2,1995)


( (1+(Tsd/Tc)/(Vsd/Vc)2)

Tsd/Tc= 2.16
Vsd = 182.27
Vc = 64.80
Vsd/Vc= 2.81
bvc= 0.793
VRd = 308.64
Thus the actual capacity
of concrete section
{ Vc =
TC =
51.39
4.97

Design Shear Reinforcement

A v df yd Vs = 130.88
s=
Vs
Use Dia 14 As = 0.000308
s = 0.255 m
Max S = 0.120 m Use S= 0.120

Design Torsion Reinforcement


Tef= 12.67
S=2*Aef*fyd*As/Tef

Use Dia 14 As = 0.00031


S = 0.959 m
Max S = 0.143 m Use S= 0.143

Avtot/S= 1.530 mm2/mm Asmin/S= 0.400 mm2/mm


use 14 S provided= 100 mm

Design Longitudinal Reinforcement


Tef=2*Aef*fyd*AL/Uef Longitudinal (Additional)
AL= 0.000366
Use Dia 12 (Skin Reinforcement)
No = 2

FFB3+TORSION
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

FIRST FLOOR BEAM - FFB4

0.4 d = 0.367 m

0.25
Negative Moment 59.00 kn-m
Posetive Moment 44.00 kn-m
Shear 90.00 kn

Calculate Reinforcement

Concrete - Grade C-25 Steel


Fck 20,000 kpa [EBCS 2 Table 2.3] Fyk 300,000 kpa
Fctk 1,500 kpa [EBCS 2 Table 2.4] PS 1.15
PS Factor 1.5 [EBCS 2 Table 3.1] Fyd 260,870 kpa
Fcd 11333.3333 kpa Es 200,000 kpa
Fctd 1,000 kpa r (min) = 0.002
Ecm 29,000 kpa [EBCS 2 Table 2.5] r (max) = 0.0165

f Mu
ρreq =
1
m [ √
1− 1−

Neagtive Reinforcement
2 mR n
f yd ] m=
f cd
yd

Posetive Reinforcement
Rn =
bd 2

m = 23.02 m = 23.02
Rn = 1752.18466 Rn = 1306.713986
r = 0.0073 = 0.00533687
As = 0.00067 As = 0.00049
f = 16 f = 16
No = 2 No = 2
f = 16 f = 16
No = 2 No = 1
As prvd = 0.00080425 As prvd = 0.0006
Capacity = 69.23 Capacity = 53.38
Reserve = 17.34% Reserve = 21.32%

Shear Capacity of Concrete Design Shear Reinforcement

V c =0 . 25 f ctd k 1 k 2 b w d A v df yd
s= Vs =
Vs 49.32
k1 = 1.438
k2 = 1.233 Use Dia 8 Av = 0.00010053
s = 0.20 m

FFB4
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

Vc = 40.68 kn Max S = 0.110 m Use 0.110

FFB4
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

FIRST FLOOR BEAM - FFB5

0.4 d = 0.365 m

0.25
Negative Moment 75.00 kn-m
Posetive Moment 46.00 kn-m
Shear 90.00 kn

Calculate Reinforcement

Concrete - Grade C-25 Steel


Fck 20,000 kpa [EBCS 2 Table 2.3] Fyk 300,000 kpa
Fctk 1,500 kpa [EBCS 2 Table 2.4] PS 1.15
PS Factor 1.5 [EBCS 2 Table 3.1] Fyd 260,870 kpa
Fcd 11333.3333 kpa Es 200,000 kpa
Fctd 1,000 kpa r (min) = 0.002
Ecm 29,000 kpa [EBCS 2 Table 2.5] r (max) = 0.0165

f Mu
ρreq =
1
m [ √
1− 1−

Neagtive Reinforcement
2 mR n
f yd ] m=
f cd
yd

Posetive Reinforcement
Rn =
bd 2

m = 23.02 m = 23.02
Rn = 2251.82961 Rn = 1381.122162
r = 0.0097 = 0.005663447
As = 0.00089 As = 0.00052
f = 20 f = 16
No = 2 No = 2
f = 16 f = 16
No = 2 No = 1
As prvd = 0.00103044 As prvd = 0.0006
Capacity = 85.36 Capacity = 53.06
Reserve = 13.82% Reserve = 15.36%

Shear Capacity of Concrete Design Shear Reinforcement

V c =0 . 25 f ctd k 1 k 2 b w d A v df yd
s= Vs =
Vs 45.92
k1 = 1.565
k2 = 1.235 Use Dia 10 Av = 0.00015708
s = 0.33 m

FFB5
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

Vc = 44.08 kn Max S = 0.100 m Use 0.100

FFB5
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

FIRST FLOOR BEAM - FFB5

0.4 d = 0.368 m

0.25
Negative Moment 30.00 kn-m
Posetive Moment 20.00 kn-m
Shear 40.00 kn

Calculate Reinforcement

Concrete - Grade C-25 Steel


Fck 20,000 kpa [EBCS 2 Table 2.3] Fyk 300,000 kpa
Fctk 1,500 kpa [EBCS 2 Table 2.4] PS 1.15
PS Factor 1.5 [EBCS 2 Table 3.1] Fyd 260,870 kpa
Fcd 11333.3333 kpa Es 200,000 kpa
Fctd 1,000 kpa r (min) = 0.002
Ecm 29,000 kpa [EBCS 2 Table 2.5] r (max) = 0.0165

f Mu
ρreq =
1
m [ √
1− 1−

Neagtive Reinforcement
2 mR n
f yd ] m=
f cd
yd

Posetive Reinforcement
Rn =
bd 2

m = 23.02 m = 23.02
Rn = 886.10586 Rn = 590.7372401
r = 0.0035 = 0.002326802
As = 0.00033 As = 0.00021
f = 14 f = 14
No = 2 No = 2
f = 14 f = 16
No = 1 No = 0
As prvd = 0.00046181 As prvd = 0.0003
Capacity = 41.77 Capacity = 28.42
Reserve = 39.24% Reserve = 42.09%

Shear Capacity of Concrete Design Shear Reinforcement

V c =0 . 25 f ctd k 1 k 2 b w d A v df yd
s= Vs =
Vs 4.55
k1 = 1.251
k2 = 1.232 Use Dia 10 Av = 0.00015708
s = 3.31 m

FFB5 6
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

Vc = 35.45 kn Max S = 0.180 m Use 0.180

FFB5 6
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

FIRST FLOOR BEAM - FFB5

0.4 d = 0.368 m

0.25
Negative Moment 33.00 kn-m
Posetive Moment 15.00 kn-m
Shear 20.00 kn

Calculate Reinforcement

Concrete - Grade C-25 Steel


Fck 20,000 kpa [EBCS 2 Table 2.3] Fyk 300,000 kpa
Fctk 1,500 kpa [EBCS 2 Table 2.4] PS 1.15
PS Factor 1.5 [EBCS 2 Table 3.1] Fyd 260,870 kpa
Fcd 11333.3333 kpa Es 200,000 kpa
Fctd 1,000 kpa r (min) = 0.002
Ecm 29,000 kpa [EBCS 2 Table 2.5] r (max) = 0.0165

f Mu
ρreq =
1
m [ √
1− 1−

Neagtive Reinforcement
2 mR n
f yd ] m=
f cd
yd

Posetive Reinforcement
Rn =
bd 2

m = 23.02 m = 23.02
Rn = 974.716446 Rn = 443.0529301
r = 0.0039 = 0.001732932
As = 0.00036 As = 0.00000
f = 14 f = 12
No = 2 No = 2
f = 14 f = 16
No = 1 No = -1
As prvd = 0.00046181 As prvd = 0.0000
Capacity = 41.77 Capacity = 2.41
Reserve = 26.58% Reserve = -83.97%

Shear Capacity of Concrete Design Shear Reinforcement

V c =0 . 25 f ctd k 1 k 2 b w d A v df yd
s= Vs =
Vs 0.00
k1 = 1.251
k2 = 1.232 Use Dia 10 Av = 0.00015708
s = 0.20 m

FFB5 7
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

Vc = 35.45 kn Max S = 0.180 m Use 0.180

FFB5 7
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

FIRST FLOOR BEAM - FFB5

0.4 d = 0.367 m

0.25
Negative Moment 50.00 kn-m
Posetive Moment 57.00 kn-m
Shear 78.00 kn

Calculate Reinforcement

Concrete - Grade C-25 Steel


Fck 20,000 kpa [EBCS 2 Table 2.3] Fyk 300,000 kpa
Fctk 1,500 kpa [EBCS 2 Table 2.4] PS 1.15
PS Factor 1.5 [EBCS 2 Table 3.1] Fyd 260,870 kpa
Fcd 11333.3333 kpa Es 200,000 kpa
Fctd 1,000 kpa r (min) = 0.002
Ecm 29,000 kpa [EBCS 2 Table 2.5] r (max) = 0.0165

f Mu
ρreq =
1
m [ √
1− 1−

Neagtive Reinforcement
2 mR n
f yd ] m=
f cd
yd

Posetive Reinforcement
Rn =
bd 2

m = 23.02 m = 23.02
Rn = 1484.90226 Rn = 1692.788572
r = 0.0061 = 0.007063189
As = 0.00056 As = 0.00065
f = 16 f = 16
No = 2 No = 2
f = 16 f = 16
No = 1 No = 2
As prvd = 0.00060319 As prvd = 0.0008
Capacity = 53.38 Capacity = 69.23
Reserve = 6.76% Reserve = 21.46%

Shear Capacity of Concrete Design Shear Reinforcement

V c =0 . 25 f ctd k 1 k 2 b w d A v df yd
s= Vs =
Vs 40.42
k1 = 1.329
k2 = 1.233 Use Dia 8 Av = 0.00010053
s = 0.24 m

FFB5 8
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

Vc = 37.58 kn Max S = 0.110 m Use 0.110

FFB5 8
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

FIRST FLOOR BEAM - FFB5

0.5 d = 0.465 m

0.25
Negative Moment 100.00 kn-m
Posetive Moment 135.00 kn-m
Shear 90.00 kn

Calculate Reinforcement

Concrete - Grade C-25 Steel


Fck 20,000 kpa [EBCS 2 Table 2.3] Fyk 300,000 kpa
Fctk 1,500 kpa [EBCS 2 Table 2.4] PS 1.15
PS Factor 1.5 [EBCS 2 Table 3.1] Fyd 260,870 kpa
Fcd 11333.3333 kpa Es 200,000 kpa
Fctd 1,000 kpa r (min) = 0.002
Ecm 29,000 kpa [EBCS 2 Table 2.5] r (max) = 0.0165

f Mu
ρreq =
1
m [ √
1− 1−

Neagtive Reinforcement
2 mR n
f yd ] m=
f cd
yd

Posetive Reinforcement
Rn =
bd 2

m = 23.02 m = 23.02
Rn = 1849.92485 Rn = 2497.398543
r = 0.0078 = 0.01095443
As = 0.00091 As = 0.00127
f = 20 f = 20
No = 2 No = 2
f = 20 f = 20
No = 1 No = 3
As prvd = 0.00094248 As prvd = 0.0016
Capacity = 103.66 Capacity = 160.91
Reserve = 3.66% Reserve = 19.19%

Shear Capacity of Concrete Design Shear Reinforcement

V c =0 . 25 f ctd k 1 k 2 b w d A v df yd
s= Vs =
Vs 43.64
k1 = 1.405
k2 = 1.135 Use Dia 8 Av = 0.00010053
s = 0.28 m

FFB5 9
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

Vc = 46.36 kn Max S = 0.130 m Use 0.130

FFB5 9
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

FIRST FLOOR BEAM - FFB5

0.4 d = 0.367 m

0.25
Negative Moment 50.00 kn-m
Posetive Moment 43.00 kn-m
Shear 57.00 kn

Calculate Reinforcement

Concrete - Grade C-25 Steel


Fck 20,000 kpa [EBCS 2 Table 2.3] Fyk 300,000 kpa
Fctk 1,500 kpa [EBCS 2 Table 2.4] PS 1.15
PS Factor 1.5 [EBCS 2 Table 3.1] Fyd 260,870 kpa
Fcd 11333.3333 kpa Es 200,000 kpa
Fctd 1,000 kpa r (min) = 0.002
Ecm 29,000 kpa [EBCS 2 Table 2.5] r (max) = 0.0165

f Mu
ρreq =
1
m [ √
1− 1−

Neagtive Reinforcement
2 mR n
f yd ] m=
f cd
yd

Posetive Reinforcement
Rn =
bd 2

m = 23.02 m = 23.02
Rn = 1484.90226 Rn = 1277.01594
r = 0.0061 = 0.005207305
As = 0.00056 As = 0.00048
f = 16 f = 14
No = 2 No = 2
f = 16 f = 14
No = 1 No = 2
As prvd = 0.00060319 As prvd = 0.0006
Capacity = 53.38 Capacity = 54.40
Reserve = 6.76% Reserve = 26.51%

Shear Capacity of Concrete Design Shear Reinforcement

V c =0 . 25 f ctd k 1 k 2 b w d A v df yd
s= Vs =
Vs 19.42
k1 = 1.329
k2 = 1.233 Use Dia 8 Av = 0.00010053
s = 0.50 m

FFB5 10
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

Vc = 37.58 kn Max S = 0.180 m Use 0.180

FFB5 10
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

FIRST FLOOR BEAM - FFB5

0.5 d = 0.465 m

0.25
Negative Moment 150.00 kn-m
Posetive Moment 110.00 kn-m
Shear 120.00 kn

Calculate Reinforcement

Concrete - Grade C-25 Steel


Fck 20,000 kpa [EBCS 2 Table 2.3] Fyk 300,000 kpa
Fctk 1,500 kpa [EBCS 2 Table 2.4] PS 1.15
PS Factor 1.5 [EBCS 2 Table 3.1] Fyd 260,870 kpa
Fcd 11333.3333 kpa Es 200,000 kpa
Fctd 1,000 kpa r (min) = 0.002
Ecm 29,000 kpa [EBCS 2 Table 2.5] r (max) = 0.0165

f Mu
ρreq =
1
m [ √
1− 1−

Neagtive Reinforcement
2 mR n
f yd ] m=
f cd
yd

Posetive Reinforcement
Rn =
bd 2

m = 23.02 m = 23.02
Rn = 2774.88727 Rn = 2034.917331
r = 0.0124 = 0.008664543
As = 0.00144 As = 0.00101
f = 20 f = 20
No = 2 No = 2
f = 20 f = 20
No = 3 No = 2
As prvd = 0.0015708 As prvd = 0.0013
Capacity = 160.91 Capacity = 133.47
Reserve = 7.28% Reserve = 21.34%

Shear Capacity of Concrete Design Shear Reinforcement

V c =0 . 25 f ctd k 1 k 2 b w d A v df yd
s= Vs =
Vs 64.73
k1 = 1.676
k2 = 1.135 Use Dia 8 Av = 0.00010053
s = 0.19 m

FFB11
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

Vc = 55.27 kn Max S = 0.130 m Use 0.130

FFB11
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

FIRST FLOOR BEAM - FFB5

0.4 d = 0.369 m

0.25
Negative Moment 30.00 kn-m
Posetive Moment 20.00 kn-m
Shear 20.00 kn

Calculate Reinforcement

Concrete - Grade C-25 Steel


Fck 20,000 kpa [EBCS 2 Table 2.3] Fyk 300,000 kpa
Fctk 1,500 kpa [EBCS 2 Table 2.4] PS 1.15
PS Factor 1.5 [EBCS 2 Table 3.1] Fyd 260,870 kpa
Fcd 11333.3333 kpa Es 200,000 kpa
Fctd 1,000 kpa r (min) = 0.002
Ecm 29,000 kpa [EBCS 2 Table 2.5] r (max) = 0.0165

f Mu
ρreq =
1
m [ √
1− 1−

Neagtive Reinforcement
2 mR n
f yd ] m=
f cd
yd

Posetive Reinforcement
Rn =
bd 2

m = 23.02 m = 23.02
Rn = 881.309626 Rn = 587.5397507
r = 0.0035 = 0.002313854
As = 0.00032 As = 0.00021
f = 12 f = 12
No = 2 No = 2
f = 12 f = 12
No = 1 No = 0
As prvd = 0.00033929 As prvd = 0.0002
Capacity = 31.28 Capacity = 21.16
Reserve = 4.26% Reserve = 5.80%

Shear Capacity of Concrete Design Shear Reinforcement

V c =0 . 25 f ctd k 1 k 2 b w d A v df yd
s= Vs =
Vs 0.00
k1 = 1.184
k2 = 1.231 Use Dia 8 Av = 0.00010053
s = 0.20 m

FFB12
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

Vc = 33.61 kn Max S = 0.180 m Use 0.180

FFB12
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

FIRST FLOOR BEAM - FFB5

0.5 d = 0.465 m

0.25
Negative Moment 143.00 kn-m
Posetive Moment 124.00 kn-m
Shear 180.00 kn

Calculate Reinforcement

Concrete - Grade C-25 Steel


Fck 20,000 kpa [EBCS 2 Table 2.3] Fyk 300,000 kpa
Fctk 1,500 kpa [EBCS 2 Table 2.4] PS 1.15
PS Factor 1.5 [EBCS 2 Table 3.1] Fyd 260,870 kpa
Fcd 11333.3333 kpa Es 200,000 kpa
Fctd 1,000 kpa r (min) = 0.002
Ecm 29,000 kpa [EBCS 2 Table 2.5] r (max) = 0.0165

f Mu
ρreq =
1
m [ √
1− 1−

Neagtive Reinforcement
2 mR n
f yd ] m=
f cd
yd

Posetive Reinforcement
Rn =
bd 2

m = 23.02 m = 23.02
Rn = 2645.39253 Rn = 2293.90681
r = 0.0117 = 0.0099276
As = 0.00136 As = 0.00115
f = 20 f = 20
No = 2 No = 2
f = 20 f = 20
No = 3 No = 2
As prvd = 0.0015708 As prvd = 0.0013
Capacity = 160.91 Capacity = 133.47
Reserve = 12.53% Reserve = 7.64%

Shear Capacity of Concrete Design Shear Reinforcement

V c =0 . 25 f ctd k 1 k 2 b w d A v df yd
s= Vs =
Vs 124.73
k1 = 1.676
k2 = 1.135 Use Dia 8 Av = 0.00010053
s = 0.10 m

FFB13
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

Vc = 55.27 kn Max S = 0.130 m Use 0.090

FFB13
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

FIRST FLOOR BEAM - FFB5

0.4 d = 0.369 m

0.25
Negative Moment 30.00 kn-m
Posetive Moment 20.00 kn-m
Shear 20.00 kn

Calculate Reinforcement

Concrete - Grade C-25 Steel


Fck 20,000 kpa [EBCS 2 Table 2.3] Fyk 300,000 kpa
Fctk 1,500 kpa [EBCS 2 Table 2.4] PS 1.15
PS Factor 1.5 [EBCS 2 Table 3.1] Fyd 260,870 kpa
Fcd 11333.3333 kpa Es 200,000 kpa
Fctd 1,000 kpa r (min) = 0.002
Ecm 29,000 kpa [EBCS 2 Table 2.5] r (max) = 0.0165

f Mu
ρreq =
1
m [ √
1− 1−

Neagtive Reinforcement
2 mR n
f yd ] m=
f cd
yd

Posetive Reinforcement
Rn =
bd 2

m = 23.02 m = 23.02
Rn = 881.309626 Rn = 587.5397507
r = 0.0035 = 0.002313854
As = 0.00032 As = 0.00021
f = 12 f = 12
No = 2 No = 2
f = 12 f = 12
No = 1 No = 0
As prvd = 0.00033929 As prvd = 0.0002
Capacity = 31.28 Capacity = 21.16
Reserve = 4.26% Reserve = 5.80%

Shear Capacity of Concrete Design Shear Reinforcement

V c =0 . 25 f ctd k 1 k 2 b w d A v df yd
s= Vs =
Vs 0.00
k1 = 1.184
k2 = 1.231 Use Dia 8 Av = 0.00010053
s = 0.20 m

FFB14
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

Vc = 33.61 kn Max S = 0.180 m Use 0.180

FFB14
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

FIRST FLOOR BEAM - FFB5

0.4 d = 0.369 m

0.25
Negative Moment 30.00 kn-m
Posetive Moment 24.00 kn-m
Shear 20.00 kn

Calculate Reinforcement

Concrete - Grade C-25 Steel


Fck 20,000 kpa [EBCS 2 Table 2.3] Fyk 300,000 kpa
Fctk 1,500 kpa [EBCS 2 Table 2.4] PS 1.15
PS Factor 1.5 [EBCS 2 Table 3.1] Fyd 260,870 kpa
Fcd 11333.3333 kpa Es 200,000 kpa
Fctd 1,000 kpa r (min) = 0.002
Ecm 29,000 kpa [EBCS 2 Table 2.5] r (max) = 0.0165

f Mu
ρreq =
1
m [ √
1− 1−

Neagtive Reinforcement
2 mR n
f yd ] m=
f cd
yd

Posetive Reinforcement
Rn =
bd 2

m = 23.02 m = 23.02
Rn = 881.309626 Rn = 705.0477009
r = 0.0035 = 0.002792426
As = 0.00032 As = 0.00026
f = 12 f = 12
No = 2 No = 2
f = 12 f = 12
No = 1 No = 1
As prvd = 0.00033929 As prvd = 0.0003
Capacity = 31.28 Capacity = 31.28
Reserve = 4.26% Reserve = 30.33%

Shear Capacity of Concrete Design Shear Reinforcement

V c =0 . 25 f ctd k 1 k 2 b w d A v df yd
s= Vs =
Vs 0.00
k1 = 1.184
k2 = 1.231 Use Dia 8 Av = 0.00010053
s = 0.20 m

FFB15
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

Vc = 33.61 kn Max S = 0.180 m Use 0.180

FFB15
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

FIRST FLOOR BEAM - FFB5

0.4 d = 0.369 m

0.25
Negative Moment 30.00 kn-m
Posetive Moment 24.00 kn-m
Shear 20.00 kn

Calculate Reinforcement

Concrete - Grade C-25 Steel


Fck 20,000 kpa [EBCS 2 Table 2.3] Fyk 300,000 kpa
Fctk 1,500 kpa [EBCS 2 Table 2.4] PS 1.15
PS Factor 1.5 [EBCS 2 Table 3.1] Fyd 260,870 kpa
Fcd 11333.3333 kpa Es 200,000 kpa
Fctd 1,000 kpa r (min) = 0.002
Ecm 29,000 kpa [EBCS 2 Table 2.5] r (max) = 0.0165

f Mu
ρreq =
1
m [ √
1− 1−

Neagtive Reinforcement
2 mR n
f yd ] m=
f cd
yd

Posetive Reinforcement
Rn =
bd 2

m = 23.02 m = 23.02
Rn = 881.309626 Rn = 705.0477009
r = 0.0035 = 0.002792426
As = 0.00032 As = 0.00026
f = 12 f = 12
No = 2 No = 2
f = 12 f = 12
No = 1 No = 1
As prvd = 0.00033929 As prvd = 0.0003
Capacity = 31.28 Capacity = 31.28
Reserve = 4.26% Reserve = 30.33%

Shear Capacity of Concrete Design Shear Reinforcement

V c =0 . 25 f ctd k 1 k 2 b w d A v df yd
s= Vs =
Vs 0.00
k1 = 1.184
k2 = 1.231 Use Dia 8 Av = 0.00010053
s = 0.20 m

FFB16
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

Vc = 33.61 kn Max S = 0.180 m Use 0.180

FFB16
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

FIRST FLOOR BEAM - FFB5

0.4 d = 0.369 m

0.25
Negative Moment 30.00 kn-m
Posetive Moment 20.00 kn-m
Shear 20.00 kn

Calculate Reinforcement

Concrete - Grade C-25 Steel


Fck 20,000 kpa [EBCS 2 Table 2.3] Fyk 300,000 kpa
Fctk 1,500 kpa [EBCS 2 Table 2.4] PS 1.15
PS Factor 1.5 [EBCS 2 Table 3.1] Fyd 260,870 kpa
Fcd 11333.3333 kpa Es 200,000 kpa
Fctd 1,000 kpa r (min) = 0.002
Ecm 29,000 kpa [EBCS 2 Table 2.5] r (max) = 0.0165

f Mu
ρreq =
1
m [ √
1− 1−

Neagtive Reinforcement
2 mR n
f yd ] m=
f cd
yd

Posetive Reinforcement
Rn =
bd 2

m = 23.02 m = 23.02
Rn = 881.309626 Rn = 587.5397507
r = 0.0035 = 0.002313854
As = 0.00032 As = 0.00021
f = 12 f = 12
No = 2 No = 2
f = 12 f = 12
No = 1 No = 0
As prvd = 0.00033929 As prvd = 0.0002
Capacity = 31.28 Capacity = 21.16
Reserve = 4.26% Reserve = 5.80%

Shear Capacity of Concrete Design Shear Reinforcement

V c =0 . 25 f ctd k 1 k 2 b w d A v df yd
s= Vs =
Vs 0.00
k1 = 1.184
k2 = 1.231 Use Dia 8 Av = 0.00010053
s = 0.20 m

FFB18
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

Vc = 33.61 kn Max S = 0.180 m Use 0.180

FFB18
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

SECOND FLOOR BEAM - SFB1

0.4 d = 0.367 m

0.25
Negative Moment 50.00 kn-m
Posetive Moment 30.00 kn-m
Shear 67.00 kn

Calculate Reinforcement

Concrete - Grade C-25 Steel


Fck 20,000 kpa [EBCS 2 Table 2.3] Fyk 300,000 kpa
Fctk 1,500 kpa [EBCS 2 Table 2.4] PS 1.15
PS Factor 1.5 [EBCS 2 Table 3.1] Fyd 260,870 kpa
Fcd 11333.3333 kpa Es 200,000 kpa
Fctd 1,000 kpa r (min) = 0.002
Ecm 29,000 kpa [EBCS 2 Table 2.5] r (max) = 0.0165

f Mu
ρreq =
1
m [ √
1− 1−

Neagtive Reinforcement
2 mR n
f yd ] m=
f cd
yd

Posetive Reinforcement
Rn =
bd 2

m = 23.02 m = 23.02
Rn = 1484.90226 Rn = 890.9413538
r = 0.0061 = 0.003561236
As = 0.00056 As = 0.00033
f = 16 f = 14
No = 2 No = 2
f = 16 f = 14
No = 1 No = 1
As prvd = 0.00060319 As prvd = 0.0005
Capacity = 53.38 Capacity = 41.65
Reserve = 6.76% Reserve = 38.84%

Shear Capacity of Concrete Design Shear Reinforcement

V c =0 . 25 f ctd k 1 k 2 b w d A v df yd
s= Vs =
Vs 29.42
k1 = 1.329
k2 = 1.233 Use Dia 8 Av = 0.00010053
s = 0.33 m

SFB1
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

Vc = 37.58 kn Max S = 0.110 m Use 0.110

SFB1
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

SECOND FLOOR BEAM - SFB2

0.4 d = 0.365 m

0.25
Negative Moment 84.00 kn-m
Posetive Moment 20.00 kn-m
Shear 70.00 kn

Calculate Reinforcement

Concrete - Grade C-25 Steel


Fck 20,000 kpa [EBCS 2 Table 2.3] Fyk 300,000 kpa
Fctk 1,500 kpa [EBCS 2 Table 2.4] PS 1.15
PS Factor 1.5 [EBCS 2 Table 3.1] Fyd 260,870 kpa
Fcd 11333.3333 kpa Es 200,000 kpa
Fctd 1,000 kpa r (min) = 0.002
Ecm 29,000 kpa [EBCS 2 Table 2.5] r (max) = 0.0165

f Mu
ρreq =
1
m [ √
1− 1−

Neagtive Reinforcement
2 mR n
f yd ] m=
f cd
yd

Posetive Reinforcement
Rn =
bd 2

m = 23.02 m = 23.02
Rn = 2522.04916 Rn = 600.4878964
r = 0.0111 = 0.002366314
As = 0.00101 As = 0.00022
f = 20 f = 14
No = 2 No = 2
f = 20 f = 14
No = 2 No = 0
As prvd = 0.00125664 As prvd = 0.0003
Capacity = 100.69 Capacity = 28.18
Reserve = 19.87% Reserve = 40.88%

Shear Capacity of Concrete Design Shear Reinforcement

V c =0 . 25 f ctd k 1 k 2 b w d A v df yd
s= Vs =
Vs 22.43
k1 = 1.689
k2 = 1.235 Use Dia 8 Av = 0.00010053
s = 0.43 m

SFB2
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

Vc = 47.57 kn Max S = 0.180 m Use 0.180

SFB2
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

SECOND FLOOR BEAM - SFB3

0.45 d = 0.415 m

0.25
Negative Moment 148.28 kn-m
Posetive Moment 108.55 kn-m
Shear 181.88 kn

Calculate Reinforcement

Concrete - Grade C-25 Steel


Fck 20,000 kpa [EBCS 2 Table 2.3] Fyk 300,000 kpa
Fctk 1,500 kpa [EBCS 2 Table 2.4] PS 1.15
PS Factor 1.5 [EBCS 2 Table 3.1] Fyd 260,870 kpa
Fcd 11333.3333 kpa Es 200,000 kpa
Fctd 1,000 kpa r (min) = 0.002
Ecm 29,000 kpa [EBCS 2 Table 2.5] r (max) = 0.0165

f Mu
ρreq =
1
m [ √
1− 1−

Neagtive Reinforcement
2 mR n
f yd ] m=
f cd
yd

Posetive Reinforcement
Rn =
bd 2

m = 23.02 m = 23.02
Rn = 3443.79271 Rn = 2521.201916
r = 0.0162 = 0.011076671
As = 0.00168 As = 0.00115
f = 20 f = 20
No = 2 No = 2
f = 20 f = 20
No = 4 No = 2
As prvd = 0.00188496 As prvd = 0.0013
Capacity = 161.40 Capacity = 117.08
Reserve = 8.85% Reserve = 7.85%

Shear Capacity of Concrete Design Shear Reinforcement

V c =0 . 25 f ctd k 1 k 2 b w d A v df yd
s= Vs =
Vs 123.23
k1 = 1.908
k2 = 1.185 Use Dia 10 Av = 0.00015708
s = 0.14 m

SFB3
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

Vc = 58.66 kn Max S = 0.120 m Use 0.120

SFB3
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

SECOND FLOOR BEAM - SFB4

0.4 d = 0.367 m

0.25
Negative Moment 45.00 kn-m
Posetive Moment 30.00 kn-m
Shear 70.00 kn

Calculate Reinforcement

Concrete - Grade C-25 Steel


Fck 20,000 kpa [EBCS 2 Table 2.3] Fyk 300,000 kpa
Fctk 1,500 kpa [EBCS 2 Table 2.4] PS 1.15
PS Factor 1.5 [EBCS 2 Table 3.1] Fyd 260,870 kpa
Fcd 11333.3333 kpa Es 200,000 kpa
Fctd 1,000 kpa r (min) = 0.002
Ecm 29,000 kpa [EBCS 2 Table 2.5] r (max) = 0.0165

f Mu
ρreq =
1
m [ √
1− 1−

Neagtive Reinforcement
2 mR n
f yd ] m=
f cd
yd

Posetive Reinforcement
Rn =
bd 2

m = 23.02 m = 23.02
Rn = 1336.41203 Rn = 890.9413538
r = 0.0055 = 0.003561236
As = 0.00050 As = 0.00033
f = 16 f = 14
No = 2 No = 2
f = 16 f = 14
No = 1 No = 1
As prvd = 0.00060319 As prvd = 0.0005
Capacity = 53.38 Capacity = 41.65
Reserve = 18.62% Reserve = 38.84%

Shear Capacity of Concrete Design Shear Reinforcement

V c =0 . 25 f ctd k 1 k 2 b w d A v df yd
s= Vs =
Vs 32.42
k1 = 1.329
k2 = 1.233 Use Dia 8 Av = 0.00010053
s = 0.30 m

SFB4
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

Vc = 37.58 kn Max S = 0.110 m Use 0.110

SFB4
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

SECOND FLOOR BEAM - SFB5

0.4 d = 0.365 m

0.25
Negative Moment 115.00 kn-m
Posetive Moment 93.00 kn-m
Shear 120.00 kn

Calculate Reinforcement

Concrete - Grade C-25 Steel


Fck 20,000 kpa [EBCS 2 Table 2.3] Fyk 300,000 kpa
Fctk 1,500 kpa [EBCS 2 Table 2.4] PS 1.15
PS Factor 1.5 [EBCS 2 Table 3.1] Fyd 260,870 kpa
Fcd 11333.3333 kpa Es 200,000 kpa
Fctd 1,000 kpa r (min) = 0.002
Ecm 29,000 kpa [EBCS 2 Table 2.5] r (max) = 0.0165

f Mu
ρreq =
1
m [ √
1− 1−

Neagtive Reinforcement
2 mR n
f yd ] m=
f cd
yd

Posetive Reinforcement
Rn =
bd 2

m = 23.02 m = 23.02
Rn = 3452.8054 Rn = 2792.268718
r = 0.0163 = 0.012502766
As = 0.00149 As = 0.00114
f = 20 f = 20
No = 2 No = 2
f = 20 f = 16
No = 3 No = 3
As prvd = 0.0015708 As prvd = 0.0012
Capacity = 119.94 Capacity = 99.05
Reserve = 4.29% Reserve = 6.50%

Shear Capacity of Concrete Design Shear Reinforcement

V c =0 . 25 f ctd k 1 k 2 b w d A v df yd
s= Vs =
Vs 67.58
k1 = 1.861
k2 = 1.235 Use Dia 8 Av = 0.00010053
s = 0.14 m

SFB5
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

Vc = 52.42 kn Max S = 0.100 m Use 0.100

SFB5
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

SECOND FLOOR BEAM - SFB5

0.4 d = 0.365 m

0.25
Negative Moment 70.00 kn-m
Posetive Moment 40.00 kn-m
Shear 120.00 kn

Calculate Reinforcement

Concrete - Grade C-25 Steel


Fck 20,000 kpa [EBCS 2 Table 2.3] Fyk 300,000 kpa
Fctk 1,500 kpa [EBCS 2 Table 2.4] PS 1.15
PS Factor 1.5 [EBCS 2 Table 3.1] Fyd 260,870 kpa
Fcd 11333.3333 kpa Es 200,000 kpa
Fctd 1,000 kpa r (min) = 0.002
Ecm 29,000 kpa [EBCS 2 Table 2.5] r (max) = 0.0165

f Mu
ρreq =
1
m [ √
1− 1−

Neagtive Reinforcement
2 mR n
f yd ] m=
f cd
yd

Posetive Reinforcement
Rn =
bd 2

m = 23.02 m = 23.02
Rn = 2101.70764 Rn = 1200.975793
r = 0.0090 = 0.004877543
As = 0.00082 As = 0.00045
f = 20 f = 16
No = 2 No = 2
f = 14 f = 16
No = 2 No = 1
As prvd = 0.00093619 As prvd = 0.0006
Capacity = 78.62 Capacity = 53.06
Reserve = 12.31% Reserve = 32.66%

Shear Capacity of Concrete Design Shear Reinforcement

V c =0 . 25 f ctd k 1 k 2 b w d A v df yd
s= Vs =
Vs 77.37
k1 = 1.513
k2 = 1.235 Use Dia 8 Av = 0.00010053
s = 0.12 m

SFB6
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

Vc = 42.63 kn Max S = 0.100 m Use 0.100

SFB6
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

SECOND FLOOR BEAM - SFB5

0.5 d = 0.465 m

0.25
Negative Moment 100.00 kn-m
Posetive Moment 132.00 kn-m
Shear 90.00 kn

Calculate Reinforcement

Concrete - Grade C-25 Steel


Fck 20,000 kpa [EBCS 2 Table 2.3] Fyk 300,000 kpa
Fctk 1,500 kpa [EBCS 2 Table 2.4] PS 1.15
PS Factor 1.5 [EBCS 2 Table 3.1] Fyd 260,870 kpa
Fcd 11333.3333 kpa Es 200,000 kpa
Fctd 1,000 kpa r (min) = 0.002
Ecm 29,000 kpa [EBCS 2 Table 2.5] r (max) = 0.0165

f Mu
ρreq =
1
m [ √
1− 1−

Neagtive Reinforcement
2 mR n
f yd ] m=
f cd
yd

Posetive Reinforcement
Rn =
bd 2

m = 23.02 m = 23.02
Rn = 1849.92485 Rn = 2441.900798
r = 0.0078 = 0.010671195
As = 0.00091 As = 0.00124
f = 20 f = 20
No = 2 No = 2
f = 16 f = 20
No = 2 No = 2
As prvd = 0.00103044 As prvd = 0.0013
Capacity = 112.25 Capacity = 133.47
Reserve = 12.25% Reserve = 1.11%

Shear Capacity of Concrete Design Shear Reinforcement

V c =0 . 25 f ctd k 1 k 2 b w d A v df yd
s= Vs =
Vs 42.39
k1 = 1.443
k2 = 1.135 Use Dia 8 Av = 0.00010053
s = 0.29 m

SFB7
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

Vc = 47.61 kn Max S = 0.130 m Use 0.130

SFB7
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

SECOND FLOOR BEAM - SFB5

0.4 d = 0.365 m

0.25
Negative Moment 100.00 kn-m
Posetive Moment 132.00 kn-m
Shear 90.00 kn

Calculate Reinforcement

Concrete - Grade C-25 Steel


Fck 20,000 kpa [EBCS 2 Table 2.3] Fyk 300,000 kpa
Fctk 1,500 kpa [EBCS 2 Table 2.4] PS 1.15
PS Factor 1.5 [EBCS 2 Table 3.1] Fyd 260,870 kpa
Fcd 11333.3333 kpa Es 200,000 kpa
Fctd 1,000 kpa r (min) = 0.002
Ecm 29,000 kpa [EBCS 2 Table 2.5] r (max) = 0.0165

f Mu
ρreq =
1
m [ √
1− 1−

Neagtive Reinforcement
2 mR n
f yd ] m=
f cd
yd

Posetive Reinforcement
Rn =
bd 2

m = 23.02 m = 23.02
Rn = 3002.43948 Rn = 3963.220116
r = 0.0137 = 0.019624833 Dbl!!
As = 0.00125 As = 0.00179
f = 20 f = 16
No = 2 No = 2
f = 16 f = 16
No = 4 No = 7
As prvd = 0.00143257 As prvd = 0.0018
Capacity = 111.76 Capacity = 132.98
Reserve = 11.76% Reserve = 0.74%

Shear Capacity of Concrete Design Shear Reinforcement

V c =0 . 25 f ctd k 1 k 2 b w d A v df yd
s= Vs =
Vs 39.71
k1 = 1.785
k2 = 1.235 Use Dia 8 Av = 0.00010053
s = 0.24 m

SFB8
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

Vc = 50.29 kn Max S = 0.100 m Use 0.100

SFB8
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

SECOND FLOOR BEAM - SFB5

0.4 d = 0.365 m

0.25
Negative Moment 80.00 kn-m
Posetive Moment 65.00 kn-m
Shear 111.00 kn

Calculate Reinforcement

Concrete - Grade C-25 Steel


Fck 20,000 kpa [EBCS 2 Table 2.3] Fyk 300,000 kpa
Fctk 1,500 kpa [EBCS 2 Table 2.4] PS 1.15
PS Factor 1.5 [EBCS 2 Table 3.1] Fyd 260,870 kpa
Fcd 11333.3333 kpa Es 200,000 kpa
Fctd 1,000 kpa r (min) = 0.002
Ecm 29,000 kpa [EBCS 2 Table 2.5] r (max) = 0.0165

f Mu
ρreq =
1
m [ √
1− 1−

Neagtive Reinforcement
2 mR n
f yd ] m=
f cd
yd

Posetive Reinforcement
Rn =
bd 2

m = 23.02 m = 23.02
Rn = 2401.95159 Rn = 1951.585663
r = 0.0105 = 0.008267788
As = 0.00096 As = 0.00075
f = 20 f = 20
No = 2 No = 2
f = 16 f = 16
No = 2 No = 1
As prvd = 0.00103044 As prvd = 0.0008
Capacity = 85.36 Capacity = 70.71
Reserve = 6.71% Reserve = 8.79%

Shear Capacity of Concrete Design Shear Reinforcement

V c =0 . 25 f ctd k 1 k 2 b w d A v df yd
s= Vs =
Vs 66.92
k1 = 1.565
k2 = 1.235 Use Dia 8 Av = 0.00010053
s = 0.14 m

SFB9
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

Vc = 44.08 kn Max S = 0.100 m Use 0.100

SFB9
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

SECOND FLOOR BEAM - SFB5

0.4 d = 0.367 m

0.25
Negative Moment 40.00 kn-m
Posetive Moment 40.00 kn-m
Shear 30.00 kn

Calculate Reinforcement

Concrete - Grade C-25 Steel


Fck 20,000 kpa [EBCS 2 Table 2.3] Fyk 300,000 kpa
Fctk 1,500 kpa [EBCS 2 Table 2.4] PS 1.15
PS Factor 1.5 [EBCS 2 Table 3.1] Fyd 260,870 kpa
Fcd 11333.3333 kpa Es 200,000 kpa
Fctd 1,000 kpa r (min) = 0.002
Ecm 29,000 kpa [EBCS 2 Table 2.5] r (max) = 0.0165

f Mu
ρreq =
1
m [ √
1− 1−

Neagtive Reinforcement
2 mR n
f yd ] m=
f cd
yd

Posetive Reinforcement
Rn =
bd 2

m = 23.02 m = 23.02
Rn = 1187.92181 Rn = 1187.921805
r = 0.0048 = 0.004821216
As = 0.00044 As = 0.00044
f = 16 f = 14
No = 2 No = 2
f = 14 f = 14
No = 1 No = 1
As prvd = 0.00055606 As prvd = 0.0005
Capacity = 49.52 Capacity = 41.65
Reserve = 23.81% Reserve = 4.13%

Shear Capacity of Concrete Design Shear Reinforcement

V c =0 . 25 f ctd k 1 k 2 b w d A v df yd
s= Vs =
Vs 0.00
k1 = 1.303
k2 = 1.233 Use Dia 8 Av = 0.00010053
s = 0.20 m

TFB1
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

Vc = 36.85 kn Max S = 0.180 m Use 0.180

TFB1
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

SECOND FLOOR BEAM - SFB5

0.4 d = 0.367 m

0.25
Negative Moment 57.00 kn-m
Posetive Moment 49.00 kn-m
Shear 90.00 kn

Calculate Reinforcement

Concrete - Grade C-25 Steel


Fck 20,000 kpa [EBCS 2 Table 2.3] Fyk 300,000 kpa
Fctk 1,500 kpa [EBCS 2 Table 2.4] PS 1.15
PS Factor 1.5 [EBCS 2 Table 3.1] Fyd 260,870 kpa
Fcd 11333.3333 kpa Es 200,000 kpa
Fctd 1,000 kpa r (min) = 0.002
Ecm 29,000 kpa [EBCS 2 Table 2.5] r (max) = 0.0165

f Mu
ρreq =
1
m [ √
1− 1−

Neagtive Reinforcement
2 mR n
f yd ] m=
f cd
yd

Posetive Reinforcement
Rn =
bd 2

m = 23.02 m = 23.02
Rn = 1692.78857 Rn = 1455.204211
r = 0.0071 = 0.005991421
As = 0.00065 As = 0.00055
f = 16 f = 14
No = 2 No = 2
f = 16 f = 14
No = 2 No = 2
As prvd = 0.00080425 As prvd = 0.0006
Capacity = 69.23 Capacity = 54.40
Reserve = 21.46% Reserve = 11.02%

Shear Capacity of Concrete Design Shear Reinforcement

V c =0 . 25 f ctd k 1 k 2 b w d A v df yd
s= Vs =
Vs 49.32
k1 = 1.438
k2 = 1.233 Use Dia 8 Av = 0.00010053
s = 0.20 m

TFB2
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

Vc = 40.68 kn Max S = 0.110 m Use 0.110

TFB2
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

SECOND FLOOR BEAM - SFB5

0.4 d = 0.365 m

0.25
Negative Moment 85.00 kn-m
Posetive Moment 20.00 kn-m
Shear 75.00 kn

Calculate Reinforcement

Concrete - Grade C-25 Steel


Fck 20,000 kpa [EBCS 2 Table 2.3] Fyk 300,000 kpa
Fctk 1,500 kpa [EBCS 2 Table 2.4] PS 1.15
PS Factor 1.5 [EBCS 2 Table 3.1] Fyd 260,870 kpa
Fcd 11333.3333 kpa Es 200,000 kpa
Fctd 1,000 kpa r (min) = 0.002
Ecm 29,000 kpa [EBCS 2 Table 2.5] r (max) = 0.0165

f Mu
ρreq =
1
m [ √
1− 1−

Neagtive Reinforcement
2 mR n
f yd ] m=
f cd
yd

Posetive Reinforcement
Rn =
bd 2

m = 23.02 m = 23.02
Rn = 2552.07356 Rn = 600.4878964
r = 0.0112 = 0.002366314
As = 0.00103 As = 0.00022
f = 20 f = 14
No = 2 No = 2
f = 16 f = 14
No = 2 No = 0
As prvd = 0.00103044 As prvd = 0.0003
Capacity = 85.36 Capacity = 28.18
Reserve = 0.43% Reserve = 40.88%

Shear Capacity of Concrete Design Shear Reinforcement

V c =0 . 25 f ctd k 1 k 2 b w d A v df yd
s= Vs =
Vs 30.92
k1 = 1.565
k2 = 1.235 Use Dia 8 Av = 0.00010053
s = 0.31 m

TFB3
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

Vc = 44.08 kn Max S = 0.100 m Use 0.100

TFB3
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

SECOND FLOOR BEAM - SFB5

0.4 d = 0.368 m

0.25
Negative Moment 40.00 kn-m
Posetive Moment 30.00 kn-m
Shear 30.00 kn

Calculate Reinforcement

Concrete - Grade C-25 Steel


Fck 20,000 kpa [EBCS 2 Table 2.3] Fyk 300,000 kpa
Fctk 1,500 kpa [EBCS 2 Table 2.4] PS 1.15
PS Factor 1.5 [EBCS 2 Table 3.1] Fyd 260,870 kpa
Fcd 11333.3333 kpa Es 200,000 kpa
Fctd 1,000 kpa r (min) = 0.002
Ecm 29,000 kpa [EBCS 2 Table 2.5] r (max) = 0.0165

f Mu
ρreq =
1
m [ √
1− 1−

Neagtive Reinforcement
2 mR n
f yd ] m=
f cd
yd

Posetive Reinforcement
Rn =
bd 2

m = 23.02 m = 23.02
Rn = 1181.47448 Rn = 886.1058601
r = 0.0048 = 0.00354105
As = 0.00044 As = 0.00033
f = 14 f = 14
No = 2 No = 2
f = 14 f = 12
No = 1 No = 1
As prvd = 0.00046181 As prvd = 0.0004
Capacity = 41.77 Capacity = 38.29
Reserve = 4.43% Reserve = 27.62%

Shear Capacity of Concrete Design Shear Reinforcement

V c =0 . 25 f ctd k 1 k 2 b w d A v df yd
s= Vs =
Vs 0.00
k1 = 1.251
k2 = 1.232 Use Dia 8 Av = 0.00010053
s = 0.20 m

TFB4
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

Vc = 35.45 kn Max S = 0.180 m Use 0.180

TFB4
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

SECOND FLOOR BEAM - SFB5

0.4 d = 0.365 m

0.25
Negative Moment 80.00 kn-m
Posetive Moment 115.00 kn-m
Shear 40.00 kn

Calculate Reinforcement

Concrete - Grade C-25 Steel


Fck 20,000 kpa [EBCS 2 Table 2.3] Fyk 300,000 kpa
Fctk 1,500 kpa [EBCS 2 Table 2.4] PS 1.15
PS Factor 1.5 [EBCS 2 Table 3.1] Fyd 260,870 kpa
Fcd 11333.3333 kpa Es 200,000 kpa
Fctd 1,000 kpa r (min) = 0.002
Ecm 29,000 kpa [EBCS 2 Table 2.5] r (max) = 0.0165

f Mu
ρreq =
1
m [ √
1− 1−

Neagtive Reinforcement
2 mR n
f yd ] m=
f cd
yd

Posetive Reinforcement
Rn =
bd 2

m = 23.02 m = 23.02
Rn = 2401.95159 Rn = 3452.805404
r = 0.0105 = 0.016289707
As = 0.00096 As = 0.00149
f = 20 f = 20
No = 2 No = 2
f = 16 f = 20
No = 2 No = 3
As prvd = 0.00103044 As prvd = 0.0016
Capacity = 85.36 Capacity = 119.94
Reserve = 6.71% Reserve = 4.29%

Shear Capacity of Concrete Design Shear Reinforcement

V c =0 . 25 f ctd k 1 k 2 b w d A v df yd
s= Vs =
Vs 0.00
k1 = 1.565
k2 = 1.235 Use Dia 8 Av = 0.00010053
s = 0.20 m

TFB5
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

Vc = 44.08 kn Max S = 0.180 m Use 0.180

TFB5
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

SECOND FLOOR BEAM - SFB5

0.4 d = 0.368 m

0.25
Negative Moment 50.00 kn-m
Posetive Moment 50.00 kn-m
Shear 40.00 kn

Calculate Reinforcement

Concrete - Grade C-25 Steel


Fck 20,000 kpa [EBCS 2 Table 2.3] Fyk 300,000 kpa
Fctk 1,500 kpa [EBCS 2 Table 2.4] PS 1.15
PS Factor 1.5 [EBCS 2 Table 3.1] Fyd 260,870 kpa
Fcd 11333.3333 kpa Es 200,000 kpa
Fctd 1,000 kpa r (min) = 0.002
Ecm 29,000 kpa [EBCS 2 Table 2.5] r (max) = 0.0165

f Mu
ρreq =
1
m [ √
1− 1−

Neagtive Reinforcement
2 mR n
f yd ] m=
f cd
yd

Posetive Reinforcement
Rn =
bd 2

m = 23.02 m = 23.02
Rn = 1476.8431 Rn = 1476.8431
r = 0.0061 = 0.006087764
As = 0.00056 As = 0.00056
f = 14 f = 14
No = 2 No = 2
f = 14 f = 14
No = 2 No = 2
As prvd = 0.00061575 As prvd = 0.0006
Capacity = 54.56 Capacity = 54.56
Reserve = 9.12% Reserve = 9.12%

Shear Capacity of Concrete Design Shear Reinforcement

V c =0 . 25 f ctd k 1 k 2 b w d A v df yd
s= Vs =
Vs 2.18
k1 = 1.335
k2 = 1.232 Use Dia 8 Av = 0.00010053
s = 4.42 m

TFB7)
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

Vc = 37.82 kn Max S = 0.180 m Use 0.180

TFB7)
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

SECOND FLOOR BEAM - SFB5

0.5 d = 0.465 m

0.25
Negative Moment 145.00 kn-m
Posetive Moment 60.00 kn-m
Shear 100.00 kn

Calculate Reinforcement

Concrete - Grade C-25 Steel


Fck 20,000 kpa [EBCS 2 Table 2.3] Fyk 300,000 kpa
Fctk 1,500 kpa [EBCS 2 Table 2.4] PS 1.15
PS Factor 1.5 [EBCS 2 Table 3.1] Fyd 260,870 kpa
Fcd 11333.3333 kpa Es 200,000 kpa
Fctd 1,000 kpa r (min) = 0.002
Ecm 29,000 kpa [EBCS 2 Table 2.5] r (max) = 0.0165

f Mu
ρreq =
1
m [ √
1− 1−

Neagtive Reinforcement
2 mR n
f yd ] m=
f cd
yd

Posetive Reinforcement
Rn =
bd 2

m = 23.02 m = 23.02
Rn = 2682.39103 Rn = 1109.954908
r = 0.0119 = 0.004486486
As = 0.00139 As = 0.00052
f = 20 f = 16
No = 2 No = 2
f = 16 f = 14
No = 4 No = 1
As prvd = 0.00143257 As prvd = 0.0006
Capacity = 149.13 Capacity = 63.74
Reserve = 2.85% Reserve = 6.23%

Shear Capacity of Concrete Design Shear Reinforcement

V c =0 . 25 f ctd k 1 k 2 b w d A v df yd
s= Vs =
Vs 46.69
k1 = 1.616
k2 = 1.135 Use Dia 8 Av = 0.00010053
s = 0.26 m

TFB8
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

Vc = 53.31 kn Max S = 0.130 m Use 0.130

TFB8
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

SECOND FLOOR BEAM - SFB5

0.4 d = 0.365 m

0.25
Negative Moment 60.00 kn-m
Posetive Moment 40.00 kn-m
Shear 80.00 kn

Calculate Reinforcement

Concrete - Grade C-25 Steel


Fck 20,000 kpa [EBCS 2 Table 2.3] Fyk 300,000 kpa
Fctk 1,500 kpa [EBCS 2 Table 2.4] PS 1.15
PS Factor 1.5 [EBCS 2 Table 3.1] Fyd 260,870 kpa
Fcd 11333.3333 kpa Es 200,000 kpa
Fctd 1,000 kpa r (min) = 0.002
Ecm 29,000 kpa [EBCS 2 Table 2.5] r (max) = 0.0165

f Mu
ρreq =
1
m [ √
1− 1−

Neagtive Reinforcement
2 mR n
f yd ] m=
f cd
yd

Posetive Reinforcement
Rn =
bd 2

m = 23.02 m = 23.02
Rn = 1801.46369 Rn = 1200.975793
r = 0.0076 = 0.004877543
As = 0.00069 As = 0.00045
f = 20 f = 16
No = 2 No = 2
f = 16 f = 14
No = 1 No = 1
As prvd = 0.00082938 As prvd = 0.0006
Capacity = 70.71 Capacity = 49.23
Reserve = 17.85% Reserve = 23.08%

Shear Capacity of Concrete Design Shear Reinforcement

V c =0 . 25 f ctd k 1 k 2 b w d A v df yd
s= Vs =
Vs 39.02
k1 = 1.454
k2 = 1.235 Use Dia 8 Av = 0.00010053
s = 0.25 m

TFB9
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

Vc = 40.98 kn Max S = 0.100 m Use 0.100

TFB9
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

ROOF BEAM - RB1

0.4 d = 0.367 m

0.25
Negative Moment 40.00 kn-m
Posetive Moment 22.00 kn-m
Shear 30.00 kn

Calculate Reinforcement

Concrete - Grade C-25 Steel


Fck 20,000 kpa [EBCS 2 Table 2.3] Fyk 300,000 kpa
Fctk 1,500 kpa [EBCS 2 Table 2.4] PS 1.15
PS Factor 1.5 [EBCS 2 Table 3.1] Fyd 260,870 kpa
Fcd 11333.3333 kpa Es 200,000 kpa
Fctd 1,000 kpa r (min) = 0.002
Ecm 29,000 kpa [EBCS 2 Table 2.5] r (max) = 0.0165

f Mu
ρreq =
1
m [ √
1− 1−

Neagtive Reinforcement
2 mR n
f yd ] m=
f cd
yd

Posetive Reinforcement
Rn =
bd 2

m = 23.02 m = 23.02
Rn = 1187.92181 Rn = 653.3569928
r = 0.0048 = 0.002581216
As = 0.00044 As = 0.00024
f = 16 f = 12
No = 2 No = 2
f = 12 f = 12
No = 1 No = 0
As prvd = 0.00051522 As prvd = 0.0002
Capacity = 46.14 Capacity = 21.04
Reserve = 15.35% Reserve = -4.36%

Shear Capacity of Concrete Design Shear Reinforcement

V c =0 . 25 f ctd k 1 k 2 b w d A v df yd
s= Vs =
Vs 0.00
k1 = 1.281
k2 = 1.233 Use Dia 8 Av = 0.00010053
s = 0.20 m

RB1
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

Vc = 36.22 kn Max S = 0.180 m Use 0.180

RB1
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

ROOF BEAM - RB2

0.4 d = 0.368 m

0.25
Negative Moment 38.00 kn-m
Posetive Moment 30.00 kn-m
Shear 50.00 kn

Calculate Reinforcement

Concrete - Grade C-25 Steel


Fck 20,000 kpa [EBCS 2 Table 2.3] Fyk 300,000 kpa
Fctk 1,500 kpa [EBCS 2 Table 2.4] PS 1.15
PS Factor 1.5 [EBCS 2 Table 3.1] Fyd 260,870 kpa
Fcd 11333.3333 kpa Es 200,000 kpa
Fctd 1,000 kpa r (min) = 0.002
Ecm 29,000 kpa [EBCS 2 Table 2.5] r (max) = 0.0165

f Mu
ρreq =
1
m [ √
1− 1−

Neagtive Reinforcement
2 mR n
f yd ] m=
f cd
yd

Posetive Reinforcement
Rn =
bd 2

m = 23.02 m = 23.02
Rn = 1122.40076 Rn = 886.1058601
r = 0.0045 = 0.00354105
As = 0.00042 As = 0.00033
f = 14 f = 12
No = 2 No = 2
f = 12 f = 12
No = 1 No = 0
As prvd = 0.00042097 As prvd = 0.0002
Capacity = 38.29 Capacity = 21.10
Reserve = 0.75% Reserve = -29.67%

Shear Capacity of Concrete Design Shear Reinforcement

V c =0 . 25 f ctd k 1 k 2 b w d A v df yd
s= Vs =
Vs 15.18
k1 = 1.229
k2 = 1.232 Use Dia 8 Av = 0.00010053
s = 0.64 m

RB2
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

Vc = 34.82 kn Max S = 0.180 m Use 0.180

RB2
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

ROOF BEAM - RB3

0.4 d = 0.367 m

0.25
Negative Moment 50.00 kn-m
Posetive Moment 43.00 kn-m
Shear 70.00 kn

Calculate Reinforcement

Concrete - Grade C-25 Steel


Fck 20,000 kpa [EBCS 2 Table 2.3] Fyk 300,000 kpa
Fctk 1,500 kpa [EBCS 2 Table 2.4] PS 1.15
PS Factor 1.5 [EBCS 2 Table 3.1] Fyd 260,870 kpa
Fcd 11333.3333 kpa Es 200,000 kpa
Fctd 1,000 kpa r (min) = 0.002
Ecm 29,000 kpa [EBCS 2 Table 2.5] r (max) = 0.0165

f Mu
ρreq =
1
m [ √
1− 1−

Neagtive Reinforcement
2 mR n
f yd ] m=
f cd
yd

Posetive Reinforcement
Rn =
bd 2

m = 23.02 m = 23.02
Rn = 1484.90226 Rn = 1277.01594
r = 0.0061 = 0.005207305
As = 0.00056 As = 0.00048
f = 16 f = 16
No = 2 No = 2
f = 16 f = 14
No = 1 No = 1
As prvd = 0.00060319 As prvd = 0.0006
Capacity = 53.38 Capacity = 49.52
Reserve = 6.76% Reserve = 15.17%

Shear Capacity of Concrete Design Shear Reinforcement

V c =0 . 25 f ctd k 1 k 2 b w d A v df yd
s= Vs =
Vs 32.42
k1 = 1.329
k2 = 1.233 Use Dia 8 Av = 0.00010053
s = 0.30 m

RB3
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

Vc = 37.58 kn Max S = 0.110 m Use 0.110

RB3
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

STAIR BEAM - STB1

0.4 d = 0.367 m

0.25
Negative Moment 40.00 kn-m
Posetive Moment 28.55 kn-m
Shear 70.00 kn

Calculate Reinforcement

Concrete - Grade C-25 Steel


Fck 20,000 kpa [EBCS 2 Table 2.3] Fyk 300,000 kpa
Fctk 1,500 kpa [EBCS 2 Table 2.4] PS 1.15
PS Factor 1.5 [EBCS 2 Table 3.1] Fyd 260,870 kpa
Fcd 11333.3333 kpa Es 200,000 kpa
Fctd 1,000 kpa r (min) = 0.002
Ecm 29,000 kpa [EBCS 2 Table 2.5] r (max) = 0.0165

f Mu
ρreq =
1
m [ √
1− 1−

Neagtive Reinforcement
2 mR n
f yd ] m=
f cd
yd

Posetive Reinforcement
Rn =
bd 2

m = 23.02 m = 23.02
Rn = 1187.92181 Rn = 847.7654448
r = 0.0048 = 0.003381356
As = 0.00044 As = 0.00031
f = 16 f = 12
No = 2 No = 2
f = 16 f = 12
No = 1 No = 1
As prvd = 0.00060319 As prvd = 0.0003
Capacity = 53.38 Capacity = 31.10
Reserve = 33.45% Reserve = 8.95%

Shear Capacity of Concrete Design Shear Reinforcement

V c =0 . 25 f ctd k 1 k 2 b w d A v df yd
s= Vs =
Vs 32.42
k1 = 1.329
k2 = 1.233 Use Dia 8 Av = 0.00010053
s = 0.30 m

STB1
PROJECT Residential Building Date
OWNER By E.T
DESCRIPTION Beam Design Chkd E.T

Vc = 37.58 kn Max S = 0.110 m Use 0.110

STB1