0% found this document useful (0 votes)
141 views4 pages

OFM (Sections)

Download as xls, pdf, or txt
Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1/ 4

2.

DESIGN OF ABUTMENT WALL [SECTION C - C]

Unit Weight of Concrete = 2.4 t/cum Live Load = 0.4 t/m2


Unit Weight of Earth = 2.1 t/cum

Live Load + 82.929 TBL


0.500
W3 - Earth 0.310 + 82.619
W2 0.150 + 82.469

W6 W5

1.450 W4 W1 0.950

0.450 0.300 0.15 + 81.669


0.15 A 0.750
0.300
W7
B 1.050 + 81.369
Taking moments about A (Stresses in concrete)

Force
Load Particulars L.A. Moment
V H
W1 0.30 x 0.800 x 2.4 0.576 0.600 0.346
W2 0.45 x 0.150 x 2.5 0.169 0.675 0.114
WLL1 0.45 x 0.400 0.180 0.675 0.122
WLL2 0.45 x 0.400 0.180 0.225 0.041
W3 0.90 x 0.310 x 2.1 0.586 0.450 0.264
W4 0.50 x 0.450 x 0.950 x 2.4 0.513 0.300 0.154
W5 0.50 x 0.450 x 0.950 x 2.1 0.449 0.150 0.068
Pv 0.0384 x 1.853 x 2.1 0.149 ---
Ph 0.134 x 1.853 x 2.1 0.522 0.503* 0.263
∑V 2.802
∑M 1.372

Lever arm =M/V = 1.372 / 2.802 = 0.49 m


Eccentricity = 0.49 - 0.750 /2 = 0.115 m

Permissible 'e' = 0.750 /6 = 0.125 > 0.115

Max. comp. Stress = 2.802 x ( 1 + 6 x 0.115 ) = 7.173 t/sq.m.


0.750 0.750

Min. Stress = 2.802 x ( 1 - 6 x 0.115 ) = 0.299 t/sq.m.


0.750 0.750

(Note: 1.853 = 1.4502 - 0.5002 )

* Please refer "Lever Arm Calculations - I"

APWSIP VII - 6
Consultants’ Services for Engineering Design
Taking moments about B (Stresses on soil)

Force
Load Particulars L.A. Moment
V H
W1 0.30 x 0.800 x 2.4 0.576 0.750 0.432
W2 0.45 x 0.150 x 2.5 0.169 0.825 0.140
WLL1 0.45 x 0.400 0.180 0.825 0.149
WLL2 0.45 x 0.400 0.180 0.375 0.068
WLL3 0.15 x 0.400 0.060 0.075 0.005
W3 0.90 x 0.310 x 2.1 0.586 0.600 0.352
W4 0.50 x 0.450 x 0.95 x 2.4 0.513 0.450 0.231
W5 0.50 x 0.450 x 0.95 x 2.1 0.449 0.300 0.135
W6 0.15 x 1.450 x 2.1 0.457 0.075 0.035
W7 1.05 x 0.300 x 2.4 0.756 0.525 0.397
Pv 0.0384 x 2.814 x 2.1 0.227 ---
Ph 0.134 x 2.814 x 2.1 0.792 0.633* 0.502
∑V 4.152
∑M 2.446

Lever arm = M/V = 2.446 / 4.152 = 0.589 m

Eccentricity 0.589 - 1.050 /2 = 0.064 m

Permissible 'e' = 1.050 /6 = 0.175 > 0.064

Max. comp. Stress = 4.152 x ( 1 + 6 x 0.064 ) = 5.401 t/sq.m.


1.050 1.050

Min. Stress = 4.152 x ( 1 - 6 x 0.064 ) = 2.508 t/sq.m.


1.050 1.050

(Note: 2.814 = 1.7502 - 0.5002 )

* Please refer "Lever Arm Calculations - II"

APWSIP VII - 7
Consultants’ Services for Engineering Design
Lever Arm Calculations - I

Unit weight of Earth (w) = 2.1 t/cum


Live Load considered = 0.4 t/m2

h = (0.4 / 2.1) + 0.310 = 0.500 m


H = 1.450 m
0.6 x h = 0.300 m
0.4 x H = 0.580 m

P1 = 0.0384 x w x h2
= 0.0384 x 2.1 x h2
= 0.081 h2 P1 0.500

P2 = 0.0384 x w x H2
= 0.0384 x 2.1 x H2
= 0.081 H2 1.450
P2

Lever Arm (P2 x 0.4 H) - P1 x (H - 0.6 h)


=
(L.A.) (P2 - P1)

0.081 H2 x 0.4 H - 0.081 h2 (H - 0.6 h)


=
0.081 (H2 - h2)

(H2 x 0.4 H) - (h2 (H - 0.6 h))


=
(H2 - h2)

(0.4 x 1.4503) - ((0.500)2 (1.450 - 0.300)


=
(1.4502 - 0.5002)

1.221 - 0.288
=
1.853

= 0.503 m

APWSIP VII - 8
Consultants’ Services for Engineering Design
Lever Arm Calculations - II

Unit weight of Earth (w) = 2.1 t/cum


Live Load considered = 0.4 t/m2

h = (0.4 / 2.1) + 0.310 = 0.500 m


H = 1.750 m
0.6 x h = 0.300 m
0.4 x H = 0.700 m

P1 = 0.0384 x w x h2
= 0.0384 x 2.1 x h2
= 0.081 h2 P1 0.500

P2 = 0.0384 x w x H2
= 0.0384 x 2.1 x H2
= 0.081 H2 1.750
P2

Lever Arm (P2 x 0.4 H) - P1 x (H - 0.6 h)


=
(L.A.) (P2 - P1)

0.081 H2 x 0.4 H - 0.081 h2 (H - 0.6 h)


=
0.081 (H2 - h2)

(H2 x 0.4 H) - (h2 (H - 0.6 h))


=
(H2 - h2)

(0.4 x 1.7503) - ((0.500)2 (1.750 - 0.300)


=
(1.7502 - 0.5002)

2.146 - 0.363
=
2.814

= 0.633 m

APWSIP VII - 9
Consultants’ Services for Engineering Design

You might also like