BILL OF QUANTITY
Client : PNG University of Technology
Contract Description : Road Pavement Repair
Item
Description Unit Quantity
No.
Group 1 - General
1.01 Quality Ansurance Plan LS 1.00
1.02 Environmental Management Plan LS 1.00
1.03 Traffic controlling during construction LS 1.00
Allow for other expenses in conforming to the
1.04 GCOC not covered by the foregoing items LS 1.00
Total Group 1 - General
Group 5- Pavement
Supply,Place,Shape and Compact 150 mm thick
5.01 basecoarse material to finish surface. cu.m 2,190.00
Total Group 5 - Pavement
Provision of Material
Percentage on Items 19.2 to allow for all incidental
19.2 costs, overehaeds and profit.
Sub - Total Materials
Rate Amount ( K )
15,000.00 16,000.00
16,000.00 19,000.00
7,000.00 8,000.00
20,000.00 25,000.00
68,000.00
- -
- -
- -
-
- -
-
- -
- -
-
- -
-
- -
- -
- -
- -
- -
-
- -
- -
- -
-
1,050.00 -
1,250.00 -
1,400.00 -
-
1,280.00 -
1,520.00 -
1,650.00 -
-
- -
- -
- -
- -
-
- -
- -
- -
- -
-
60,000.00
12.00
8.00
8.00
6.00
4.50
60,000.00
60,000.00
60,000.00
60,000.00
180.00
252.00
216.00
222.00
270.00
200.00
450.00
240.00
222.00
192.00
60,000.00
248,000.00
10.00% 24,800.00
272,800.00
B. EQUIPMENT:
C. LABOUR:
SUMMARY:
MATERIALS
EQUIPMENT
LABOUR
SAY
B. EQUIPMENT:
1 - 2Tonne Truck = 220 Kina x
Day
C. LABOUR:
1 - Safety Officer = 10 Kina x
Hour
6 - Safety Aide/Trafficmen = 2.5 Kina x
Hour
SUMMARY:
MATERIALS
EQUIPMENT
LABOUR
SAY
h. Consumables = 1 lot
i. Mobilization/Demobilization:
2 - Graders
2 - Rollers
2 - Excavator
2 - Backhoe
1 - Screening Plant
9 units = 9 units
B. EQUIPMENT:
1 - Genset = 350 Kina x
Day
C. LABOUR:
3 - Hausmeri = 2.5 Kina x
Hour
2 - Cook = 2.5 Kina x
Hour
8 - Security = 2 Kina x
Hour
SUMMARY:
MATERIALS
EQUIPMENT
LABOUR
SAY
d. Consumables = 1 lot
B. EQUIPMENT:
C. LABOUR:
1 - Hausmeri = 2.5 Kina x
Hour
1 - Cook = 2.5 Kina x
Hour
2 - Security = 2 Kina x
Hour
SUMMARY:
MATERIALS
EQUIPMENT
LABOUR
PLUS: 30% OVERHEAD COST
TOTAL
SAY
B. Equipment:
1 - Crew Cab 1@ 220
C. Labour:
1 - Leadinghand 1@ 6.25 per hour
1 - Carpenter/Mason 1@ 3 per hour
2 - Casual 4@ 2.5 per hour
SUMMARY:
MATERIALS
EQUIPMENT
LABOUR
SAY
Item 3.1 Clearing and Grubbing and Stripping of Topsoil of existing road shoulders 1.0m to 1.5m away from th
A. MATERIALS:
B. EQUIPMENT:
1 - Grader = 220 Kina x
Hour
1 - Backhoe = 180 Kina x
Hour
1 - Tipper = 180 Kina
Hour
= 4640 Kina
Day
C. LABOUR:
1 - Leadinghand = 6.25 Kina x
Hour
2 - Trafficemen = 2.5 Kina x
Hour
4 - Labourer = 2.5 Kina x
Hour
= 170 Kina
Day
SUMMARY:
MATERIALS
EQUIPMENT
LABOUR
SAY
B. EQUIPMENT
1 - Grader = 0 Kina x
Hour
1 - Backhoe = 180 Kina x
Hour
2 - Tipper = 180 Kina x
Hour
= 4320 Kina
Day
C. LABOUR:
1 - Leadinghand = 6.25 Kina x
Hour
2 - Trafficmen = 2.5 Kina x
Hour
4 - Labourer = 2.5 Kina x
Hour
= 130 Kina
Day
SUMMARY:
MATERIALS
EQUIPMENT
LABOUR
SAY
B. EQUIPMENT:
1 - Grader = 220 Kina x
Hour
1 - Roller = 160 Kina x
Hour
= 3040 Kina
Day
C. LABOUR:
1 - Leadinghand = 6.25 Kina x
Hour
2 - Trafficmen = 2.5 Kina x
Hour
4 - Labourer = 2.5 Kina x
Hour
= 170 Kina
Day
SUMMARY:
MATERIALS
EQUIPMENT
LABOUR
PLUS: 30% OVERHEAD COST
TOTAL
SAY
B. EQUIPMENT:
1 - Excavator = 270 Kina x
Hour
2 - Tipper = 180 Kina x
Hour
= 5040 Kina
Day
B. LABOUR:
1 - Leadinghand = 6.25 Kina x
Hour
2 - Trafficmen = 2.5 Kina x
Hour
4 - Labourer = 2.5 Kina x
Hour
= 170 Kina
Day
SUMMARY:
MATERIALS
EQUIPMENT
LABOUR
SAY
B. EQUIPMENT:
1 - Excavator = 270 Kina x
Hour
2 - Tipper = 180 Kina x
Hour
= 5040 Kina
Day
B. LABOUR:
1 - Leadinghand = 6.25 Kina x
Hour
2 - Trafficmen = 2.5 Kina x
Hour
4 - Labourer = 2.5 Kina x
Hour
= 170 Kina
Day
SUMMARY:
MATERIALS
EQUIPMENT
LABOUR
SAY
Item 4.5.5 Excavate and remove the existing Road Base up to a depth of 200mm
A. MATERIALS:
B. EQUIPMENT:
1 - Excavator = 270 Kina x
Hour
1 - Loader = 230 Kina x
Hour
2 - Tippers = 270 Kina x
Hour
= 8320 Kina
Day
C. LABOUR:
1 - Leadinghand = 6.25 Kina x
Hour
2 - Trafficmen = 2.5 Kina x
Hour
4 - Labourer = 2.5 Kina x
Hour
= 170 Kina
Day
SUMMARY:
MATERIALS
EQUIPMENT
LABOUR
SAY
B. EQUIPMENT:
1 - Grader = 220 Kina x
Hour
1 - Roller = 160 Kina x
Hour
1 - Water Truck = 180 Kina x
Hour
2 - Tipper = 180 Kina x
Hour
= 7360 Kina
Day
C. LABOUR:
1 - Leadinghand = 6.25 Kina x
Hour
2 - Trafficmen = 2.5 Kina x
Hour
4 - Labourer = 2.5 Kina x
Hour
= 170 Kina
Day
SUMMARY:
MATERIALS
EQUIPMENT
LABOUR
SAY
Item 4.6 Construction of Road Shoulder up to finished level of Road pavement 1.0m to 1.5m width
A. MATERIALS:
Base Course Materials = 80 Kina x
Ton
Sub-base Materials = 60 Kina x
Ton
Hauling Cost (Tipper) = 180 Kina x
Hour
Cement for 25Mpa = 325 Kg x
m3
B. EQUIPMENT:
1 - Grader = 220 Kina x
Hour
1 - Roller = 160 Kina x
Hour
1 - Water Truck = 180 Kina x
Hour
= 4480 Kina
Day
C. LABOUR:
1 - Leadinghand = 6.25 Kina x
Hour
2 - Trafficmen = 2.5 Kina x
Hour
6 - Labourer = 2.5 Kina x
Hour
= 210 Kina
Day
SUMMARY:
MATERIALS
EQUIPMENT
LABOUR
SAY
B. EQUIPMENT:
1 - Grader = 220 Kina x
Hour
1 - Roller = 160 Kina x
Hour
1 - Water Truck = 180 Kina x
Hour
= 4480 Kina
Day
C. LABOUR:
1 - Leadinghand = 6.25 Kina x
Hour
2 - Trafficmen = 2.5 Kina x
Hour
4 - Labourer = 2.5 Kina x
Hour
= 170 Kina
Day
SUMMARY:
MATERIALS
EQUIPMENT
LABOUR
SAY
B. EQUIPMENT:
1 - Batchin Plant = 400 Kina x
Hour
1 - Backhoe = 180 Kina x
Hour
1 - Concrete Vibrator = 40 Kina x
Hour
1 - Concete Cutter = 40 Kina x
Hour
C. LABOUR:
1 - Leadinghand = 6.25 Kina x
Hour
2 - Trafficmen = 2.5 Kina x
Hour
10 - Labourer = 2.5 Kina x
Hour
= 290 Kina
Day
SUMMARY:
MATERIALS
EQUIPMENT
LABOUR
SAY
B. EQUIPMENT:
1 - Excavator = 270 Kina x
Hour
1 - Compactor Rammer = 40 Kina x
Hour
1 - Tipper = 180 Kina x
Hour
= 3920 Kina
Day
C. LABOUR:
1 - Leadinghand = 6.25 Kina x
Hour
2 - Trafficmen = 2.5 Kina x
Hour
8 - Labourer = 2.5 Kina x
Hour
= 250 Kina
Day
SUMMARY:
MATERIALS
EQUIPMENT
LABOUR
SAY
B. EQUIPMENT:
1 - Excavator = 270 Kina x
Hour
1 - Compactor Rammer = 40 Kina x
Hour
1 - Tipper = 180 Kina x
Hour
= 3920 Kina
Day
C. LABOUR:
1 - Leadinghand = 6.25 Kina x
Hour
2 - Trafficmen = 2.5 Kina x
Hour
8 - Labourer = 2.5 Kina x
Hour
= 250 Kina
Day
SUMMARY:
MATERIALS
EQUIPMENT
LABOUR
SAY
= 3920 Kina
Day
C. LABOUR:
1 - Leadinghand = 6.25 Kina x
Hour
2 - Trafficmen = 2.5 Kina x
Hour
8 - Labourer = 2.5 Kina x
Hour
= 250 Kina
Day
SUMMARY:
MATERIALS
EQUIPMENT
LABOUR
SAY
= 3920 Kina
Day
C. LABOUR:
1 - Leadinghand = 6.25 Kina x
Hour
2 - Trafficmen = 2.5 Kina x
Hour
8 - Labourer = 2.5 Kina x
Hour
= 250 Kina
Day
SUMMARY:
MATERIALS
EQUIPMENT
LABOUR
SAY
B. EQUIPMENT:
1 - Excavator = 270 Kina x
Hour
1 - Compactor Rammer = 40 Kina x
Hour
1 - Tipper = 180 Kina x
Hour
= 3920 Kina
Day
C. LABOUR:
1 - Leadinghand = 6.25 Kina x
Hour
2 - Trafficmen = 2.5 Kina x
Hour
4 - Labourer = 2.5 Kina x
Hour
= 170 Kina
Day
SUMMARY:
MATERIALS
EQUIPMENT
LABOUR
SAY
Assorted Nails =
B. EQUIPMENT:
1 - Excavator = 270 Kina x
Hour
1 - Cement Mixer = 40 Kina x
Hour
1 - Compactor Rammer = 40 Kina x
Hour
1 - Tipper = 180 Kina x
Hour
= 4240 Kina
Day
C. LABOUR:
1 - Leadinghand = 6.25 Kina x
Hour
2 - Trafficmen = 2.5 Kina x
Hour
8 - Labourer = 2.5 Kina x
Hour
= 250 Kina
Day
SUMMARY:
MATERIALS
EQUIPMENT
LABOUR
PLUS: 30% OVERHEAD COST
TOTAL
SAY
Assorted Nails =
B. EQUIPMENT:
1 - Excavator = 270 Kina x
Hour
1 - Cement Mixer = 40 Kina x
Hour
1 - Compactor Rammer = 40 Kina x
Hour
1 - Tipper = 180 Kina x
Hour
= 4240 Kina
Day
C. LABOUR:
1 - Leadinghand = 6.25 Kina x
Hour
2 - Trafficmen = 2.5 Kina x
Hour
8 - Labourer = 2.5 Kina x
Hour
= 250 Kina
Day
SUMMARY:
MATERIALS
EQUIPMENT
LABOUR
SAY
Item 7.6a Drainage Inlet and Outlet Structure, 600mm dia. CSP Culvert
A. MATERIALS:
Cement for Structure = 21 Kina x 1
Bag 50
Assorted Nails =
B. EQUIPMENT:
1 - Excavator = 270 Kina x
Hour
1 - Cement Mixer = 40 Kina x
Hour
1 - Compactor Rammer = 40 Kina x
Hour
= 2800 Kina
Day
C. LABOUR:
1 - Leadinghand = 6.25 Kina x
Hour
2 - Mason/Carpenter = 4.25 Kina x
Hour
8 - Labourer = 2.5 Kina x
Hour
= 278 Kina
Day
SUMMARY:
MATERIALS
EQUIPMENT
LABOUR
Item 7.6b Drainage Inlet and Outlet Structures for 750mm dia. CSP
A. MATERIALS:
Cement for Structure = 21 Kina x 1
Bag 50
Assorted Nails =
B. EQUIPMENT:
1 - Excavator = 270 Kina x
Hour
1 - Cement Mixer = 40 Kina x
Hour
1 - Compactor Rammer = 40 Kina x
Hour
= 2800 Kina
Day
C. LABOUR:
1 - Leadinghand = 6.25 Kina x
Hour
2 - Mason/Carpenter = 4.25 Kina x
Hour
8 - Labourer = 2.5 Kina x
Hour
= 278 Kina
Day
SUMMARY:
MATERIALS
EQUIPMENT
LABOUR
SAY
Item 7.6c Drainage Inlet and Outlet Structure for 900mm dia. CSP
A. MATERIALS:
Cement for Structure = 21 Kina x 1
Bag 50
Assorted Nails =
B. EQUIPMENT:
1 - Excavator = 270 Kina x
Hour
1 - Cement Mixer = 40 Kina x
Hour
1 - Compactor Rammer = 40 Kina x
Hour
= 2800 Kina
Day
C. LABOUR:
1 - Leadinghand = 6.25 Kina x
Hour
2 - Mason/Carpenter = 4.25 Kina x
Hour
8 - Labourer = 2.5 Kina x
Hour
= 278 Kina
Day
SUMMARY:
MATERIALS
EQUIPMENT
LABOUR
SAY
Assorted Nails =
B. EQUIPMENT:
1 - Backhoe = 180 Kina x
Hour
1 - Compactor Rammer = 40 Kina x
Hour
1 - Cement Mixer = 40 Kina x
Hour
= 2080 Kina
Day
C. LABOUR:
1 - Leadinghand = 6.25 Kina x
Hour
2 - Mason/Carpenter = 4.25 Kina x
Hour
8 - Labourer = 2.5 Kina x
Hour
= 278 Kina
Day
SUMMARY:
MATERIALS
EQUIPMENT
LABOUR
SAY
Item 7.9 Clearing Gully Pits
A. MATERIALS:
B. EQUIPMENT:
1 - Backhoe = 180 Kina x
Hour
1 - Tipper = 180 Kina x
Hour
= 2880 Kina
Day
C. LABOUR:
1 - Leadinghand = 6.25 Kina x
Hour
6 - Labourer = 4.25 Kina x
Hour
= 254 Kina
Day
SUMMARY:
MATERIALS
EQUIPMENT
LABOUR
SAY
Assorted Nails =
B. EQUIPMENT:
1 - Excavator = 270 Kina x
Hour
1 - Cement Mixer = 40 Kina x
Hour
1 - Compactor Rammer = 40 Kina x
Hour
= 2800 Kina
Day
C. LABOUR:
1 - Leadinghand = 6.25 Kina x
Hour
2 - Mason/Carpenter = 4.25 Kina x
Hour
8 - Labourer = 2.5 Kina x
Hour
= 278 Kina
Day
SUMMARY:
MATERIALS
EQUIPMENT
LABOUR
SAY
B. EQUIPMENT:
1 - Backhoe = 180 Kina x
Hour
1 - Crew Cab = 75 Kina x
Hour
= 2040 Kina
Day
C. LABOUR:
1 - Leadinghand = 6.25 Kina x
Hour
2- Skilled Labour = 4.25 Kina x
Hour
8 - Labourer = 2.5 Kina x
Hour
= 278 Kina
Day
SUMMARY:
MATERIALS
EQUIPMENT
LABOUR
B. Equipment:
1 - Line Marker 1@ 40
1 - Service Vehicle 1@ 75
= 920 Kina/day
C. Labour:
1 - Leadinghand 1@ 6.25
2 - Traffic Aide 2@ 2.5
8 - Casuals 8@ 2.5
= 210 Kina/day
SUMMARY:
MATERIALS
EQUIPMENT
LABOUR
SAY
B. Equipment:
1 - Line Marker 1@ 40
1 - Service Vehicle 1@ 75
= 920 Kina/day
C. Labour:
1 - Leadinghand 1@ 6.25
2 - Traffic Aide 2@ 2.5
8 - Casuals 8@ 2.5
= 210 Kina/day
SUMMARY:
MATERIALS
EQUIPMENT
LABOUR
SAY
B. Equipment:
1 - Line Marker 1@ 40
1 - Service Vehicle 1@ 75
= 920 Kina/day
C. Labour:
1 - Leadinghand 1@ 6.25
2 - Traffic Aide 2@ 2.5
8 - Casuals 8@ 2.5
= 210 Kina/day
SUMMARY:
MATERIALS
EQUIPMENT
LABOUR
SAY
B. Equipment:
1 - Service Vehicle 1@ 43.75
= 350 Kina/day
C. Labour:
1 - Leadinghand 1@ 6.25
6 - Casuals 6@ 2.5
= 170 Kina/day
SUMMARY:
MATERIALS
EQUIPMENT
LABOUR
say
= 177000
= none
= none
230000
= 8000
none
8 Hours = 1760
Day
8 Hours = 1440
Day
8 Hours = 1440
Day 4640
x 1 Day = 10.31111
450 m2
8 Hours x 1= 50
Day
8 Hours x 2= 40
Day
8 Hours x 4= 80
Day 170
x 1 Day = 0.377778
450 m2
= 0 per m2
= 10.31111
= 0.377778
10.68889
3.206667
13.89556 per m2 0.104444 0
14 per m2
= none
8 Hours x 1 unit = 0
Day
8 Hours x 1 unit = 1440
Day
8 Hours x 2 unit = 2880
Day 4320
x 1 Day = 36
120 metres
8 Hours x 1 person = 50
Day
8 Hours x 2 person = 40
Day
8 Hours x 2 person = 40
Day 130
x 1 Day = 1.083333
120 metres
= 0 per metre
= 36 0
= 1.083333 0
37.08333 0
11.125
48.20833 per metre 21.20833 0
27 per metre
= none
x 1 Day = 6.08
500 m2
8 Hours x 1 person = 50
Day
8 Hours x 2 person = 40
Day
8 Hours x 4 person = 80
Day 170
x 1 Day = 0.34
500 m2
= 0 per m2
= 6.08 0
= 0.34 0
6.42 0
1.926
8.346 per m2
8 per m2 0.346 0
= none
x 1 Day = 21
240 m3
8 Hours x 1 person = 50
Day
8 Hours x 2 person = 40
Day
8 Hours x 4 person = 80
Day 170
x 1 Day = 0.708333
240 m3
= 0 per m3
= 21 0
= 0.708333 0
21.70833 0
6.5125
28.22083 per m3
28 per m3 0.220833 0
= none
8 Hours x 1 unit = 2160
Day
8 Hours x 2 unit = 2880
Day 5040
8 Hours x 1 person = 50
Day
8 Hours x 2 person = 40
Day
8 Hours x 4 person = 80
Day 170
= 0 per m3
= 25.2 0
= 0.85 0
26.05 0
7.815
33.865 per m3
34 per m3 0.135 0
= none
x 1 Day = 41.6
200 m3
8 Hours x 1 person = 50
Day
8 Hours x 2 person = 40
Day
8 Hours x 4 person = 80
Day 170
x 1 Day = 0.85
200 m3
= 0 per m3
= 41.6 0
= 0.85 0
42.45 0
12.735
55.185 per m3
55 per m3 0.185 0
= none
x 1 Day = 5.257143
1400 m2
8 Hours x 1 person = 50
Day
8 Hours x 2 person = 40
Day
8 Hours x 4 person = 80
Day 170
x 1 Day = 0.121429
1400 m2
= 0 per m2
= 5.257143 0
= 0.121429 0
5.378571 0
1.613571
6.992143 per m2
7 per m2 0.007857 0
1 Roll x 1 m2 = 10
100 m2 0.15 m3
16.5 metres x 3 Bays x 1 set = 9.166667
3 Bays 2.025 m3 4 uses
8 Hours x 1 person = 50
Day
8 Hours x 2 person = 40
Day
8 Hours x 6 person = 120
Day 210
x 1 Day = 2.625
80 m3
= 493.1659 per m3 0
= 56 0
= 2.625 0
551.7909 0
165.5373
717.3282 per m3
1.65 Ton = 99
m3
8 Hours x 1 Day = 36
Day 40 m3 135
x 1 Day = 37.33333
120 m3
8 Hours x 1 person = 50
Day
8 Hours x 2 person = 40
Day
8 Hours x 4 person = 80
Day 170
x 1 Day = 1.416667
120 m3
= 135 per m3 0
= 37.33333 0
= 1.416667 0
173.75 0
52.125
225.875 per m3
1 Roll x 1 m2 = 7.5
100 m2 0.2 m3
4 metres x 1 m2 = 51.4
m2 0.2 m3
4 metres x 1 m2 = 21.8
m2 0.2 m3
8 Hours = 160
20 m3
8 Hours = 72
20 m3
8 Hours = 16
20 m3
8 Hours = 16
20 m3 264
8 Hours x 1 person = 50
Day
8 Hours x 2 person = 40
Day
8 Hours x 10 person = 200
Day 290
x 1 Day = 14.5
20 m3
= 456.8097 per m3 0
= 264 0
= 14.5 0
735.3097 0
220.5929
955.9026 per m3
8 Hours = 2160
Day
8 Hours = 320
Day
8 Hours = 1440
Day 3920
8 Hours x 1= 50
Day
8 Hours x 2= 40
Day
8 Hours x 8= 160
Day 250
8 Hours = 2160
Day
8 Hours = 320
Day
8 Hours = 1440
Day 3920
8 Hours x 1= 50
Day
8 Hours x 2= 40
Day
8 Hours x 8= 160
Day 250
8 Hours x 1= 50
Day
8 Hours x 2= 40
Day
8 Hours x 8= 160
Day 250
1 piece = 620.3279
1.22 meter
1 Bag = 17.21311
1.22 meter
8 Hours x 1= 50
Day
8 Hours x 2= 40
Day
8 Hours x 8= 160
Day 250
8 Hours = 2160
Day
8 Hours = 320
Day
8 Hours = 1440
Day 3920
x 1 Day = 196 per metre
20 metres
8 Hours x 1= 50
Day
8 Hours x 2= 40
Day
8 Hours x 4= 80
Day 170
m3 x 0.6 = 12
metre
Sheet = 16.27465
metres
Length = 1.25
uses
metre = 0.75
metre
Tonne x 0.2 m3 = 33
m3 metre
Length = 1.125
uses
= 0.2375
116.2072 per metre
8 Hours = 2160
Day
8 Hours = 320
Day
8 Hours = 320
Day
8 Hours = 1440
Day 4240
8 Hours x 1= 50
Day
8 Hours x 2= 40
Day
8 Hours x 8= 160
Day 250
m3 x 0.6 = 19.2
metre
Sheet = 19.52958
metres
Length = 1.25
uses
metre = 0.75
metre
Length = 1.125
uses
= 0.2375
154.0961 per metre
8 Hours = 2160
Day
8 Hours = 320
Day
8 Hours = 320
Day
8 Hours = 1440
Day 4240
8 Hours x 1= 50
Day
8 Hours x 2= 40
Day
8 Hours x 8= 160
Day 250
= 38.376
m3 x 0.6 = 13.44
metre
8 Hours = 2160
Day
8 Hours = 320
Day
8 Hours = 320
Day 2800
x 4 Days = 11200
Set
8 Hours x 1= 50
Day
8 Hours x 2= 68
Day
8 Hours x 8= 160
Day 278
x 4 Days = 1112
Set
= 39.276
m3 x 0.6 = 13.44
metre
8 Hours = 2160
Day
8 Hours = 320
Day
8 Hours = 320
Day 2800
x 4 Days = 11200
Set
8 Hours x 1= 50
Day
8 Hours x 2= 68
Day
8 Hours x 8= 160
Day 278
x 4 Days = 1112
Set
= 54.684
m3 x 0.6 = 13.44
metre
8 Hours = 2160
Day
8 Hours = 320
Day
8 Hours = 320
Day 2800
x 4 Days = 11200
Set
8 Hours x 1= 50
Day
8 Hours x 2= 68
Day
8 Hours x 8= 160
Day 278
x 4 Days = 1112
Set
metres x 1 Forms = 9
metre 2 uses
= 2.88
162.68 per metre
8 Hours = 1440
Day
8 Hours = 320
Day
8 Hours = 320
Day 2080
8 Hours x 1= 50
Day
8 Hours x 2= 68
Day
8 Hours x 8= 160
Day 278
8 Hours = 1440
Day
8 Hours = 1440
Day 2880
8 Hours x 1= 50
Day
8 Hours x 6= 204
Day 254
= 0 per piece
= 960 0
= 84.66667 0
1044.667 0
313.4
1358.067 per piece
= 38.016
900.656 per set
8 Hours = 2160
Day
8 Hours = 320
Day
8 Hours = 320
Day 2800
x 2 Days = 5600
Set
8 Hours x 1= 50
Day
8 Hours x 2= 68
Day
8 Hours x 8= 160
Day 278
x 2 Days = 556
Set
8 Hours = 1440
Day
8 Hours = 600
Day 2040
8 Hours x 1= 50
Day
8 Hours x 2= 68
Day
8 Hours x 8= 160
Day 278
= 600
= 60
= 10
= 15
= 5
690
x 1 day = 175
2 set
x 1 day = 85
2 set
per m2
per m2
per m3
per m3
per m3
per m3
per m2
per m2
per m3
per m3
per m3
per m3
per m3
per m3
per m3
per m3
per m3
per m3
per m3
per set
per set
per set