SOP For Documents Sub-Station Operating (DG) 2
SOP For Documents Sub-Station Operating (DG) 2
SOP For Documents Sub-Station Operating (DG) 2
Revision No.: 03
Document No: PDyL-CS-SOP-002 Issue Date : 20.06.17
Revision Date: 17.06.20
A. CHANGE HISTORY
A. DISTRIBUTION
SI
DOCUMENT STATUS
DATE DEPARTMENT G
HOLDER (COPY/ORIGINAL)
N
20.06.17 HEAD OF FACTORY ADMIN COPY
1.0 PURPOSE:
2.0 SCOPE:
All inter Applies to the Generator used for PRAN Dairy Limited of Sub-station areas.
3.0 RESPONSIBILITY:
3.1 Head of Engineering Division is responsible to ensure that concern maintenance personnel
followed this SOP properly.
3.2 Sectional In-charges is responsible to execute this SOP properly
5.0 PROCEDURE:
PREPARATION
5.1 Check the radiator water level with coolant level.
5.2 Check the lube oil level as per standard deep scale.
5.3 Check the Fuel Level (at least 50%) from Fuel Service Tank.
5.4 Check the battery voltage (23 to 26 Volt DC).
5.5 Check the Utility leakage.
Confidentiality Company Confidential
AUTHOR: I/C PPS. CHECKED BY : Asst. Chief APPROVED BY: General
Eng. Manager- PIP
Page 1 of 2
CS
Revision No.: 03
Document No: PDyL-CS-SOP-002 Issue Date : 20.06.17
Revision Date: 17.06.20
Page 2 of 2