Machine RM Status Qty No - of Day Start End Date

The document contains a production schedule for machine parts at two indexes. Index-2 has five parts scheduled between February 11th and March 8th. Index-3 has eleven parts scheduled between February 11th and March 21st. The schedule details the part number, quantity, production rate, number of days to complete production, and start/end dates for each part.

Uploaded by

Mechtek Lab
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
34 views

Machine RM Status Qty No - of Day Start End Date

The document contains a production schedule for machine parts at two indexes. Index-2 has five parts scheduled between February 11th and March 8th. Index-3 has eleven parts scheduled between February 11th and March 21st. The schedule details the part number, quantity, production rate, number of days to complete production, and start/end dates for each part.

Uploaded by

Mechtek Lab
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 5

2/11/2018

2/12/2018
2/13/2018
2/14/2018
Machine Part RM status Qty No.of day Start End date

Index-2 10006B-104 ordered 6000 15 2/11/2018 2/27/2018 1 2 3 4


100x3 ordered 2500 6.25 2/3/2018 3/8/2018
100x4 ordered 2500 6.25 3/10/2018 3/15/2018
10004B-102 5000 12.5 3/17/2018 3/29/2018

Index-3 10004B-104 ordered 4000 10 2/11/2018 2/21/2018 1 2 3 4


FW1924-0404B ordered 2000 5 2/24/2018 2/28/2018
FW1924-0304B ordered 2000 5 3/1/2018 3/6/2018
10004B-Y04 ordered 2000 5 3/8/2018 3/12/2018
10006B-306 ordered 1000 2.5 3/14/2018 3/17/2018
10006B-A05 800 2 3/18/2018 3/19/2018
10005B-A05 800 2 3/20/2018 3/21/2018
5
5
2/15/2018
2/16/2018
2/17/2018

6
6
2/18/2018

7
7 2/19/2018

8
8

2/20/2018
2/21/2018

9 10
2/22/2018
9 10 11

2/23/2018
1
2 2/24/2018
2/25/2018
3

2/26/2018
4

2/27/2018
12 13 14 15

2/28/2018
1

3/1/2018
3/2/2018
2
1

3/3/2018
3
2

3/4/2018
4
3

3/5/2018
5
4

3/6/2018
5

3/7/2018
1
6

3/8/2018
3/9/2018
2
1

3/10/2018
3
2

3/11/2018
4
3

3/12/2018
5
4

3/13/2018
1
5
3/14/2018

2
6
3/15/2018
3/16/2018
3/17/2018

3
1
3/18/2018

1
2
3/19/2018

2
3

1
4 3/20/2018

2
5
3/21/2018
6

3/22/2018
3/23/2018
1

3/24/2018
2

3/25/2018
3

3/26/2018
4

3/27/2018
5

3/28/2018
6

3/29/2018
3/30/2018
3/31/2018
Part Qty RM size poduction/day No. of day Start date
10006B-104 6000 Hex 9/16 400 15 2/11/2018
10004B-104 4000 Hex 9/16 400 10 2/11/2018

FW1924-0404B 1500 Round 7/16 400 3.75 2/21/2018


100x4 2000 Hex 7/16" 400 5 2/20/2018

FW1924-0304 2000 Round 7/16 400 5 2/21/2018


100x3 2500 Hex 3/8" 400 6.25 2/25/2018

10004B-Y04 1500 Hex 5/8" 400 3.75


10006B-306 1000 Hex 5/8" 400 2.5
10006B-A05 800 Hex 5/8" 400 2
10005B-A05 800 Hex 5/8" 400 2

10006B-Y06 2200 Hex 3/4" 400 5.5


42x4 1500 cancell 800 1.875

10004B-102 3000 Hex 7/16" 800 3.75

Start
Index-2 10006B-104 2/11/2018

Index-3 10004B-104 2/11/2018


Complition date Current status
2/27/2018 Running
2/21/2018 Running

2/24/2018 RM ordered
2/24/2018 RM ordered

2/23/2018 Next time


3/1/2018 Next time

We will use in 10004B-102