CBLM - Trainees Progress Chart
CBLM - Trainees Progress Chart
CBLM - Trainees Progress Chart
LO2. Prepare 2.1 Creates portable 4 hrs Oct 15, Oct 15, C LBJ OVC
installer bootable devices in 2020 2020 Competent
accordance with
software
manufacturer
instruction.
2.2 Prepares
customized
installers in
accordance with
software utilization
guide and end user
agreement.
2.3 Carries installation
of portable
Date Developed Document No ELC72433
1
Sept 14, 2020 Issued by Page
Supervise Work-Based
Date Revised
Learning
3
Developed by Revision
Oliver V. Calledo
Units of Training Date Date Trainee’s Supervisor’s
Training Activity Rating
Competency Duration Started Finished Initial Initial
applications in
accordance with
software user guide
and software license
LO3. Install 3.1 Installs Operating 12 hrs Oct 17, Oct 17, C LBJ OVC
operating system (OS) in 2020 2020 Competent
system and accordance with
drivers for established
peripherals/d installation
evices procedures and to
comply with end-
user requirements.
3.2 Installs and
configures
peripherals/devices
drivers in
accordance with
manufacturer’s
instructions and/or
OS installation
procedures.
3.3 Access and installs
Date Developed Document No ELC72433
1
Sept 14, 2020 Issued by Page
Supervise Work-Based
Date Revised
Learning
4
Developed by Revision
Oliver V. Calledo
Units of Training Date Date Trainee’s Supervisor’s
Training Activity Rating
Competency Duration Started Finished Initial Initial
OS and drivers
updates/patches in
accordance with
manufacturer’s
recommendations
and requirements.
3.4 Undertakes on-
going checks of the
quality of the work
in accordance with
established
procedures
LO4. Install 4.1 Installs application 12 hrs Oct 19, Oct 19, C LBJ OVC
application software based on 2020 2020 Competent
software software installation
guides, end-user
requirements &
software license
agreement.
4.2 Carry out variation
to application
software installation
Date Developed Document No ELC72433
1
Sept 14, 2020 Issued by Page
Supervise Work-Based
Date Revised
Learning
5
Developed by Revision
Oliver V. Calledo
Units of Training Date Date Trainee’s Supervisor’s
Training Activity Rating
Competency Duration Started Finished Initial Initial
in accordance to
customer/client
requirements.
4.3 Access and installs
software updates in
accordance with
manufacturer’s
recommendations
and requirements.
LO5. Conduct 5.1 Tests 4 hrs Oct 19, Oct 19, C LBJ OVC
testing and devices/systems 2020 2020 Competent
documentatio and/or installation
n to determine
whether it conforms
to requirements.
5.2 Conducts stress
test to ensure
reliability of
equipment in
accordance with
manufacturer’s
instructions and
Date Developed Document No ELC72433
1
Sept 14, 2020 Issued by Page
Supervise Work-Based
Date Revised
Learning
6
Developed by Revision
Oliver V. Calledo
Units of Training Date Date Trainee’s Supervisor’s
Training Activity Rating
Competency Duration Started Finished Initial Initial
system
requirements.
5.3 Follows 5S and 3Rs
according to
environmental
policies.
5.4 Forwards
documentation in
relation to the test
to appropriate
personnel and/or
authority in
accordance with
requirements
Total 40 hrs
Note: The trainee and the supervisor must have a copy of this form. The column for rating maybe used either by giving a numerical rating or
simply indicating competent or not yet competent. For purposes of analysis, you may require industry supervisors to give a numerical
rating for the performance of your trainees. Please take note however that in TESDA, we do not us