INSTALLATION INSTRUCTIONS
SCSR Seismic Restrained
Spring Isolators
SCSR
1, 2, 3, 4
Installation Instructions
File No.: INS-SCSR-003 Date: 14 Oct 2016
tel: 416-291-7371 1-800-565-8401 web: www.vibro-acoustics.com
fax: 416-291-8049 1-888-811-2264 eml: [email protected] Supersedes: INS-SCSR-002 Date: 1 Apr 2013
INSTRUCTIONS
1. Handle the isolators with care and do not drop or hit as components
may shift or come loose. Some models have precompressed springs and
holes for
could present a hazard if damaged.
attaching to
2. Properly locate each isolator as per the submittal drawing using the equipment
isolator model and spring color(s) as identification. equipment
support
3. Elevate equipment enough to place spring isolators underneath and lower plate
equipment onto isolators. Position the isolators to ensure load is centered (isolator
top plate)
on equipment support plate and that, if used, steel beam webs are located
directly above the center rod. If isolators are to be bolted to the supporting
structure locate bolt hole locations and make preparations as appropriate
(drill holes and install anchor bolts). Leave shipping spacers in place.
4. For attachment to concrete structure, please refer to engineering
calculations and follow the specification for concrete anchor. Edge
distance, minimum anchor embedment, should be followed as specified. steel
structure
7. Back off the hold-down nuts until it locks with the limit bolt.
reinforced neoprene snubbers
4 5 2
9. Remove all spacer pieces as soon as the top plate is lifted off the 10. Ensure the restraint limit bolt is not touching the hold-down plate but
spacers. The spacers should slide out with no effort. is in the center of the hole, and that rubber grommets are in position.