Absensi Harian Subcon Juli 2020

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 291

DAFTAR ABSENSI HARIAN SUBCONTRACTOR PT.

NONGSA JAYA BUANA SHIPYARD


01-Jul-20
WORKING HOURS 8 Hours/day
TOTAL HOURS 2696 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN QC WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-235 - - - - 1 - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


2 H-236 - - - 5 3 7 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


3 H-237 - 1 - 5 7 7 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


4 H-238 - - - 1 2 2 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


5 H-235,H-236,H-239,H-240 - - - 4 5 5 - -
(PIPING JOB)

PT.KBB
6 H-239 - - - 2 1 1 - -
(TUG BOAT 30 MTR)

PT.KBB
7 H-240 - 3 - 7 7 8 - -
(TUG BOAT 30 MTR)
PT.KRD
8 H-241 - - - 12 5 10 - -
(TONGKANG 330 FT)

PT.TWU
9 H-242 - 1 - 10 16 3 - -
(TONGKANG 330 FT)

PT.PLS
10 H-243 - 3 - 26 9 2 - -
(TONGKANG 330 FT)

PT.HKJB
11 H-244 - - - 13 10 9 - -
(TONGKANG 330 FT)

PT.KRD
12 H-245 - 2 - 15 9 10 - -
(TONGKANG 330 FT)

PT.MUJ
13 H-246 - - - 17 19 12 - -
(TONGKANG 330 FT)

PT. IMMANUEL BATAM


14 CARPENTER TUG BOAT - - - - - 7 - -
MARINDO

PT. BINA DHARMA


15 HARIAN NJB - - - - - 9 - -
SEJAHTERA

MEKANIK
16 PT.MMJA - 1 - 1 2 1 - -
H-235,H-239

MEKANIK
17 PT M.S.M - - - 5 - 2 - -
H-236,H-240
18 PT.CFB BLASTING & PAINTING - - - - - - - -

BLASTING & PAINTING


19 PT.BKB - - - - - 7 - -
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS 0 11 0 123 96 102 0 0

MASUK MALAM TGL 30- JUNE - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 48 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-238 - - - 4 - - - -
(TUG BOAT 30 MTR)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 30- JUNE - 2020 (17:00 - 23:45 - 05:00) JAM 23:45 = 3 ORANG
WORKING HOURS Hours/day
TOTAL HOURS 141 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-238 - - - 13 - - - -
(TUG BOAT 30 MTR)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 30- JUNE - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 84 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.KBB
1 H-240 - - - 6 - 1 - -
(TUG BOAT 30 MTR)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 30- JUNE - 2020 (17:00 - 22:00 - 24:00 - 05:00) JAM 24 = 1 ORANG , JAM 22:00 = 2 ORANG
WORKING HOURS Hours/day
TOTAL HOURS 75 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.KRD
1 H-245 - - - 6 - 2 - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

LEMBUR TGL 30- JUNE - 2020 (17:00 - 24:00)


WORKING HOURS Hours/day
TOTAL HOURS 7 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.KRD
1 H-245 - - - 1 - - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 30- JUNE - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 24 Hours
JABATAN
NO. NAMA SUBCONT PROJECT
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.MUJ
1 H-246 - - - 2 - - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

LEMBUR TGL 30- JUNE - 2020 (17:00 - 23:30)


WORKING HOURS Hours/day
TOTAL HOURS 42 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.MUJ
1 H-246 - - - - - 6 - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER MATERIAL PER PROJECT

- - - - 1 1 Orang 8

- - - - 15 15 Orang 120

- - 1 - 21 21 Orang 168

- - - - 5 5 Orang 40

- - - - 14 14 Orang 112

- - - - 4 4 Orang 32

- 1 - - 26 26 Orang 208
- - 1 - 28 28 Orang 224

- - - - 30 30 Orang 240

- - 1 - 41 41 Orang 328

- - 1 - 33 33 Orang 264

- - - - 36 36 Orang 288

- - - - 48 48 Orang 384

- - - - 7 7 Orang 56

- - - - 9 9 Orang 72

- - - - 5 5 Orang 40

- - - - 7 7 Orang 56
- - - - 0 0 Orang 0

- - - - 7 7 Orang 56

0 1 4 0 337 337 Orang 2696

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 4 4 Orang 48

4 Orang 48

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 13 13 Orang 141
13 Orang 141
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 7 7 Orang 84
7 Orang 84

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 8 8 Orang 75
8 Orang 75

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 1 1 Orang 7
1 Orang 7

TOTAL WORKERS
TOTAL
WORKERS
HOURS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 2 2 Orang 24
2 Orang 24

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 6 6 Orang 42
6 Orang 42
DAFTAR ABSENSI HARIAN SUBCONTRACTOR PT. NONGSA JAYA BUANA SHIPYARD
02-Jul-20
WORKING HOURS 8 Hours/day
TOTAL HOURS 2288 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN QC WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-235 - - - - - 2 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


2 H-236 - - - 2 3 3 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


3 H-237 - - - 1 4 7 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


4 H-238 - - - 4 3 4 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


5 H-235,H-236,H-239,H-240 - - - 6 3 6 - -
(PIPING JOB)

PT.KBB
6 H-239 - 2 - 4 8 7 - -
(TUG BOAT 30 MTR)

PT.KBB
7 H-240 - - - 5 1 8 - -
(TUG BOAT 30 MTR)
PT.KRD
8 H-241 - - - 7 5 15 - -
(TONGKANG 330 FT)

PT.TWU
9 H-242 - - - 11 8 3 - -
(TONGKANG 330 FT)

PT.PLS
10 H-243 - 1 - 25 5 6 - -
(TONGKANG 330 FT)

PT.HKJB
11 H-244 - - - 12 6 12 - -
(TONGKANG 330 FT)

PT.KRD
12 H-245 - 1 - 12 9 4 - -
(TONGKANG 330 FT)

PT.MUJ
13 H-246 - - - 12 9 8 - -
(TONGKANG 330 FT)

PT. IMMANUEL BATAM


14 CARPENTER TUG BOAT - - - - 1 6 - -
MARINDO

PT. BINA DHARMA


15 HARIAN NJB - - - - - 9 - -
SEJAHTERA

MEKANIK
16 PT.MMJA - - - - - - - -
H-235,H-239

MEKANIK
17 PT M.S.M - - - 4 - - - -
H-236,H-240
18 PT.CFB BLASTING & PAINTING - - - - - - - -

BLASTING & PAINTING


19 PT.BKB - - - - - 7 - -
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS 0 4 0 105 65 107 0 0

MASUK MALAM TGL 1- JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 84 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.KRD
1 H-245 - - - 7 - - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 1- JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 84 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.KBB
1 H-239 - - - 7 - - - -
(TUG BOAT 30 MTR)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 1- JULI - 2020 (17:00 - 21:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 28 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-238 - - - 3 - - - -
(TUG BOAT 30 MTR)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 1- JULI - 2020 (17:00 - 21:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 28 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-238 - - - 3 - - - -
(TUG BOAT 30 MTR)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 1- JULI - 2020 (17:00 - 21:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 60 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.MUJ
1 H-246 - - - 5 - - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 1- JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 72 Hours
JABATAN
NO. NAMA SUBCONT PROJECT
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.KBB
1 H-240 - - - 6 - - - -
(TUG BOAT 30 MTR)
TOTAL WORKERS & HOURS

LEMBUR TGL 1- JULI - 2020 (17:00 - 21:30 - 23:00)


WORKING HOURS Hours/day
TOTAL HOURS 54 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.HKJB
1 H-244 - - - 10 - - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER MATERIAL PER PROJECT

- - - - 2 2 Orang 16

- 2 - - 10 10 Orang 80

- - - - 12 12 Orang 96

- - - - 11 11 Orang 88

- - - - 15 15 Orang 120

- - - - 21 21 Orang 168

- 1 - - 15 15 Orang 120
- - - - 27 27 Orang 216

- - - - 22 22 Orang 176

- - 1 - 38 38 Orang 304

- - 1 - 31 31 Orang 248

- - - - 26 26 Orang 208

- - - - 29 29 Orang 232

- - - - 7 7 Orang 56

- - - - 9 9 Orang 72

- - - - 0 0 Orang 0

- - - - 4 4 Orang 32
- - - - 0 0 Orang 0

- - - - 7 7 Orang 56

0 3 2 0 286 286 Orang 2288

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 7 7 Orang 84

7 Orang 84

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 7 7 Orang 84
7 Orang 84
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 3 3 Orang 28
3 Orang 28

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 3 3 Orang 28
3 Orang 28

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 5 5 Orang 60
5 Orang 60

TOTAL WORKERS
TOTAL
WORKERS
HOURS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 6 6 Orang 72
6 Orang 72

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 10 10 Orang 54
10 Orang 54
DAFTAR ABSENSI HARIAN SUBCONTRACTOR PT. NONGSA JAYA BUANA SHIPYARD
03-Jul-20
WORKING HOURS 8 Hours/day
TOTAL HOURS 2552 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN QC WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-235 - - - - - - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


2 H-236 - - - - - 3 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


3 H-237 - - - 1 6 2 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


4 H-238 - 1 - 8 6 14 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


5 H-235,H-236,H-239,H-240 - - - 6 3 8 - -
(PIPING JOB)

PT.KBB
6 H-239 - - - - - - - -
(TUG BOAT 30 MTR)

PT.KBB
7 H-240 - 2 - 4 5 17 - -
(TUG BOAT 30 MTR)
PT.KRD
8 H-241 - - - 18 6 17 - -
(TONGKANG 330 FT)

PT.TWU
9 H-242 - - - 5 12 3 - -
(TONGKANG 330 FT)

PT.PLS
10 H-243 - 2 - 39 2 5 - -
(TONGKANG 330 FT)

PT.HKJB
11 H-244 - 3 - 19 4 10 - -
(TONGKANG 330 FT)

PT.KRD
12 H-245 - - - 9 4 5 - -
(TONGKANG 330 FT)

PT.MUJ
13 H-246 - - - 13 8 10 - -
(TONGKANG 330 FT)

PT. IMMANUEL BATAM


14 CARPENTER TUG BOAT - - - - 1 6 - -
MARINDO

PT. BINA DHARMA


15 HARIAN NJB - - - - - 12 - -
SEJAHTERA

MEKANIK
16 PT.MMJA - 1 - - - 4 - -
H-235,H-239

MEKANIK
17 PT M.S.M - - - 2 - 3 - -
H-236,H-240
18 PT.CFB BLASTING & PAINTING - - - - - - - -

BLASTING & PAINTING


19 PT.BKB - - - - - 6 - -
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS 0 9 0 124 57 125 0 0

MASUK MALAM TGL 1- JULI - 2020 (17:00 - 06:00)


WORKING HOURS Hours/day
TOTAL HOURS 65 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.MUJ
1 H-246 - - - 5 - - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 1- JULI - 2020 (17:00 - 24:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 52 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.KRD
1 H-245 - - - 6 - - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 1- JULI - 2020 (17:50 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 33 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-238 - - - 3 - - - -
(TUG BOAT 30 MTR)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 1- JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 84 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.KBB
1 H-240 - - - 6 - 1 - -
(TUG BOAT 30 MTR)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 1- JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 84 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.KBB
1 H-239 - - - 6 - 1 - -
(TUG BOAT 30 MTR)
TOTAL WORKERS & HOURS
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER MATERIAL PER PROJECT

- - - - 0 0 Orang 0

- - - - 3 3 Orang 24

- - - - 9 9 Orang 72

- 1 - - 30 30 Orang 240

- - - - 17 17 Orang 136

- - - - 0 0 Orang 0

- 1 - - 29 29 Orang 232
- - - - 41 41 Orang 328

- - - - 20 20 Orang 160

- - 1 - 49 49 Orang 392

- - 1 - 37 37 Orang 296

- - - - 18 18 Orang 144

- - - - 31 31 Orang 248

- - - - 7 7 Orang 56

- - - - 12 12 Orang 96

- - - - 5 5 Orang 40

- - - - 5 5 Orang 40
- - - - 0 0 Orang 0

- - - - 6 6 Orang 48

0 2 2 0 319 319 Orang 2552

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 5 5 Orang 65

5 Orang 65

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 6 6 Orang 52
6 Orang 52
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 3 3 Orang 33
3 Orang 33

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 7 7 Orang 84
7 Orang 84

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 7 7 Orang 84
7 Orang 84
DAFTAR ABSENSI HARIAN SUBCONTRACTOR PT. NONGSA JAYA BUANA SHIPYARD
03-Jul-20
WORKING HOURS 8 Hours/day
TOTAL HOURS 2512 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN QC WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-235 - - - - - 1 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


2 H-236 - 1 - 1 2 2 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


3 H-237 - 1 - 5 11 9 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


4 H-238 - - - 1 1 3 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


5 H-235,H-236,H-239,H-240 - 1 - 6 5 7 - -
(PIPING JOB)

PT.KBB
6 H-239 - - - 3 2 1 - -
(TUG BOAT 30 MTR)

PT.KBB
7 H-240 - 2 - 5 6 12 - -
(TUG BOAT 30 MTR)
PT.KRD
8 H-241 - - - 15 8 15 - -
(TONGKANG 330 FT)

PT.TWU
9 H-242 - 1 - 9 10 6 - -
(TONGKANG 330 FT)

PT.PLS
10 H-243 - 1 - 31 3 2 - -
(TONGKANG 330 FT)

PT.HKJB
11 H-244 - - - 17 6 11 - -
(TONGKANG 330 FT)

PT.KRD
12 H-245 - 1 - 6 10 7 - -
(TONGKANG 330 FT)

PT.MUJ
13 H-246 - - - 10 7 12 - -
(TONGKANG 330 FT)

PT. IMMANUEL BATAM


14 CARPENTER TUG BOAT - - - - 1 6 - -
MARINDO

PT. BINA DHARMA


15 HARIAN NJB - - - - - 11 - -
SEJAHTERA

MEKANIK
16 PT.MMJA - 1 - 1 2 1 - -
H-235,H-239

MEKANIK
17 PT M.S.M - 1 - 2 - 2 - -
H-236,H-240
18 PT.CFB BLASTING & PAINTING - 1 - - - - - 1

BLASTING & PAINTING


19 PT.BKB - - - - - 6 - -
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS 0 11 0 112 74 114 0 1

MASUK MALAM TGL 3 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 60 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

1 PT.CFB BLASTING & PAINTING - - - - - 5 - -

TOTAL WORKERS & HOURS

MASUK MALAM TGL 3 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 60 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.KBB
1 H-240 - - - 5 - - - -
(TUG BOAT 30 MTR)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 3 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 24 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.MUJ
1 H-246 - - - 2 - - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 3 - JULI - 2020 (17:30 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 77 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.KRD
1 H-245 - - - 7 - - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 3 - JULI - 2020 (17:30 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 48 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.KBB
1 H-239 - - - 4 - - - -
(TUG BOAT 30 MTR)
TOTAL WORKERS & HOURS

LEMBUR TGL 3 - JULI - 2020 (17:00 - 21:00)


WORKING HOURS Hours/day
TOTAL HOURS 32 Hours
JABATAN
NO. NAMA SUBCONT PROJECT
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.HKJB
1 H-244 - 2 - 3 2 - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

LEMBUR TGL 3 - JULI - 2020 (17:00 - 21:00)


WORKING HOURS Hours/day
TOTAL HOURS 16 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.PLS
1 H-243 - - - 4 - - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER MATERIAL PER PROJECT

- - - - 1 1 Orang 8

- 1 - - 7 7 Orang 56

- - - - 26 26 Orang 208

- - - - 5 5 Orang 40

- - - - 19 19 Orang 152

- - - - 6 6 Orang 48

- 1 - - 26 26 Orang 208
- - - - 38 38 Orang 304

- - - - 26 26 Orang 208

- - - - 37 37 Orang 296

- - - - 34 34 Orang 272

- - - - 24 24 Orang 192

- - - - 29 29 Orang 232

- - - - 7 7 Orang 56

- - - - 11 11 Orang 88

- - - - 5 5 Orang 40

- - - - 5 5 Orang 40
- - - - 2 2 Orang 16

- - - - 6 6 Orang 48

0 2 0 0 314 314 Orang 2512

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 5 5 Orang 60

5 Orang 60

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 5 5 Orang 60
5 Orang 60
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 2 2 Orang 24
2 Orang 24

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 7 7 Orang 77
7 Orang 77

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 4 4 Orang 48
4 Orang 48

TOTAL WORKERS
TOTAL
WORKERS
HOURS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - 1 - 8 8 Orang 32
8 Orang 32

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 4 4 Orang 16
4 Orang 16
DAFTAR ABSENSI HARIAN SUBCONTRACTOR PT. NONGSA JAYA BUANA SHIPYARD
03-Jul-20
WORKING HOURS 8 Hours/day
TOTAL HOURS 2512 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN QC WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-235 - - - - - 1 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


2 H-236 - 1 - 1 2 2 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


3 H-237 - 1 - 5 11 9 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


4 H-238 - - - 1 1 3 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


5 H-235,H-236,H-239,H-240 - 1 - 6 5 7 - -
(PIPING JOB)

PT.KBB
6 H-239 - - - 3 2 1 - -
(TUG BOAT 30 MTR)

PT.KBB
7 H-240 - 2 - 5 6 12 - -
(TUG BOAT 30 MTR)
PT.KRD
8 H-241 - - - 15 8 15 - -
(TONGKANG 330 FT)

PT.TWU
9 H-242 - 1 - 9 10 6 - -
(TONGKANG 330 FT)

PT.PLS
10 H-243 - 1 - 31 3 2 - -
(TONGKANG 330 FT)

PT.HKJB
11 H-244 - - - 17 6 11 - -
(TONGKANG 330 FT)

PT.KRD
12 H-245 - 1 - 6 10 7 - -
(TONGKANG 330 FT)

PT.MUJ
13 H-246 - - - 10 7 12 - -
(TONGKANG 330 FT)

PT. IMMANUEL BATAM


14 CARPENTER TUG BOAT - - - - 1 6 - -
MARINDO

PT. BINA DHARMA


15 HARIAN NJB - - - - - 11 - -
SEJAHTERA

MEKANIK
16 PT.MMJA - 1 - 1 2 1 - -
H-235,H-239

MEKANIK
17 PT M.S.M - 1 - 2 - 2 - -
H-236,H-240
18 PT.CFB BLASTING & PAINTING - 1 - - - - - 1

BLASTING & PAINTING


19 PT.BKB - - - - - 6 - -
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS 0 11 0 112 74 114 0 1

MASUK MALAM TGL 3 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 60 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

1 PT.CFB BLASTING & PAINTING - - - - - 5 - -

TOTAL WORKERS & HOURS

MASUK MALAM TGL 3 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 60 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.KBB
1 H-240 - - - 5 - - - -
(TUG BOAT 30 MTR)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 3 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 24 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.MUJ
1 H-246 - - - 2 - - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 3 - JULI - 2020 (17:30 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 77 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.KRD
1 H-245 - - - 7 - - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 3 - JULI - 2020 (17:30 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 48 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.KBB
1 H-239 - - - 4 - - - -
(TUG BOAT 30 MTR)
TOTAL WORKERS & HOURS

LEMBUR TGL 3 - JULI - 2020 (17:00 - 21:00)


WORKING HOURS Hours/day
TOTAL HOURS 32 Hours
JABATAN
NO. NAMA SUBCONT PROJECT
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.HKJB
1 H-244 - 2 - 3 2 - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

LEMBUR TGL 3 - JULI - 2020 (17:00 - 21:00)


WORKING HOURS Hours/day
TOTAL HOURS 16 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.PLS
1 H-243 - - - 4 - - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER MATERIAL PER PROJECT

- - - - 1 1 Orang 8

- 1 - - 7 7 Orang 56

- - - - 26 26 Orang 208

- - - - 5 5 Orang 40

- - - - 19 19 Orang 152

- - - - 6 6 Orang 48

- 1 - - 26 26 Orang 208
- - - - 38 38 Orang 304

- - - - 26 26 Orang 208

- - - - 37 37 Orang 296

- - - - 34 34 Orang 272

- - - - 24 24 Orang 192

- - - - 29 29 Orang 232

- - - - 7 7 Orang 56

- - - - 11 11 Orang 88

- - - - 5 5 Orang 40

- - - - 5 5 Orang 40
- - - - 2 2 Orang 16

- - - - 6 6 Orang 48

0 2 0 0 314 314 Orang 2512

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 5 5 Orang 60

5 Orang 60

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 5 5 Orang 60
5 Orang 60
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 2 2 Orang 24
2 Orang 24

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 7 7 Orang 77
7 Orang 77

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 4 4 Orang 48
4 Orang 48

TOTAL WORKERS
TOTAL
WORKERS
HOURS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - 1 - 8 8 Orang 32
8 Orang 32

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 4 4 Orang 16
4 Orang 16
DAFTAR ABSENSI HARIAN SUBCONTRACTOR PT. NONGSA JAYA BUANA SHIPYARD
06-Jul-20
WORKING HOURS 8 Hours/day
TOTAL HOURS 2576 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN QC WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-235 - - - 2 5 5 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


2 H-236 - - - - - - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


3 H-237 - 1 - 1 4 12 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


4 H-238 - 3 - 1 4 1 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


5 H-235,H-236,H-239,H-240 - - - 7 5 7 - -
(PIPING JOB)

PT.KBB
6 H-239 - 3 - 4 3 4 - -
(TUG BOAT 30 MTR)

PT.KBB
7 H-240 - - - 7 8 9 - -
(TUG BOAT 30 MTR)
PT.KRD
8 H-241 - - - 8 8 9 - -
(TONGKANG 330 FT)

PT.TWU
9 H-242 - 1 - 10 13 4 - -
(TONGKANG 330 FT)

PT.PLS
10 H-243 - 1 - 30 7 5 - -
(TONGKANG 330 FT)

PT.HKJB
11 H-244 - 1 - 17 5 7 - -
(TONGKANG 330 FT)

PT.KRD
12 H-245 - 2 - 18 8 10 - -
(TONGKANG 330 FT)

PT.MUJ
13 H-246 - - - 12 7 6 - -
(TONGKANG 330 FT)

PT. IMMANUEL BATAM


14 CARPENTER TUG BOAT - - - - - 5 - -
MARINDO

PT. BINA DHARMA


15 HARIAN NJB - - - - - 8 - -
SEJAHTERA

MEKANIK
16 PT.MMJA - - - 1 - 5 - -
H-235,H-239

MEKANIK
17 PT M.S.M - - - 2 - 5 - -
H-236,H-240
18 PT.CFB BLASTING & PAINTING - 1 - - - - - 2

BLASTING & PAINTING


19 PT.BKB - - - - - 5 - -
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS 0 13 0 120 77 107 0 2

MASUK MALAM TGL 5 - JULI - 2020 (16:00 - 05:00) = 3 ORANG ,(17:00 - 05:00) = 2 ORANG
WORKING HOURS Hours/day
TOTAL HOURS 58 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

1 PT.CFB BLASTING & PAINTING - - - - - 5 - -

TOTAL WORKERS & HOURS

MASUK MALAM TGL 5 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 24 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

1 PT.CFB BLASTING & PAINTING - - - 2 - - - -


TOTAL WORKERS & HOURS

MASUK MALAM TGL 5 - JULI - 2020 (17:00 - 24:00)


WORKING HOURS Hours/day
TOTAL HOURS 28 Hours
JABATAN
NO. NAMA SUBCONT PROJECT
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.KBB
1 H-239 - - - 4 - - - -
(TUG BOAT 30 MTR)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 5 - JULI - 2020 (17:00 - 24:00)


WORKING HOURS Hours/day
TOTAL HOURS 42 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.KRD
1 H-245 - - - 6 - - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 5 - JULI - 2020 (15:30 - 24:00)


WORKING HOURS Hours/day
TOTAL HOURS 48 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.KBB
1 H-240 - - - 6 - - - -
(TUG BOAT 30 MTR)
TOTAL WORKERS & HOURS
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER MATERIAL PER PROJECT

- - - - 12 12 Orang 96

- - - - 0 0 Orang 0

- - - - 18 18 Orang 144

- - - - 9 9 Orang 72

- - - - 19 19 Orang 152

- - - - 14 14 Orang 112

- 1 - - 25 25 Orang 200
- - - - 25 25 Orang 200

- - - - 28 28 Orang 224

- - 1 - 44 44 Orang 352

- - 1 - 31 31 Orang 248

- - - - 38 38 Orang 304

- - - - 25 25 Orang 200

- - - - 5 5 Orang 40

- - - - 8 8 Orang 64

- - - - 6 6 Orang 48

- - - - 7 7 Orang 56
- - - - 3 3 Orang 24

- - - - 5 5 Orang 40

0 1 2 0 322 322 Orang 2576

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 5 5 Orang 58

5 Orang 58

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 2 2 Orang 24
2 Orang 24

TOTAL WORKERS
TOTAL
WORKERS
HOURS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 4 4 Orang 28
4 Orang 28

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 6 6 Orang 42
6 Orang 42

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 6 6 Orang 48
6 Orang 48
DAFTAR ABSENSI HARIAN SUBCONTRACTOR PT. NONGSA JAYA BUANA SHIPYARD
07-Jul-20
WORKING HOURS 8 Hours/day
TOTAL HOURS 2336 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN QC WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-235 - - - 1 2 - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


2 H-236 - 1 - - 2 9 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


3 H-237 - 3 - - 2 1 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


4 H-238 - 1 - 4 4 5 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


5 H-235,H-236,H-239,H-240 - - - 4 5 7 - -
(PIPING JOB)

PT.KBB
6 H-239 - 1 - 8 12 15 - -
(TUG BOAT 30 MTR)

PT.KBB
7 H-240 - - - - - - - -
(TUG BOAT 30 MTR)
PT.KRD
8 H-241 - - - 12 6 13 - -
(TONGKANG 330 FT)

PT.TWU
9 H-242 - - - 6 18 5 - -
(TONGKANG 330 FT)

PT.PLS
10 H-243 - 1 - 36 3 5 - -
(TONGKANG 330 FT)

PT.HKJB
11 H-244 - - - 9 5 7 - -
(TONGKANG 330 FT)

PT.KRD
12 H-245 - 1 - 13 6 5 - -
(TONGKANG 330 FT)

PT.MUJ
13 H-246 - - - 3 10 9 - -
(TONGKANG 330 FT)

PT. IMMANUEL BATAM


14 CARPENTER TUG BOAT - - - - 1 6 - -
MARINDO

PT. BINA DHARMA


15 HARIAN NJB - - - - - 6 - -
SEJAHTERA

MEKANIK
16 PT.MMJA - - - 1 1 2 - -
H-235,H-239

MEKANIK
17 PT M.S.M - - - 2 - 5 - -
H-236,H-240
18 PT.CFB BLASTING & PAINTING - 1 - - - - - 2

BLASTING & PAINTING


19 PT.BKB - - - - - 3 - -
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS 0 9 0 99 77 103 0 2

LEMBUR TGL 6 - JULI - 2020 (17:00 - 21:00)


WORKING HOURS Hours/day
TOTAL HOURS 56 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.HKJB
1 H-244 - - - 3 1 10 - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

LEMBUR TGL 6 - JULI - 2020 (17:00 - 21:00)


WORKING HOURS Hours/day
TOTAL HOURS 40 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-238 - - - 3 - 7 - -
(TUG BOAT 30 MTR)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 6 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 48 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-238 - - - - - 4 - -
(TUG BOAT 30 MTR)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 6 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 144 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.KBB
1 H-239,H-240 - - - 12 - - - -
(TUG BOAT 30 MTR)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 6 - JULI - 2020 (18:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 55 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-238 - - - 5 - - - -
(TUG BOAT 30 MTR)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 6 - JULI - 2020 (18:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 62 Hours
JABATAN
NO. NAMA SUBCONT PROJECT
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

1 PT.CFB BLASTING & PAINTING - - - - - 5 - -

TOTAL WORKERS & HOURS

MASUK MALAM TGL 6 - JULI - 2020 (18:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 77 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.KRD
1 H-245 - - - 5 - 2 - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 6 - JULI - 2020 (18:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 48 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.MUJ
1 H-246 - - - 4 - - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER MATERIAL PER PROJECT

- - - - 3 3 Orang 24

- - - - 12 12 Orang 96

- - - - 6 6 Orang 48

- - - - 14 14 Orang 112

- - - - 16 16 Orang 128

- 1 - - 37 37 Orang 296

- - - - 0 0 Orang 0
- - - - 31 31 Orang 248

- - - - 29 29 Orang 232

- - - - 45 45 Orang 360

- - 1 - 22 22 Orang 176

- - - - 25 25 Orang 200

- - - - 22 22 Orang 176

- - - - 7 7 Orang 56

- - - - 6 6 Orang 48

- - - - 4 4 Orang 32

- - - - 7 7 Orang 56
- - - - 3 3 Orang 24

- - - - 3 3 Orang 24

0 1 1 0 292 292 Orang 2336

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 14 14 Orang 56

14 Orang 56

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 10 10 Orang 40
10 Orang 40
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 4 4 Orang 48
4 Orang 48

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 12 12 Orang 144
12 Orang 144

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 5 5 Orang 55
5 Orang 55

TOTAL WORKERS
TOTAL
WORKERS
HOURS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 5 5 Orang 62

5 Orang 62

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 7 7 Orang 77
7 Orang 77

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 4 4 Orang 48
4 Orang 48
DAFTAR ABSENSI HARIAN SUBCONTRACTOR PT. NONGSA JAYA BUANA SHIPYARD
08-Jul-20
WORKING HOURS 8 Hours/day
TOTAL HOURS 2392 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN QC WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-235 - 1 - 3 5 9 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


2 H-236 - - - 1 2 1 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


3 H-237 - - - - - - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


4 H-238 - - - - 1 5 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


5 H-235,H-236,H-239,H-240 - - - 7 6 6 - -
(PIPING JOB)

PT.KBB
6 H-239 - 2 - 10 11 15 - -
(TUG BOAT 30 MTR)

PT.KBB
7 H-240 - - - - - - - -
(TUG BOAT 30 MTR)
PT.KRD
8 H-241 - - - 7 10 11 - -
(TONGKANG 330 FT)

PT.TWU
9 H-242 - 1 - 12 19 3 - -
(TONGKANG 330 FT)

PT.PLS
10 H-243 - - - 32 4 3 - -
(TONGKANG 330 FT)

PT.HKJB
11 H-244 - 1 - 14 4 5 - -
(TONGKANG 330 FT)

PT.KRD
12 H-245 - 1 - 11 7 7 - -
(TONGKANG 330 FT)

PT.MUJ
13 H-246 - - - 14 8 8 - -
(TONGKANG 330 FT)

PT. IMMANUEL BATAM


14 CARPENTER TUG BOAT - - - 1 - 6 - -
MARINDO

PT. BINA DHARMA


15 HARIAN NJB - - - - - 6 - -
SEJAHTERA

MEKANIK
16 PT.MMJA - 1 - 1 2 1 - -
H-235,H-239

MEKANIK
17 PT M.S.M - - - - - 4 - -
H-236,H-240
18 PT.CFB BLASTING & PAINTING - 2 - 1 - 1 - -

BLASTING & PAINTING


19 PT.BKB - - - - - 3 - -
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS 0 9 0 114 79 94 0 0

MASUK MALAM TGL 7 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 24 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.MUJ
1 H-246 - - - 2 - - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 7 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 36 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-237 - - - 3 - - - -
(TUG BOAT 30 MTR)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 7 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 120 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.KBB
1 H-239,H-240 - - - 10 - - - -
(TUG BOAT 30 MTR)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 7 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 36 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-238 - - - 3 - - - -
(TUG BOAT 30 MTR)
TOTAL WORKERS & HOURS

LEMBUR TGL 7 - JULI - 2020 (17:00 - 21:00)


WORKING HOURS Hours/day
TOTAL HOURS 16 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-238 - - - - - 4 - -
(TUG BOAT 30 MTR)
TOTAL WORKERS & HOURS

LEMBUR TGL 7 - JULI - 2020 (17:00 - 21:00)


WORKING HOURS Hours/day
TOTAL HOURS 4 Hours
JABATAN
NO. NAMA SUBCONT PROJECT
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. BINA DHARMA


1 HARIAN NJB - - - - - 1 - -
SEJAHTERA
TOTAL WORKERS & HOURS
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER MATERIAL PER PROJECT

- - - - 18 18 Orang 144

- - - - 4 4 Orang 32

- - - - 0 0 Orang 0

- - - - 6 6 Orang 48

- - - - 19 19 Orang 152

- 1 - - 39 39 Orang 312

- - - - 0 0 Orang 0
- - - - 28 28 Orang 224

- - - - 35 35 Orang 280

- - 1 - 40 40 Orang 320

- - - - 24 24 Orang 192

- - 1 - 27 27 Orang 216

- - - - 30 30 Orang 240

- - - - 7 7 Orang 56

- - - - 6 6 Orang 48

- - - - 5 5 Orang 40

- - - - 4 4 Orang 32
- - - - 4 4 Orang 32

- - - - 3 3 Orang 24

0 1 2 0 299 299 Orang 2392

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 2 2 Orang 24

2 Orang 24

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 3 3 Orang 36
3 Orang 36
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 10 10 Orang 120
10 Orang 120

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 3 3 Orang 36
3 Orang 36

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 4 4 Orang 16
4 Orang 16

TOTAL WORKERS
TOTAL
WORKERS
HOURS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 1 1 Orang 4

1 Orang 4
DAFTAR ABSENSI HARIAN SUBCONTRACTOR PT. NONGSA JAYA BUANA SHIPYARD
09-Jul-20
WORKING HOURS 8 Hours/day
TOTAL HOURS 2088 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN QC WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-235 - - - 1 2 3 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


2 H-236 - - - 1 - - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


3 H-237 - 2 - 2 4 4 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


4 H-238 - - - 1 1 9 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


5 H-235,H-236,H-239,H-240 - - - 6 6 6 - -
(PIPING JOB)

PT.KBB
6 H-239 - 1 - 12 10 14 - -
(TUG BOAT 30 MTR)

PT.KBB
7 H-240 - - - 3 - - - -
(TUG BOAT 30 MTR)
PT.KRD
8 H-241 - 1 - 8 10 6 - -
(TONGKANG 330 FT)

PT.TWU
9 H-242 - 1 - 14 12 4 - -
(TONGKANG 330 FT)

PT.PLS
10 H-243 - 1 - 30 6 1 - -
(TONGKANG 330 FT)

PT.HKJB
11 H-244 - - - 7 4 7 - -
(TONGKANG 330 FT)

PT.KRD
12 H-245 - - - - - - - -
(TONGKANG 330 FT)

PT.MUJ
13 H-246 - - - 15 10 3 - -
(TONGKANG 330 FT)

PT. IMMANUEL BATAM


14 CARPENTER TUG BOAT - - - - 1 6 - -
MARINDO

PT. BINA DHARMA


15 HARIAN NJB - - - 2 - 11 - -
SEJAHTERA

MEKANIK
16 PT.MMJA - 1 - 1 1 2 - -
H-235,H-239

MEKANIK
17 PT M.S.M - - - - - - - -
H-236,H-240
18 PT.CFB BLASTING & PAINTING - - - - - - - -

BLASTING & PAINTING


19 PT.BKB - - - - - 5 - -
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS 0 7 0 103 67 81 0 0

LEMBUR TGL 8 - JULI - 2020 (17:00 - 21:00)


WORKING HOURS Hours/day
TOTAL HOURS 28 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.HKJB
1 H-244 - - - - - 7 - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 8 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 24 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.MUJ
1 H-246 - - - 2 - - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 8 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 69 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.KBB
1 H-240 - - - 8 - - - -
(TUG BOAT 30 MTR)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 8 - JULI - 2020 (16:00 - 20:30) = 1 ORANG (17:00 - 05:00)
WORKING HOURS Hours/day
TOTAL HOURS 53 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.KBB
1 H-239 - - - 5 - - - -
(TUG BOAT 30 MTR)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 8 - JULI - 2020 (18:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 22 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-238 - - - 5 - - - -
(TUG BOAT 30 MTR)
TOTAL WORKERS & HOURS

LEMBUR TGL 8 - JULI - 2020 (18:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 22 Hours
JABATAN
NO. NAMA SUBCONT PROJECT
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-238 - - - 5 - - - -
(TUG BOAT 30 MTR)
TOTAL WORKERS & HOURS

LEMBUR TGL 8 - JULI - 2020 (18:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 55 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

1 PT.CFB BLASTING & PAINTING - - - - - 5 - -

TOTAL WORKERS & HOURS

MASUK MALAM TGL 8 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 60 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. BINA DHARMA


1 HARIAN NJB - - - - - 5 - -
SEJAHTERA
TOTAL WORKERS & HOURS
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER MATERIAL PER PROJECT

- - - - 6 6 Orang 48

- - - - 1 1 Orang 8

- - - - 12 12 Orang 96

- 1 - - 12 12 Orang 96

- - - - 18 18 Orang 144

- 1 - - 38 38 Orang 304

- - - - 3 3 Orang 24
- - - - 25 25 Orang 200

- - - - 31 31 Orang 248

- - 1 - 39 39 Orang 312

- - - - 18 18 Orang 144

- - - - 0 0 Orang 0

- - - - 28 28 Orang 224

- - - - 7 7 Orang 56

- - - - 13 13 Orang 104

- - - - 5 5 Orang 40

- - - - 0 0 Orang 0
- - - - 0 0 Orang 0

- - - - 5 5 Orang 40

0 2 1 0 261 261 Orang 2088

TOTAL WORKERS TOTAL


WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 7 7 Orang 28

7 Orang 28

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 2 2 Orang 24
2 Orang 24
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 8 8 Orang 69
8 Orang 69

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 5 5 Orang 53
5 Orang 53

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 5 5 Orang 22
5 Orang 22

TOTAL WORKERS
TOTAL
WORKERS
HOURS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 5 5 Orang 22

5 Orang 22

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 5 5 Orang 55

5 Orang 55

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 5 5 Orang 60
5 Orang 60
DAFTAR ABSENSI HARIAN SUBCONTRACTOR PT. NONGSA JAYA BUANA SHIPYARD
10-Jul-20
WORKING HOURS 8 Hours/day
TOTAL HOURS 2144 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN QC WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-235 - - - - - 3 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


2 H-236 - - - 2 1 5 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


3 H-237 - - - 6 7 4 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


4 H-238 - - - - - 4 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


5 H-235,H-236,H-239,H-240 - - - 5 6 9 - -
(PIPING JOB)

PT.KBB
6 H-239 - 2 - 9 9 15 - -
(TUG BOAT 30 MTR)

PT.KBB
7 H-240 - - - 3 - - - -
(TUG BOAT 30 MTR)
PT.KRD
8 H-241 - 2 - 16 3 5 - -
(TONGKANG 330 FT)

PT.TWU
9 H-242 - 1 - 14 16 2 - -
(TONGKANG 330 FT)

PT.PLS
10 H-243 - 1 - 32 1 5 - -
(TONGKANG 330 FT)

PT.HKJB
11 H-244 - - - 15 4 5 - -
(TONGKANG 330 FT)

PT.KRD
12 H-245 - - - - - - - -
(TONGKANG 330 FT)

PT.MUJ
13 H-246 - - - 11 10 7 - -
(TONGKANG 330 FT)

PT. IMMANUEL BATAM


14 CARPENTER TUG BOAT - - - - 1 5 - -
MARINDO

PT. BINA DHARMA


15 HARIAN NJB - - - - - 2 - -
SEJAHTERA

MEKANIK
16 PT.MMJA - - - - - - - -
H-235,H-239

MEKANIK
17 PT M.S.M - - - 4 - 4 - -
H-236,H-240
18 PT.CFB BLASTING & PAINTING - 1 - - - 2 - -

BLASTING & PAINTING


19 PT.BKB - - - - - 7 - -
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS 0 7 0 117 58 84 0 0

LEMBUR TGL 9 - JULI - 2020 (17:00 - 23:00)


WORKING HOURS Hours/day
TOTAL HOURS 24 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.HKJB
1 H-244 - - - - - 4 - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 9 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 55 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.MUJ
1 H-246 - - - 5 - - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 9 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 48 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.KBB
1 H-240 - - - 4 - - - -
(TUG BOAT 30 MTR)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 9 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 24 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.KBB
1 H-239 - - - 2 - - - -
(TUG BOAT 30 MTR)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 9 - JULI - 2020 (18:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 33 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-238 - - - 3 - - - -
(TUG BOAT 30 MTR)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 9 - JULI - 2020 (17:00 - 03:00)


WORKING HOURS Hours/day
TOTAL HOURS 50 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

1 PT.CFB BLASTING & PAINTING - - - - - - - 5

TOTAL WORKERS & HOURS


TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER MATERIAL PER PROJECT

- - - - 3 3 Orang 24

- - - - 8 8 Orang 64

- - - - 17 17 Orang 136

- - - - 4 4 Orang 32

- - - - 20 20 Orang 160

- 1 - - 36 36 Orang 288

- - - - 3 3 Orang 24
- - - - 26 26 Orang 208

- - - - 33 33 Orang 264

- - - - 39 39 Orang 312

- - 1 - 25 25 Orang 200

- - - - 0 0 Orang 0

- - - - 28 28 Orang 224

- - - - 6 6 Orang 48

- - - - 2 2 Orang 16

- - - - 0 0 Orang 0

- - - - 8 8 Orang 64
- - - - 3 3 Orang 24

- - - - 7 7 Orang 56

0 1 1 0 268 268 Orang 2144

TOTAL WORKERS TOTAL


WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 4 4 Orang 24

4 Orang 24

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 5 5 Orang 55
5 Orang 55
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 4 4 Orang 48
4 Orang 48

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 2 2 Orang 24
2 Orang 24

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 3 3 Orang 33
3 Orang 33
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 5 5 Orang 50

5 Orang 50
DAFTAR ABSENSI HARIAN SUBCONTRACTOR PT. NONGSA JAYA BUANA SHIPYARD
11-Jul-20
WORKING HOURS 8 Hours/day
TOTAL HOURS 2120 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN QC WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-235 - - - - 1 5 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


2 H-236 - - - 4 1 - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


3 H-237 - 3 - 4 6 10 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


4 H-238 - - - - - - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


5 H-235,H-236,H-239,H-240 - - - 6 5 6 - -
(PIPING JOB)

PT.KBB
6 H-239 - 2 - 11 8 14 - -
(TUG BOAT 30 MTR)

PT.KBB
7 H-240 - - - 4 - - - -
(TUG BOAT 30 MTR)
PT.KRD
8 H-241 - 1 - 9 9 12 - -
(TONGKANG 330 FT)

PT.TWU
9 H-242 - 1 - 12 16 2 - -
(TONGKANG 330 FT)

PT.PLS
10 H-243 - 1 - 17 - 1 - -
(TONGKANG 330 FT)

PT.HKJB
11 H-244 - 1 - 11 3 8 - -
(TONGKANG 330 FT)

PT.KRD
12 H-245 - - - - - - - -
(TONGKANG 330 FT)

PT.MUJ
13 H-246 - - - 9 9 11 - -
(TONGKANG 330 FT)

PT. IMMANUEL BATAM


14 CARPENTER TUG BOAT - - - 1 - 6 - -
MARINDO

PT. BINA DHARMA


15 HARIAN NJB - - - - - 8 - -
SEJAHTERA

MEKANIK
16 PT.MMJA - 1 - 1 2 2 - -
H-235,H-239

MEKANIK
17 PT M.S.M - - - 2 - 7 - -
H-236,H-240
18 PT.CFB BLASTING & PAINTING - 1 - - - 1 - -

BLASTING & PAINTING


19 PT.BKB - - - - - 7 1 -
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS 0 11 0 91 60 100 1 0

MASUK MALAM TGL 10 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 36 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-235 - - - 3 - - - -
(TUG BOAT 30 MTR)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 10 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 36 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.MUJ
1 H-246 - - - 3 - - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 10 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 65 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

1 PT.CFB BLASTING & PAINTING - - - - - 5 - -

TOTAL WORKERS & HOURS

LEMBUR TGL 10 - JULI - 2020 (17:00 - 21:00)


WORKING HOURS Hours/day
TOTAL HOURS 182 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.KRD
1 H-241 - - - 8 6 - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

LEMBUR TGL 10 - JULI - 2020 (17:00 - 22:30)


WORKING HOURS Hours/day
TOTAL HOURS 42 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.HKJB
1 H-244 - - - - - 7 - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

LEMBUR TGL 10 - JULI - 2020 (17:00 - 21:00 - 22:00 - 24:00)


WORKING HOURS Hours/day
TOTAL HOURS 36 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-237 - - - 5 - 2 - -
(TUG BOAT 30 MTR)
TOTAL WORKERS & HOURS
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER MATERIAL PER PROJECT

- - - - 6 6 Orang 48

- - - - 5 5 Orang 40

- - - - 23 23 Orang 184

- - - - 0 0 Orang 0

- - - - 17 17 Orang 136

- 1 - - 36 36 Orang 288

- - - - 4 4 Orang 32
- - 1 - 32 32 Orang 256

- - - - 31 31 Orang 248

- - - - 19 19 Orang 152

- - - - 23 23 Orang 184

- - - - 0 0 Orang 0

- - - - 29 29 Orang 232

- - - - 7 7 Orang 56

- - - - 8 8 Orang 64

- - - - 6 6 Orang 48

- - - - 9 9 Orang 72
- - - - 2 2 Orang 16

- - - - 8 8 Orang 64

0 1 1 0 265 265 Orang 2120

TOTAL WORKERS TOTAL


WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 3 3 Orang 36

3 Orang 36

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 3 3 Orang 36
3 Orang 36
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 5 5 Orang 65

5 Orang 65

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 14 14 Orang 182
14 Orang 182

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 7 7 Orang 42
7 Orang 42
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 7 7 Orang 36
7 Orang 36
DAFTAR ABSENSI HARIAN SUBCONTRACTOR PT. NONGSA JAYA BUANA SHIPYARD
12-Jul-20
WORKING HOURS 8 Hours/day
TOTAL HOURS 2272 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN QC WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-235 - - - - 1 2 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


2 H-236 - - - 2 1 6 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


3 H-237 - - - 3 4 5 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


4 H-238 - 5 - 2 3 4 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


5 H-235,H-236,H-239,H-240 - - - 6 7 5 - -
(PIPING JOB)

PT.KBB
6 H-239 - 1 - 9 8 17 - -
(TUG BOAT 30 MTR)

PT.KBB
7 H-240 - - - 2 - 1 - -
(TUG BOAT 30 MTR)
PT.KRD
8 H-241 - 1 - 8 6 12 - -
(TONGKANG 330 FT)

PT.TWU
9 H-242 - - - 12 19 3 - -
(TONGKANG 330 FT)

PT.PLS
10 H-243 - 1 - 21 3 8 - -
(TONGKANG 330 FT)

PT.HKJB
11 H-244 - - - 17 2 14 - -
(TONGKANG 330 FT)

PT.KRD
12 H-245 - - - - - - - -
(TONGKANG 330 FT)

PT.MUJ
13 H-246 - - - 12 6 8 - -
(TONGKANG 330 FT)

PT. IMMANUEL BATAM


14 CARPENTER TUG BOAT - - - - - 7 - -
MARINDO

PT. BINA DHARMA


15 HARIAN NJB - - - - - 8 - -
SEJAHTERA

MEKANIK
16 PT.MMJA - 1 - 1 2 2 - -
H-235,H-239

MEKANIK
17 PT M.S.M - - - 2 - 3 - -
H-236,H-240
18 PT.CFB BLASTING & PAINTING - 2 - - - 1 - 2

BLASTING & PAINTING


19 PT.BKB - - - - - 3 2 -
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS 0 11 0 97 62 109 2 2

MASUK MALAM TGL 12 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 72 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.MUJ
1 H-246 - - - 6 - - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 12 - JULI - 2020 (16:00 - 04:00)


WORKING HOURS Hours/day
TOTAL HOURS 48 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

1 PT.CFB BLASTING & PAINTING - - - - - 4 - -

TOTAL WORKERS & HOURS

MASUK MALAM TGL 12 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 36 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.KBB
1 H-240 - - - 3 - - - -
(TUG BOAT 30 MTR)

TOTAL WORKERS & HOURS

MASUK MALAM TGL 12 - JULI - 2020 (16:00 - :03:00)


WORKING HOURS Hours/day
TOTAL HOURS 66 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. BINA DHARMA


1 HARIAN NJB - - - - - 6 - -
SEJAHTERA
TOTAL WORKERS & HOURS
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER MATERIAL PER PROJECT

- - - - 3 3 Orang 24

- 1 - - 10 10 Orang 80

- - - - 12 12 Orang 96

- - - - 14 14 Orang 112

- - - - 18 18 Orang 144

- - - - 35 35 Orang 280

- - - - 3 3 Orang 24
- - - - 27 27 Orang 216

- - - - 34 34 Orang 272

- - - - 33 33 Orang 264

- - - - 33 33 Orang 264

- - - - 0 0 Orang 0

- - - - 26 26 Orang 208

- - - - 7 7 Orang 56

- - - - 8 8 Orang 64

- - - - 6 6 Orang 48

- - - - 5 5 Orang 40
- - - - 5 5 Orang 40

- - - - 5 5 Orang 40

0 1 0 0 284 284 Orang 2272

TOTAL WORKERS TOTAL


WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 6 6 Orang 72

6 Orang 72

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 4 4 Orang 48

4 Orang 48
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 3 3 Orang 36

3 Orang 36

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 6 6 Orang 66
6 Orang 66
DAFTAR ABSENSI HARIAN SUBCONTRACTOR PT. NONGSA JAYA BUANA SHIPYARD
13-Jul-20
WORKING HOURS 8 Hours/day
TOTAL HOURS 2272 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN QC WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-235 - - - - 1 2 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


2 H-236 - - - 2 1 6 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


3 H-237 - - - 3 4 5 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


4 H-238 - 5 - 2 3 4 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


5 H-235,H-236,H-239,H-240 - - - 6 7 5 - -
(PIPING JOB)

PT.KBB
6 H-239 - 1 - 9 8 17 - -
(TUG BOAT 30 MTR)

PT.KBB
7 H-240 - - - 2 - 1 - -
(TUG BOAT 30 MTR)
PT.KRD
8 H-241 - 1 - 8 6 12 - -
(TONGKANG 330 FT)

PT.TWU
9 H-242 - - - 12 19 3 - -
(TONGKANG 330 FT)

PT.PLS
10 H-243 - 1 - 21 3 8 - -
(TONGKANG 330 FT)

PT.HKJB
11 H-244 - - - 17 2 14 - -
(TONGKANG 330 FT)

PT.KRD
12 H-245 - - - - - - - -
(TONGKANG 330 FT)

PT.MUJ
13 H-246 - - - 12 6 8 - -
(TONGKANG 330 FT)

PT. IMMANUEL BATAM


14 CARPENTER TUG BOAT - - - - - 7 - -
MARINDO

PT. BINA DHARMA


15 HARIAN NJB - - - - - 8 - -
SEJAHTERA

MEKANIK
16 PT.MMJA - 1 - 1 2 2 - -
H-235,H-239

MEKANIK
17 PT M.S.M - - - 2 - 3 - -
H-236,H-240
18 PT.CFB BLASTING & PAINTING - 2 - - - 1 - 2

BLASTING & PAINTING


19 PT.BKB - - - - - 3 2 -
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS 0 11 0 97 62 109 2 2

MASUK MALAM TGL 12 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 72 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.MUJ
1 H-246 - - - 6 - - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 12 - JULI - 2020 (16:00 - 04:00)


WORKING HOURS Hours/day
TOTAL HOURS 48 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

1 PT.CFB BLASTING & PAINTING - - - - - 4 - -

TOTAL WORKERS & HOURS

MASUK MALAM TGL 12 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 36 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.KBB
1 H-240 - - - 3 - - - -
(TUG BOAT 30 MTR)

TOTAL WORKERS & HOURS

MASUK MALAM TGL 12 - JULI - 2020 (16:00 - :03:00)


WORKING HOURS Hours/day
TOTAL HOURS 66 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. BINA DHARMA


1 HARIAN NJB - - - - - 6 - -
SEJAHTERA
TOTAL WORKERS & HOURS
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER MATERIAL PER PROJECT

- - - - 3 3 Orang 24

- 1 - - 10 10 Orang 80

- - - - 12 12 Orang 96

- - - - 14 14 Orang 112

- - - - 18 18 Orang 144

- - - - 35 35 Orang 280

- - - - 3 3 Orang 24
- - - - 27 27 Orang 216

- - - - 34 34 Orang 272

- - - - 33 33 Orang 264

- - - - 33 33 Orang 264

- - - - 0 0 Orang 0

- - - - 26 26 Orang 208

- - - - 7 7 Orang 56

- - - - 8 8 Orang 64

- - - - 6 6 Orang 48

- - - - 5 5 Orang 40
- - - - 5 5 Orang 40

- - - - 5 5 Orang 40

0 1 0 0 284 284 Orang 2272

TOTAL WORKERS TOTAL


WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 6 6 Orang 72

6 Orang 72

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 4 4 Orang 48

4 Orang 48
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 3 3 Orang 36

3 Orang 36

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 6 6 Orang 66
6 Orang 66
DAFTAR ABSENSI HARIAN SUBCONTRACTOR PT. NONGSA JAYA BUANA SHIPYARD
14-Jul-20
WORKING HOURS 8 Hours/day
TOTAL HOURS 2168 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN QC WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-235 - - - - - - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


2 H-236 - - - - - 1 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


3 H-237 - 1 - 3 7 5 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


4 H-238 - 1 - 4 3 7 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


5 H-235,H-236,H-239,H-240 - - - 7 6 6 - -
(PIPING JOB)

PT.KBB
6 H-239 - 2 - 10 8 15 - -
(TUG BOAT 30 MTR)

PT.KBB
7 H-240 - - - 3 - 2 - -
(TUG BOAT 30 MTR)
PT.KRD
8 H-241 - 1 - 13 5 10 - -
(TONGKANG 330 FT)

PT.TWU
9 H-242 - - - 9 14 3 - -
(TONGKANG 330 FT)

PT.PLS
10 H-243 - 1 - 24 4 7 - -
(TONGKANG 330 FT)

PT.HKJB
11 H-244 - - - 13 7 6 - -
(TONGKANG 330 FT)

PT.KRD
12 H-245 - - - - - - - -
(TONGKANG 330 FT)

PT.MUJ
13 H-246 - - - 7 7 6 - -
(TONGKANG 330 FT)

PT. IMMANUEL BATAM


14 CARPENTER TUG BOAT - - - 1 - 6 - -
MARINDO

PT. BINA DHARMA


15 HARIAN NJB - - - - - 8 - -
SEJAHTERA

MEKANIK
16 PT.MMJA - 1 - 1 2 2 - -
H-235,H-239

MEKANIK
17 PT M.S.M - - - 1 - 5 - -
H-236,H-240
18 PT.CFB BLASTING & PAINTING - 1 - - - 1 - 1

BLASTING & PAINTING


19 PT.BKB - - - - - 5 1 1
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS 0 8 0 96 63 95 1 2

MASUK MALAM TGL 12 - JULI - 2020 (16:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 39 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

1 PT.CFB BLASTING & PAINTING - - - - - 3 - -

TOTAL WORKERS & HOURS

MASUK MALAM TGL 13 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 24 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.KBB
1 H-239 - - - 2 - - - -
(TUG BOAT 30 MTR)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 13 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 24 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.KBB
1 H-240 - - - 2 - - - -
(TUG BOAT 30 MTR)

TOTAL WORKERS & HOURS

MASUK MALAM TGL 13 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 12 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.MUJ
1 H-246 - - - 1 - - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 13 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 48 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-238 - - - 4 - - - -
(TUG BOAT 30 MTR)
TOTAL WORKERS & HOURS

LEMBUR TGL 13 - JULI - 2020 (17:00 - 20:30)


WORKING HOURS Hours/day
TOTAL HOURS 4 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

MEKANIK
1 PT.MMJA - - - 1 - - - -
H-235,H-239,H-237
TOTAL WORKERS & HOURS

LEMBUR TGL 13 - JULI - 2020 (17:00 - 20:30)


WORKING HOURS Hours/day
TOTAL HOURS 4 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-237 - - - 1 - - - -
(TUG BOAT 30 MTR)
TOTAL WORKERS & HOURS

LEMBUR TGL 13 - JULI - 2020 (17:00 - 21:30)


WORKING HOURS Hours/day
TOTAL HOURS 25 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.HKJB
1 H-244 - - - - - 5 - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER MATERIAL PER PROJECT

- - - - 0 0 Orang 0

- 1 - - 2 2 Orang 16

- - - - 16 16 Orang 128

- 1 - - 16 16 Orang 128

- - - - 19 19 Orang 152

- - - - 35 35 Orang 280

- - - - 5 5 Orang 40
- - - - 29 29 Orang 232

- - - - 26 26 Orang 208

1 - 2 - 39 39 Orang 312

- - 1 - 27 27 Orang 216

- - - - 0 0 Orang 0

- - - - 20 20 Orang 160

- - - - 7 7 Orang 56

- - - - 8 8 Orang 64

- - - - 6 6 Orang 48

- - - - 6 6 Orang 48
- - - - 3 3 Orang 24

- - - - 7 7 Orang 56

1 2 3 0 271 271 Orang 2168

TOTAL WORKERS TOTAL


WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 3 3 Orang 39

3 Orang 39

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 2 2 Orang 24

2 Orang 24
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 2 2 Orang 24

2 Orang 24

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 1 1 Orang 12
1 Orang 12

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 4 4 Orang 48
4 Orang 48
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 1 1 Orang 4
1 Orang 4

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 1 1 Orang 4
1 Orang 4

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 5 5 Orang 25
5 Orang 25
DAFTAR ABSENSI HARIAN SUBCONTRACTOR PT. NONGSA JAYA BUANA SHIPYARD
15-Jul-20
WORKING HOURS 8 Hours/day
TOTAL HOURS 2024 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN QC WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-235 - - - - - - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


2 H-236 - - - - - - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


3 H-237 - - - 2 2 4 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


4 H-238 - 5 - 5 6 8 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


5 H-235,H-236,H-239,H-240 - - - 7 7 6 - -
(PIPING JOB)

PT.KBB
6 H-239 - 2 - 10 10 12 - -
(TUG BOAT 30 MTR)

PT.KBB
7 H-240 - - - - 1 5 - -
(TUG BOAT 30 MTR)
PT.KRD
8 H-241 - 2 - 16 4 7 - -
(TONGKANG 330 FT)

PT.TWU
9 H-242 - - - 10 5 9 - -
(TONGKANG 330 FT)

PT.PLS
10 H-243 - 1 - 17 1 5 - -
(TONGKANG 330 FT)

PT.HKJB
11 H-244 - - - 11 4 4 - -
(TONGKANG 330 FT)

PT.KRD
12 H-245 - - - - - - - -
(TONGKANG 330 FT)

PT.MUJ
13 H-246 - - - 11 4 9 - -
(TONGKANG 330 FT)

PT. IMMANUEL BATAM


14 CARPENTER TUG BOAT - - - 1 - 7 - -
MARINDO

PT. BINA DHARMA


15 HARIAN NJB - - - - - 9 - -
SEJAHTERA

MEKANIK
16 PT.MMJA - 1 - 1 2 2 - -
H-235,H-239

MEKANIK
17 PT M.S.M - - - 4 - 2 - -
H-236,H-240
18 PT.CFB BLASTING & PAINTING - 1 - - - 1 - 2

BLASTING & PAINTING


19 PT.BKB - - - - - 4 - -
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS 0 12 0 95 46 94 0 2

MASUK MALAM TGL 14 - JULI - 2020 (17:30 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 33 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.MUJ
1 H-246 - - - 3 - - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 14 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 60 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. BINA DHARMA


1 HARIAN NJB - - - - - 5 - -
SEJAHTERA
TOTAL WORKERS & HOURS

MASUK MALAM TGL 14 - JULI - 2020 (16:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 65 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

1 PT.CFB BLASTING & PAINTING - - - - - 5 - -

TOTAL WORKERS & HOURS

MASUK MALAM TGL 14 - JULI - 2020 (17:30 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 55 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.KBB
1 H-239 - - - - - 5 - -
(TUG BOAT 30 MTR)
TOTAL WORKERS & HOURS

LEMBUR TGL 14 - JULI - 2020 (17:00 - 21:00)


WORKING HOURS Hours/day
TOTAL HOURS 12 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-237 - 1 - 2 - - - -
(TUG BOAT 30 MTR)
TOTAL WORKERS & HOURS

LEMBUR TGL 14 - JULI - 2020 (17:00 - 21:00)


WORKING HOURS Hours/day
TOTAL HOURS 15 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-238 - - - 3 - - - -
(TUG BOAT 30 MTR)
TOTAL WORKERS & HOURS

LEMBUR TGL 14 - JULI - 2020 (17:00 - 22:30)


WORKING HOURS Hours/day
TOTAL HOURS 48 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.HKJB
1 H-244 - - - 2 - 6 - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER MATERIAL PER PROJECT

- - - - 0 0 Orang 0

- - - - 0 0 Orang 0

- - - - 8 8 Orang 64

- 2 - - 26 26 Orang 208

- - - - 20 20 Orang 160

- - - - 34 34 Orang 272

- - - - 6 6 Orang 48
- - - - 29 29 Orang 232

- - - - 24 24 Orang 192

- - 1 - 25 25 Orang 200

- - 1 - 20 20 Orang 160

- - - - 0 0 Orang 0

- - - - 24 24 Orang 192

- - - - 8 8 Orang 64

- - - - 9 9 Orang 72

- - - - 6 6 Orang 48

- - - - 6 6 Orang 48
- - - - 4 4 Orang 32

- - - - 4 4 Orang 32

0 2 2 0 253 253 Orang 2024

TOTAL WORKERS TOTAL


WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 3 3 Orang 33

3 Orang 33

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 5 5 Orang 60

5 Orang 60
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 5 5 Orang 65

5 Orang 65

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 5 5 Orang 55
5 Orang 55

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 3 3 Orang 12
3 Orang 12
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 3 3 Orang 15
3 Orang 15

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 8 8 Orang 48
8 Orang 48
DAFTAR ABSENSI HARIAN SUBCONTRACTOR PT. NONGSA JAYA BUANA SHIPYARD
16-Jul-20
WORKING HOURS 8 Hours/day
TOTAL HOURS 2264 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN QC WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-235 - - - - - 1 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


2 H-236 - - - - - - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


3 H-237 - - - - - 2 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


4 H-238 - 5 - 8 8 7 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


5 H-235,H-236,H-239,H-240 - - - 5 5 3 - -
(PIPING JOB)

PT.KBB
6 H-239 - 2 - 12 6 17 - -
(TUG BOAT 30 MTR)

PT.KBB
7 H-240 - - - - - - - -
(TUG BOAT 30 MTR)
PT.KRD
8 H-241 - 1 - 24 4 11 - -
(TONGKANG 330 FT)

PT.TWU
9 H-242 - - - 11 12 5 - -
(TONGKANG 330 FT)

PT.PLS
10 H-243 - 1 - 20 4 13 - -
(TONGKANG 330 FT)

PT.HKJB
11 H-244 - - - 11 3 6 - -
(TONGKANG 330 FT)

PT.KRD
12 H-245 - - - 1 3 1 - -
(TONGKANG 330 FT)

PT.MUJ
13 H-246 - - - 12 7 13 - -
(TONGKANG 330 FT)

PT. IMMANUEL BATAM


14 CARPENTER TUG BOAT - - - - - 7 - -
MARINDO

PT. BINA DHARMA


15 HARIAN NJB - - - - - 10 - -
SEJAHTERA

MEKANIK
16 PT.MMJA - 1 - 1 2 2 - -
H-235,H-239

MEKANIK
17 PT M.S.M - - - 3 - 2 - -
H-236,H-240
18 PT.CFB BLASTING & PAINTING - 1 - - - - - 4

BLASTING & PAINTING


19 PT.BKB - - - - - 4 - -
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS 0 11 0 108 54 104 0 4

MASUK MALAM TGL 15 - JULI - 2020 (17:30 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 55 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.KBB
1 H-239 - - - 5 - - - -
(TUG BOAT 30 MTR)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 15 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 48 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.MUJ
1 H-246 - - - 4 - - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 15 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 60 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. BINA DHARMA


1 HARIAN NJB - - - - - 5 - -
SEJAHTERA

TOTAL WORKERS & HOURS

MASUK MALAM TGL 15 - JULI - 2020 (16:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 52 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

1 PT.CFB BLASTING & PAINTING - - - - - 4 - -

TOTAL WORKERS & HOURS

MASUK MALAM TGL 15 - JULI - 2020 (18:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 33 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-238 - - - 3 - - - -
(TUG BOAT 30 MTR)

TOTAL WORKERS & HOURS

LEMBUR TGL 15 - JULI - 2020 (17:00 - 21:00)


WORKING HOURS Hours/day
TOTAL HOURS 12 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-237 - - - 3 - - - -
(TUG BOAT 30 MTR)
TOTAL WORKERS & HOURS

LEMBUR TGL 15 - JULI - 2020 (17:00 - 21:00)


WORKING HOURS Hours/day
TOTAL HOURS 4 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

MEKANIK
1 PT.MMJA - - - 1 - - - -
H-235,H-239
TOTAL WORKERS & HOURS

LEMBUR TGL 15 - JULI - 2020 (17:00 - 23:00)


WORKING HOURS Hours/day
TOTAL HOURS 48 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

MEKANIK
1 PT.MMJA - - - - - 8 - -
H-235,H-239
TOTAL WORKERS & HOURS
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER MATERIAL PER PROJECT

- - - - 1 1 Orang 8

- - - - 0 0 Orang 0

- - - - 2 2 Orang 16

- 1 - - 29 29 Orang 232

- - - - 13 13 Orang 104

- - - - 37 37 Orang 296

- - - - 0 0 Orang 0
- - - - 40 40 Orang 320

- - - - 28 28 Orang 224

- - 1 - 39 39 Orang 312

- - - - 20 20 Orang 160

- - - - 5 5 Orang 40

- - - - 32 32 Orang 256

- - - - 7 7 Orang 56

- - - - 10 10 Orang 80

- - - - 6 6 Orang 48

- - - - 5 5 Orang 40
- - - - 5 5 Orang 40

- - - - 4 4 Orang 32

0 1 1 0 283 283 Orang 2264

TOTAL WORKERS TOTAL


WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 5 5 Orang 55

5 Orang 55

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 4 4 Orang 48

4 Orang 48
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 5 5 Orang 60

5 Orang 60

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 4 4 Orang 52

4 Orang 52

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 3 3 Orang 33

3 Orang 33
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 3 3 Orang 12
3 Orang 12

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 1 1 Orang 4

1 Orang 4

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 8 8 Orang 48
8 Orang 48
DAFTAR ABSENSI HARIAN SUBCONTRACTOR PT. NONGSA JAYA BUANA SHIPYARD
17-Jul-20
WORKING HOURS 8 Hours/day
TOTAL HOURS 2264 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN QC WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-235 - 1 - - - 1 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


2 H-236 - - - - - - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


3 H-237 - 3 - 6 4 11 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


4 H-238 - - - 1 2 1 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


5 H-235,H-236,H-239,H-240 - - - 6 5 5 - -
(PIPING JOB)

PT.KBB
6 H-239 - - - 11 9 21 - -
(TUG BOAT 30 MTR)

PT.KBB
7 H-240 - - - 1 - - - -
(TUG BOAT 30 MTR)
PT.KRD
8 H-241 - 1 - 24 6 13 - -
(TONGKANG 330 FT)

PT.TWU
9 H-242 - - - 13 12 4 - -
(TONGKANG 330 FT)

PT.PLS
10 H-243 - 1 - 17 5 1 - -
(TONGKANG 330 FT)

PT.HKJB
11 H-244 - - - 16 3 11 - -
(TONGKANG 330 FT)

PT.KRD
12 H-245 - - - - - - - -
(TONGKANG 330 FT)

PT.MUJ
13 H-246 - - - 12 4 10 - -
(TONGKANG 330 FT)

PT. IMMANUEL BATAM


14 CARPENTER TUG BOAT - - - - - 7 - -
MARINDO

PT. BINA DHARMA


15 HARIAN NJB - - - - - 9 - -
SEJAHTERA

MEKANIK
16 PT.MMJA - - - 1 2 3 - -
H-235,H-239

MEKANIK
17 PT M.S.M - - - 1 - 5 - -
H-236,H-240
18 PT.CFB BLASTING & PAINTING - 1 - - - 3 - 1

BLASTING & PAINTING


19 PT.BKB - - - - - 8 - -
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS 0 7 0 109 52 113 0 1

MASUK MALAM TGL 16 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 36 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-238 - - - 3 - - - -
(TUG BOAT 30 MTR)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 16 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 55 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

1 PT.CFB BLASTING & PAINTING - - - - - - - 5

TOTAL WORKERS & HOURS

MASUK MALAM TGL 16 - JULI - 2020 (17:30 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 55 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. BINA DHARMA


1 HARIAN NJB - - - - - 5 - -
SEJAHTERA

TOTAL WORKERS & HOURS

MASUK MALAM TGL 16 - JULI - 2020 (17:30 - 05:30)


WORKING HOURS Hours/day
TOTAL HOURS 36 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.MUJ
1 H-246 - - - 3 - - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 16 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 24 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

BLASTING & PAINTING


1 PT.BKB - - - - - - - 2
H-235,H-236,-H-239, H-240

TOTAL WORKERS & HOURS

MASUK MALAM TGL 16 - JULI - 2020 (17:00 - 19:00)


WORKING HOURS Hours/day
TOTAL HOURS 6 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-237 - - - 3 - - - -
(TUG BOAT 30 MTR)
TOTAL WORKERS & HOURS

LEMBUR TGL 16 - JULI - 2020 (17:00 - 22:00)


WORKING HOURS Hours/day
TOTAL HOURS 25 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.HKJB
1 H-244 - - - - - 5 - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER MATERIAL PER PROJECT

- - - - 2 2 Orang 16

- - - - 0 0 Orang 0

- - - - 24 24 Orang 192

- - - - 4 4 Orang 32

- - - - 16 16 Orang 128

- - - - 41 41 Orang 328

- - - - 1 1 Orang 8
- - - - 44 44 Orang 352

- - - - 29 29 Orang 232

- - 1 - 25 25 Orang 200

- - - - 30 30 Orang 240

- - - - 0 0 Orang 0

- - - - 26 26 Orang 208

- - - - 7 7 Orang 56

- - - - 9 9 Orang 72

- - - - 6 6 Orang 48

- - - - 6 6 Orang 48
- - - - 5 5 Orang 40

- - - - 8 8 Orang 64

0 0 1 0 283 283 Orang 2264

TOTAL WORKERS TOTAL


WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 3 3 Orang 36

3 Orang 36

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 5 5 Orang 55

5 Orang 55
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 5 5 Orang 55

5 Orang 55

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 3 3 Orang 36

3 Orang 36

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 2 2 Orang 24

2 Orang 24
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 3 3 Orang 6
3 Orang 6

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 5 5 Orang 25

5 Orang 25
DAFTAR ABSENSI HARIAN SUBCONTRACTOR PT. NONGSA JAYA BUANA SHIPYARD
18-Jul-20
WORKING HOURS 8 Hours/day
TOTAL HOURS 2352 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN QC WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-235 - - - - - 1 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


2 H-236 - - - - - - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


3 H-237 - - - 3 - 9 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


4 H-238 - 2 - 6 5 13 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


5 H-235,H-236,H-239,H-240 - - - 9 5 6 - -
(PIPING JOB)

PT.KBB
6 H-239 - 2 - 11 6 14 - -
(TUG BOAT 30 MTR)

PT.KBB
7 H-240 - - - 3 - 3 - -
(TUG BOAT 30 MTR)
PT.KRD
8 H-241 - - - - - - - -
(TONGKANG 330 FT)

PT.TWU
9 H-242 - - - 9 9 8 - -
(TONGKANG 330 FT)

PT.PLS
10 H-243 - 1 - 16 7 4 - -
(TONGKANG 330 FT)

PT.HKJB
11 H-244 - - - 17 5 13 - -
(TONGKANG 330 FT)

PT.KRD
12 H-245 - 1 - 25 6 9 - -
(TONGKANG 330 FT)

PT.MUJ
13 H-246 - - - 10 6 10 - -
(TONGKANG 330 FT)

PT. IMMANUEL BATAM


14 CARPENTER TUG BOAT - - - 1 - 6 - -
MARINDO

PT. BINA DHARMA


15 HARIAN NJB - - - - - - - -
SEJAHTERA

MEKANIK
16 PT.MMJA - 1 - 1 2 2 - -
H-235,H-239

MEKANIK
17 PT M.S.M - - - 3 - 4 - -
H-236,H-240
18 PT.CFB BLASTING & PAINTING - 1 - - - - - 2

BLASTING & PAINTING


19 PT.BKB - - - - - 16 - -
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS 0 8 0 114 51 118 0 2

MASUK MALAM TGL 17 - JULI - 2020 (17:30 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 33 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-238 - - - 3 - - - -
(TUG BOAT 30 MTR)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 17 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 48 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.KBB
1 H-239 - - - 2 - 2 - -
(TUG BOAT 30 MTR)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 17 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 84 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.MUJ
1 H-246 - - - 7 - - - -
(TONGKANG 330 FT)

TOTAL WORKERS & HOURS

MASUK MALAM TGL 17 - JULI - 2020 (18:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 12 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. BINA DHARMA


1 HARIAN NJB - - - - - 2 - -
SEJAHTERA
TOTAL WORKERS & HOURS

MASUK MALAM TGL 17 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 60 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

1 PT.CFB BLASTING & PAINTING - - - - - - 1 4

TOTAL WORKERS & HOURS

MASUK MALAM TGL 17 - JULI - 2020 (18:00 - 06:00)


WORKING HOURS Hours/day
TOTAL HOURS 36 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

BLASTING & PAINTING


1 PT.BKB - - - - - - 1 2
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS

LEMBUR TGL 17 - JULI - 2020 (17:00 - 21:00)


WORKING HOURS Hours/day
TOTAL HOURS 24 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

BLASTING & PAINTING


1 PT.BKB - - - - - 6 - -
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER MATERIAL PER PROJECT

- - - - 1 1 Orang 8

- - - - 0 0 Orang 0

- - - - 12 12 Orang 96

- - - - 26 26 Orang 208

- - - - 20 20 Orang 160

- - - - 33 33 Orang 264

- - - - 6 6 Orang 48
- - - - 0 0 Orang 0

- - - - 26 26 Orang 208

- - 1 - 29 29 Orang 232

- - - - 35 35 Orang 280

- - - - 41 41 Orang 328

- - - - 26 26 Orang 208

- - - - 7 7 Orang 56

- - - - 0 0 Orang 0

- - - - 6 6 Orang 48

- - - - 7 7 Orang 56
- - - - 3 3 Orang 24

- - - - 16 16 Orang 128

0 0 1 0 294 294 Orang 2352

TOTAL WORKERS TOTAL


WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 3 3 Orang 33

3 Orang 33

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 4 4 Orang 48

4 Orang 48
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 7 7 Orang 84

7 Orang 84

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 2 2 Orang 12

2 Orang 12

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 5 5 Orang 60

5 Orang 60
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 3 3 Orang 36
3 Orang 36

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 6 6 Orang 24

6 Orang 24
DAFTAR ABSENSI HARIAN SUBCONTRACTOR PT. NONGSA JAYA BUANA SHIPYARD
18-Jul-20
WORKING HOURS 8 Hours/day
TOTAL HOURS 2352 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN QC WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-235 - - - - - 1 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


2 H-236 - - - - - - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


3 H-237 - - - 3 - 9 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


4 H-238 - 2 - 6 5 13 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


5 H-235,H-236,H-239,H-240 - - - 9 5 6 - -
(PIPING JOB)

PT.KBB
6 H-239 - 2 - 11 6 14 - -
(TUG BOAT 30 MTR)

PT.KBB
7 H-240 - - - 3 - 3 - -
(TUG BOAT 30 MTR)
PT.KRD
8 H-241 - - - - - - - -
(TONGKANG 330 FT)

PT.TWU
9 H-242 - - - 9 9 8 - -
(TONGKANG 330 FT)

PT.PLS
10 H-243 - 1 - 16 7 4 - -
(TONGKANG 330 FT)

PT.HKJB
11 H-244 - - - 17 5 13 - -
(TONGKANG 330 FT)

PT.KRD
12 H-245 - 1 - 25 6 9 - -
(TONGKANG 330 FT)

PT.MUJ
13 H-246 - - - 10 6 10 - -
(TONGKANG 330 FT)

PT. IMMANUEL BATAM


14 CARPENTER TUG BOAT - - - 1 - 6 - -
MARINDO

PT. BINA DHARMA


15 HARIAN NJB - - - - - - - -
SEJAHTERA

MEKANIK
16 PT.MMJA - 1 - 1 2 2 - -
H-235,H-239

MEKANIK
17 PT M.S.M - - - 3 - 4 - -
H-236,H-240
18 PT.CFB BLASTING & PAINTING - 1 - - - - - 2

BLASTING & PAINTING


19 PT.BKB - - - - - 16 - -
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS 0 8 0 114 51 118 0 2

MASUK MALAM TGL 17 - JULI - 2020 (17:30 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 33 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-238 - - - 3 - - - -
(TUG BOAT 30 MTR)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 17 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 48 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.KBB
1 H-239 - - - 2 - 2 - -
(TUG BOAT 30 MTR)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 17 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 84 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.MUJ
1 H-246 - - - 7 - - - -
(TONGKANG 330 FT)

TOTAL WORKERS & HOURS

MASUK MALAM TGL 17 - JULI - 2020 (18:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 12 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. BINA DHARMA


1 HARIAN NJB - - - - - 2 - -
SEJAHTERA
TOTAL WORKERS & HOURS

MASUK MALAM TGL 17 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 60 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

1 PT.CFB BLASTING & PAINTING - - - - - - 1 4

TOTAL WORKERS & HOURS

MASUK MALAM TGL 17 - JULI - 2020 (18:00 - 06:00)


WORKING HOURS Hours/day
TOTAL HOURS 36 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

BLASTING & PAINTING


1 PT.BKB - - - - - - 1 2
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS

LEMBUR TGL 17 - JULI - 2020 (17:00 - 21:00)


WORKING HOURS Hours/day
TOTAL HOURS 24 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

BLASTING & PAINTING


1 PT.BKB - - - - - 6 - -
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER MATERIAL PER PROJECT

- - - - 1 1 Orang 8

- - - - 0 0 Orang 0

- - - - 12 12 Orang 96

- - - - 26 26 Orang 208

- - - - 20 20 Orang 160

- - - - 33 33 Orang 264

- - - - 6 6 Orang 48
- - - - 0 0 Orang 0

- - - - 26 26 Orang 208

- - 1 - 29 29 Orang 232

- - - - 35 35 Orang 280

- - - - 41 41 Orang 328

- - - - 26 26 Orang 208

- - - - 7 7 Orang 56

- - - - 0 0 Orang 0

- - - - 6 6 Orang 48

- - - - 7 7 Orang 56
- - - - 3 3 Orang 24

- - - - 16 16 Orang 128

0 0 1 0 294 294 Orang 2352

TOTAL WORKERS TOTAL


WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 3 3 Orang 33

3 Orang 33

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 4 4 Orang 48

4 Orang 48
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 7 7 Orang 84

7 Orang 84

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 2 2 Orang 12

2 Orang 12

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 5 5 Orang 60

5 Orang 60
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 3 3 Orang 36
3 Orang 36

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 6 6 Orang 24

6 Orang 24
DAFTAR ABSENSI HARIAN SUBCONTRACTOR PT. NONGSA JAYA BUANA SHIPYARD
20-Jul-20
WORKING HOURS 8 Hours/day
TOTAL HOURS 2168 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN QC WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-235 - - - - - - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


2 H-236 - - - - - - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


3 H-237 - - - 2 - 3 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


4 H-238 - 4 - 6 9 8 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


5 H-235,H-236,H-239,H-240 - - - 5 6 7 - -
(PIPING JOB)

PT.KBB
6 H-239 - - - - - - - -
(TUG BOAT 30 MTR)

PT.KBB
7 H-240 - - - - - - - -
(TUG BOAT 30 MTR)
PT.KRD
8 H-241 - 1 - 27 8 13 - -
(TONGKANG 330 FT)

PT.TWU
9 H-242 - - - 13 11 4 - -
(TONGKANG 330 FT)

PT.PLS
10 H-243 - 3 - 15 6 3 - -
(TONGKANG 330 FT)

PT.HKJB
11 H-244 - - - 15 6 12 - -
(TONGKANG 330 FT)

PT.KRD
12 H-245 - - - - - - - -
(TONGKANG 330 FT)

PT.MUJ
13 H-246 - - - 15 4 15 - -
(TONGKANG 330 FT)

PT. IMMANUEL BATAM


14 CARPENTER TUG BOAT - - - - - 7 - -
MARINDO

PT. BINA DHARMA


15 HARIAN NJB - - - - - 8 - -
SEJAHTERA

MEKANIK
16 PT.MMJA - 1 - 1 2 2 - -
H-235,H-239

MEKANIK
17 PT M.S.M - - - 2 - 6 - -
H-236,H-240
18 PT.CFB BLASTING & PAINTING - 1 - - - 1 1 2

BLASTING & PAINTING


19 PT.BKB - - - - - 14 - -
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS 0 10 0 101 52 103 1 2

LEMBUR TGL 19 - JULI - 2020 (17:00 - 24:00)


WORKING HOURS Hours/day
TOTAL HOURS 14 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.KRD
1 H-241 - - - 2 - - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 19 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 60 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.MUJ
1 H-246 - - - 5 - - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 19 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 24 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.HKJB
1 H-244 - - - 2 - - - -
(TONGKANG 330 FT)

TOTAL WORKERS & HOURS

MASUK MALAM TGL 19 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 60 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

1 PT.CFB BLASTING & PAINTING - - - - - 5 - -

TOTAL WORKERS & HOURS

MASUK MALAM TGL 19 - JULI - 2020 (17:00 - 24:00)


WORKING HOURS Hours/day
TOTAL HOURS 30 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. BINA DHARMA


1 HARIAN NJB - - - - - 5 - -
SEJAHTERA

TOTAL WORKERS & HOURS


TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER MATERIAL PER PROJECT

- - - - 0 0 Orang 0

- - - - 0 0 Orang 0

- - - - 5 5 Orang 40

- 1 - - 28 28 Orang 224

- - - - 18 18 Orang 144

- - - - 0 0 Orang 0

- - - - 0 0 Orang 0
- - - - 49 49 Orang 392

- - - - 28 28 Orang 224

- - 1 - 28 28 Orang 224

- - - - 33 33 Orang 264

- - - - 0 0 Orang 0

- - - - 34 34 Orang 272

- - - - 7 7 Orang 56

- - - - 8 8 Orang 64

- - - - 6 6 Orang 48

- - - - 8 8 Orang 64
- - - - 5 5 Orang 40

- - - - 14 14 Orang 112

0 1 1 0 271 271 Orang 2168

TOTAL WORKERS TOTAL


WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 2 2 Orang 14

2 Orang 14

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 5 5 Orang 60

5 Orang 60
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 2 2 Orang 24

2 Orang 24

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 5 5 Orang 60

5 Orang 60

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 5 5 Orang 30

5 Orang 30
DAFTAR ABSENSI HARIAN SUBCONTRACTOR PT. NONGSA JAYA BUANA SHIPYARD
21-Jul-20
WORKING HOURS 8 Hours/day
TOTAL HOURS 1912 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN QC WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-235 - - - - 4 1 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


2 H-236 - - - - - - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


3 H-237 - 1 - 3 2 2 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


4 H-238 - 1 - 7 6 12 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


5 H-235,H-236,H-239,H-240 - - - 7 6 7 - -
(PIPING JOB)

PT.KBB
6 H-239 - - - - - - - -
(TUG BOAT 30 MTR)

PT.KBB
7 H-240 - - - - - - - -
(TUG BOAT 30 MTR)
PT.KRD
8 H-241 - 1 - 18 3 10 - -
(TONGKANG 330 FT)

PT.TWU
9 H-242 - 1 - 10 11 2 - -
(TONGKANG 330 FT)

PT.PLS
10 H-243 - 1 - 14 3 3 - -
(TONGKANG 330 FT)

PT.HKJB
11 H-244 - - - 20 5 14 - -
(TONGKANG 330 FT)

PT.KRD
12 H-245 - - - - - - - -
(TONGKANG 330 FT)

PT.MUJ
13 H-246 - - - 9 7 5 - -
(TONGKANG 330 FT)

PT. IMMANUEL BATAM


14 CARPENTER TUG BOAT - - - 1 - 7 - -
MARINDO

PT. BINA DHARMA


15 HARIAN NJB - - - - - 13 - -
SEJAHTERA

MEKANIK
16 PT.MMJA - 1 - 1 2 2 - -
H-235,H-239

MEKANIK
17 PT M.S.M - - - - - 5 - -
H-236,H-240
18 PT.CFB BLASTING & PAINTING - 2 - - - 2 1 -

BLASTING & PAINTING


19 PT.BKB - - - - - 5 - -
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS 0 8 0 90 49 90 1 0

MASUK MALAM TGL 20 - JULI - 2020 (17:00 - 06:00)


WORKING HOURS Hours/day
TOTAL HOURS 78 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

BLASTING & PAINTING


1 PT.BKB - - - - - 4 1 1
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS

LEMBUR TGL 20 - JULI - 2020 (17:00 - 22:30)


WORKING HOURS Hours/day
TOTAL HOURS 42 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.HKJB
1 H-244 - - - - - 7 - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 20 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 24 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.HKJB
1 H-244 - - - - - 2 - -
(TONGKANG 330 FT)

TOTAL WORKERS & HOURS

MASUK MALAM TGL 20 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 60 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

1 PT.CFB BLASTING & PAINTING - - - - - 5 - -

TOTAL WORKERS & HOURS

MASUK MALAM TGL 20 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 24 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.MUJ
1 H-246 - - - 2 - - - -
(TONGKANG 330 FT)

TOTAL WORKERS & HOURS


TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER MATERIAL PER PROJECT

- - - - 5 5 Orang 40

- - - - 0 0 Orang 0

- - - - 8 8 Orang 64

- - - - 26 26 Orang 208

- - - - 20 20 Orang 160

- - - - 0 0 Orang 0

- - - - 0 0 Orang 0
- - - - 32 32 Orang 256

- - - - 24 24 Orang 192

- - - - 21 21 Orang 168

- - 1 - 40 40 Orang 320

- - - - 0 0 Orang 0

- - - - 21 21 Orang 168

- - - - 8 8 Orang 64

- - - - 13 13 Orang 104

- - - - 6 6 Orang 48

- - - - 5 5 Orang 40
- - - - 5 5 Orang 40

- - - - 5 5 Orang 40

0 0 1 0 239 239 Orang 1912

TOTAL WORKERS TOTAL


WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 6 6 Orang 78

6 Orang 78

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 7 7 Orang 42

7 Orang 42
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 2 2 Orang 24

2 Orang 24

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 5 5 Orang 60

5 Orang 60

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 2 2 Orang 24

2 Orang 24
DAFTAR ABSENSI HARIAN SUBCONTRACTOR PT. NONGSA JAYA BUANA SHIPYARD
22-Jul-20
WORKING HOURS 8 Hours/day
TOTAL HOURS 2112 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN QC WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-235 - - - - - - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


2 H-236 - - - - - - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


3 H-237 - 1 - 2 3 8 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


4 H-238 - 2 - 10 6 5 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


5 H-235,H-236,H-239,H-240 - - - 7 5 6 - -
(PIPING JOB)

PT.KBB
6 H-239 - - - - - - - -
(TUG BOAT 30 MTR)

PT.KBB
7 H-240 - - - - - - - -
(TUG BOAT 30 MTR)
PT.KRD
8 H-241 - 1 - 20 8 12 - -
(TONGKANG 330 FT)

PT.TWU
9 H-242 - 1 - 8 10 3 - -
(TONGKANG 330 FT)

PT.PLS
10 H-243 - 1 - 18 6 4 - -
(TONGKANG 330 FT)

PT.HKJB
11 H-244 - - - 27 9 7 - -
(TONGKANG 330 FT)

PT.HKJ
12 H-245 - - - - 2 3 - -
(TONGKANG 330 FT)

PT.MUJ
13 H-246 - - - 8 3 12 - -
(TONGKANG 330 FT)

PT. IMMANUEL BATAM


14 CARPENTER TUG BOAT - - - - - 7 - -
MARINDO

PT. BINA DHARMA


15 HARIAN NJB - - - - - 10 - -
SEJAHTERA

MEKANIK
16 PT.MMJA - 1 - 1 2 2 - -
H-235,H-239

MEKANIK
17 PT M.S.M - - - - - 3 - -
H-236,H-240
18 PT.CFB BLASTING & PAINTING - 1 - - - 2 - 1

BLASTING & PAINTING


19 PT.BKB - - - - - 13 - -
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS 0 8 0 101 54 97 0 1

MASUK MALAM TGL 20 - JULI - 2020 (17:00 - 06:00)


WORKING HOURS Hours/day
TOTAL HOURS 78 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

BLASTING & PAINTING


1 PT.BKB - - - - - 4 1 1
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS

LEMBUR TGL 20 - JULI - 2020 (17:00 - 22:30)


WORKING HOURS Hours/day
TOTAL HOURS 42 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.HKJB
1 H-244 - - - - - 7 - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 20 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 24 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.HKJB
1 H-244 - - - - - 2 - -
(TONGKANG 330 FT)

TOTAL WORKERS & HOURS

MASUK MALAM TGL 20 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 60 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

1 PT.CFB BLASTING & PAINTING - - - - - 5 - -

TOTAL WORKERS & HOURS

MASUK MALAM TGL 20 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 24 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.MUJ
1 H-246 - - - 2 - - - -
(TONGKANG 330 FT)

TOTAL WORKERS & HOURS


TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER MATERIAL PER PROJECT

- - - - 0 0 Orang 0

- - - - 0 0 Orang 0

- 1 - - 15 15 Orang 120

- - - - 23 23 Orang 184

- - - - 18 18 Orang 144

- - - - 0 0 Orang 0

- - - - 0 0 Orang 0
- - - - 41 41 Orang 328

- - - - 22 22 Orang 176

- - 1 - 30 30 Orang 240

- - 1 - 44 44 Orang 352

- - - - 5 5 Orang 40

- - - - 23 23 Orang 184

- - - - 7 7 Orang 56

- - - - 10 10 Orang 80

- - - - 6 6 Orang 48

- - - - 3 3 Orang 24
- - - - 4 4 Orang 32

- - - - 13 13 Orang 104

0 1 2 0 264 264 Orang 2112

TOTAL WORKERS TOTAL


WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 6 6 Orang 78

6 Orang 78

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 7 7 Orang 42

7 Orang 42
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 2 2 Orang 24

2 Orang 24

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 5 5 Orang 60

5 Orang 60

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 2 2 Orang 24

2 Orang 24
DAFTAR ABSENSI HARIAN SUBCONTRACTOR PT. NONGSA JAYA BUANA SHIPYARD
23-Jul-20
WORKING HOURS 8 Hours/day
TOTAL HOURS 2240 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN QC WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-235 - - - - - 1 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


2 H-236 - 1 - 4 6 6 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


3 H-237 - 1 - 3 4 3 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


4 H-238 - - - - - - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


5 H-235,H-236,H-239,H-240 - - - 8 7 4 - -
(PIPING JOB)

PT.KBB
6 H-239 - - - - - 1 - -
(TUG BOAT 30 MTR)

PT.KBB
7 H-240 - - - - - - - -
(TUG BOAT 30 MTR)
PT.KRD
8 H-241 - 1 - 20 7 11 - -
(TONGKANG 330 FT)

PT.TWU
9 H-242 - 1 - 11 5 8 - -
(TONGKANG 330 FT)

PT.PLS
10 H-243 - 1 - 13 3 8 - -
(TONGKANG 330 FT)

PT.HKJB
11 H-244 - - - 37 6 13 - -
(TONGKANG 330 FT)

PT.HKJ
12 H-245 - - - 6 1 - - -
(TONGKANG 330 FT)

PT.MUJ
13 H-246 - - - 9 6 11 - -
(TONGKANG 330 FT)

PT. IMMANUEL BATAM


14 CARPENTER TUG BOAT - - - - - 6 - -
MARINDO

PT. BINA DHARMA


15 HARIAN NJB - - - - - 11 - -
SEJAHTERA

MEKANIK
16 PT.MMJA - 1 - 1 2 2 - -
H-235,H-239

MEKANIK
17 PT M.S.M - - - - - 6 - -
H-236,H-240
18 PT.CFB BLASTING & PAINTING - 1 - - - 2 - 2

BLASTING & PAINTING


19 PT.BKB - - - - - 17 - 1
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS 0 7 0 112 47 110 0 3

MASUK MALAM TGL 22 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 96 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.MUJ
1 H-246 - - - 7 - 1 - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 22 - JULI - 2020 (16:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 52 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

1 PT.CFB BLASTING & PAINTING - - - 4 - - - -

TOTAL WORKERS & HOURS

MASUK MALAM TGL 22 - JULI - 2020 (17:00 - 20:00)


WORKING HOURS Hours/day
TOTAL HOURS 18 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

1 PT.BKB BLASTING & PAINTING - - - - - 4 1 1

TOTAL WORKERS & HOURS

MASUK MALAM TGL 22 - JULI - 2020 (17:00 - 20:00)


WORKING HOURS Hours/day
TOTAL HOURS 28 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.HKJB
1 H-244 - - - - - 4 - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER MATERIAL PER PROJECT

- - - - 1 1 Orang 8

- - - - 17 17 Orang 136

- - - - 11 11 Orang 88

- - - - 0 0 Orang 0

- - - - 19 19 Orang 152

- - - - 1 1 Orang 8

- - - - 0 0 Orang 0
- - - - 39 39 Orang 312

- - - - 25 25 Orang 200

- - - - 25 25 Orang 200

- - - - 56 56 Orang 448

- - 1 - 8 8 Orang 64

- - - - 26 26 Orang 208

- - - - 6 6 Orang 48

- - - - 11 11 Orang 88

- - - - 6 6 Orang 48

- - - - 6 6 Orang 48
- - - - 5 5 Orang 40

- - - - 18 18 Orang 144

0 0 1 0 280 280 Orang 2240

TOTAL WORKERS TOTAL


WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 8 8 Orang 96

8 Orang 96

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 4 4 Orang 52

4 Orang 52
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 6 6 Orang 18

6 Orang 18

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 4 4 Orang 28

4 Orang 28
DAFTAR ABSENSI HARIAN SUBCONTRACTOR PT. NONGSA JAYA BUANA SHIPYARD
24-Jul-20
WORKING HOURS 8 Hours/day
TOTAL HOURS 2184 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN QC WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-235 - - - - 4 2 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


2 H-236 - - - - - 2 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


3 H-237 - 2 - 8 3 6 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


4 H-238 - 1 - 1 4 3 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


5 H-235,H-236,H-239,H-240 - - - 11 4 4 - -
(PIPING JOB)

PT.KBB
6 H-239 - - - 1 - 2 - -
(TUG BOAT 30 MTR)

PT.KBB
7 H-240 - - - - - - - -
(TUG BOAT 30 MTR)
PT.KRD
8 H-241 - - - 19 6 9 - -
(TONGKANG 330 FT)

PT.TWU
9 H-242 - 1 - 9 6 3 - -
(TONGKANG 330 FT)

PT.PLS
10 H-243 - 1 - 20 3 14 - -
(TONGKANG 330 FT)

PT.HKJB
11 H-244 - - - 33 6 4 - -
(TONGKANG 330 FT)

PT.HKJ
12 H-245 - - - - 3 2 - -
(TONGKANG 330 FT)

PT.MUJ
13 H-246 - 1 - 12 4 9 - -
(TONGKANG 330 FT)

PT. IMMANUEL BATAM


14 CARPENTER TUG BOAT - - - 1 - 5 - -
MARINDO

PT. BINA DHARMA


15 HARIAN NJB - - - - - 7 - -
SEJAHTERA

MEKANIK
16 PT.MMJA - 1 - 1 2 2 - -
H-235,H-239

MEKANIK
17 PT M.S.M - - - - - 5 - -
H-236,H-240
18 PT.CFB BLASTING & PAINTING - - - - - 5 - 1

BLASTING & PAINTING


19 PT.BKB - 1 - - - 17 - 1
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS 0 8 0 116 45 101 0 2

MASUK MALAM TGL 23 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 60 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. BINA DHARMA


1 HARIAN NJB - - - - - 5 - -
SEJAHTERA
TOTAL WORKERS & HOURS

MASUK MALAM TGL 23 - JULI - 2020 (17:00 - 03:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 42 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

1 PT.CFB BLASTING & PAINTING - - - - - 4 - -

TOTAL WORKERS & HOURS

MASUK MALAM TGL 23 - JULI - 2020 (17:00 - 24:00)


WORKING HOURS Hours/day
TOTAL HOURS 35 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

BLASTING & PAINTING


1 PT.BKB - - - - - 5 - -
H-235,H-236,-H-239, H-240

TOTAL WORKERS & HOURS

MASUK MALAM TGL 23 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 48 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.HKJB
1 H-244 - - - 4 - - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

LEMBUR TGL 23 - JULI - 2020 (17:00 - 22:30)


WORKING HOURS Hours/day
TOTAL HOURS 60 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.HKJB
1 H-244 - - - - - 10 - -
(TONGKANG 330 FT)

TOTAL WORKERS & HOURS

MASUK MALAM TGL 23 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 96 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.MUJ
1 H-246 - - - 7 1 - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER MATERIAL PER PROJECT

- - - - 6 6 Orang 48

- - - - 2 2 Orang 16

- - - - 19 19 Orang 152

- 1 - - 10 10 Orang 80

- - - - 19 19 Orang 152

- - - - 3 3 Orang 24

- - - - 0 0 Orang 0
- - - - 34 34 Orang 272

- - - - 19 19 Orang 152

- - - - 38 38 Orang 304

- - - - 43 43 Orang 344

- - - - 5 5 Orang 40

- - - - 26 26 Orang 208

- - - - 6 6 Orang 48

- - - - 7 7 Orang 56

- - - - 6 6 Orang 48

- - - - 5 5 Orang 40
- - - - 6 6 Orang 48

- - - - 19 19 Orang 152

0 1 0 0 273 273 Orang 2184

TOTAL WORKERS TOTAL


WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 5 5 Orang 60

5 Orang 60

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 4 4 Orang 42

4 Orang 42
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 5 5 Orang 35

5 Orang 35

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 4 4 Orang 48

4 Orang 48

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 10 10 Orang 60

10 Orang 60
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 8 8 Orang 96
8 Orang 96
DAFTAR ABSENSI HARIAN SUBCONTRACTOR PT. NONGSA JAYA BUANA SHIPYARD
25-Jul-20
WORKING HOURS 8 Hours/day
TOTAL HOURS 2416 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN QC WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-235 - 1 - 2 2 1 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


2 H-236 - - - - 2 2 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


3 H-237 - - - - 1 1 6 -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


4 H-238 - 3 - 10 4 12 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


5 H-235,H-236,H-239,H-240 - - - 7 5 7 - -
(PIPING JOB)

PT.GKS
6 H-239 - - - - - 1 - -
(TUG BOAT 30 MTR)

PT.GKS
7 H-240 - - - - 1 1 - -
(TUG BOAT 30 MTR)
PT.KRD
8 H-241 - 1 - 25 4 9 - -
(TONGKANG 330 FT)

PT.TWU
9 H-242 - 1 - 17 9 2 - -
(TONGKANG 330 FT)

PT.PLS
10 H-243 - 2 - 16 6 11 - -
(TONGKANG 330 FT)

PT.HKJB
11 H-244 - - - 2 2 1 - -
(TONGKANG 330 FT)

PT.HKJB
12 H-245 - - - 21 7 13 - -
(TONGKANG 330 FT)

PT.MUJ
13 H-246 - - - 15 6 16 - -
(TONGKANG 330 FT)

PT. IMMANUEL BATAM


14 CARPENTER TUG BOAT - - - - - 7 - -
MARINDO

PT. BINA DHARMA


15 HARIAN NJB - - - - - 8 - -
SEJAHTERA

MEKANIK
16 PT.MMJA - 1 - 1 2 2 - -
H-235,H-239

MEKANIK
17 PT M.S.M - - - - - 6 - -
H-236,H-240
18 PT.CFB BLASTING & PAINTING - - - - - 5 - -

BLASTING & PAINTING


19 PT.BKB - 1 - - - 8 1 3
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS 0 10 0 116 51 113 7 3

MASUK MALAM TGL 24 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 60 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. BINA DHARMA


1 H-245 - - - 5 - - - -
SEJAHTERA
TOTAL WORKERS & HOURS

LEMBUR TGL 24 - JULI - 2020 (17:00 - 22:00)


WORKING HOURS Hours/day
TOTAL HOURS 100 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. BINA DHARMA


1 H-245 - - - 10 - 10 - -
SEJAHTERA
TOTAL WORKERS & HOURS

MASUK MALAM TGL 24 - JULI - 2020 (18:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 88 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.MUJ
1 H-246 - - - 7 - 1 - -
(TONGKANG 330 FT)

TOTAL WORKERS & HOURS

MASUK MALAM TGL 24 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 24 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.MUJ
1 H-246 - - - - - 1 - 1
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

LEMBUR TGL 24 - JULI - 2020 (17:00 - 20:00)


WORKING HOURS Hours/day
TOTAL HOURS 3 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.MUJ
1 H-246 - - - - - - - 1
(TONGKANG 330 FT)

TOTAL WORKERS & HOURS

MASUK MALAM TGL 24 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 48 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. BINA DHARMA


1 HARIAN NJB - - - - - 4 - -
SEJAHTERA
TOTAL WORKERS & HOURS

MASUK MALAM TGL 24 - JULI - 2020 (17:00 - 23:00)


WORKING HOURS Hours/day
TOTAL HOURS 24 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

1 PT.CFB BLASTING & PAINTING - - - - - 4 - -

TOTAL WORKERS & HOURS

MASUK MALAM TGL 24 - JULI - 2020 (17:00 - 21:00)


WORKING HOURS Hours/day
TOTAL HOURS 12 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

MEKANIK
1 PT.MMJA - - - 3 - - - -
H-235,H-239
TOTAL WORKERS & HOURS
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER MATERIAL PER PROJECT

- - - - 6 6 Orang 48

- - - - 4 4 Orang 32

- - - - 8 8 Orang 64

- - - - 29 29 Orang 232

- - - - 19 19 Orang 152

- - - - 1 1 Orang 8

- - - - 2 2 Orang 16
- - - - 39 39 Orang 312

- - - - 29 29 Orang 232

- - 1 - 36 36 Orang 288

- - 1 - 6 6 Orang 48

- - - - 41 41 Orang 328

- - - - 37 37 Orang 296

- - - - 7 7 Orang 56

- - - - 8 8 Orang 64

- - - - 6 6 Orang 48

- - - - 6 6 Orang 48
- - - - 5 5 Orang 40

- - - - 13 13 Orang 104

0 0 2 0 302 302 Orang 2416

TOTAL WORKERS TOTAL


WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 5 5 Orang 60

5 Orang 60

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 20 20 Orang 100

20 Orang 100
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 8 8 Orang 88

8 Orang 88

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 2 2 Orang 24

2 Orang 24

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 1 1 Orang 3

1 Orang 3
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 4 4 Orang 48
4 Orang 48

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 4 4 Orang 24

4 Orang 24

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 3 3 Orang 12
3 Orang 12
DAFTAR ABSENSI HARIAN SUBCONTRACTOR PT. NONGSA JAYA BUANA SHIPYARD
26-Jul-20
WORKING HOURS 8 Hours/day
TOTAL HOURS 1336 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN QC WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-235 - - - - - - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


2 H-236 - 2 - 1 1 3 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


3 H-237 - 1 - 2 6 4 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


4 H-238 - - - - - 3 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


5 H-235,H-236,H-239,H-240 - - - 10 7 4 - -
(PIPING JOB)

PT.GKS
6 H-239 - - - 1 1 - - -
(TUG BOAT 30 MTR)

PT.GKS
7 H-240 - - - 1 - - - -
(TUG BOAT 30 MTR)
PT.KRD
8 H-241 - - - 15 - 7 - -
(TONGKANG 330 FT)

PT.TWU
9 H-242 - - - 2 - 2 - -
(TONGKANG 330 FT)

PT.PLS
10 H-243 - 1 - 11 7 4 - -
(TONGKANG 330 FT)

PT.HKJB
11 H-244 - - - 12 4 6 - -
(TONGKANG 330 FT)

PT.HKJB
12 H-245 - - - 3 - 1 - -
(TONGKANG 330 FT)

PT.MUJ
13 H-246 - 1 - 13 4 - - -
(TONGKANG 330 FT)

PT. IMMANUEL BATAM


14 CARPENTER TUG BOAT - - - - - - - -
MARINDO

PT. BINA DHARMA


15 HARIAN NJB - - - - - 4 - -
SEJAHTERA

MEKANIK
16 PT.MMJA - - - - - - - -
H-235,H-239

MEKANIK
17 PT M.S.M - - - - - 7 - -
H-236,H-240
18 PT.CFB BLASTING & PAINTING - 1 - - - 2 1 1

BLASTING & PAINTING


19 PT.BKB - 2 - - - 4 1 1
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS 0 8 0 71 30 51 2 2

MASUK MALAM TGL 25 - JULI - 2020 (18:00 - 04:30)


WORKING HOURS Hours/day
TOTAL HOURS 31.5 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. BINA DHARMA


1 H-245 - - - 3 - - - -
SEJAHTERA
TOTAL WORKERS & HOURS

MASUK MALAM TGL 25 - JULI - 2020 (18:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 22 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.MUJ
1 H-246 - - - 2 - - - -
(TONGKANG 330 FT)

TOTAL WORKERS & HOURS

LEMBUR TGL 25 - JULI - 2020 (18:00 - 21:00)


WORKING HOURS Hours/day
TOTAL HOURS 45 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.HKJB
1 H-245 - - - 15 - - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER MATERIAL PER PROJECT

- - - - 0 0 Orang 0

- - - - 7 7 Orang 56

- - - - 13 13 Orang 104

- - - - 3 3 Orang 24

- - - - 21 21 Orang 168

- - - - 2 2 Orang 16

- - - - 1 1 Orang 8
- - - - 22 22 Orang 176

- - - - 4 4 Orang 32

- - 1 - 24 24 Orang 192

- - 1 - 23 23 Orang 184

- 1 - - 5 5 Orang 40

- - - - 18 18 Orang 144

- - - - 0 0 Orang 0

- - - - 4 4 Orang 32

- - - - 0 0 Orang 0

- - - - 7 7 Orang 56
- - - - 5 5 Orang 40

- - - - 8 8 Orang 64

0 1 2 0 167 167 Orang 1336

TOTAL WORKERS TOTAL


WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 3 3 Orang 31.5

3 Orang 31.5

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 2 2 Orang 22

2 Orang 22
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 15 15 Orang 45
15 Orang 45
DAFTAR ABSENSI HARIAN SUBCONTRACTOR PT. NONGSA JAYA BUANA SHIPYARD
27-Jul-20
WORKING HOURS 8 Hours/day
TOTAL HOURS 2472 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN QC WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-235 - - - 2 1 3 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


2 H-236 - 2 - 3 3 2 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


3 H-237 - 1 - 6 5 3 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


4 H-238 - - - 3 6 10 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES H-235,H-236,H-237,H-238,


5 - - - 6 6 4 - -
(PIPING JOB) H-239,H-240

PT.GKS
6 H-239 - - - - - 1 - -
(TUG BOAT 30 MTR)

PT.GKS
7 H-240 - 1 - 1 1 - - -
(TUG BOAT 30 MTR)
PT.KRD
8 H-241 - - - 22 4 9 - -
(TONGKANG 330 FT)

PT.TWU
9 H-242 - 1 - 21 10 2 - -
(TONGKANG 330 FT)

PT.PLS
10 H-243 - 4 - 14 7 6 - -
(TONGKANG 330 FT)

PT.HKJB
11 H-244 - - - 25 6 10 - -
(TONGKANG 330 FT)

PT.HKJB
12 H-245 - - - 8 1 1 - -
(TONGKANG 330 FT)

PT.MUJ
13 H-246 - 1 - 18 3 10 - -
(TONGKANG 330 FT)

PT. IMMANUEL BATAM


14 CARPENTER TUG BOAT - - - 1 - 5 - -
MARINDO

PT. BINA DHARMA


15 HARIAN NJB - - - - - 10 - -
SEJAHTERA

MEKANIK
16 PT.MMJA - 1 - 2 2 1 - -
H-235,H-239

MEKANIK
17 PT M.S.M - - - - - 6 - -
H-236,H-240
18 PT.CFB BLASTING & PAINTING - 1 - - - 2 - 2

BLASTING & PAINTING


19 PT.BKB - 1 - - - - 1 2
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS 0 13 0 132 55 85 1 4

MASUK MALAM TGL 26 - JULI - 2020 (18:00 - 24:00)


WORKING HOURS Hours/day
TOTAL HOURS 6 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.MUJ
1 H-246 - - - 1 - - - -
(TONGKANG 330 FT)

TOTAL WORKERS & HOURS

MASUK MALAM TGL 26 - JULI - 2020 (18:00 - 24:00)


WORKING HOURS Hours/day
TOTAL HOURS 18 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.HKJB
1 H-245 - - - 3 - - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

LEMBUR TGL 26 - JULI - 2020 (18:00 - 21:30)


WORKING HOURS Hours/day
TOTAL HOURS 14 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.HKJB
1 H-245 - - - 4 - - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER MATERIAL PER PROJECT

- - - - 6 6 Orang 48

- - - - 10 10 Orang 80

- 1 - - 16 16 Orang 128

- - - - 19 19 Orang 152

- - - - 16 16 Orang 128

- - - - 1 1 Orang 8

- - - - 3 3 Orang 24
- - - - 35 35 Orang 280

- - - - 34 34 Orang 272

- - 1 - 32 32 Orang 256

- - - - 41 41 Orang 328

- 1 - - 11 11 Orang 88

- - - - 32 32 Orang 256

- - - - 6 6 Orang 48

- - - - 10 10 Orang 80

- 1 - - 7 7 Orang 56

- - - - 6 6 Orang 48
- - - - 5 5 Orang 40

15 - - - 19 19 Orang 152

15 3 1 0 309 309 Orang 2472

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 1 1 Orang 6

1 Orang 6

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 3 3 Orang 18
3 Orang 18
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 4 4 Orang 14
4 Orang 14
DAFTAR ABSENSI HARIAN SUBCONTRACTOR PT. NONGSA JAYA BUANA SHIPYARD
28-Jul-20
WORKING HOURS 8 Hours/day
TOTAL HOURS 2768 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN QC WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-235 - - - 2 - - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


2 H-236 - - - - - 3 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


3 H-237 - - - 4 5 6 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


4 H-238 - 1 - 6 5 4 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES H-235,H-236,H-237,H-238,


5 - - - 6 7 5 - -
(PIPING JOB) H-239,H-240

PT.GKS
6 H-239 - 1 - 6 3 12 - -
(TUG BOAT 30 MTR)

PT.GKS
7 H-240 - - - - - 1 - -
(TUG BOAT 30 MTR)
PT.KRD
8 H-241 - 1 - 20 7 9 - -
(TONGKANG 330 FT)

PT.TWU
9 H-242 - 1 - 15 20 3 - -
(TONGKANG 330 FT)

PT.PLS
10 H-243 - 2 - 17 16 5 - -
(TONGKANG 330 FT)

PT.HKJB
11 H-244 - - - 29 5 7 - -
(TONGKANG 330 FT)

PT.HKJB
12 H-245 - - - 5 - 2 - -
(TONGKANG 330 FT)

PT.MUJ
13 H-246 - - - 24 7 15 - -
(TONGKANG 330 FT)

PT. IMMANUEL BATAM


14 CARPENTER TUG BOAT - - - 1 - 6 - -
MARINDO

PT. BINA DHARMA


15 HARIAN NJB - - - - - 13 - -
SEJAHTERA

MEKANIK
16 PT.MMJA - 1 - 1 2 1 - -
H-235,H-239

MEKANIK
17 PT M.S.M - - - - - 5 - -
H-236,H-240
18 PT.CFB BLASTING & PAINTING - 1 - - - - - 3

BLASTING & PAINTING


19 PT.BKB - - - - - 17 1 2
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS 0 8 0 136 77 114 1 5

MASUK MALAM TGL 27 - JULI - 2020 (18:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 33 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.MUJ
1 H-246 - - - 3 - - - -
(TONGKANG 330 FT)

TOTAL WORKERS & HOURS

MASUK MALAM TGL 27 - JULI - 2020 (18:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 121 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.HKJB
1 H-245 - - - 11 - - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

LEMBUR TGL 27 - JULI - 2020 (17:00 - 22:00)


WORKING HOURS Hours/day
TOTAL HOURS 40 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.HKJB
1 H-244 - - - - - 8 - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 27 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 60 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.HKJB
1 H-244 - - - 5 - - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 27 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 12 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. BINA DHARMA


1 HARIAN NJB - - - - - 1 - -
SEJAHTERA
TOTAL WORKERS & HOURS

MASUK MALAM TGL 27 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 120 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

1 PT.CFB BLASTING & PAINTING - - - - - 4 - 6


TOTAL WORKERS & HOURS
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER MATERIAL PER PROJECT

- - - - 2 2 Orang 16

- - - - 3 3 Orang 24

- 1 1 - 17 17 Orang 136

- - - - 16 16 Orang 128

- - - - 18 18 Orang 144

- - - - 22 22 Orang 176

- - - - 1 1 Orang 8
- - - - 37 37 Orang 296

- - - - 39 39 Orang 312

- - 1 - 41 41 Orang 328

- - 1 - 42 42 Orang 336

- - - - 7 7 Orang 56

- - - - 46 46 Orang 368

- - - - 7 7 Orang 56

- - - - 13 13 Orang 104

- 1 - - 6 6 Orang 48

- - - - 5 5 Orang 40
- - - - 4 4 Orang 32

- - - - 20 20 Orang 160

0 2 3 0 346 346 Orang 2768

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 3 3 Orang 33

3 Orang 33

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 11 11 Orang 121
11 Orang 121
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 8 8 Orang 40
8 Orang 40

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 5 5 Orang 60
5 Orang 60

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 1 1 Orang 12
1 Orang 12
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 10 10 Orang 120
10 Orang 120
DAFTAR ABSENSI HARIAN SUBCONTRACTOR PT. NONGSA JAYA BUANA SHIPYARD
29-Jul-20
WORKING HOURS 8 Hours/day
TOTAL HOURS 2016 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN QC WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-235 - - - 3 2 2 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


2 H-236 - - - - - - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


3 H-237 - 3 - 3 2 8 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


4 H-238 - 1 - 6 6 8 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES H-235,H-236,H-237,H-238,


5 - - - 8 7 6 - -
(PIPING JOB) H-239,H-240

PT.GKS
6 H-239 - - - 2 6 2 - -
(TUG BOAT 30 MTR)

PT.GKS
7 H-240 - - - - 1 1 - -
(TUG BOAT 30 MTR)
PT.KRD
8 H-241 - - - 18 2 12 - -
(TONGKANG 330 FT)

PT.TWU
9 H-242 - - - 9 5 3 - -
(TONGKANG 330 FT)

PT.PLS
10 H-243 - 1 - 14 7 7 - -
(TONGKANG 330 FT)

PT.HKJB
11 H-244 - - - 16 4 2 - -
(TONGKANG 330 FT)

PT.HKJB
12 H-245 - - - 10 - 5 - -
(TONGKANG 330 FT)

PT.MUJ
13 H-246 - 1 - 16 1 5 - -
(TONGKANG 330 FT)

PT. IMMANUEL BATAM


14 CARPENTER TUG BOAT - - - - - 7 - -
MARINDO

PT. BINA DHARMA


15 HARIAN NJB - - - - - 4 - -
SEJAHTERA

MEKANIK
16 PT.MMJA - 1 - 1 2 2 - -
H-235,H-239

MEKANIK
17 PT M.S.M - - - - - 3 - -
H-236,H-240
18 PT.CFB BLASTING & PAINTING - 1 - - - 1 1 1

BLASTING & PAINTING


19 PT.BKB - 1 - - - 9 1 2
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS 0 9 0 106 45 87 2 3

MASUK MALAM TGL 28 - JULI - 2020 (18:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 33 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.MUJ
1 H-246 - - - 3 - - - -
(TONGKANG 330 FT)

TOTAL WORKERS & HOURS

MASUK MALAM TGL 28 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 48 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.HKJB
1 H-245 - - - 4 - - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

LEMBUR TGL 28 - JULI - 2020 (17:00 - 21:00)


WORKING HOURS Hours/day
TOTAL HOURS 24 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.HKJB
1 H-244 - - - - - 6 - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 28 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 156 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.HKJB
1 H-244 - - - 13 - - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

LEMBUR TGL 28 - JULI - 2020 (17:00 - 20:30)


WORKING HOURS Hours/day
TOTAL HOURS 7 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.PLS
1 H-243 - - - - 2 - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 28 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 108 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

1 PT.CFB BLASTING & PAINTING - - - - - 2 - 7


TOTAL WORKERS & HOURS

LEMBUR TGL 28 - JULI - 2020 (17:00 - 20:00)


WORKING HOURS Hours/day
TOTAL HOURS 21 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-238 - - - 5 - 2 - -
(TUG BOAT 30 MTR)
TOTAL WORKERS & HOURS

LEMBUR TGL 28 - JULI - 2020 (17:00 - 20:40)


WORKING HOURS Hours/day
TOTAL HOURS 15.2 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-237 - - - 2 - 2 - -
(TUG BOAT 30 MTR)
TOTAL WORKERS & HOURS
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER MATERIAL PER PROJECT

- - - - 7 7 Orang 56

- - - - 0 0 Orang 0

- - - - 16 16 Orang 128

- - - - 21 21 Orang 168

- - - - 21 21 Orang 168

- - - - 10 10 Orang 80

- - - - 2 2 Orang 16
- - - - 32 32 Orang 256

- - - - 17 17 Orang 136

- - - - 29 29 Orang 232

- - - - 22 22 Orang 176

- - - - 15 15 Orang 120

- - - - 23 23 Orang 184

- - - - 7 7 Orang 56

- - - - 4 4 Orang 32

- - - - 6 6 Orang 48

- - - - 3 3 Orang 24
- - - - 4 4 Orang 32

- - - - 13 13 Orang 104

0 0 0 0 252 252 Orang 2016

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 3 3 Orang 33

3 Orang 33

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 4 4 Orang 48
4 Orang 48
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 6 6 Orang 24
6 Orang 24

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 13 13 Orang 156
13 Orang 156

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 2 2 Orang 7
2 Orang 7
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 9 9 Orang 108
9 Orang 108

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 7 7 Orang 21
7 Orang 21

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 4 4 Orang 15.2
4 Orang 15.2
DAFTAR ABSENSI HARIAN SUBCONTRACTOR PT. NONGSA JAYA BUANA SHIPYARD
30-Jul-20
WORKING HOURS 8 Hours/day
TOTAL HOURS 2504 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN QC WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-235 - - - 2 1 - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


2 H-236 - - - - - - - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


3 H-237 - 2 - 11 8 12 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES


4 H-238 - - - 1 1 4 - -
(TUG BOAT 30 MTR)

PT. GUNA KARYA SUKSES H-235,H-236,H-237,H-238,


5 - - - 6 7 6 - -
(PIPING JOB) H-239,H-240

PT.GKS
6 H-239 - 1 - 4 4 8 - -
(TUG BOAT 30 MTR)

PT.GKS
7 H-240 - - - - 2 3 - -
(TUG BOAT 30 MTR)
PT.KRD
8 H-241 - - - 18 6 11 - -
(TONGKANG 330 FT)

PT.TWU
9 H-242 - 1 - 19 10 7 - -
(TONGKANG 330 FT)

PT.PLS
10 H-243 - 2 - 8 6 4 - -
(TONGKANG 330 FT)

PT.HKJB
11 H-244 - - - 14 3 5 - -
(TONGKANG 330 FT)

PT.HKJB
12 H-245 - - - 20 2 3 - -
(TONGKANG 330 FT)

PT.MUJ
13 H-246 - 1 - 14 7 10 - -
(TONGKANG 330 FT)

PT. IMMANUEL BATAM


14 CARPENTER TUG BOAT - - - - - 7 - -
MARINDO

PT. BINA DHARMA


15 HARIAN NJB - - - - - 12 - -
SEJAHTERA

MEKANIK
16 PT.MMJA - 1 - 1 2 1 - -
H-235,H-239

MEKANIK
17 PT M.S.M - - - 1 - 6 - -
H-236,H-240
18 PT.CFB BLASTING & PAINTING - 3 - - - 3 - 1

BLASTING & PAINTING


19 PT.BKB - 1 - - - 9 2 4
H-235,H-236,-H-239, H-240
TOTAL WORKERS & HOURS 0 12 0 119 59 111 2 5

MASUK MALAM TGL 28 - JULI - 2020 (18:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 33 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.MUJ
1 H-246 - - - 3 - - - -
(TONGKANG 330 FT)

TOTAL WORKERS & HOURS

MASUK MALAM TGL 28 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 48 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.HKJB
1 H-245 - - - 4 - - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

LEMBUR TGL 28 - JULI - 2020 (17:00 - 21:00)


WORKING HOURS Hours/day
TOTAL HOURS 24 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.HKJB
1 H-244 - - - - - 6 - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 28 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 156 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.HKJB
1 H-244 - - - 13 - - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

LEMBUR TGL 28 - JULI - 2020 (17:00 - 20:30)


WORKING HOURS Hours/day
TOTAL HOURS 7 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT.PLS
1 H-243 - - - - 2 - - -
(TONGKANG 330 FT)
TOTAL WORKERS & HOURS

MASUK MALAM TGL 28 - JULI - 2020 (17:00 - 05:00)


WORKING HOURS Hours/day
TOTAL HOURS 108 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

1 PT.CFB BLASTING & PAINTING - - - - - 2 - 7


TOTAL WORKERS & HOURS

LEMBUR TGL 28 - JULI - 2020 (17:00 - 20:00)


WORKING HOURS Hours/day
TOTAL HOURS 21 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-238 - - - 5 - 2 - -
(TUG BOAT 30 MTR)
TOTAL WORKERS & HOURS

LEMBUR TGL 28 - JULI - 2020 (17:00 - 20:40)


WORKING HOURS Hours/day
TOTAL HOURS 15.2 Hours
JABATAN
NO. NAMA SUBCONT PROJECT SPV FOREMAN LEADER WELDER FITTER HELPER PAINTER BLASTER

PT. GUNA KARYA SUKSES


1 H-237 - - - 2 - 2 - -
(TUG BOAT 30 MTR)
TOTAL WORKERS & HOURS
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER MATERIAL PER PROJECT

- - - - 3 3 Orang 24

- - - - 0 0 Orang 0

- 1 - - 34 34 Orang 272

- - - - 6 6 Orang 48

- - - - 19 19 Orang 152

- - - - 17 17 Orang 136

- - - - 5 5 Orang 40
- - - - 35 35 Orang 280

- - 1 - 38 38 Orang 304

- - 1 - 21 21 Orang 168

- - - - 22 22 Orang 176

- - 1 - 26 26 Orang 208

- - - - 32 32 Orang 256

- - - - 7 7 Orang 56

- - - - 12 12 Orang 96

- 1 - - 6 6 Orang 48

- - - - 7 7 Orang 56
- - - - 7 7 Orang 56

- - - - 16 16 Orang 128

0 2 3 0 313 313 Orang 2504

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT

- - - - 3 3 Orang 33

3 Orang 33

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 4 4 Orang 48
4 Orang 48
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 6 6 Orang 24
6 Orang 24

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 13 13 Orang 156
13 Orang 156

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 2 2 Orang 7
2 Orang 7
TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 9 9 Orang 108
9 Orang 108

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 7 7 Orang 21
7 Orang 21

TOTAL WORKERS
TOTAL
WORKERS
HOURS
STORE SAFETY MARKER ADMIN PER PROJECT
- - - - 4 4 Orang 15.2
4 Orang 15.2
1 - - - - 1 - - -
2 - - - - - 2 - -
3 - - - - - - - -
4 - - - - - 1 - -
5 - - - - - 1 - -
6 - - - 2 5 5 - -
7 - - - 1 2 - - -
8 - 1 - 3 5 9 - -
9 - - - 1 2 3 - -
10 - - - - - 3 - -
11 - - - - 1 5 - -
12 - - - - 1 2 - -
13 - - - - 1 2 - -
14 - - - - - - - -
15 - - - - - - - -
16 - - - - - 1 - -
17 - 1 - - - 1 - -
18 - - - - - 1 - -
19 - - - - - 1 - -
20 - - - - - - - -
21 - - - - 4 1 - -
22 - - - - - - - -
23 - - - - - 1 - -
24 - - - - 4 2 - -
25 - 1 - 2 2 1 - -
26 - - - - - - - -
27 - - - 2 1 3 - -
28 - - - 2 - - - -
29 - - - 3 2 2 - -
30 - - - 2 1 - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
JABATAN
NO. NAMA SUBCONT PROJECT
SPV FOREMAN QC WELDER FITTER

PT. GUNA KARYA


1-Jul SUKSES (TUG BOAT 30 H-237 - 1 - 5 7
MTR)

PT. GUNA KARYA


2-Jul SUKSES (TUG BOAT 30 H-237 - - - 1 4
MTR)

PT. GUNA KARYA


3-Jul SUKSES (TUG BOAT 30 H-237 - - - 1 6
MTR)

PT. GUNA KARYA


4-Jul SUKSES (TUG BOAT 30 H-237 - 1 - 5 11
MTR)

PT. GUNA KARYA


5-Jul SUKSES (TUG BOAT 30 H-237 - 1 - 5 11
MTR)

PT. GUNA KARYA


6-Jul SUKSES (TUG BOAT 30 H-237 - 1 - 1 4
MTR)

PT. GUNA KARYA


7-Jul SUKSES (TUG BOAT 30 H-237 - 3 - - 2
MTR)

PT. GUNA KARYA


8-Jul SUKSES (TUG BOAT 30 H-237 - - - - -
MTR)

PT. GUNA KARYA


9-Jul SUKSES (TUG BOAT 30 H-237 - 2 - 2 4
MTR)

PT. GUNA KARYA


10-Jul SUKSES (TUG BOAT 30 H-237 - - - 6 7
MTR)

PT. GUNA KARYA


11-Jul SUKSES (TUG BOAT 30 H-237 - 3 - 4 6
MTR)

PT. GUNA KARYA


12-Jul SUKSES (TUG BOAT 30 H-237 - - - 3 4
MTR)
PT. GUNA KARYA
13-Jul SUKSES (TUG BOAT 30 H-237 - - - 3 4
MTR)

PT. GUNA KARYA


14-Jul SUKSES (TUG BOAT 30 H-237 - 1 - 3 7
MTR)

PT. GUNA KARYA


15-Jul SUKSES (TUG BOAT 30 H-237 - - - 2 2
MTR)

PT. GUNA KARYA


16-Jul SUKSES (TUG BOAT 30 H-237 - - - - -
MTR)

PT. GUNA KARYA


17-Jul SUKSES (TUG BOAT H-237 - 3 - 6 4
30 MTR)

PT. GUNA KARYA


18-Jul SUKSES (TUG BOAT H-237 - - - 3 -
30 MTR)

PT. GUNA KARYA


19-Jul SUKSES (TUG BOAT H-237 - - - 3 -
30 MTR)

PT. GUNA KARYA


20-Jul SUKSES (TUG BOAT H-237 - - - 2 -
30 MTR)

PT. GUNA KARYA


21-Jul SUKSES (TUG BOAT H-237 - 1 - 3 2
30 MTR)

PT. GUNA KARYA


22-Jul SUKSES (TUG BOAT H-237 - 1 - 2 3
30 MTR)

PT. GUNA KARYA


23-Jul SUKSES (TUG BOAT H-237 - 1 - 3 4
30 MTR)

PT. GUNA KARYA


24-Jul SUKSES (TUG BOAT H-237 - 2 - 8 3
30 MTR)

PT. GUNA KARYA


25-Jul SUKSES (TUG BOAT H-237 - - - - 1
30 MTR)
PT. GUNA KARYA
26-Jul SUKSES (TUG BOAT H-237 - 1 - 2 6
30 MTR)

PT. GUNA KARYA


27-Jul SUKSES (TUG BOAT H-237 - 1 - 6 5
30 MTR)

PT. GUNA KARYA


28-Jul SUKSES (TUG BOAT H-237 - - - 4 5
30 MTR)

PT. GUNA KARYA


29-Jul SUKSES (TUG BOAT H-237 - 3 - 3 2
30 MTR)

PT. GUNA KARYA


30-Jul SUKSES (TUG BOAT H-237 - 2 - 11 8
30 MTR)
JABATAN TOTAL WORKERS
TOTAL WORKERS
HELPER PAINTER BLASTER STORE SAFETY MARKER MATERIAL PER PROJECT

7 - - - - 1 - 21 21

7 - - - - - - 12 12

2 - - - - - - 9 9

9 - - - - - - 26 26

9 - - - - - - 26 26

12 - - - - - - 18 18

1 - - - - - - 6 6

- - - - - - - 0 0

4 - - - - - - 12 12

4 - - - - - - 17 17

10 - - - - - - 23 23

5 - - - - - - 12 12
5 - - - - - - 12 12

5 - - - - - - 16 16

4 - - - - - - 8 8

2 - - - - - - 2 2

11 - - - - - - 24 24

9 - - - - - - 12 12

9 - - - - - - 12 12

3 - - - - - - 5 5

2 - - - - - - 8 8

8 - - - 1 - - 15 15

3 - - - - - - 11 11

6 - - - - - - 19 19

1 6 - - - - - 8 8
4 - - - - - - 13 13

3 - - - 1 - - 16 16

6 - - - 1 1 - 17 17

8 - - - - - - 16 16

12 - - - 1 - - 34 34
TOTAL WORKERS HOURS

Orang 168

Orang 96

Orang 72

Orang 208

Orang 208

Orang 144

Orang 48

Orang 0

Orang 96

Orang 136

Orang 184

Orang 96
Orang 96

Orang 128

Orang 64

Orang 16

Orang 192

Orang 96

Orang 96

Orang 40

Orang 64

Orang 120

Orang 88

Orang 152

Orang 64
Orang 104

Orang 128

Orang 136

Orang 128

Orang 272