Revised 1.5m Piled RE Wall

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 2

Jalan Takan – Micropile to support 1.

5m RE wall

X Coordinate
-1 -0.5 0 0.5 1
-30

1.5 -20
m
-10

Y Coordinate
0.3 m
0

10
6m
20
Pile tip level
30 Pile cap level

2 rows of 250mm diameter


micropile at 3m spacing at
longitudinal direction

Cross section Plan


Calculation

SPTN=9 material
C’=0kPa Phi=28

Dimension of RC wall = 4.3 m x 3m (HxW)

Vertical load on piles/m = 4.1 x 24 + 7.6 x 18 + 7.5 x 3 = 276 kN /m (4.1m2 – concrete, 7.6m2 – backfill, 7.5 kPa surcharge)
Horizontal force on piles/m = 0.5 x 4.3^2 x 18 x 0.36 + 7.5 x 4.3 x 0.36 = 72 kN / m
BM on piles/m = 72 x 4.3 / 3 = 103 kN.m / m

Piglet analysis model 21 rows of piles to eliminate the numerical side effect, therefore the length is 3*21=63m. Loads and BM input for 63m are;

Vertical load on piles/63m = 276 x 63 = 17388 kN


Horizontal force on piles/63m = 72 x 63 = 4536kN
BM on piles/63m = 103 x 63 = 6489 kN.m