Rab Kosong Pondasi Untuk Kontraktor
Rab Kosong Pondasi Untuk Kontraktor
Rab Kosong Pondasi Untuk Kontraktor
A MATERIAL SEMEN
1 Semen PC / 50 kg, 73,550.00 /zak
2 Semen Putih 40 kg 58,840.00 /zak
3 Semen warna (semen naat) 13,700.00 /Kg
B MATERIAL MORTAR UTAMA (MU)
1 Plester premium (MU 100) 77,000.00 /zak 40Kg
2 Plester trasraam (MU 101) 90,000.00 /zak 40Kg
3 Acian plesteran / beton expose (MU 200) 171,000.00 /zak 40Kg
4 Acian plesteran (MU 250) 158,000.00 /zak 40Kg
5 Acian profil (MU 260) 188,500.00 /zak 25Kg
6 Acian putih (MU 270) Perekat keramik area lembab 153,000.00 /zak 25Kg
7 Finish plester (MU 290) 97,000.00 /zak 40Kg
8 Pasangan bata (MU 300) 60,000.00 /zak 40Kg
9 Pasangan & plesteran bata (MU 301) 62,500.00 /zak 50Kg
10 Perekat bata ringan (MU 380) 158,500.00 /zak 40Kg
11 Perekat keramik dinding (MU 400) 136,000.00 /zak 25Kg
12 Pengisi naad keramik (MU 408) 12,500.00 /Kg
13 Perata lantai (MU 440) 62,000.00 /zak 40Kg
14 Perata lantai premium (MU 445) 165,000.00 /zak 40Kg
15 Perekat keramik lantai (MU450) 195,000.00 /zak 40Kg
16 Perekat keramik daerah basah (MU 460) 428,500.00 /zak 25Kg
17 Perekat keramik diatas keramik (MU 480) 253,000.00 /zak 25Kg
18 Multi Purpose Tile Adhesive (MU 485) 1,100,000.00 /40Kg set
19 Fast Setting Tile Adhesive (MU 490) 352,000.00 /zak 25Kg
20 Perekat mortar & beton / Bonding Agent (MU L-500) 263,500.00 / 2Kg
21 Pelapis kedap air (MU 600) 1,060,000.00 /30Kg set
22 Floor Hardener (MU 700) 137,500.00 /zak 25Kg
23 Non shrink grout (MU 800) 158,000.00 /zak 40Kg
24 Perbaikan permukaan beton (MU 830) 257,000.00 /zak 40Kg
25 Pengisi celah beton / Finish Coat Repair (MU 840) 320,000.00 / 25Kg set
F MATERIAL KAYU
Kayu Meranti basah
1 - Balok Meranti basah (8/15,8/12,6/15,6/12, 5/10x400 cm) katagori kelas - II 4,284,500.00 /M3
2 - Kasau Meranti basah (5/7x400, 4/6x400 cm) 4,275,200.00 /M3
3 - Reng (3/4x400, 2/3x400) 4,303,000.00 /M3
I MATERIAL KACA
- Kaca Tempered
1 Kaca polos tempered 12 mm, ex Asahi Mas 517,500.00 / M2
2 Kaca warna tempered 12 mm, ex Asahi Mas 966,000.00 / M2
3 Kaca polos tempered 10 mm, ex Asahi Mas 455,400.00 / M2
4 Kaca warna tempered 10 mm, ex Asahi Mas 821,100.00 / M2
5 Kaca polos tempered 8 mm, ex Asahi Mas 358,800.00 / M2
6 Kaca warna tempered 8 mm, ex Asahi Mas 531,300.00 / M2
J MATERIAL ALLUMUNIUM
ALLUMUNIUM PRODUK YKK
1 Profil kosen Allumunium 1 3/4 x 3", Silver Clear Anodized ex YKK 95,000.00 / M'
2 Profil kosen Allumunium 1 3/4 x 4", Silver Clear Anodized ex YKK 110,000.00 / M'
3 Profil Frame Allumunium Pintu kaca, Silver Clear Anodized ex YKK 100,000.00 / M'
4 Profil Frame Allumunium Jendela kaca, Silver Clear Anodized ex YKK 85,000.00 / M'
5 Profil kosen Allumunium 1 3/4 x 3", Black/Brown Anodized ex YKK 110,000.00 / M'
6 Profil kosen Allumunium 1 3/4 x 4", Black/Brown Anodized ex YKK 150,000.00 / M'
7 Profil Frame Allumunium Pintu kaca, Black/Brown Anodized ex YKK 140,000.00 / M'
8 Profil Frame Allumunium Jendela kaca, Black/Brown Anodized ex YKK 100,000.00 / M'
9 Profil kosen Allumunium 1 3/4 x 3", Powder Coating ex YKK 140,000.00 / M'
10 Profil kosen Allumunium 1 3/4 x 4", Powder Coating ex YKK 160,000.00 / M'
11 Profil Frame Allumunium Pintu kaca, Powder Coating ex YKK 154,000.00 / M'
12 Profil Frame Allumunium Jendela kaca, Powder Coating ex YKK 120,000.00 / M'
ALLUMUNIUM PRODUK ALEXINDO
1 Profil kosen Allumunium 1 3/4 x 3", Silver Clear Anodized ex Alexindo 55,000.00 / M'
2 Profil kosen Allumunium 1 3/4 x 4", Silver Clear Anodized ex Alexindo 70,000.00 / M'
3 Profil Frame Allumunium Pintu kaca, Silver Clear Anodized ex Alexindo 65,000.00 / M'
4 Profil Frame Allumunium Jendela kaca, Silver Clear Anodized ex Alexindo 55,000.00 / M'
5 Profil kosen Allumunium 1 3/4 x 3", Black/Brown Anodized ex Alexindo 70,000.00 / M'
6 Profil kosen Allumunium 1 3/4 x 4", Black/Brown Anodized ex Alexindo 75,000.00 / M'
7 Profil Frame Allumunium Pintu kaca, Black/Brown Anodized ex Alexindo 72,500.00 / M'
8 Profil Frame Allumunium Jendela kaca, Black/Brown Anodized ex alexindo 62,500.00 / M'
9 Profil kosen Allumunium 1 3/4 x 3", Powder Coating serat kayu, ex Alexindo 130,000.00 / M'
10 Profil kosen Allumunium 1 3/4 x 4", Powder Coating serat kayu, ex Alexindo 160,000.00 / M'
11 Profil Frame Allumunium Pintu kaca, Powder Coating serat kayu, ex Alexindo 150,000.00 / M'
12 Profil Frame Allumunium Jendela kaca, Powder Coating serat kayu, ex Alexindo 120,000.00 / M'
13 Sealant kaca 8,125.00 / M'
14 Karet kaca 2,750.00 / M'
15 Sticker kaca, type clear sandblast 85,000.00 / M2
16 Allumunium plat tebal 0,4 mm, uk. 1000x2000 mm 123,500.00 /lmbr
17 Allumunium plat tebal 0,4 mm, uk. 1220x2440 mm 183,500.00 /lmbr
18 Allumunium plat tebal 0,5 mm, uk. 1000x2000 mm 154,500.00 /lmbr
K MATERIAL ATAP
1 Genteng Plentong Glazur, ex Jatiwangi 4,250.00 /bh
2 Nok Genteng Plentong Glazur, ex Jatiwangi 7,500.00 /bh
3 Genteng Plentong tidak Glazur, ex Jatiwangi 3,500.00 /bh
4 Nok Genteng Plentong tidak Glazur, ex Jatiwangi 6,000.00 /bh
5 Genteng Keramik Glazur ex Kanmuri Milenio, warna Natural 7,370.00 /bh
6 Genteng Keramik Glazur ex Kanmuri Milenio, warna Standart 8,250.00 /bh
7 Genteng Keramik Glazur ex Kanmuri Espancia, warna Natural 7,150.00 /bh
8 Genteng Keramik Glazur ex Kanmuri Espancia, warna Standart 9,570.00 /bh
9 Genteng Keramik Glazur ex M Class (Double Interlocking) warna Natural 7,150.00 /bh
10 Genteng Keramik Glazur ex M Class (Double Interlocking) warna Standart 7,700.00 /bh
11 Genteng Keramik Glazur ex KIA 8,500.00 /bh
12 Nok Genteng Keramik Glazur, ex KIA 25,300.00 /bh
13 Genteng Keramik ex Cisangkan type Victoria 10,000.00 /bh
14 Nok Genteng Keramik, ex Cisangkan 25,000.00 /bh
15 Genteng Morando Glazur, ex Jatiwangi 3,500.00 /bh
16 Genteng Morando tidak Glazur, ex Jatiwangi 4,000.00 /bh
17 Nok Genteng Morando tidak Glazur, ex Jatiwangi 10,000.00 /bh
18 Genteng Beton ex Karangpilang (berwarna) 9,000.00 /bh
19 Genteng Nok Beton Karangpilang (berwarna) 25,000.00 /bh
20 Djabes gelombang kecil (B100) uk. 300x105, tbl. 6mm 125,000.00 /Lbr
21 Djabes gelombang kecil (B100) uk. 300x105, tbl. 5mm 115,000.00 /Lbr
22 Djabes gelombang kecil (K200) uk. 240x105, tbl. 4mm 90,000.00 /Lbr
23 Asbes Gelombang kecil uk. 210 cm x 105 cm, tebal 4 mm 60,000.00 /Lbr
24 Asbes Gelombang kecil uk. 240 cm x 105 cm, tebal 4 mm 68,000.00 /Lbr
25 Asbes Gelombang kecil uk. 270 cm x 105 cm, tebal 4 mm 77,000.00 /Lbr
26 Asbes Gelombang kecil uk. 300 cm x 105 cm, tebal 4 mm 85,000.00 /Lbr
27 Asbes Gelombang besar uk. 200 cm x 102 cm, tebal 5 mm 75,000.00 /Lbr
28 Asbes Gelombang besar uk. 225 cm x 102 cm, tebal 5 mm 79,000.00 /Lbr
29 Asbes Gelombang besar uk. 250 cm x 102 cm, tebal 5 mm 82,000.00 /Lbr
30 Asbes Gelombang besar uk. 200 cm x 102 cm, tebal 6 mm 77,500.00 /Lbr
31 Asbes Gelombang besar uk. 225 cm x 102 cm, tebal 6 mm 85,000.00 /Lbr
32 Asbes Gelombang besar uk. 250 cm x 102 cm, tebal 6 mm 90,000.00 /Lbr
33 Jendela Naco (kerangka + kaca 5 mm) 150,000.00 /m2
34 Skrup + ring 450.00 /bh
35 Atap Sirap 225,000.00 /M2
36 Paku sirap 30,000.00 /Kg
37 Atap Metal Zincalume, type KLIP-LOK HI-TEN, tebal 0,5 mm ex BLUESCOPE LYSAGHT 168,850.00 /M2
38 Atap Metal Zincalume, type OPTIMA HI-TEN, tebal 0,5 mm ex BLUESCOPE LYSAGHT 158,070.00 /M2
39 Atap Metal Zincalume, type SPANDEK HI-TEN, tebal 0,5 mm ex BLUESCOPE LYSAGHT 133,980.00 /M2
40 Atap Metal Zincalume, type TRIMDEK HI-TEN, tebal 0,5 mm ex BLUESCOPE LYSAGHT 123,420.00 /M2
41 Atap Metal Zincalume, type CUSTOM-ORB HI-TEN, tebal 0,5 mm ex BLUESCOPE LYSAGHT 123,420.00 /M2
42 Atap Glmbg GALVALUME, type SPANDEK LYSAGHT, tbl 0,75 mm (ex. CV. Cipta Prima Sentosa) 186,450.00 /M2
43 Atap Glmbg GALVALUME, type SPANDEK LYSAGHT, tbl 0,50 mm (ex. CV. Cipta Prima Sentosa) 127,600.00 /M2
44 Atap Metal ZINCALUM, type ada sterofoam 5cm 220,000.00 /M2
45 Atap Metal Spandex Zincalum tebal 0,5 mm (ex. CV. Cipta Prima Sentosa) 127,600.00 /M2
46 Genteng Metal (Sakura Roof) 31,500.00 /lbr
47 Nok Genteng Metal (Sakura Roof) 28,500.00 /lbr
48 Atap Polli Carbonat, 2,1 x 11,8 m, tebal 4 mm 1,182,500.00 /lbr
49 Atap Polli Carbonat, 2,1 x 11,8 m, tebal 4,2 mm 1,265,000.00 /lbr
50 Atap Polli Carbonat, 2,1 x 11,8 m, tebal 5 mm 2,035,000.00 /lbr
51 Atap Polli Carbonat, 2,1 x 11,8 m, tebal 6 mm 2,420,000.00 /lbr
52 Atap Polli Carbonat, 2,1 x 11,8 m, tebal 10 mm 3,850,000.00 /lbr
L MATERIAL WATERPROOFING
1 Lapisan Coating PF Primer 15,000.00 /M2
2 Waterproofing Membrane, Sopralene 180 4 S/P (4 mm) (1 Roll = Rp. 545.000) 36,486.98 /M2
3 Waterproofing Membrane, Sopralene 180 3 S/P (3 mm) (1 Roll = Rp. 426.000) 28,520.10 /M2
4 Waterproofing Membrane, Sopralene 180 Granuler (3 mm) (1 Roll = Rp. 365.000) 24,436.24 /M2
5 Waterproofing Membrane, Eshagun 3 SP (3 mm) (1 Roll = Rp. 325.250) 21,775.03 /M2
6 Waterproofing Membrane, Eshagun 3 Ard (3 mm) (1 Roll = Rp. 345.000) 23,097.27 /M2
7 Waterproofing Membrane, Eshagun 3 SP (3 mm) (1 Roll = Rp. 378.650) 25,350.09 /M2
8 Waterproofing jenis Coating ex Sika/AM/setara 55,000.00 /Kg
R MATERIAL CAT
1 Cat Duco Danagloss 79,193.00 /Kg
2 Cat Duco Nipple 2000 55,575.00 /Kg
3 Dempul Duco Sanpolac 30,300.00 /Kg
4 Tinner Up 23,700.00 /Kg
5 Cat Tembok Catylac (Acrilyc Emulsion), putih 25,000.00 /Kg
6 Cat Tembok dalam, Dulux ICI (Acrilyc Emulsion), Pentalitte Warna putih BD = 1,4 kg/lt 41,918.57 /Kg
7 Cat Tembok dalam, Dulux ICI (Acrilyc Emulsion), Pentalitte Warna biasa 42,129.14 /Kg
8 Cat Tembok dalam, Dulux ICI (Acrilyc Emulsion), Pentalitte Warna tua 43,978.57 /Kg
9 Cat Tembok luar (ICI Dulux Weathershield) Warna putih 61,500.00 /Kg
10 Cat Tembok luar (ICI Dulux Weathershield) Warna biasa 65,000.00 /Kg
11 Cat Tembok luar (ICI Dulux Weathershield), warna tua Warna tua 63,500.00 /Kg
12 Alkali Resistants Dulux ICI 43,428.57 /Kg
13 Cat Tembok Mowilex (Acrilyc Emulsion) 37,500.00 /Kg
14 Cat Tembok Mowilex (Wather Coat) 45,750.00 /Kg
15 Cat Tembok (cat minyak) ex Mowilex 50,000.00 /Kg
16 Cat Tembok Vinilex Super 19,000.00 /Kg
17 Plamur Tembok Matex (5 kg) 9,360.00 /Kg
18 Cat Kayu/besi (ICI Dulux Super Gloss) 46,722.00 /Kg
19 Cat Kayu/besi (ex Danapaint, Gloss) 46,000.00 /Kg
20 Cat Kayu / besi (kwalitas sedang, Ftalit, Kuda Terbang) 45,000.00 /Kg
21 Cat antikarat Zinchromate 40,000.00 /Kg
22 Plamur kayu 22,585.00 /Kg
23 Pelitur 47,375.00 /Kg
24 Melamik (Ultran) 42,535.00 /Kg
25 Wood Stain (Cat warna Standart ex Ultran) 58,500.00 /Kg
26 Sanding Sealer (Ultran) 76,142.00 /Kg
27 Filler Ultran 50,000.00 /Kg
S MATERIAL MEKANIKAL
1 Pompa air (dengan otomatis) 600,000.00 /Bh
2 Pompa air (jet pump) 2,500,000.00 /Bh
3 Pompa air (non otomatis) 350,000.00 /Bh
4 Pipa besi galvanis ø 0,5 (inch) 20,000.00 /M'
5 Pipa besi galvanis ø 0,75 (inch) 24,100.00 /M'
6 Pipa besi galvanis ø 1 (inch) 34,500.00 /M'
7 Pipa besi galvanis ø 1,25 (inch) 41,500.00 /M'
8 Pipa besi galvanis ø 1,5 (inch) 47,500.00 /M'
9 Pipa besi galvanis ø 2 (inch) 51,400.00 /M'
10 Pipa besi galvanis ø 3 (inch) 85,000.00 /M'
11 Pipa besi galvanis ø 4 (inch) 120,000.00 /M'
12 Pipa besi ø 0,5 (inch) 20,000.00 /M'
13 Pipa besi ø 0,75 (inch) 22,500.00 /M'
14 Pipa besi ø 1 (inch) 22,500.00 /M'
15 Pipa besi ø 1,25 (inch) 35,000.00 /M'
16 Pipa besi ø 1,5 (inch) 41,250.00 /M'
17 Pipa besi ø 2 (inch) 45,000.00 /M'
18 Pipa beton ø 20 cm, panjang 1 m' 73,600.00 /Bh
19 Pipa beton ø 60 cm, panjang 1 m' 121,325.00 /Bh
20 Pipa PVC ø 1/2 (inch) AW, panjang 4 m 5,000.00 /M'
21 Pipa PVC ø 3/4 (inch) AW, panjang 4 m 6,500.00 /M'
22 Pipa PVC ø 1(inch) AW, panjang 4 m 7,750.00 /M'
23 Pipa PVC ø 1,5 (inch) AW, panjang 4 m 15,000.00 /M'
24 Pipa PVC ø 2 (inch) AW, panjang 4 m 20,000.00 /M'
25 Pipa PVC ø 2,5 (inch) AW, panjang 4 m 30,000.00 /M'
26 Pipa PVC ø 3 (inch) AW, panjang 4 m 40,000.00 /M'
27 Pipa PVC ø 4 (inch) AW, panjang 4 m 55,000.00 /M'
28 Pipa PVC ø 6 (inch) AW, panjang 4 m 116,250.00 /M'
29 Pipa PVC ø 5/8 500.00 /M'
30 Tangki air / hydrant umum fiberglass 1.000 liter 1,550,000.00 /Bh
31 Tangki air / hydrant umum fiberglass 2.000 liter 3,050,000.00 /Bh
32 Tangki air / hydrant umum fiberglass 3.000 liter 6,328,450.00 /Bh
33 Tangki air / hydrant umum fiberglass 6.000 liter (horizontal) 19,263,075.00 /Bh
34 Tangki air / hydrant umum polyethylene 1.000 liter 1,774,450.00 /Bh
35 Tangki air / hydrant umum polyethylene 2.000 liter 4,083,075.00 /Bh
36 Tangki air / hydrant umum polyethylene 3.000 liter 5,506,200.00 /Bh
37 Tangki air / hydrant umum polyethylene 4.000 liter 7,036,850.00 /Bh
38 Tangki air / hydrant umum polyethylene 5.000 liter 8,225,950.00 /Bh
39 Tangki air / hydrant umum polyethylene 500 liter 900,000.00 /Bh
40 Tangki air fiberglass (oranye) 1.000 liter 1,350,000.00 /Bh
41 Tangki air fiberglass (oranye) 2.000 liter 2,700,000.00 /Bh
42 Tangki air fiberglass (oranye) 3.000 liter 3,500,000.00 /Bh
43 Tangki air fiberglass (oranye) 500 liter 800,000.00 /Bh
MATERIAL TAMAN
1 Rumput Gajah 15,000.00 /M2
2 Rabuk 20,000.00 /kg
3 Pohon Peneduh, tinggi 2 - 2,5 m 75,000.00 /pohon
MATERIAL ASPAL
1 Aspal Polimer lokal 11,900.00 /kg
MATERIAL SALURAN
1 Tutup Saluran
2 - Tutup U30 @ 60 cm LD 58,500.00 /Bh
3 - Tutup U40 @ 60 cm LD 89,500.00 /Bh
4 - Tutup U50 @ 60 cm LD 113,500.00 /Bh
5 - Tutup U60 @ 60 cm LD 136,500.00 /Bh
6 - Tutup U80 @ 60 cm LD 174,500.00 /Bh
7 - Tutup U100 @ 60 cm LD 262,500.00 /Bh
8 - Tutup U120 @ 60 cm LD 295,500.00 /Bh
9 - Tutup U140 @ 60 cm LD 449,500.00 /Bh
10 Saluran precast type 40 (uk 40 x 40) tebal 55 mm 197,472.00 /M'
11 Saluran precast type 40 (uk 40 x 60) tebal 55 mm 310,728.00 /M'
12 Saluran precast type 50 (uk 50 x 50) tebal 60 mm 270,072.00 /M'
I. PEKERJAAN : PERSIAPAN
Pekerjaan : PERSIAPAN
Jenis Pembayaran : Pengukuran Lapangan
Satuan Pembayaran : M2
Harga Satuan : Rp 8,593.20
AHSP-I-001
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pembantu Surveyor OH 0.0100 Rp 95,000.00 Rp 950.00
Surveyor OH 0.0100 Rp 150,000.00 Rp 1,500.00
Sub-Total ( 1 ) Rp 2,450.00
2 Bahan
Kayu/balok Gergajian kelas III m3 0.0012 Rp 3,635,500.00 Rp 4,362.60
Paku kg 0.0020 Rp 15,300.00 Rp 30.60
Sub-Total ( 2 ) Rp 4,393.20
3 Peralatan
Sewa Alat Ukur jam 0.0050 Rp 350,000.00 Rp 1,750.00
Sub-Total ( 3 ) Rp 1,750.00
Pekerjaan : PERSIAPAN
Jenis Pembayaran : Pembersihan Lapangan
Satuan Pembayaran : M2
Harga Satuan : Rp 8,100.00
AHSP-I-002
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.1000 Rp 70,000.00 Rp 7,000.00
Mandor OH 0.0100 Rp 110,000.00 Rp 1,100.00
Sub-Total ( 1 ) Rp 8,100.00
2 Bahan
Sub-Total ( 2 ) Rp -
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : PERSIAPAN
Jenis Pembayaran : Papan Nama Proyek, uk. 80 x 120 cm
Satuan Pembayaran : Unit
Harga Satuan : Rp 781,347.39
AHSP-I-003
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Tukang Kayu OH 1.0000 Rp 100,000.00 Rp 100,000.00
Tukang Batu OH 0.0180 Rp 90,000.00 Rp 1,620.00
Tukang Cat OH 1.0000 Rp 90,000.00 Rp 90,000.00
Pekerja OH 2.1000 Rp 70,000.00 Rp 147,000.00
Mandor OH 1.0050 Rp 110,000.00 Rp 110,550.00
Sub-Total ( 1 ) Rp 449,170.00
2 Bahan
Kayu Meranti m³ 0.0350 Rp 4,601,234.00 Rp 161,043.19
Seng plate lebar 90 cm m' 1.4000 Rp 40,000.00 Rp 56,000.00
Paku kg 0.6000 Rp 16,420.00 Rp 9,852.00
Cat kayu kg 1.5000 Rp 45,000.00 Rp 67,500.00
Semen portland kg 16.8000 Rp 1,471.00 Rp 24,712.80
Pasir beton m³ 0.0270 Rp 192,800.00 Rp 5,205.60
Batu pecah/split 2/3 m³ 0.0410 Rp 191,800.00 Rp 7,863.80
Sub-Total ( 2 ) Rp 332,177.39
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : PERSIAPAN
Jenis Pembayaran : Bangunan Direksi Keet
Satuan Pembayaran : M2
Harga Satuan : Rp 660,310.05
AHSP-I-004
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Kep. Tukang Kayu OH 0.3000 Rp 100,000.00 Rp 30,000.00
Tukang Kayu OH 1.0000 Rp 100,000.00 Rp 100,000.00
Tukang Batu OH 1.0000 Rp 90,000.00 Rp 90,000.00
Pekerja OH 1.0000 Rp 70,000.00 Rp 70,000.00
Mandor OH 0.0500 Rp 110,000.00 Rp 5,500.00
Sub-Total ( 1 ) Rp 295,500.00
2 Bahan
Kayu dolken Ø 8-10/400 cm btg 1.2500 Rp 30,000.00 Rp 37,500.00
Kayu Gergajian Kelas III m³ 0.0210 Rp 3,635,500.00 Rp 76,345.50
Paku biasa 2"-5" kg 0.8500 Rp 15,300.00 Rp 13,005.00
Besi pelat strip kg 1.1000 Rp 9,250.00 Rp 10,175.00
Semen portland kg 35.0000 Rp 1,471.00 Rp 51,485.00
Pasir pasang m³ 0.2500 Rp 183,700.00 Rp 45,925.00
Batu pecah/split 2/3 m³ 0.1500 Rp 191,800.00 Rp 28,770.00
Bata merah bh 30.0000 Rp 650.00 Rp 19,500.00
Asbes gelombang uk. 2,40x1,05 (m) t 4 mm Lbr 0.2500 Rp 90,000.00 Rp 22,500.00
Jendela nako (rangka) m2 0.0800 Rp 125,000.00 Rp 10,000.00
Kunci tanam sederhana bh 0.1500 Rp 80,000.00 Rp 12,000.00
Triplek tebal 4 mm uk. 1.22 x 2.44 (m) lbr 0.0800 Rp 55,500.00 Rp 4,440.00
Sub-Total ( 2 ) Rp 331,645.50
3 Peralatan
Alat Bantu Ls 1.0000 Rp 33,164.55 Rp 33,164.55
Sub-Total ( 3 ) Rp 33,164.55
Pekerjaan : PERSIAPAN
Jenis Pembayaran : Gudang Semen & Peralatan
Satuan Pembayaran : M2
Harga Satuan : Rp 627,136.70
AHSP-I-005
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Kep. Tukang Kayu OH 0.3000 Rp 100,000.00 Rp 30,000.00
Tukang Kayu OH 2.0000 Rp 100,000.00 Rp 200,000.00
Pekerja OH 1.0000 Rp 70,000.00 Rp 70,000.00
Mandor OH 0.0500 Rp 110,000.00 Rp 5,500.00
Sub-Total ( 1 ) Rp 305,500.00
2 Bahan
Kayu dolken Ø 8-10/400 cm btg 1.2500 Rp 30,000.00 Rp 37,500.00
Kayu Gergajian Kelas III m³ 0.0210 Rp 3,635,500.00 Rp 76,345.50
Paku biasa 2"-5" kg 0.8500 Rp 15,300.00 Rp 13,005.00
Semen portland kg 10.5000 Rp 1,471.00 Rp 15,445.50
Pasir Pasang m³ 0.0300 Rp 183,700.00 Rp 5,511.00
Batu pecah/split 2/3 m³ 0.0500 Rp 191,800.00 Rp 9,590.00
Asbes gelombang uk. 2,40x1,05 (m) t 4 mm Lbr 1.5000 Rp 90,000.00 Rp 135,000.00
Sub-Total ( 2 ) Rp 292,397.00
3 Peralatan
Alat Bantu Ls 1.0000 Rp 29,239.70 Rp 29,239.70
Sub-Total ( 3 ) Rp 29,239.70
Pekerjaan : PERSIAPAN
Jenis Pembayaran : Pagar Pengaman Proyek
Satuan Pembayaran : M'
Harga Satuan : Rp 223,549.70
AHSP-I-006
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Tukang kayu OH 0.2000 Rp 100,000.00 Rp 20,000.00
Pekerja OH 0.4000 Rp 70,000.00 Rp 28,000.00
Kepala tukang OH 0.0200 Rp 100,000.00 Rp 2,000.00
Mandor OH 0.0200 Rp 110,000.00 Rp 2,200.00
Sub-Total ( 1 ) Rp 52,200.00
2 Bahan
Kayu dolken Ø 8-10/400 cm btg 1.2500 Rp 30,000.00 Rp 37,500.00
Semen portland kg 2.5000 Rp 1,471.00 Rp 3,677.50
Pasir Beton m³ 0.0050 Rp 192,800.00 Rp 964.00
Batu pecah/split 2/3 m³ 0.0090 Rp 191,800.00 Rp 1,726.20
Kayu Gergajian Kelas III m³ 0.0180 Rp 3,635,500.00 Rp 65,439.00
Paku biasa 2"-5" kg 0.0600 Rp 15,300.00 Rp 918.00
Seng gelombang 180 x 90 x 0.03 Lbr 1.2000 Rp 30,000.00 Rp 36,000.00
Cat meni besi kg 0.4500 Rp 22,500.00 Rp 10,125.00
Kuas bh 1.0000 Rp 15,000.00 Rp 15,000.00
Sub-Total ( 2 ) Rp 171,349.70
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : PERSIAPAN
Jenis Pembayaran : Pengukuran dan Pemasangan Bowplank
Satuan Pembayaran : M2
Harga Satuan : Rp 102,367.04
AHSP-I-007
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Kep. Tukang Kayu OH 0.0100 Rp 100,000.00 Rp 1,000.00
Tukang Kayu OH 0.1000 Rp 100,000.00 Rp 10,000.00
Pekerja OH 0.1000 Rp 70,000.00 Rp 7,000.00
Mandor OH 0.0050 Rp 110,000.00 Rp 550.00
Sub-Total ( 1 ) Rp 18,550.00
2 Bahan
Kayu Meranti kasau m³ 0.0120 Rp 4,275,200.00 Rp 51,302.40
Kayu Meranti papan 3/20 m³ 0.0070 Rp 4,601,234.00 Rp 32,208.64
Paku kg 0.0200 Rp 15,300.00 Rp 306.00
Sub-Total ( 2 ) Rp 83,817.04
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : PERSIAPAN
Jenis Pembayaran : Listrik Kerja (Sewa Genset)
Satuan Pembayaran : Bulan
Harga Satuan : Rp 22,366,292.80
AHSP-I-008
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Operator Genset OH 30.0000 Rp 150,000.00 Rp 4,500,000.00
Pembantu Operator OH 30.0000 Rp 95,000.00 Rp 2,850,000.00
Sub-Total ( 1 ) Rp 7,350,000.00
2 Bahan
Solar ltr/bln 300.0000 Rp 10,800.00 Rp 3,240,000.00
Pelumas ltr/bln 10.0000 Rp 25,000.00 Rp 250,000.00
Sub-Total ( 2 ) Rp 3,490,000.00
3 Peralatan
Sewa Generator set Jam 210.0000 Rp 54,887.11 Rp 11,526,292.80
Sub-Total ( 3 ) Rp 11,526,292.80
Pekerjaan : PERSIAPAN
Jenis Pembayaran : Listrik Kerja (Penyambungan sementara PLN)
Satuan Pembayaran : Bulan
Harga Satuan : Rp 11,400,000.00
AHSP-I-08A
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Penyambungan daya sementara PLN 3.300 VA OH 3,300.00 Rp 1,500.00 Rp 4,950,000.00
Sub-Total ( 1 ) Rp 4,950,000.00
2 Bahan
Pemasangan instalasi titik lampu, berikut lampunya titik 8.00 Rp 375,000.00 Rp 3,000,000.00
Pemasangan instalasi titik stop kontak tenaga 500 watt titik 4.00 Rp 375,000.00 Rp 1,500,000.00
Pemasangan instalasi titik stop kontak tenaga 1000 watt titik 2.00 Rp 375,000.00 Rp 750,000.00
Pemasangan Bok MCB 3 group unit 1.00 Rp 250,000.00 Rp 250,000.00
- Pas. MCB 3 phase 16A bh 1.00 Rp 350,000.00 Rp 350,000.00
- Pas. MCB 1 phase 16A bh 3.00 Rp 200,000.00 Rp 600,000.00
Sub-Total ( 2 ) Rp 6,450,000.00
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : PERSIAPAN
Jenis Pembayaran : Air Kerja
Satuan Pembayaran : Lot
Harga Satuan : Rp 11,892,000.00
AHSP-I-009
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.40 Rp 70,000.00 Rp 28,000.00
Tukang pasang pipa OH 0.70 Rp 90,000.00 Rp 63,000.00
Kepala tukang OH 0.75 Rp 100,000.00 Rp 75,000.00
Mandor OH 0.50 Rp 110,000.00 Rp 55,000.00
Sub-Total ( 1 ) Rp 221,000.00
2 Bahan
Pantek sumur unit 1.00 Rp 4,500,000.00 Rp 4,500,000.00
Pompa air (jet pump) unit 1.00 Rp 3,000,000.00 Rp 3,000,000.00
Pipa PVC dia.1 1/4" m' 20.00 Rp 15,000.00 Rp 300,000.00
Pipa GIP dia.1 1/4" m' 2.00 Rp 47,500.00 Rp 95,000.00
Sock draad dalam besi 1 1/4" bh 1.00 Rp 8,000.00 Rp 8,000.00
Sock draad luar PVC 1 1/4" bh 1.00 Rp 7,000.00 Rp 7,000.00
Tangki air 1000 liter bh 2.00 Rp 1,350,000.00 Rp 2,700,000.00
Sub-Total ( 2 ) Rp 10,610,000.00
3 Peralatan
Alat Bantu Ls 1.0000 Rp 1,061,000.00 Rp 1,061,000.00
Sub-Total ( 3 ) Rp 1,061,000.00
Pekerjaan : PERSIAPAN
Jenis Pembayaran : Biaya Pengurusan IMB
Satuan Pembayaran : Bulan
Harga Satuan : Rp 80,181,320.96
AHSP-I-010
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
Sub-Total ( 1 ) Rp 5,562,009,600.00
Sub-Total ( 2 ) Rp 80,181,320.96
T O T A L (2) Rp 80,181,320.96
HARGA SATUAN PEKERJAAN Rp 80,181,320.96
Pekerjaan : TANAH
Jenis Pembayaran : Pengupasan Lapisan Atas/ Scraping
Satuan Pembayaran : M2
Harga Satuan : Rp 18,820.00
AHSP-II-001
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.2500 Rp 70,000.00 Rp 17,500.00
Mandor OH 0.0120 Rp 110,000.00 Rp 1,320.00
Sub-Total ( 1 ) Rp 18,820.00
2 Bahan
Sub-Total ( 2 ) Rp -
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : TANAH
Jenis Pembayaran : Galian Tanah Biasa sedalam 1 m
Satuan Pembayaran : M3
Harga Satuan : Rp 55,250.00 SNI 2835, 6.1 - 2008
AHSP-II-002
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.7500 Rp 70,000.00 Rp 52,500.00
Mandor OH 0.0250 Rp 110,000.00 Rp 2,750.00
Sub-Total ( 1 ) Rp 55,250.00
2 Bahan
Sub-Total ( 2 ) Rp -
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : TANAH
Jenis Pembayaran : Galian Tanah Biasa sedalam 2 m
Satuan Pembayaran : M3
Harga Satuan : Rp 67,950.00 SNI 2835, 6.2 - 2008
AHSP-II-003
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.9000 Rp 70,000.00 Rp 63,000.00
Mandor OH 0.0450 Rp 110,000.00 Rp 4,950.00
Sub-Total ( 1 ) Rp 67,950.00
2 Bahan
Sub-Total ( 2 ) Rp -
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : TANAH
Jenis Pembayaran : Galian Tanah Keras, sedalam 1 m
Satuan Pembayaran : M3
Harga Satuan : Rp 73,520.00 SNI 2835, 6.4 - 2008
AHSP-II-004
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 1.0000 Rp 70,000.00 Rp 70,000.00
Mandor OH 0.0320 Rp 110,000.00 Rp 3,520.00
Sub-Total ( 1 ) Rp 73,520.00
2 Bahan
Sub-Total ( 2 ) Rp -
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : TANAH
Jenis Pembayaran : Galian Tanah Cadas, sedalam 2 m
Satuan Pembayaran : M3
Harga Satuan : Rp 111,600.00
AHSP-II-005
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 1.5000 Rp 70,000.00 Rp 105,000.00
Mandor OH 0.0600 Rp 110,000.00 Rp 6,600.00
Sub-Total ( 1 ) Rp 111,600.00
2 Bahan
Sub-Total ( 2 ) Rp -
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : TANAH
Jenis Pembayaran : Galian tanah dengan excavator (CUT)
Satuan Pembayaran : M3
Harga Satuan : Rp 90,427.50
AHSP-II-006
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.3615 Rp 70,000.00 Rp 25,305.00
Mandor OH 0.0602 Rp 110,000.00 Rp 6,622.00
Sub-Total ( 1 ) Rp 31,927.00
2 Bahan
Sub-Total ( 2 ) Rp -
3 Peralatan
Excavator jam 0.0602 Rp 531,286.87 Rp 32,005.23
Dump Truck 3 - 5 ton jam 0.0971 Rp 272,765.92 Rp 26,495.26
Sub-Total ( 3 ) Rp 58,500.50
Pekerjaan : TANAH
Jenis Pembayaran : Urugan tanah dari sumber lokasi (FILL)
Satuan Pembayaran : M3
Harga Satuan : Rp 102,660.00
AHSP-II-007
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.3000 Rp 70,000.00 Rp 21,000.00
Mandor OH 0.0100 Rp 110,000.00 Rp 1,100.00
Sub-Total ( 1 ) Rp 22,100.00
2 Bahan
Sub-Total ( 2 ) Rp -
3 Peralatan
Wheel Loader jam 0.0178 Rp 456,429.16 Rp 8,124.44
Dump Truck 3 - 5 ton jam 0.2289 Rp 272,765.92 Rp 62,436.12
Motor Grader jam 0.0068 Rp 661,489.75 Rp 4,498.13
Vibro Roller jam 0.0111 Rp 340,223.69 Rp 3,776.48
Water Tanker jam 0.0070 Rp 246,403.90 Rp 1,724.83
Sub-Total ( 3 ) Rp 80,560.00
Pekerjaan : TANAH
Jenis Pembayaran : Urugan tanah dari sumber lain lokasi (didatangkan)
Satuan Pembayaran : M3
Harga Satuan : Rp 191,980.00
AHSP-II-008
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.3000 Rp 70,000.00 Rp 21,000.00
Mandor OH 0.0100 Rp 110,000.00 Rp 1,100.00
Sub-Total ( 1 ) Rp 22,100.00
2 Bahan
Urugan tanah biasa m3 1.1000 Rp 81,200.00 Rp 89,320.00
Sub-Total ( 2 ) Rp 89,320.00
3 Peralatan
Wheel Loader jam 0.0178 Rp 456,429.16 Rp 8,124.44
Dump Truck 3 - 5 ton jam 0.2289 Rp 272,765.92 Rp 62,436.12
Motor Grader jam 0.0068 Rp 661,489.75 Rp 4,498.13
Vibro Roller jam 0.0111 Rp 340,223.69 Rp 3,776.48
Water Tanker jam 0.0070 Rp 246,403.90 Rp 1,724.83
Sub-Total ( 3 ) Rp 80,560.00
Pekerjaan : TANAH
Jenis Pembayaran : Urugan tanah kembali
Satuan Pembayaran : M3
Harga Satuan : Rp 22,100.00
AHSP-II-009
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.3000 Rp 70,000.00 Rp 21,000.00
Mandor OH 0.0100 Rp 110,000.00 Rp 1,100.00
Sub-Total ( 1 ) Rp 22,100.00
2 Bahan
Sub-Total ( 2 ) Rp -
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : TANAH
Jenis Pembayaran : Penyiapan Badan Jalan
Satuan Pembayaran : M2
Harga Satuan : Rp 5,647.35
AHSP-II-010
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.0111 Rp 70,000.00 Rp 777.00
Mandor OH 0.0028 Rp 110,000.00 Rp 308.00
Sub-Total ( 1 ) Rp 1,085.00
2 Bahan
Sub-Total ( 2 ) Rp -
3 Peralatan
Motor Grader jam 0.0028 Rp 661,489.75 Rp 1,837.47
Vibro Roller jam 0.0044 Rp 340,223.69 Rp 1,496.98
Water Tanker jam 0.0033 Rp 246,403.90 Rp 813.13
Alat Bantu Ls 1.0000 Rp 414.76 Rp 414.76
Sub-Total ( 3 ) Rp 4,562.35
Pekerjaan : TANAH
Jenis Pembayaran : Pemadatan Tanah dengan alat Berat
Satuan Pembayaran : M2
Harga Satuan : Rp 31,716.39
AHSP-II-011
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.0357 Rp 70,000.00 Rp 2,499.00
Mandor OH 0.0031 Rp 110,000.00 Rp 341.00
Sub-Total ( 1 ) Rp 2,840.00
2 Bahan
Sub-Total ( 2 ) Rp -
3 Peralatan
Wheel Loader jam 0.0356 Rp 456,429.16 Rp 16,248.88
Vibro Roller jam 0.0222 Rp 340,223.69 Rp 7,552.97
Water Tanker jam 0.0140 Rp 246,403.90 Rp 3,449.65
Alat Bantu Ls 1.0000 Rp 1,624.89 Rp 1,624.89
Sub-Total ( 3 ) Rp 28,876.39
Pekerjaan : TANAH
Jenis Pembayaran : Pemadatan Tanah dengan Stamper
Satuan Pembayaran : M2
Harga Satuan : Rp 22,290.18
AHSP-II-012
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.2499 Rp 70,000.00 Rp 17,493.00
Mandor OH 0.0217 Rp 110,000.00 Rp 2,387.00
Sub-Total ( 1 ) Rp 19,880.00
2 Bahan
Sub-Total ( 2 ) Rp -
3 Peralatan
Stamper jam 0.0712 Rp 30,773.43 Rp 2,191.07
Alat Bantu Ls 1.0000 Rp 219.11 Rp 219.11
Sub-Total ( 3 ) Rp 2,410.18
Pekerjaan : TANAH
Jenis Pembayaran : Limestone 30 cm
Satuan Pembayaran : M3
Harga Satuan : Rp 113,122.25
AHSP-II-013
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.3000 Rp 70,000.00 Rp 21,000.00
Mandor OH 0.0100 Rp 110,000.00 Rp 1,100.00
Sub-Total ( 1 ) Rp 22,100.00
2 Bahan
Lime stone m3 0.3630 Rp 250,750.00 Rp 91,022.25
Sub-Total ( 2 ) Rp 91,022.25
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 0.3000 Rp 70,000.00 Rp 21,000.00
Mandor OH 0.0100 Rp 110,000.00 Rp 1,100.00
Sub-Total ( 1 ) Rp 22,100.00
2 Bahan
Pasir Urug m³ 1.2000 Rp 134,900.00 Rp 161,880.00
Sub-Total ( 2 ) Rp 161,880.00
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 0.3000 Rp 70,000.00 Rp 21,000.00
Mandor OH 0.0100 Rp 110,000.00 Rp 1,100.00
Sub-Total ( 1 ) Rp 22,100.00
2 Bahan
Sirtu m3 0.1800 Rp 166,400.00 Rp 29,952.00
Sub-Total ( 2 ) Rp 29,952.00
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 0.2500 Rp 70,000.00 Rp 17,500.00
Mandor OH 0.0250 Rp 110,000.00 Rp 2,750.00
Sub-Total ( 1 ) Rp 20,250.00
2 Bahan
Sirtu m3 1.2000 Rp 166,400.00 Rp 199,680.00
Sub-Total ( 2 ) Rp 199,680.00
3 Peralatan
Sewa Vibratory Roller (pemadatan) jam 0.0100 Rp 340,223.69 Rp 3,402.24
Sewa Watertank hari 0.0020 Rp 1,724,827.30 Rp 3,449.65
Sub-Total ( 3 ) Rp 6,851.89
1 Tenaga
Pekerja OH 0.3000 Rp 70,000.00 Rp 21,000.00
Mandor OH 0.0100 Rp 110,000.00 Rp 1,100.00
Sub-Total ( 1 ) Rp 22,100.00
2 Bahan
Pasir Extra Beton m³ 1.2000 Rp 192,800.00 Rp 231,360.00
Sub-Total ( 2 ) Rp 231,360.00
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 0.3000 Rp 70,000.00 Rp 21,000.00
Mandor OH 0.0100 Rp 110,000.00 Rp 1,100.00
Sub-Total ( 1 ) Rp 22,100.00
2 Bahan
Batu Pecah 2-3 cm m3 0.1331 Rp 191,800.00 Rp 25,528.58
Sub-Total ( 2 ) Rp 25,528.58
3 Peralatan
Sub-Total ( 3 ) Rp -
Sub-Total ( 1 ) Rp 2,800.00
2 Bahan
Aspal Polimer Lokal kg 0.8880 Rp 11,900.00 Rp 10,567.20
Minyak Tanah Ltr 0.2530 Rp 9,800.00 Rp 2,479.40
Sub-Total ( 2 ) Rp 13,046.60
3 Peralatan
Asphalt sprayer jam 0.0030 Rp 69,660.86 Rp 208.98
Air Compressor jam 0.0063 Rp 179,864.85 Rp 1,133.15
Alat Bantu Ls 1.0000 Rp 268.43 Rp 268.43
Sub-Total ( 3 ) Rp 1,610.56
Sub-Total ( 1 ) Rp 17,493.00
2 Bahan
Batu pecah/split 2-3 m³ 0.0421 Rp 191,800.00 Rp 8,074.78
Abu batu m³ 0.0186 Rp 231,084.00 Rp 4,298.16
Filler untuk hotmix (semen) kg 6.0019 Rp 1,471.00 Rp 8,828.79
Aspal Polimer Lokal kg 8.2688 Rp 11,900.00 Rp 98,398.72
Sub-Total ( 2 ) Rp 119,600.46
3 Peralatan
Wheel Loader jam 0.0011 Rp 456,429.16 Rp 502.07
Asphalt Mixing Plant jam 0.0022 Rp 7,015,788.77 Rp 15,434.74
Genset jam 0.0022 Rp 384,209.76 Rp 845.26
Dump Truck 10 ton jam 0.0160 Rp 494,897.70 Rp 7,918.36
Asphalt Finisher jam 0.0027 Rp 373,027.34 Rp 1,007.17
Tandem Roller jam 0.0010 Rp 277,852.88 Rp 277.85
Pheneumatic Tire Roller jam 0.0012 Rp 347,725.99 Rp 417.27
Alat Bantu jam 1.0000 Rp 5,280.55 Rp 5,280.55
Sub-Total ( 3 ) Rp 31,683.28
1 Tenaga
Pekerja OH 0.2500 Rp 70,000.00 Rp 17,500.00
Tukang batu OH 0.1000 Rp 90,000.00 Rp 9,000.00
Kepala tukang OH 0.0100 Rp 100,000.00 Rp 1,000.00
Mandor OH 0.0010 Rp 110,000.00 Rp 110.00
Sub-Total ( 1 ) Rp 27,610.00
2 Bahan
Paving Block tebal 6 cm (abu-abu) M2 1.0500 Rp 95,000.00 Rp 99,750.00
Sub-Total ( 2 ) Rp 99,750.00
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 0.3000 Rp 70,000.00 Rp 21,000.00
Tukang batu OH 0.1500 Rp 90,000.00 Rp 13,500.00
Kepala tukang OH 0.0100 Rp 100,000.00 Rp 1,000.00
Mandor OH 0.0010 Rp 110,000.00 Rp 110.00
Sub-Total ( 1 ) Rp 35,610.00
2 Bahan
Kansteen beton 15x30x40 cm Bh 2.5000 Rp 38,000.00 Rp 95,000.00
Sub-Total ( 2 ) Rp 95,000.00
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : TAMAN
Jenis Pembayaran : Tanaman Rumput
Satuan Pembayaran : M2
Harga Satuan : Rp 34,700.00
AHSP-II-023
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.2000 Rp 70,000.00 Rp 14,000.00
Mandor OH 0.0200 Rp 110,000.00 Rp 2,200.00
Sub-Total ( 1 ) Rp 16,200.00
2 Bahan
Rumput Gajahan M2 1.1000 Rp 15,000.00 Rp 16,500.00
Rabuk Kg 0.1000 Rp 20,000.00 Rp 2,000.00
Sub-Total ( 2 ) Rp 18,500.00
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : TAMAN
Jenis Pembayaran : Pohon Peneduh
Satuan Pembayaran : Pohon
Harga Satuan : Rp 131,200.00
AHSP-II-024
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.2000 Rp 70,000.00 Rp 14,000.00
Mandor OH 0.0200 Rp 110,000.00 Rp 2,200.00
Sub-Total ( 1 ) Rp 16,200.00
2 Bahan
Pohon Peneduh, tinggi 2 - 2,5 m phn 1.0000 Rp 75,000.00 Rp 75,000.00
Rabuk Kg 2.0000 Rp 20,000.00 Rp 40,000.00
Sub-Total ( 2 ) Rp 115,000.00
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 0.0070 Rp 70,000.00 Rp 490.00
Tukang besi OH 0.0070 Rp 90,000.00 Rp 630.00
Kepala tukang OH 0.0007 Rp 100,000.00 Rp 70.00
Mandor OH 0.0004 Rp 110,000.00 Rp 44.00
Sub-Total ( 1 ) Rp 1,234.00
2 Bahan
Besi beton ulir kg 1.0500 Rp 8,000.00 Rp 8,400.00
Kawat beton kg 0.0150 Rp 18,022.00 Rp 270.33
Sub-Total ( 2 ) Rp 8,670.33
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 0.0070 Rp 70,000.00 Rp 490.00
Tukang besi OH 0.0070 Rp 90,000.00 Rp 630.00
Kepala tukang OH 0.0007 Rp 100,000.00 Rp 70.00
Mandor OH 0.0004 Rp 110,000.00 Rp 44.00
Sub-Total ( 1 ) Rp 1,234.00
2 Bahan
Besi beton polos kg 1.0500 Rp 8,000.00 Rp 8,400.00
Kawat beton kg 0.0100 Rp 18,022.00 Rp 180.22
Sub-Total ( 2 ) Rp 8,580.22
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 1.6500 Rp 70,000.00 Rp 115,500.00
Tukang batu OH 0.2750 Rp 90,000.00 Rp 24,750.00
Kepala tukang OH 0.0280 Rp 100,000.00 Rp 2,800.00
Mandor OH 0.0830 Rp 110,000.00 Rp 9,130.00
Sub-Total ( 1 ) Rp 152,180.00
2 Bahan
Beton Ready Mix K-250 M3 1.1000 Rp 856,750.00 Rp 942,425.00
Sub-Total ( 2 ) Rp 942,425.00
3 Peralatan
Sewa Mobil Mixer OH 0.1611 Rp 250,000.00 Rp 40,275.00
Sewa Concrete Pump OH 0.0780 Rp 3,000,000.00 Rp 234,000.00
Sewa Concrete Vibrator OH 0.0700 Rp 350,000.00 Rp 24,500.00
Sub-Total ( 3 ) Rp 298,775.00
1 Tenaga
Pekerja OH 1.6500 Rp 70,000.00 Rp 115,500.00
Tukang batu OH 0.2750 Rp 90,000.00 Rp 24,750.00
Kepala tukang OH 0.0280 Rp 100,000.00 Rp 2,800.00
Mandor OH 0.0830 Rp 110,000.00 Rp 9,130.00
Sub-Total ( 1 ) Rp 152,180.00
2 Bahan
Beton Ready Mix K-275 M3 1.1000 Rp 891,250.00 Rp 980,375.00
Sub-Total ( 2 ) Rp 980,375.00
3 Peralatan
Sewa Mobil Mixer OH 0.1611 Rp 250,000.00 Rp 40,275.00
Sewa Concrete Pump OH 0.0780 Rp 3,000,000.00 Rp 234,000.00
Sewa Concrete Vibrator OH 0.0700 Rp 350,000.00 Rp 24,500.00
Sub-Total ( 3 ) Rp 298,775.00
1 Tenaga
Pekerja OH 1.6500 Rp 70,000.00 Rp 115,500.00
Tukang batu OH 0.2750 Rp 90,000.00 Rp 24,750.00
Kepala tukang OH 0.0280 Rp 100,000.00 Rp 2,800.00
Mandor OH 0.0830 Rp 110,000.00 Rp 9,130.00
Sub-Total ( 1 ) Rp 152,180.00
2 Bahan
Beton Ready Mix K-300 M3 1.1000 Rp 937,250.00 Rp 1,030,975.00
Sub-Total ( 2 ) Rp 1,030,975.00
3 Peralatan
Sewa Mobil Mixer OH 0.1611 Rp 250,000.00 Rp 40,275.00
Sewa Concrete Pump OH 0.0780 Rp 3,000,000.00 Rp 234,000.00
Sewa Concrete Vibrator OH 0.0700 Rp 350,000.00 Rp 24,500.00
Sub-Total ( 3 ) Rp 298,775.00
1 Tenaga
Pekerja OH 1.6500 Rp 70,000.00 Rp 115,500.00
Tukang batu OH 0.2750 Rp 90,000.00 Rp 24,750.00
Kepala tukang OH 0.0280 Rp 100,000.00 Rp 2,800.00
Mandor OH 0.0830 Rp 110,000.00 Rp 9,130.00
Sub-Total ( 1 ) Rp 152,180.00
2 Bahan
Semen PC kg 371.00 Rp 1,471.00 Rp 545,741.00
Pasir beton BD. = 1.6 2000 kg 698.00 Rp 96.40 Rp 67,287.20
Batu pecah/split 2-3 BD. = 1.9 2375 kg 1,047.00 Rp 80.76 Rp 84,553.52
Air ltr 215.00 Rp 260.00 Rp 55,900.00
Sub-Total ( 2 ) Rp 753,481.72
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 1.6500 Rp 70,000.00 Rp 115,500.00
Tukang batu OH 0.2750 Rp 90,000.00 Rp 24,750.00
Kepala tukang OH 0.0280 Rp 100,000.00 Rp 2,800.00
Mandor OH 0.0830 Rp 110,000.00 Rp 9,130.00
Sub-Total ( 1 ) Rp 152,180.00
2 Bahan
Semen PC kg 384.00 Rp 1,471.00 Rp 564,864.00
Pasir beton BD. = 1.6 2000 kg 692.00 Rp 96.40 Rp 66,708.80
Batu pecah/split 2-3 BD. = 1.9 2375 kg 1,039.00 Rp 80.76 Rp 83,907.45
Air ltr 215.00 Rp 260.00 Rp 55,900.00
Sub-Total ( 2 ) Rp 771,380.25
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 1.6500 Rp 70,000.00 Rp 115,500.00
Tukang batu OH 0.2750 Rp 90,000.00 Rp 24,750.00
Kepala tukang OH 0.0280 Rp 100,000.00 Rp 2,800.00
Mandor OH 0.0830 Rp 110,000.00 Rp 9,130.00
Sub-Total ( 1 ) Rp 152,180.00
2 Bahan
Semen PC kg 406.0000 Rp 1,471.00 Rp 597,226.00
Pasir beton BD. = 1.6 2000 kg 684.00 Rp 96.40 Rp 65,937.60
Batu pecah/split 2-3 BD. = 1.9 2375 kg 1,026.00 Rp 80.76 Rp 82,857.60
Air ltr 215.0000 Rp 260.00 Rp 55,900.00
Sub-Total ( 2 ) Rp 801,921.20
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 1.6500 Rp 70,000.00 Rp 115,500.00
Tukang batu OH 0.2750 Rp 90,000.00 Rp 24,750.00
Kepala tukang OH 0.0280 Rp 100,000.00 Rp 2,800.00
Mandor OH 0.0830 Rp 110,000.00 Rp 9,130.00
Sub-Total ( 1 ) Rp 152,180.00
2 Bahan
Semen PC kg 413.00 Rp 1,471.00 Rp 607,523.00
Pasir beton BD. = 1.6 2000 kg 681.00 Rp 96.40 Rp 65,648.40
Batu pecah/split 2-3 BD. = 1.9 2375 kg 1,021.00 Rp 80.76 Rp 82,453.81
Air ltr 215.00 Rp 260.00 Rp 55,900.00
Sub-Total ( 2 ) Rp 811,525.21
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Kep. Tukang Batu OH 0.0850 Rp 100,000.00 Rp 8,500.00
Tukang Batu OH 0.8500 Rp 90,000.00 Rp 76,500.00
Pekerja OH 3.4000 Rp 70,000.00 Rp 238,000.00
Mandor OH 0.1700 Rp 110,000.00 Rp 18,700.00
Sub-Total ( 1 ) Rp 341,700.00
2 Bahan
Semen PC kg 194.0000 Rp 1,471.00 Rp 285,374.00
Pasir beton M3 0.3120 Rp 192,800.00 Rp 60,153.60
Batu pecah/split 2-3 M3 0.4680 Rp 191,800.00 Rp 89,762.40
Batu belah M3 0.4800 Rp 170,500.00 Rp 81,840.00
Besi beton kg 126.0000 Rp 8,000.00 Rp 1,008,000.00
Kawat beton kg 1.8000 Rp 18,022.00 Rp 32,439.60
Sub-Total ( 2 ) Rp 1,557,569.60
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 1.2000 Rp 70,000.00 Rp 84,000.00
Tukang batu OH 0.2000 Rp 90,000.00 Rp 18,000.00
Kepala tukang OH 0.0200 Rp 100,000.00 Rp 2,000.00
Mandor OH 0.0600 Rp 110,000.00 Rp 6,600.00
Sub-Total ( 1 ) Rp 110,600.00
2 Bahan
Semen portland kg 230.0000 Rp 1,471.00 Rp 338,330.00
Pasir beton BD. = 1.6 2000 kg 893.00 Rp 96.40 Rp 86,085.20
Batu pecah/split 2/3 BD. = 1.9 2375 kg 1,027.00 Rp 80.76 Rp 82,938.36
Air ltr 200.0000 Rp 260.00 Rp 52,000.00
Sub-Total ( 2 ) Rp 559,353.56
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 0.1800 Rp 70,000.00 Rp 12,600.00
Tukang batu OH 0.0200 Rp 90,000.00 Rp 1,800.00
Tukang kayu OH 0.0200 Rp 100,000.00 Rp 2,000.00
Tukang besi OH 0.0200 Rp 90,000.00 Rp 1,800.00
Kepala Tukang batu OH 0.0060 Rp 100,000.00 Rp 600.00
Mandor OH 0.0090 Rp 110,000.00 Rp 990.00
Sub-Total ( 1 ) Rp 19,790.00
2 Bahan
Semen PC kg 4.0000 Rp 1,471.00 Rp 5,884.00
Pasir beton m3 0.0060 Rp 192,800.00 Rp 1,156.80
Kerikil / split (2-3 cm) m3 0.0090 Rp 191,800.00 Rp 1,726.20
Kayu kelas III (kayu papan Terentang) M3 0.0020 Rp 2,500,000.00 Rp 5,000.00
Paku 5-12 cm Kg 0.0100 Rp 15,300.00 Rp 153.00
Besi beton polos Kg 3.0000 Rp 8,000.00 Rp 24,000.00
Kawat beton Kg 0.0450 Rp 18,022.00 Rp 810.99
Sub-Total ( 2 ) Rp 38,730.99
3 Peralatan
Sub-Total ( 3 ) Rp -
Sub-Total ( 1 ) Rp 32,680.00
2 Bahan
Semen PC kg 5.5000 Rp 1,471.00 Rp 8,090.50
Pasir beton m3 0.0090 Rp 192,800.00 Rp 1,735.20
Kerikil / split (2-3 cm) m3 0.0150 Rp 191,800.00 Rp 2,877.00
Kayu kelas III (kayu papan Terentang) M3 0.0030 Rp 2,500,000.00 Rp 7,500.00
Paku 5-12 cm Kg 0.0200 Rp 15,300.00 Rp 306.00
Besi beton polos Kg 3.6000 Rp 8,000.00 Rp 28,800.00
Kawat beton Kg 0.0500 Rp 18,022.00 Rp 901.10
Sub-Total ( 2 ) Rp 50,209.80
3 Peralatan
Sub-Total ( 3 ) Rp -
Sub-Total ( 1 ) Rp 675,900.00
2 Bahan
Kayu kelas III (kayu papan Terentang) M3 0.3200 Rp 2,500,000.00 Rp 800,000.00
Paku 5-12 cm Kg 3.2000 Rp 15,300.00 Rp 48,960.00
Minyak bekisting liter 1.6000 Rp 2,478.00 Rp 3,964.80
Besi beton polos Kg 131.2500 Rp 8,000.00 Rp 1,050,000.00
Kawat beton Kg 2.2500 Rp 18,022.00 Rp 40,549.50
Semen PC kg 336.0000 Rp 1,471.00 Rp 494,256.00
Pasir beton m3 0.5400 Rp 192,800.00 Rp 104,112.00
Kerikil / split (2-3 cm) m3 0.8100 Rp 191,800.00 Rp 155,358.00
Kayu kelas III (kayu basah Balok kelas III) M3 0.1200 Rp 3,635,500.00 Rp 436,260.00
Plywood/multiplex 9mm lmbr 2.8000 Rp 105,000.00 Rp 294,000.00
Dolken kayu Galam, dia. 8-10cm, panjang 4m btg 32.0000 Rp 30,000.00 Rp 960,000.00
Sub-Total ( 2 ) Rp 4,387,460.30
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 0.5200 Rp 70,000.00 Rp 36,400.00
Tukang kayu OH 0.2600 Rp 100,000.00 Rp 26,000.00
Kepala tukang OH 0.0260 Rp 100,000.00 Rp 2,600.00
Mandor OH 0.0260 Rp 110,000.00 Rp 2,860.00
Sub-Total ( 1 ) Rp 67,860.00
2 Bahan
Kayu Terentang papan 3 cm m³ 0.0400 Rp 2,500,000.00 Rp 100,000.00
Paku biasa 2"-5" kg 0.3000 Rp 15,300.00 Rp 4,590.00
Minyak Bekisting lt 0.1000 Rp 2,478.00 Rp 247.80
Sub-Total bahan Rp 104,837.80
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 0.5200 Rp 70,000.00 Rp 36,400.00
Tukang kayu OH 0.2600 Rp 100,000.00 Rp 26,000.00
Kepala tukang OH 0.0260 Rp 100,000.00 Rp 2,600.00
Mandor OH 0.0260 Rp 110,000.00 Rp 2,860.00
Sub-Total ( 1 ) Rp 67,860.00
2 Bahan
Kayu Terentang papan 3 cm m³ 0.0450 Rp 2,500,000.00 Rp 112,500.00
Paku biasa 2"-5" kg 0.3000 Rp 15,300.00 Rp 4,590.00
Minyak Bekisting lt 0.1000 Rp 2,478.00 Rp 247.80
Sub-Total bahan Rp 117,337.80
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 0.6600 Rp 70,000.00 Rp 46,200.00
Tukang kayu OH 0.3300 Rp 100,000.00 Rp 33,000.00
Kepala tukang OH 0.0330 Rp 100,000.00 Rp 3,300.00
Mandor OH 0.0330 Rp 110,000.00 Rp 3,630.00
Sub-Total ( 1 ) Rp 86,130.00
2 Bahan
Kayu gergajian kelas III (kasau) m³ 0.0400 Rp 3,635,000.00 Rp 145,400.00
Paku biasa 2"-5" kg 0.4000 Rp 15,300.00 Rp 6,120.00
Minyak bekisting lt 0.2000 Rp 2,478.00 Rp 495.60
Kayu gergajian kelas III (papan) m³ 0.0150 Rp 3,928,000.00 Rp 58,920.00
Plywood/multiplex 9mm lbr 0.3500 Rp 105,000.00 Rp 36,750.00
Kayu dolken Ø 8-10/400 cm btg 2.0000 Rp 30,000.00 Rp 60,000.00
Sub-Total bahan Rp 307,685.60
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 0.6600 Rp 70,000.00 Rp 46,200.00
Tukang kayu OH 0.3300 Rp 100,000.00 Rp 33,000.00
Kepala tukang OH 0.0330 Rp 100,000.00 Rp 3,300.00
Mandor OH 0.0330 Rp 110,000.00 Rp 3,630.00
Sub-Total ( 1 ) Rp 86,130.00
2 Bahan
Kayu gergajian kelas III (kasau) m³ 0.0400 Rp 3,635,000.00 Rp 145,400.00
Paku biasa 2"-5" kg 0.4000 Rp 15,300.00 Rp 6,120.00
Minyak bekisting lt 0.2000 Rp 2,478.00 Rp 495.60
Kayu gergajian kelas III (papan) m³ 0.0180 Rp 3,928,000.00 Rp 70,704.00
Plywood/multiplex 9mm lbr 0.3500 Rp 105,000.00 Rp 36,750.00
Kayu dolken Ø 8-10/400 cm btg 2.0000 Rp 30,000.00 Rp 60,000.00
Sub-Total bahan Rp 319,469.60
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 0.6600 Rp 70,000.00 Rp 46,200.00
Tukang kayu OH 0.3300 Rp 100,000.00 Rp 33,000.00
Kepala tukang OH 0.0330 Rp 100,000.00 Rp 3,300.00
Mandor OH 0.0330 Rp 110,000.00 Rp 3,630.00
Sub-Total ( 1 ) Rp 86,130.00
2 Bahan
Kayu gergajian kelas III (kasau) m³ 0.0400 Rp 3,635,000.00 Rp 145,400.00
Paku biasa 2"-5" kg 0.4000 Rp 15,300.00 Rp 6,120.00
Minyak bekisting lt 0.2000 Rp 2,478.00 Rp 495.60
Kayu gergajian kelas III (papan) m³ 0.0150 Rp 3,928,000.00 Rp 58,920.00
Plywood/multiplex 9mm lbr 0.3500 Rp 105,000.00 Rp 36,750.00
Kayu dolken Ø 8-10/400 cm btg 6.0000 Rp 30,000.00 Rp 180,000.00
Sub-Total bahan Rp 427,685.60
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 0.6600 Rp 70,000.00 Rp 46,200.00
Tukang kayu OH 0.3300 Rp 100,000.00 Rp 33,000.00
Kepala tukang OH 0.0330 Rp 100,000.00 Rp 3,300.00
Mandor OH 0.0330 Rp 110,000.00 Rp 3,630.00
Sub-Total ( 1 ) Rp 86,130.00
2 Bahan
Kayu gergajian kelas III (kasau) m³ 0.0300 Rp 3,635,000.00 Rp 109,050.00
Paku biasa 2"-5" kg 0.4000 Rp 15,300.00 Rp 6,120.00
Minyak bekisting lt 0.1500 Rp 2,478.00 Rp 371.70
Kayu gergajian kelas III (papan) m³ 0.0150 Rp 3,928,000.00 Rp 58,920.00
Plywood/multiplex 9mm lbr 0.3500 Rp 105,000.00 Rp 36,750.00
Kayu dolken Ø 8-10/400 cm btg 2.0000 Rp 30,000.00 Rp 60,000.00
Sub-Total bahan Rp 271,211.70
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 0.6600 Rp 70,000.00 Rp 46,200.00
Tukang kayu OH 0.3300 Rp 100,000.00 Rp 33,000.00
Kepala tukang OH 0.0330 Rp 100,000.00 Rp 3,300.00
Mandor OH 0.0330 Rp 110,000.00 Rp 3,630.00
Sub-Total ( 1 ) Rp 86,130.00
2 Bahan
Kayu gergajian kelas III (kasau) m³ 0.0300 Rp 3,635,000.00 Rp 109,050.00
Paku biasa 2"-5" kg 0.4000 Rp 15,300.00 Rp 6,120.00
Minyak bekisting lt 0.2000 Rp 2,478.00 Rp 495.60
Kayu gergajian kelas III (papan) m³ 0.0200 Rp 3,928,000.00 Rp 78,560.00
Plywood/multiplex 9mm lbr 0.3500 Rp 105,000.00 Rp 36,750.00
Kayu dolken Ø 8-10/400 cm btg 3.0000 Rp 30,000.00 Rp 90,000.00
Formate/spacer/penjaga jarak bh 4.0000 Rp 10,000.00 Rp 40,000.00
Sub-Total bahan Rp 360,975.60
1 Tenaga
Pekerja OH 4.0000 Rp 70,000.00 Rp 280,000.00
Sub-Total ( 1 ) Rp 280,000.00
2 Bahan
Sub-Total ( 2 ) Rp -
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : PASANGAN
Jenis Pembayaran : Aanstampeng Batu Kali
Satuan Pembayaran : M3
Harga Satuan : Rp 360,766.80 SNI 2836 (6.9) - 2008
AHSP-IV-001
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.7800 Rp 70,000.00 Rp 54,600.00
Tukang batu OH 0.3900 Rp 90,000.00 Rp 35,100.00
Kep. Tukang Batu OH 0.0390 Rp 100,000.00 Rp 3,900.00
Mandor OH 0.0390 Rp 110,000.00 Rp 4,290.00
Sub-Total ( 1 ) Rp 97,890.00
2 Bahan
Batu kali M3 1.2000 Rp 170,500.00 Rp 204,600.00
Pasir urug M3 0.4320 Rp 134,900.00 Rp 58,276.80
Sub-Total ( 2 ) Rp 262,876.80
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : PASANGAN
Jenis Pembayaran : Pas. Pondasi Batu Kali ad 1 Pc : 3 Psr
Satuan Pembayaran : M3
Harga Satuan : Rp 779,086.50 SNI 2836 (6.1) - 2008
AHSP-IV-002
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 1.5000 Rp 70,000.00 Rp 105,000.00
Tukang batu OH 0.7500 Rp 90,000.00 Rp 67,500.00
Kep. Tukang Batu OH 0.0750 Rp 100,000.00 Rp 7,500.00
Mandor OH 0.0750 Rp 110,000.00 Rp 8,250.00
Sub-Total ( 1 ) Rp 188,250.00
2 Bahan
Semen PC Kg 202.0000 Rp 1,471.00 Rp 297,142.00
Batu kali M3 1.2000 Rp 170,500.00 Rp 204,600.00
Pasir pasang M3 0.4850 Rp 183,700.00 Rp 89,094.50
Sub-Total ( 2 ) Rp 590,836.50
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : PASANGAN
Jenis Pembayaran : Pas. Pondasi Batu Kali ad 1 Pc : 4 Psr
Satuan Pembayaran : M3
Harga Satuan : Rp 728,147.00 SNI 2836 (6.2) - 2008
AHSP-IV-003
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 1.5000 Rp 70,000.00 Rp 105,000.00
Tukang batu OH 0.7500 Rp 90,000.00 Rp 67,500.00
Kep. Tukang Batu OH 0.0750 Rp 100,000.00 Rp 7,500.00
Mandor OH 0.0750 Rp 110,000.00 Rp 8,250.00
Sub-Total ( 1 ) Rp 188,250.00
2 Bahan
Semen PC Kg 163.0000 Rp 1,471.00 Rp 239,773.00
Batu kali M3 1.2000 Rp 170,500.00 Rp 204,600.00
Pasir pasang M3 0.5200 Rp 183,700.00 Rp 95,524.00
Sub-Total ( 2 ) Rp 539,897.00
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : PASANGAN
Jenis Pembayaran : Pas. Pondasi Batu Kali ad 1 Pc : 5 Psr
Satuan Pembayaran : M3
Harga Satuan : Rp 692,838.80 SNI 2836 (6.3) - 2008
AHSP-IV-004
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 1.5000 Rp 70,000.00 Rp 105,000.00
Tukang batu OH 0.7500 Rp 90,000.00 Rp 67,500.00
Kep. Tukang Batu OH 0.0750 Rp 100,000.00 Rp 7,500.00
Mandor OH 0.0750 Rp 110,000.00 Rp 8,250.00
Sub-Total ( 1 ) Rp 188,250.00
2 Bahan
Semen PC Kg 136.0000 Rp 1,471.00 Rp 200,056.00
Batu kali M3 1.2000 Rp 170,500.00 Rp 204,600.00
Pasir pasang M3 0.5440 Rp 183,700.00 Rp 99,932.80
Sub-Total ( 2 ) Rp 504,588.80
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : PASANGAN
Jenis Pembayaran : Pas. Dinding Bata Merah (1 Batu), 1Pc : 3Ps
Satuan Pembayaran : M2
Harga Satuan : Rp 221,486.15 SNI 6897 (6.2) - 2008
AHSP-IV-005
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.6000 Rp 70,000.00 Rp 42,000.00
Tukang batu OH 0.2000 Rp 90,000.00 Rp 18,000.00
Kepala tukang OH 0.0200 Rp 100,000.00 Rp 2,000.00
Mandor OH 0.0300 Rp 110,000.00 Rp 3,300.00
Sub-Total ( 1 ) Rp 65,300.00
2 Bahan
Semen PC kg 32.9500 Rp 1,471.00 Rp 48,469.45
Batu bata uk. 5 x 11 x 23 cm Bh 140.0000 Rp 650.00 Rp 91,000.00
Pasir pasang M3 0.0910 Rp 183,700.00 Rp 16,716.70
Sub-Total ( 2 ) Rp 156,186.15
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : PASANGAN
Jenis Pembayaran : Pas. Dinding Bata Merah (1/2 Batu), 1Pc : 3Ps
Satuan Pembayaran : M2
Harga Satuan : Rp 106,636.27 SNI 6897 (6.8) - 2008
AHSP-IV-006
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.3000 Rp 70,000.00 Rp 21,000.00
Tukang batu OH 0.1000 Rp 90,000.00 Rp 9,000.00
Kepala tukang OH 0.0100 Rp 100,000.00 Rp 1,000.00
Mandor OH 0.0150 Rp 110,000.00 Rp 1,650.00
Sub-Total ( 1 ) Rp 32,650.00
2 Bahan
Semen PC kg 14.3700 Rp 1,471.00 Rp 21,138.27
Batu bata uk. 5 x 11 x 23 cm Bh 70.0000 Rp 650.00 Rp 45,500.00
Pasir pasang M3 0.0400 Rp 183,700.00 Rp 7,348.00
Sub-Total ( 2 ) Rp 73,986.27
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : PASANGAN
Jenis Pembayaran : Pas. Dinding Bata Merah (1 Batu), 1Pc : 5Ps
Satuan Pembayaran : M2
Harga Satuan : Rp 205,924.90 SNI 6897 (6.4) - 2008
AHSP-IV-007
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.6000 Rp 70,000.00 Rp 42,000.00
Tukang batu OH 0.2000 Rp 90,000.00 Rp 18,000.00
Kepala tukang OH 0.0200 Rp 100,000.00 Rp 2,000.00
Mandor OH 0.0300 Rp 110,000.00 Rp 3,300.00
Sub-Total ( 1 ) Rp 65,300.00
2 Bahan
Semen PC kg 18.5000 Rp 1,471.00 Rp 27,213.50
Batu bata uk. 5 x 11 x 23 cm Bh 140.0000 Rp 650.00 Rp 91,000.00
Pasir pasang M3 0.1220 Rp 183,700.00 Rp 22,411.40
Sub-Total ( 2 ) Rp 140,624.90
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : PASANGAN
Jenis Pembayaran : Pas. Dinding Bata Merah (1/2 Batu), 1Pc : 5Ps
Satuan Pembayaran : M2
Harga Satuan : Rp 100,655.78 SNI 6897 (6.10) - 2008
AHSP-IV-008
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.3000 Rp 70,000.00 Rp 21,000.00
Tukang batu OH 0.1000 Rp 90,000.00 Rp 9,000.00
Kepala tukang OH 0.0100 Rp 100,000.00 Rp 1,000.00
Mandor OH 0.0150 Rp 110,000.00 Rp 1,650.00
Sub-Total ( 1 ) Rp 32,650.00
2 Bahan
Semen PC kg 9.6800 Rp 1,471.00 Rp 14,239.28
Batu bata uk. 5 x 11 x 23 cm Bh 70.0000 Rp 650.00 Rp 45,500.00
Pasir pasang M3 0.0450 Rp 183,700.00 Rp 8,266.50
Sub-Total ( 2 ) Rp 68,005.78
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : PASANGAN
Jenis Pembayaran : Pas. Dinding bata ringan (Hebel) tebal 10 cm, perekat Mortar
Satuan Pembayaran : M2
Harga Satuan : Rp 132,210.00
AHSP-IV-009
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.3000 Rp 70,000.00 Rp 21,000.00
Tukang batu OH 0.1500 Rp 90,000.00 Rp 13,500.00
Kepala tukang OH 0.0150 Rp 100,000.00 Rp 1,500.00
Mandor OH 0.0150 Rp 110,000.00 Rp 1,650.00
Sub-Total ( 1 ) Rp 37,650.00
2 Bahan
Batu bata ringan (ex Hebel), 10x16x60 cm bh 8.5000 Rp 10,400.00 Rp 88,400.00
Perekat PM-100 / MU-100 (perekat) kg 3.2000 Rp 1,925.00 Rp 6,160.00
Sub-Total ( 2 ) Rp 94,560.00
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : PASANGAN
Jenis Pembayaran : Pas. Dinding batako (1/2 batu), 1Pc : 3Ps
Satuan Pembayaran : M2
Harga Satuan : Rp 101,377.04 SNI 6897 (6.20) - 2008
AHSP-IV-010
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.3000 Rp 70,000.00 Rp 21,000.00
Tukang batu OH 0.1000 Rp 90,000.00 Rp 9,000.00
Kepala tukang OH 0.0100 Rp 100,000.00 Rp 1,000.00
Mandor OH 0.0150 Rp 110,000.00 Rp 1,650.00
Sub-Total ( 1 ) Rp 32,650.00
2 Bahan
Semen PC kg 15.1600 Rp 1,471.00 Rp 22,300.36
Batako semen, uk. 9 x 19 x 39 cm Bh 12.5000 Rp 3,000.00 Rp 37,500.00
Pasir pasang M3 0.0364 Rp 183,700.00 Rp 6,686.68
Besi angkur dia 8 mm kg 0.2800 Rp 8,000.00 Rp 2,240.00
Sub-Total ( 2 ) Rp 68,727.04
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : PASANGAN
Jenis Pembayaran : Dinding Ornamen GRC
Satuan Pembayaran : M2
Harga Satuan : Rp 704,500.00
AHSP-IV-011
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Sub-Total ( 1 ) Rp -
2 Bahan
Biaya angkutan Jakarta - Kupang (Rp. 450.000,--/ 100m2) m2 1.0000 Rp 4,500.00 Rp 4,500.00
Harga Ornamen termasuk pemasangan m2 1.0000 Rp 700,000.00 Rp 700,000.00
Sub-Total ( 2 ) Rp 704,500.00
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 0.3000 Rp 70,000.00 Rp 21,000.00
Tukang batu OH 0.1500 Rp 90,000.00 Rp 13,500.00
Kepala tukang OH 0.0150 Rp 100,000.00 Rp 1,500.00
Mandor OH 0.0150 Rp 110,000.00 Rp 1,650.00
Sub-Total ( 1 ) Rp 37,650.00
2 Bahan
Semen PC kg 10.2240 Rp 1,471.00 Rp 15,039.50
Pasir pasang M3 0.0200 Rp 183,700.00 Rp 3,674.00
Sub-Total ( 2 ) Rp 18,713.50
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 0.3000 Rp 70,000.00 Rp 21,000.00
Tukang batu OH 0.1500 Rp 90,000.00 Rp 13,500.00
Kepala tukang OH 0.0150 Rp 100,000.00 Rp 1,500.00
Mandor OH 0.0150 Rp 110,000.00 Rp 1,650.00
Sub-Total ( 1 ) Rp 37,650.00
2 Bahan
Semen PC kg 7.7760 Rp 1,471.00 Rp 11,438.50
Pasir pasang M3 0.0230 Rp 183,700.00 Rp 4,225.10
Sub-Total ( 2 ) Rp 15,663.60
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 0.3000 Rp 70,000.00 Rp 21,000.00
Tukang batu OH 0.1500 Rp 90,000.00 Rp 13,500.00
Kepala tukang OH 0.0150 Rp 100,000.00 Rp 1,500.00
Mandor OH 0.0150 Rp 110,000.00 Rp 1,650.00
Sub-Total ( 1 ) Rp 37,650.00
2 Bahan
Semen PC kg 5.1840 Rp 1,471.00 Rp 7,625.66
Pasir pasang M3 0.0260 Rp 183,700.00 Rp 4,776.20
Sub-Total ( 2 ) Rp 12,401.86
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 0.4000 Rp 70,000.00 Rp 28,000.00
Tukang batu OH 0.2000 Rp 90,000.00 Rp 18,000.00
Kepala tukang OH 0.0200 Rp 100,000.00 Rp 2,000.00
Mandor OH 0.0220 Rp 110,000.00 Rp 2,420.00
Sub-Total ( 1 ) Rp 50,420.00
2 Bahan
Semen PC kg 10.3680 Rp 1,471.00 Rp 15,251.33
Pasir pasang M3 0.0310 Rp 183,700.00 Rp 5,694.70
Sub-Total ( 2 ) Rp 20,946.03
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 0.4000 Rp 70,000.00 Rp 28,000.00
Tukang batu OH 0.2000 Rp 90,000.00 Rp 18,000.00
Kepala tukang OH 0.0200 Rp 100,000.00 Rp 2,000.00
Mandor OH 0.0220 Rp 110,000.00 Rp 2,420.00
Sub-Total ( 1 ) Rp 50,420.00
2 Bahan
Semen PC kg 6.9120 Rp 1,471.00 Rp 10,167.55
Pasir pasang M3 0.0350 Rp 183,700.00 Rp 6,429.50
Sub-Total ( 2 ) Rp 16,597.05
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 0.3000 Rp 70,000.00 Rp 21,000.00
Tukang batu OH 0.1500 Rp 90,000.00 Rp 13,500.00
Kepala tukang OH 0.0150 Rp 100,000.00 Rp 1,500.00
Mandor OH 0.0150 Rp 110,000.00 Rp 1,650.00
Sub-Total ( 1 ) Rp 37,650.00
2 Bahan
Semen PC kg 11.0000 Rp 1,471.00 Rp 16,181.00
Pasir pasang M3 0.0350 Rp 183,700.00 Rp 6,429.50
Sub-Total ( 2 ) Rp 22,610.50
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 0.2000 Rp 70,000.00 Rp 14,000.00
Tukang batu OH 0.1000 Rp 90,000.00 Rp 9,000.00
Kepala tukang OH 0.0100 Rp 100,000.00 Rp 1,000.00
Mandor OH 0.0100 Rp 110,000.00 Rp 1,100.00
Sub-Total ( 1 ) Rp 25,100.00
2 Bahan
Perekat mortar & beton (MU L-500) Kg 0.1100 Rp 131,750.00 Rp 14,492.50
Plester premium (MU 100) kg 20.0000 Rp 1,925.00 Rp 38,500.00
Acian plesteran (MU 250) kg 2.0000 Rp 3,950.00 Rp 7,900.00
Sub-Total ( 2 ) Rp 60,892.50
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 0.3000 Rp 70,000.00 Rp 21,000.00
Tukang batu OH 0.1000 Rp 90,000.00 Rp 9,000.00
Kepala tukang OH 0.0100 Rp 100,000.00 Rp 1,000.00
Mandor OH 0.0150 Rp 110,000.00 Rp 1,650.00
Sub-Total ( 1 ) Rp 32,650.00
2 Bahan
Semen PC kg 4.3200 Rp 1,471.00 Rp 6,354.72
Pasir pasang M3 0.0060 Rp 183,700.00 Rp 1,102.20
Sub-Total ( 2 ) Rp 7,456.92
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 0.2000 Rp 70,000.00 Rp 14,000.00
Tukang batu OH 0.1000 Rp 90,000.00 Rp 9,000.00
Kepala tukang OH 0.0100 Rp 100,000.00 Rp 1,000.00
Mandor OH 0.0100 Rp 110,000.00 Rp 1,100.00
Sub-Total ( 1 ) Rp 25,100.00
2 Bahan
Semen PC kg 3.2500 Rp 1,471.00 Rp 4,780.75
Sub-Total ( 2 ) Rp 4,780.75
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 0.1500 Rp 70,000.00 Rp 10,500.00
Tukang batu OH 0.1000 Rp 90,000.00 Rp 9,000.00
Kepala tukang OH 0.0100 Rp 100,000.00 Rp 1,000.00
Mandor OH 0.0080 Rp 110,000.00 Rp 880.00
Sub-Total ( 1 ) Rp 21,380.00
2 Bahan
Acian plesteran / beton expose (MU 200) kg 3.0000 Rp 4,275.00 Rp 12,825.00
Sub-Total ( 2 ) Rp 12,825.00
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 0.3000 Rp 70,000.00 Rp 21,000.00
Tukang batu OH 0.3000 Rp 90,000.00 Rp 27,000.00
Kepala tukang OH 0.0300 Rp 100,000.00 Rp 3,000.00
Mandor OH 0.0030 Rp 110,000.00 Rp 330.00
Sub-Total ( 1 ) Rp 51,330.00
Sub-Total ( 2 ) Rp 124,124.90
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 0.3000 Rp 70,000.00 Rp 21,000.00
Tukang batu OH 0.3000 Rp 90,000.00 Rp 27,000.00
Kepala tukang OH 0.0300 Rp 100,000.00 Rp 3,000.00
Mandor OH 0.0030 Rp 110,000.00 Rp 330.00
Sub-Total ( 1 ) Rp 51,330.00
Sub-Total ( 2 ) Rp 125,184.90
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 0.3000 Rp 70,000.00 Rp 21,000.00
Tukang batu OH 0.3000 Rp 90,000.00 Rp 27,000.00
Kepala tukang OH 0.0300 Rp 100,000.00 Rp 3,000.00
Mandor OH 0.0030 Rp 110,000.00 Rp 330.00
Sub-Total ( 1 ) Rp 51,330.00
Sub-Total ( 2 ) Rp 144,264.90
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 0.3000 Rp 70,000.00 Rp 21,000.00
Tukang batu OH 0.3000 Rp 90,000.00 Rp 27,000.00
Kepala tukang OH 0.0300 Rp 100,000.00 Rp 3,000.00
Mandor OH 0.0030 Rp 110,000.00 Rp 330.00
Sub-Total ( 1 ) Rp 51,330.00
Sub-Total ( 2 ) Rp 128,364.90
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 0.3000 Rp 70,000.00 Rp 21,000.00
Tukang batu OH 0.3000 Rp 90,000.00 Rp 27,000.00
Kepala tukang OH 0.0300 Rp 100,000.00 Rp 3,000.00
Mandor OH 0.0030 Rp 110,000.00 Rp 330.00
Sub-Total ( 1 ) Rp 51,330.00
Sub-Total ( 2 ) Rp 174,474.90
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 0.3000 Rp 70,000.00 Rp 21,000.00
Tukang batu OH 0.3000 Rp 90,000.00 Rp 27,000.00
Kepala tukang OH 0.0300 Rp 100,000.00 Rp 3,000.00
Mandor OH 0.0030 Rp 110,000.00 Rp 330.00
Sub-Total ( 1 ) Rp 51,330.00
Sub-Total ( 2 ) Rp 179,774.90
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 0.7000 Rp 70,000.00 Rp 49,000.00
Tukang batu OH 0.3500 Rp 90,000.00 Rp 31,500.00
Kepala tukang OH 0.0350 Rp 100,000.00 Rp 3,500.00
Mandor OH 0.0350 Rp 110,000.00 Rp 3,850.00
Sub-Total ( 1 ) Rp 87,850.00
2 Bahan
Semen PC kg 12.4400 Rp 1,471.00 Rp 18,299.24
Marmer Lampung Kristaline 100x100x2 m2 1.0600 Rp 530,000.00 Rp 561,800.00
Pasir Pasang m3 0.0250 Rp 183,700.00 Rp 4,592.50
Paku 12 mm bh 3.0030 Rp 500.00 Rp 1,501.50
Sub-Total ( 2 ) Rp 586,193.24
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 0.7000 Rp 70,000.00 Rp 49,000.00
Tukang batu OH 0.3500 Rp 90,000.00 Rp 31,500.00
Kepala tukang OH 0.0350 Rp 100,000.00 Rp 3,500.00
Mandor OH 0.0350 Rp 110,000.00 Rp 3,850.00
Sub-Total ( 1 ) Rp 87,850.00
2 Bahan
Semen PC kg 12.4400 Rp 1,471.00 Rp 18,299.24
Granit Import (Nero Absolute India) jenis slab m2 1.0600 Rp 650,000.00 Rp 689,000.00
Pasir Pasang m3 0.0250 Rp 183,700.00 Rp 4,592.50
Paku 12 mm bh 3.0030 Rp 500.00 Rp 1,501.50
Sub-Total ( 2 ) Rp 713,393.24
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 0.0570 Rp 70,000.00 Rp 3,990.00
Tukang batu OH 0.0380 Rp 90,000.00 Rp 3,420.00
Kepala tukang OH 0.0380 Rp 100,000.00 Rp 3,800.00
Mandor OH 0.0030 Rp 110,000.00 Rp 330.00
Sub-Total ( 1 ) Rp 11,540.00
2 Bahan
Acian plesteran / beton expose (MU 200) kg 0.5000 Rp 4,275.00 Rp 2,137.50
Sub-Total ( 2 ) Rp 2,137.50
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 1.5000 Rp 70,000.00 Rp 105,000.00
Tukang allumunium OH 1.5000 Rp 90,000.00 Rp 135,000.00
Kepala tukang OH 0.1500 Rp 100,000.00 Rp 15,000.00
Mandor OH 0.0600 Rp 110,000.00 Rp 6,600.00
Sub-Total ( 1 ) Rp 261,600.00
2 Bahan
ACP SEVEN Bright silver 5005 (tebal ACP 4mm, tebal All 0,5mm) m2 1.1000 Rp 325,000.00 Rp 357,500.00
Rangka allumunium hollow m' 5.0000 Rp 25,000.00 Rp 125,000.00
Paku skrup kg 0.6000 Rp 40,000.00 Rp 24,000.00
Sealant m' 2.0000 Rp 8,125.00 Rp 16,250.00
Sub-Total ( 2 ) Rp 522,750.00
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 0.7000 Rp 70,000.00 Rp 49,000.00
Tukang batu OH 0.3500 Rp 90,000.00 Rp 31,500.00
Kepala tukang OH 0.0350 Rp 100,000.00 Rp 3,500.00
Mandor OH 0.0350 Rp 110,000.00 Rp 3,850.00
Sub-Total ( 1 ) Rp 87,850.00
2 Bahan
Semen PC kg 11.7500 Rp 1,471.00 Rp 17,284.25
Batu alam Andesit 15/30 cm m2 1.1000 Rp 126,168.00 Rp 138,784.80
Pasir Pasang m3 0.0350 Rp 183,700.00 Rp 6,429.50
Sub-Total ( 2 ) Rp 162,498.55
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 0.7000 Rp 70,000.00 Rp 49,000.00
Tukang batu OH 0.3500 Rp 90,000.00 Rp 31,500.00
Kepala tukang OH 0.0350 Rp 100,000.00 Rp 3,500.00
Mandor OH 0.0350 Rp 110,000.00 Rp 3,850.00
Sub-Total ( 1 ) Rp 87,850.00
2 Bahan
Semen PC kg 11.7500 Rp 1,471.00 Rp 17,284.25
Batu alam Paras Jogya 20/30 cm (cream/putih) m2 1.1000 Rp 97,584.00 Rp 107,342.40
Pasir Pasang m3 0.0350 Rp 183,700.00 Rp 6,429.50
Sub-Total ( 2 ) Rp 131,056.15
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 0.7000 Rp 70,000.00 Rp 49,000.00
Tukang batu OH 0.3500 Rp 90,000.00 Rp 31,500.00
Kepala tukang OH 0.0350 Rp 100,000.00 Rp 3,500.00
Mandor OH 0.0350 Rp 110,000.00 Rp 3,850.00
Sub-Total ( 1 ) Rp 87,850.00
2 Bahan
Semen PC kg 11.7500 Rp 1,471.00 Rp 17,284.25
Batu tempel acak hitam Sukabumi m2 1.1000 Rp 75,000.00 Rp 82,500.00
Pasir Pasang m3 0.0350 Rp 183,700.00 Rp 6,429.50
Sub-Total ( 2 ) Rp 106,213.75
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 0.2625 Rp 70,000.00 Rp 18,375.00
Tukang batu OH 0.1313 Rp 90,000.00 Rp 11,812.50
Kepala tukang OH 0.0128 Rp 100,000.00 Rp 1,275.00
Mandor OH 0.0015 Rp 110,000.00 Rp 165.00
Sub-Total ( 1 ) Rp 31,627.50
2 Bahan
Wall Paper, lebar 50 cm m' 2.2000 Rp 30,000.00 Rp 66,000.00
Lem kg 0.2500 Rp 30,000.00 Rp 7,500.00
Sub-Total ( 2 ) Rp 73,500.00
3 Peralatan
Sub-Total ( 3 ) Rp -
Sub-Total ( 1 ) Rp 60,550.00
2 Bahan
Semen PC kg 9.6000 Rp 1,471.00 Rp 14,121.60
Pasir pasang M3 0.0450 Rp 183,700.00 Rp 8,266.50
Homogenous Tile 60x60 cm, ex Granito (polish) M2 1.1160 Rp 243,100.00 Rp 271,299.60
Semen warna Kg 1.5000 Rp 13,700.00 Rp 20,550.00
Sub-Total ( 2 ) Rp 314,237.70
3 Peralatan
Sub-Total ( 3 ) Rp -
Sub-Total ( 1 ) Rp 60,550.00
2 Bahan
Semen PC kg 9.6000 Rp 1,471.00 Rp 14,121.60
Pasir pasang M3 0.0450 Rp 183,700.00 Rp 8,266.50
Homogenous Tile 60x60 cm, ex Granito (un-polish) M2 1.1160 Rp 211,200.00 Rp 235,699.20
Semen warna Kg 1.5000 Rp 13,700.00 Rp 20,550.00
Sub-Total ( 2 ) Rp 278,637.30
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 0.0950 Rp 70,000.00 Rp 6,650.00
Tukang Batu OH 0.1280 Rp 90,000.00 Rp 11,520.00
Kep. Tukang Batu OH 0.0470 Rp 100,000.00 Rp 4,700.00
Mandor OH 0.0080 Rp 110,000.00 Rp 880.00
Sub-Total ( 1 ) Rp 23,750.00
2 Bahan
Semen PC kg 1.6400 Rp 1,471.00 Rp 2,412.44
Pasir pasang M3 0.0030 Rp 183,700.00 Rp 551.10
Homogenous Tile 10x60 cm, ex Granito M2 0.1116 Rp 243,100.00 Rp 27,129.96
Semen warna Kg 0.1000 Rp 13,700.00 Rp 1,370.00
Sub-Total ( 2 ) Rp 31,463.50
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 0.3500 Rp 70,000.00 Rp 24,500.00
Tukang Batu OH 0.1750 Rp 90,000.00 Rp 15,750.00
Kep. Tukang Batu OH 0.0175 Rp 100,000.00 Rp 1,750.00
Mandor OH 0.0175 Rp 110,000.00 Rp 1,925.00
Sub-Total ( 1 ) Rp 43,925.00
Sub-Total ( 2 ) Rp 264,388.90
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 0.3500 Rp 70,000.00 Rp 24,500.00
Tukang Batu OH 0.1750 Rp 90,000.00 Rp 15,750.00
Kep. Tukang Batu OH 0.0175 Rp 100,000.00 Rp 1,750.00
Mandor OH 0.0175 Rp 110,000.00 Rp 1,925.00
Sub-Total ( 1 ) Rp 43,925.00
Sub-Total ( 2 ) Rp 233,844.10
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 0.0950 Rp 70,000.00 Rp 6,650.00
Tukang Batu OH 0.1280 Rp 90,000.00 Rp 11,520.00
Kep. Tukang Batu OH 0.0470 Rp 100,000.00 Rp 4,700.00
Mandor OH 0.0080 Rp 110,000.00 Rp 880.00
Sub-Total ( 1 ) Rp 23,750.00
2 Bahan
Semen PC kg 1.6400 Rp 1,471.00 Rp 2,412.44
Pasir pasang M3 0.0030 Rp 183,700.00 Rp 551.10
Homogenous Tile 40x40 cm, ex Granito (polish) M2 0.1116 Rp 206,800.00 Rp 23,078.88
Semen warna Kg 0.1000 Rp 13,700.00 Rp 1,370.00
Sub-Total ( 2 ) Rp 27,412.42
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 0.3500 Rp 70,000.00 Rp 24,500.00
Tukang Batu OH 0.1750 Rp 90,000.00 Rp 15,750.00
Kep. Tukang Batu OH 0.0175 Rp 100,000.00 Rp 1,750.00
Mandor OH 0.0175 Rp 110,000.00 Rp 1,925.00
Sub-Total ( 1 ) Rp 43,925.00
Sub-Total ( 2 ) Rp 233,844.10
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 0.0950 Rp 70,000.00 Rp 6,650.00
Tukang Batu OH 0.1280 Rp 90,000.00 Rp 11,520.00
Kep. Tukang Batu OH 0.0470 Rp 100,000.00 Rp 4,700.00
Mandor OH 0.0080 Rp 110,000.00 Rp 880.00
Sub-Total ( 1 ) Rp 23,750.00
2 Bahan
Semen PC kg 1.6400 Rp 1,471.00 Rp 2,412.44
Pasir pasang M3 0.0030 Rp 183,700.00 Rp 551.10
Granitto Gastello 30x30 Cm (Un-polish) Group Silver, type rustic M2 0.1116 Rp 178,200.00 Rp 19,887.12
Semen warna Kg 0.1000 Rp 13,700.00 Rp 1,370.00
Sub-Total ( 2 ) Rp 24,220.66
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 0.3500 Rp 70,000.00 Rp 24,500.00
Tukang Batu OH 0.1750 Rp 90,000.00 Rp 15,750.00
Kep. Tukang Batu OH 0.0175 Rp 100,000.00 Rp 1,750.00
Mandor OH 0.0175 Rp 110,000.00 Rp 1,925.00
Sub-Total ( 1 ) Rp 43,925.00
Sub-Total ( 2 ) Rp 591,018.99
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 0.3500 Rp 70,000.00 Rp 24,500.00
Tukang Batu OH 0.1750 Rp 90,000.00 Rp 15,750.00
Kep. Tukang Batu OH 0.0175 Rp 100,000.00 Rp 1,750.00
Mandor OH 0.0175 Rp 110,000.00 Rp 1,925.00
Sub-Total ( 1 ) Rp 43,925.00
Sub-Total ( 2 ) Rp 132,678.90
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 0.3500 Rp 70,000.00 Rp 24,500.00
Tukang Batu OH 0.1750 Rp 90,000.00 Rp 15,750.00
Kep. Tukang Batu OH 0.0175 Rp 100,000.00 Rp 1,750.00
Mandor OH 0.0175 Rp 110,000.00 Rp 1,925.00
Sub-Total ( 1 ) Rp 43,925.00
Sub-Total ( 2 ) Rp 144,986.50
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 0.3500 Rp 70,000.00 Rp 24,500.00
Tukang Batu OH 0.1750 Rp 90,000.00 Rp 15,750.00
Kep. Tukang Batu OH 0.0175 Rp 100,000.00 Rp 1,750.00
Mandor OH 0.0175 Rp 110,000.00 Rp 1,925.00
Sub-Total ( 1 ) Rp 43,925.00
Sub-Total ( 2 ) Rp 153,530.50
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 0.0950 Rp 70,000.00 Rp 6,650.00
Tukang Batu OH 0.1280 Rp 90,000.00 Rp 11,520.00
Kep. Tukang Batu OH 0.0470 Rp 100,000.00 Rp 4,700.00
Mandor OH 0.0080 Rp 110,000.00 Rp 880.00
Sub-Total ( 1 ) Rp 23,750.00
2 Bahan
Semen PC kg 1.6400 Rp 1,471.00 Rp 2,412.44
Pasir pasang M3 0.0030 Rp 183,700.00 Rp 551.10
Keramik lokal 40/40 Cm (ex Roman) Gol A M2 0.1116 Rp 98,700.00 Rp 11,014.92
Semen warna Kg 0.1000 Rp 13,700.00 Rp 1,370.00
Sub-Total ( 2 ) Rp 15,348.46
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 0.0950 Rp 70,000.00 Rp 6,650.00
Tukang Batu OH 0.1280 Rp 90,000.00 Rp 11,520.00
Kep. Tukang Batu OH 0.0470 Rp 100,000.00 Rp 4,700.00
Mandor OH 0.0080 Rp 110,000.00 Rp 880.00
Sub-Total ( 1 ) Rp 23,750.00
2 Bahan
Semen PC kg 1.6400 Rp 1,471.00 Rp 2,412.44
Pasir pasang M3 0.0030 Rp 183,700.00 Rp 551.10
Keramik lokal 30x30 Cm (ex Roman) Gol B M2 0.1116 Rp 95,000.00 Rp 10,602.00
Semen warna Kg 0.1000 Rp 13,700.00 Rp 1,370.00
Sub-Total ( 2 ) Rp 14,935.54
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 0.3000 Rp 70,000.00 Rp 21,000.00
Tukang Batu OH 0.1500 Rp 90,000.00 Rp 13,500.00
Kep. Tukang Batu OH 0.0150 Rp 100,000.00 Rp 1,500.00
Mandor OH 0.0150 Rp 110,000.00 Rp 1,650.00
Sub-Total ( 1 ) Rp 37,650.00
2 Bahan
Semen PC kg 15.5520 Rp 1,471.00 Rp 22,876.99
Pasir pasang M3 0.0460 Rp 183,700.00 Rp 8,450.20
Sub-Total ( 2 ) Rp 31,327.19
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 0.1200 Rp 70,000.00 Rp 8,400.00
Tukang kayu OH 0.1200 Rp 90,000.00 Rp 10,800.00
Kepala tukang OH 0.0120 Rp 100,000.00 Rp 1,200.00
Mandor OH 0.0060 Rp 110,000.00 Rp 660.00
Sub-Total ( 1 ) Rp 21,060.00
2 Bahan
Underlayer / Rubber corrugated m2 1.0500 Rp 40,000.00 Rp 42,000.00
Lem karpet/vinyl kg 0.3500 Rp 20,000.00 Rp 7,000.00
Sub-Total ( 2 ) Rp 49,000.00
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 0.1700 Rp 70,000.00 Rp 11,900.00
Tukang kayu OH 0.1700 Rp 100,000.00 Rp 17,000.00
Kepala tukang OH 0.0170 Rp 100,000.00 Rp 1,700.00
Mandor OH 0.0090 Rp 110,000.00 Rp 990.00
Sub-Total ( 1 ) Rp 31,590.00
2 Bahan
Karpet Sheet ex Lokal m2 1.0500 Rp 90,000.00 Rp 94,500.00
Lem karpet/vinyl kg 0.3500 Rp 20,000.00 Rp 7,000.00
Sub-Total ( 2 ) Rp 101,500.00
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 0.1700 Rp 70,000.00 Rp 11,900.00
Tukang kayu OH 0.1700 Rp 100,000.00 Rp 17,000.00
Kepala tukang OH 0.0170 Rp 100,000.00 Rp 1,700.00
Mandor OH 0.0090 Rp 110,000.00 Rp 990.00
Sub-Total ( 1 ) Rp 31,590.00
2 Bahan
Carpet Tile 50x50, ex Leiko m2 1.0500 Rp 300,000.00 Rp 315,000.00
Lem karpet/vinyl kg 0.3500 Rp 20,000.00 Rp 7,000.00
Sub-Total ( 2 ) Rp 322,000.00
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 0.3000 Rp 70,000.00 Rp 21,000.00
Tukang Batu OH 0.1500 Rp 100,000.00 Rp 15,000.00
Kep. Tukang Batu OH 0.0150 Rp 100,000.00 Rp 1,500.00
Mandor OH 0.0150 Rp 110,000.00 Rp 1,650.00
Sub-Total ( 1 ) Rp 39,150.00
2 Bahan
Semen PC kg 15.5520 Rp 1,471.00 Rp 22,876.99
Pasir pasang M3 0.0460 Rp 183,700.00 Rp 8,450.20
Floor Hardener (Tesa/Gan's Floor), 5 kg/m2 Kg 5.0000 Rp 12,500.00 Rp 62,500.00
Sub-Total ( 2 ) Rp 93,827.19
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 0.3000 Rp 70,000.00 Rp 21,000.00
Tukang Batu OH 0.1500 Rp 100,000.00 Rp 15,000.00
Kep. Tukang Batu OH 0.0150 Rp 100,000.00 Rp 1,500.00
Mandor OH 0.0150 Rp 110,000.00 Rp 1,650.00
Sub-Total ( 1 ) Rp 39,150.00
2 Bahan
Semen PC kg 15.5520 Rp 1,471.00 Rp 22,876.99
Pasir pasang M3 0.0460 Rp 183,700.00 Rp 8,450.20
Hardener (Tesa/Gan's Floor) Kg 3.5000 Rp 12,500.00 Rp 43,750.00
Epoxy resin Kg 3.0000 Rp 15,000.00 Rp 45,000.00
Sub-Total ( 2 ) Rp 120,077.19
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 0.1200 Rp 70,000.00 Rp 8,400.00
Tukang Batu OH 0.1200 Rp 100,000.00 Rp 12,000.00
Kep. Tukang Batu OH 0.0120 Rp 100,000.00 Rp 1,200.00
Mandor OH 0.0060 Rp 110,000.00 Rp 660.00
Sub-Total ( 1 ) Rp 22,260.00
2 Bahan
Floor Hardener (Tesa/Gan's Floor), 5 kg/m2 Kg 5.0000 Rp 12,500.00 Rp 62,500.00
Sub-Total ( 2 ) Rp 62,500.00
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 0.1200 Rp 70,000.00 Rp 8,400.00
Tukang Batu OH 0.1200 Rp 100,000.00 Rp 12,000.00
Kep. Tukang Batu OH 0.0120 Rp 100,000.00 Rp 1,200.00
Mandor OH 0.0060 Rp 110,000.00 Rp 660.00
Sub-Total ( 1 ) Rp 22,260.00
2 Bahan
Hardener (Tesa/Gan's Floor) Kg 3.5000 Rp 12,500.00 Rp 43,750.00
Epoxy resin Kg 3.0000 Rp 15,000.00 Rp 45,000.00
Sub-Total ( 2 ) Rp 88,750.00
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 0.7000 Rp 70,000.00 Rp 49,000.00
Tukang kayu OH 0.3500 Rp 100,000.00 Rp 35,000.00
Kep. Tukang kayu OH 0.0350 Rp 100,000.00 Rp 3,500.00
Mandor OH 0.0350 Rp 110,000.00 Rp 3,850.00
Sub-Total ( 1 ) Rp 91,350.00
2 Bahan
Red Oak lam parquet uk. 1,5 x 6 x 30 cm m2 1.0500 Rp 115,600.00 Rp 121,380.00
Lem Kg 0.6000 Rp 30,000.00 Rp 18,000.00
Sub-Total ( 2 ) Rp 139,380.00
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 0.1200 Rp 70,000.00 Rp 8,400.00
Tukang Batu OH 0.1200 Rp 100,000.00 Rp 12,000.00
Kep. Tukang Batu OH 0.0120 Rp 100,000.00 Rp 1,200.00
Mandor OH 0.0060 Rp 110,000.00 Rp 660.00
Sub-Total ( 1 ) Rp 22,260.00
2 Bahan
Kayu Kamper Samarinda m3 0.0030 Rp 9,117,500.00 Rp 27,352.50
Melamik m2 0.1200 Rp 134,673.55 Rp 16,160.83
Sub-Total ( 2 ) Rp 43,513.33
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 0.3000 Rp 70,000.00 Rp 21,000.00
Tukang Batu OH 0.1500 Rp 100,000.00 Rp 15,000.00
Kep. Tukang Batu OH 0.0150 Rp 100,000.00 Rp 1,500.00
Mandor OH 0.0150 Rp 110,000.00 Rp 1,650.00
Sub-Total ( 1 ) Rp 39,150.00
2 Bahan
Semen PC kg 10.3680 Rp 1,471.00 Rp 15,251.33
Pasir pasang M3 0.0310 Rp 183,700.00 Rp 5,694.70
Waterproofing ex Sika / setara kg 1.0000 Rp 55,000.00 Rp 55,000.00
Kuas Bh 0.5000 Rp 15,000.00 Rp 7,500.00
Sub-Total ( 2 ) Rp 83,446.03
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 0.0950 Rp 70,000.00 Rp 6,650.00
Tukang Batu OH 0.1280 Rp 100,000.00 Rp 12,800.00
Kep. Tukang Batu OH 0.0470 Rp 100,000.00 Rp 4,700.00
Mandor OH 0.0080 Rp 110,000.00 Rp 880.00
Sub-Total ( 1 ) Rp 25,030.00
2 Bahan
Semen PC kg 1.6400 Rp 1,471.00 Rp 2,412.44
Pasir pasang M3 0.0180 Rp 183,700.00 Rp 3,306.60
Stepnozing tangga, Granito Salsa Diamond / Palazzo Silver 10x60 c bh 1.6667 Rp 25,000.00 Rp 41,666.67
Semen warna Kg 0.1000 Rp 13,700.00 Rp 1,370.00
Sub-Total ( 2 ) Rp 48,755.71
3 Peralatan
Sub-Total ( 3 ) Rp -
1 Tenaga
Pekerja OH 0.0950 Rp 70,000.00 Rp 6,650.00
Tukang Batu OH 0.1280 Rp 100,000.00 Rp 12,800.00
Kep. Tukang Batu OH 0.0470 Rp 100,000.00 Rp 4,700.00
Mandor OH 0.0080 Rp 110,000.00 Rp 880.00
Sub-Total ( 1 ) Rp 25,030.00
2 Bahan
Semen PC kg 1.6400 Rp 1,471.00 Rp 2,412.44
Pasir pasang M3 0.0180 Rp 183,700.00 Rp 3,306.60
Stepnozing tangga, Keramik Roman 8x30 cm bh 3.3333 Rp 15,000.00 Rp 50,000.00
Semen warna Kg 0.1000 Rp 13,700.00 Rp 1,370.00
Sub-Total ( 2 ) Rp 57,089.04
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : PLAFOND
Jenis Pembayaran : Plafond Gypsum Board 9 mm + Rangka Hollow
Satuan Pembayaran : M2
Harga Satuan : Rp 118,916.50
AHSP-VII-001
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.2600 Rp 70,000.00 Rp 18,200.00
Tukang gypsum OH 0.0500 Rp 90,000.00 Rp 4,500.00
Tukang Allumunium OH 0.2600 Rp 90,000.00 Rp 23,400.00
Kepala tukang OH 0.0310 Rp 100,000.00 Rp 3,100.00
Mandor OH 0.0130 Rp 110,000.00 Rp 1,430.00
Sub-Total ( 1 ) Rp 50,630.00
2 Bahan
Paku peluru ramset bh 0.3900 Rp 1,750.00 Rp 682.50
Hollow 40x40 mm galvanized (tebal standart) btg 0.4590 Rp 26,000.00 Rp 11,934.00
Hollow 20x40 mm galvanized (tebal standart) btg 0.4310 Rp 20,000.00 Rp 8,620.00
Paku beton kg 0.0100 Rp 35,000.00 Rp 350.00
Sekrup 6x1-1,5 bh 14.0000 Rp 500.00 Rp 7,000.00
Gypsumboard 120x240 cm 9 mm lbr 0.3640 Rp 60,000.00 Rp 21,840.00
Sekrup gypsum bh 21.0000 Rp 600.00 Rp 12,600.00
Textile tape rol 0.0240 Rp 17,500.00 Rp 420.00
Compound gypsum kg 1.0000 Rp 4,500.00 Rp 4,500.00
Amplas lbr 0.1000 Rp 3,400.00 Rp 340.00
Sub-Total ( 2 ) Rp 68,286.50
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : PLAFOND
Jenis Pembayaran : Plafond Gypsum Board 9 mm + Rangka Metal Furing
Satuan Pembayaran : M2
Harga Satuan : Rp 151,629.17
AHSP-VII-002
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.2600 Rp 70,000.00 Rp 18,200.00
Tukang gypsum OH 0.0500 Rp 90,000.00 Rp 4,500.00
Tukang Allumunium OH 0.2600 Rp 90,000.00 Rp 23,400.00
Kepala tukang OH 0.0310 Rp 100,000.00 Rp 3,100.00
Mandor OH 0.0130 Rp 110,000.00 Rp 1,430.00
Sub-Total ( 1 ) Rp 50,630.00
2 Bahan
Paku peluru ramset bh 0.3900 Rp 1,750.00 Rp 682.50
Rangka Metal furing m' 4.0000 Rp 12,566.67 Rp 50,266.67
Kawat gantungan set 1.0000 Rp 3,000.00 Rp 3,000.00
Paku beton kg 0.0100 Rp 35,000.00 Rp 350.00
Sekrup 6x1-1,5 bh 14.0000 Rp 500.00 Rp 7,000.00
Gypsumboard 120x240 cm 9 mm lbr 0.3640 Rp 60,000.00 Rp 21,840.00
Sekrup gypsum bh 21.0000 Rp 600.00 Rp 12,600.00
Textile tape rol 0.0240 Rp 17,500.00 Rp 420.00
Compound gypsum kg 1.0000 Rp 4,500.00 Rp 4,500.00
Amplas lbr 0.1000 Rp 3,400.00 Rp 340.00
Sub-Total ( 2 ) Rp 100,999.17
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : PLAFOND
Jenis Pembayaran : Plafond Gypsum Waterresisten + Rangka Hollow
Satuan Pembayaran : M2
Harga Satuan : Rp 135,296.50
AHSP-VII-003
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.2600 Rp 70,000.00 Rp 18,200.00
Tukang gypsum OH 0.0500 Rp 90,000.00 Rp 4,500.00
Tukang Allumunium OH 0.2600 Rp 90,000.00 Rp 23,400.00
Kepala tukang OH 0.0310 Rp 100,000.00 Rp 3,100.00
Mandor OH 0.0130 Rp 110,000.00 Rp 1,430.00
Sub-Total ( 1 ) Rp 50,630.00
2 Bahan
Paku peluru ramset bh 0.3900 Rp 1,750.00 Rp 682.50
Hollow 40x40 mm galvanized (tebal standart) btg 0.4590 Rp 26,000.00 Rp 11,934.00
Hollow 20x40 mm galvanized (tebal standart) btg 0.4310 Rp 20,000.00 Rp 8,620.00
Paku beton kg 0.0100 Rp 35,000.00 Rp 350.00
Sekrup 6x1-1,5 bh 14.0000 Rp 500.00 Rp 7,000.00
Gypsumboard Waterresisten 120x240 cm 9 mm lbr 0.3640 Rp 105,000.00 Rp 38,220.00
Sekrup gypsum bh 21.0000 Rp 600.00 Rp 12,600.00
Textile tape rol 0.0240 Rp 17,500.00 Rp 420.00
Compound gypsum kg 1.0000 Rp 4,500.00 Rp 4,500.00
Amplas lbr 0.1000 Rp 3,400.00 Rp 340.00
Sub-Total ( 2 ) Rp 84,666.50
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : PLAFOND
Jenis Pembayaran : Plafond Gypsum Waterresisten + Rangka Metal Furing
Satuan Pembayaran : M2
Harga Satuan : Rp 168,009.17
AHSP-VII-004
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.2600 Rp 70,000.00 Rp 18,200.00
Tukang gypsum OH 0.0500 Rp 90,000.00 Rp 4,500.00
Tukang Allumunium OH 0.2600 Rp 90,000.00 Rp 23,400.00
Kepala tukang OH 0.0310 Rp 100,000.00 Rp 3,100.00
Mandor OH 0.0130 Rp 110,000.00 Rp 1,430.00
Sub-Total ( 1 ) Rp 50,630.00
2 Bahan
Paku peluru ramset bh 0.3900 Rp 1,750.00 Rp 682.50
Rangka Metal furing m' 4.0000 Rp 12,566.67 Rp 50,266.67
Kawat gantungan set 1.0000 Rp 3,000.00 Rp 3,000.00
Paku beton kg 0.0100 Rp 35,000.00 Rp 350.00
Sekrup 6x1-1,5 bh 14.0000 Rp 500.00 Rp 7,000.00
Gypsumboard Waterresisten 120x240 cm 9 mm lbr 0.3640 Rp 105,000.00 Rp 38,220.00
Sekrup gypsum bh 21.0000 Rp 600.00 Rp 12,600.00
Textile tape rol 0.0240 Rp 17,500.00 Rp 420.00
Compound gypsum kg 1.0000 Rp 4,500.00 Rp 4,500.00
Amplas lbr 0.1000 Rp 3,400.00 Rp 340.00
Sub-Total ( 2 ) Rp 117,379.17
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : PLAFOND
Jenis Pembayaran : Plafond Kalsiboard 6 mm + Rangka Hollow
Satuan Pembayaran : M2
Harga Satuan : Rp 129,539.70
AHSP-VII-005
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.2600 Rp 70,000.00 Rp 18,200.00
Tukang gypsum OH 0.0500 Rp 90,000.00 Rp 4,500.00
Tukang Allumunium OH 0.2600 Rp 90,000.00 Rp 23,400.00
Kepala tukang OH 0.0310 Rp 100,000.00 Rp 3,100.00
Mandor OH 0.0130 Rp 110,000.00 Rp 1,430.00
Sub-Total ( 1 ) Rp 50,630.00
2 Bahan
Paku peluru ramset bh 0.3900 Rp 1,750.00 Rp 682.50
Hollow 40x40 mm galvanized (tebal standart) btg 0.4590 Rp 26,000.00 Rp 11,934.00
Hollow 20x40 mm galvanized (tebal standart) btg 0.4310 Rp 20,000.00 Rp 8,620.00
Paku beton kg 0.0100 Rp 35,000.00 Rp 350.00
Sekrup 6x1-1,5 bh 14.0000 Rp 500.00 Rp 7,000.00
Calsium Board 1200x2400x6 mm lbr 0.3640 Rp 101,300.00 Rp 36,873.20
Sekrup gypsum bh 21.0000 Rp 600.00 Rp 12,600.00
Textile tape rol 0.0240 Rp 17,500.00 Rp 420.00
Compound gypsum kg 0.0200 Rp 4,500.00 Rp 90.00
Amplas lbr 0.1000 Rp 3,400.00 Rp 340.00
Sub-Total ( 2 ) Rp 78,909.70
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : PLAFOND
Jenis Pembayaran : Plafond Kalsiboard 6 mm + Rangka Metal Furing
Satuan Pembayaran : M2
Harga Satuan : Rp 162,252.37
AHSP-VII-006
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.2600 Rp 70,000.00 Rp 18,200.00
Tukang gypsum OH 0.0500 Rp 90,000.00 Rp 4,500.00
Tukang Allumunium OH 0.2600 Rp 90,000.00 Rp 23,400.00
Kepala tukang OH 0.0310 Rp 100,000.00 Rp 3,100.00
Mandor OH 0.0130 Rp 110,000.00 Rp 1,430.00
Sub-Total ( 1 ) Rp 50,630.00
2 Bahan
Paku peluru ramset bh 0.3900 Rp 1,750.00 Rp 682.50
Rangka Metal furing m' 4.0000 Rp 12,566.67 Rp 50,266.67
Kawat gantungan set 1.0000 Rp 3,000.00 Rp 3,000.00
Paku beton kg 0.0100 Rp 35,000.00 Rp 350.00
Sekrup 6x1-1,5 bh 14.0000 Rp 500.00 Rp 7,000.00
Calsium Board 1200x2400x6 mm lbr 0.3640 Rp 101,300.00 Rp 36,873.20
Sekrup gypsum bh 21.0000 Rp 600.00 Rp 12,600.00
Textile tape rol 0.0240 Rp 17,500.00 Rp 420.00
Compound gypsum kg 0.0200 Rp 4,500.00 Rp 90.00
Amplas lbr 0.1000 Rp 3,400.00 Rp 340.00
Sub-Total ( 2 ) Rp 111,622.37
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : PLAFOND
Jenis Pembayaran : Plafond Gypsum Tile 60x120x9 mm
Satuan Pembayaran : M2
Harga Satuan : Rp 132,987.50
AHSP-VII-007
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.0750 Rp 70,000.00 Rp 5,250.00
Tukang gypsum OH 0.2500 Rp 90,000.00 Rp 22,500.00
Tukang Allumunium OH 0.2500 Rp 90,000.00 Rp 22,500.00
Kepala tukang OH 0.0250 Rp 100,000.00 Rp 2,500.00
Mandor OH 0.0050 Rp 110,000.00 Rp 550.00
Sub-Total ( 1 ) Rp 53,300.00
2 Bahan
Profil allumunium Main Tee (p. 3,6m) m' 3.60 Rp 9,305.56 Rp 33,500.00
Profil allumunium Cross Tee (p. 1,2 m) m' 1.20 Rp 8,333.33 Rp 10,000.00
Profil allumunium Cross Tee (p. 0,60 m) m' 0.60 Rp 8,500.00 Rp 5,100.00
Kawat diameter 4mm kg 0.15 Rp 20,000.00 Rp 3,000.00
Paku peluru ramset bh 1.05 Rp 1,750.00 Rp 1,837.50
Gypsum Tile 600x1200x9 mm lmbr 1.50 Rp 17,500.00 Rp 26,250.00
Sub-Total ( 2 ) Rp 79,687.50
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : PLAFOND
Jenis Pembayaran : Plafond Gypsum Board Type Jayabelt 12 mm, rangka hollow
Satuan Pembayaran : M2
Harga Satuan : Rp 192,948.50
AHSP-VII-008
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.2600 Rp 70,000.00 Rp 18,200.00
Tukang gypsum OH 0.0500 Rp 90,000.00 Rp 4,500.00
Tukang Allumunium OH 0.2600 Rp 90,000.00 Rp 23,400.00
Kepala tukang OH 0.0310 Rp 100,000.00 Rp 3,100.00
Mandor OH 0.0130 Rp 110,000.00 Rp 1,430.00
Sub-Total ( 1 ) Rp 50,630.00
2 Bahan
Paku peluru ramset bh 0.3900 Rp 1,750.00 Rp 682.50
Hollow 40x40 mm galvanized (tebal standart) btg 0.4590 Rp 26,000.00 Rp 11,934.00
Hollow 20x40 mm galvanized (tebal standart) btg 0.4310 Rp 20,000.00 Rp 8,620.00
Paku beton kg 0.0100 Rp 35,000.00 Rp 350.00
Sekrup 6x1-1,5 bh 14.0000 Rp 500.00 Rp 7,000.00
Gypsumboard Type Jaya Belt 120x240 cm, tebal 12 mm lbr 0.3640 Rp 275,500.00 Rp 100,282.00
Sekrup gypsum bh 21.0000 Rp 600.00 Rp 12,600.00
Textile tape rol 0.0240 Rp 17,500.00 Rp 420.00
Compound gypsum kg 0.0200 Rp 4,500.00 Rp 90.00
Amplas lbr 0.1000 Rp 3,400.00 Rp 340.00
Sub-Total ( 2 ) Rp 142,318.50
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : PLAFOND
Jenis Pembayaran : Plafond Acautic Tile 60x120x15 mm
Satuan Pembayaran : M2
Harga Satuan : Rp 238,587.50 SNI 2839 (6.9) - 2008
AHSP-VII-009
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.5000 Rp 70,000.00 Rp 35,000.00
Tukang gypsum OH 0.5000 Rp 90,000.00 Rp 45,000.00
Kepala tukang OH 0.0500 Rp 100,000.00 Rp 5,000.00
Mandor OH 0.0250 Rp 110,000.00 Rp 2,750.00
Sub-Total ( 1 ) Rp 87,750.00
2 Bahan
Profil allumunium "Tee" m' 3.60 Rp 9,305.56 Rp 33,500.00
Kawat diameter 4mm kg 0.15 Rp 20,000.00 Rp 3,000.00
Paku peluru ramset bh 1.05 Rp 1,750.00 Rp 1,837.50
Acaustic Tile 600x1200x15 mm (Armstrong) lmbr 1.50 Rp 75,000.00 Rp 112,500.00
Sub-Total ( 2 ) Rp 150,837.50
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : PLAFOND
Jenis Pembayaran : Acian Plafond Beton Expose, dengan Mortar
Satuan Pembayaran : M2
Harga Satuan : Rp 34,205.00
AHSP-VII-010
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.1500 Rp 70,000.00 Rp 10,500.00
Tukang batu OH 0.1000 Rp 90,000.00 Rp 9,000.00
Kepala tukang OH 0.0100 Rp 100,000.00 Rp 1,000.00
Mandor OH 0.0080 Rp 110,000.00 Rp 880.00
Sub-Total ( 1 ) Rp 21,380.00
2 Bahan
Acian plesteran / beton expose (MU 200) kg 3.0000 Rp 4,275.00 Rp 12,825.00
Sub-Total ( 2 ) Rp 12,825.00
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : PLAFOND
Jenis Pembayaran : List Allumunium, plafond
Satuan Pembayaran : M'
Harga Satuan : Rp 19,830.00
AHSP-VII-011
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.1130 Rp 70,000.00 Rp 7,910.00
Tukang gypsum OH 0.0400 Rp 90,000.00 Rp 3,600.00
Kepala tukang OH 0.0040 Rp 100,000.00 Rp 400.00
Mandor OH 0.0070 Rp 110,000.00 Rp 770.00
Sub-Total ( 1 ) Rp 12,680.00
2 Bahan
Wall angle allumunium m' 1.1000 Rp 6,500.00 Rp 7,150.00
Sub-Total ( 2 ) Rp 7,150.00
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : PLAFOND
Jenis Pembayaran : List plafond, gypsum profil
Satuan Pembayaran : M'
Harga Satuan : Rp 23,805.00 SNI 2839 (6.8) - 2008
AHSP-VII-012
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.0600 Rp 70,000.00 Rp 4,200.00
Tukang gypsum OH 0.0600 Rp 90,000.00 Rp 5,400.00
Kepala tukang OH 0.0060 Rp 100,000.00 Rp 600.00
Mandor OH 0.0030 Rp 110,000.00 Rp 330.00
Sub-Total ( 1 ) Rp 10,530.00
2 Bahan
List Frofil Gypsum Uk. Sedang m' 1.0500 Rp 12,000.00 Rp 12,600.00
Compound gypsum kg 0.1500 Rp 4,500.00 Rp 675.00
Sub-Total ( 2 ) Rp 13,275.00
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : PLAFOND
Jenis Pembayaran : List plafond, kayu profil
Satuan Pembayaran : M'
Harga Satuan : Rp 22,619.20 SNI 2839 (6.10) - 2008
AHSP-VII-013
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.0500 Rp 70,000.00 Rp 3,500.00
Tukang kayu OH 0.0500 Rp 100,000.00 Rp 5,000.00
Kepala tukang OH 0.0050 Rp 100,000.00 Rp 500.00
Mandor OH 0.0030 Rp 110,000.00 Rp 330.00
Sub-Total ( 1 ) Rp 9,330.00
2 Bahan
List kayu profil, ukuran Sedang m' 1.0500 Rp 12,500.00 Rp 13,125.00
Paku 4 - 5 cm kg 0.0100 Rp 16,420.00 Rp 164.20
Sub-Total ( 2 ) Rp 13,289.20
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : PLAFOND
Jenis Pembayaran : Rangka Plafond (60x60 cm), kayu Kruing
Satuan Pembayaran : M2
Harga Satuan : Rp 159,372.56 SNI 3434 (6.20) - 2008
AHSP-VII-014
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.2000 Rp 70,000.00 Rp 14,000.00
Tukang kayu OH 0.3000 Rp 100,000.00 Rp 30,000.00
Kepala tukang OH 0.0300 Rp 100,000.00 Rp 3,000.00
Mandor OH 0.0100 Rp 110,000.00 Rp 1,100.00
Sub-Total ( 1 ) Rp 48,100.00
2 Bahan
Kasau-kasau 5x7 cm, kayu Kruing m' 0.0163 Rp 6,591,875.00 Rp 107,447.56
Paku 7 - 10 cm kg 0.2500 Rp 15,300.00 Rp 3,825.00
Sub-Total ( 2 ) Rp 111,272.56
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : PLAFOND
Jenis Pembayaran : Rangka Plafond (60x60 cm), kayu Borneo/Meranti super
Satuan Pembayaran : M2
Harga Satuan : Rp 130,165.00 SNI 3434 (6.20) - 2008
AHSP-VII-015
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.2000 Rp 70,000.00 Rp 14,000.00
Tukang kayu OH 0.3000 Rp 100,000.00 Rp 30,000.00
Kepala tukang OH 0.0300 Rp 100,000.00 Rp 3,000.00
Mandor OH 0.0100 Rp 110,000.00 Rp 1,100.00
Sub-Total ( 1 ) Rp 48,100.00
2 Bahan
Kasau-kasau 5x7 cm, kayu Kruing m' 0.0163 Rp 4,800,000.00 Rp 78,240.00
Paku 7 - 10 cm kg 0.2500 Rp 15,300.00 Rp 3,825.00
Sub-Total ( 2 ) Rp 82,065.00
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : PLAFOND
Jenis Pembayaran : Plafond (Langit2) Asbes 4 mm
Satuan Pembayaran : M2
Harga Satuan : Rp 43,433.60 SNI 2839 (6.1) - 2008
AHSP-VII-016
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.0300 Rp 70,000.00 Rp 2,100.00
Tukang kayu OH 0.0700 Rp 100,000.00 Rp 7,000.00
Kepala tukang OH 0.0070 Rp 100,000.00 Rp 700.00
Mandor OH 0.0040 Rp 110,000.00 Rp 440.00
Sub-Total ( 1 ) Rp 10,240.00
2 Bahan
Asbes plat 100x100x0,4 cm m' 1.1000 Rp 30,000.00 Rp 33,000.00
Paku triplek (paku halus) kg 0.0100 Rp 19,360.00 Rp 193.60
Sub-Total ( 2 ) Rp 33,193.60
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : PLAFOND
Jenis Pembayaran : Plafond (Langit2) Tripleks 4 mm
Satuan Pembayaran : M2
Harga Satuan : Rp 39,556.10 SNI 2839 (6.5) - 2008
AHSP-VII-017
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.1000 Rp 70,000.00 Rp 7,000.00
Tukang kayu OH 0.1000 Rp 100,000.00 Rp 10,000.00
Kepala tukang OH 0.0100 Rp 100,000.00 Rp 1,000.00
Mandor OH 0.0050 Rp 110,000.00 Rp 550.00
Sub-Total ( 1 ) Rp 18,550.00
2 Bahan
Tripleks 4 mm (122x244 cm) m' 0.3750 Rp 55,500.00 Rp 20,812.50
Paku triplek (paku halus) kg 0.0100 Rp 19,360.00 Rp 193.60
Sub-Total ( 2 ) Rp 21,006.10
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : PLAFOND
Jenis Pembayaran : Plafond Lambresering kayu Kamper, tebal 9 mm
Satuan Pembayaran : M2
Harga Satuan : Rp 257,343.60 SNI 2839 (6.6) - 2008
AHSP-VII-018
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.8000 Rp 70,000.00 Rp 56,000.00
Tukang kayu OH 0.8000 Rp 100,000.00 Rp 80,000.00
Kepala tukang OH 0.0800 Rp 100,000.00 Rp 8,000.00
Mandor OH 0.0400 Rp 110,000.00 Rp 4,400.00
Sub-Total ( 1 ) Rp 148,400.00
2 Bahan
Papan kayu Kamper m' 0.0150 Rp 7,250,000.00 Rp 108,750.00
Paku triplek (paku halus) kg 0.0100 Rp 19,360.00 Rp 193.60
Sub-Total ( 2 ) Rp 108,943.60
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : PLAFOND
Jenis Pembayaran : Plafond Gypsum Board, tebal 9 mm
Satuan Pembayaran : M2
Harga Satuan : Rp 39,290.00 SNI 2839 (6.7) - 2008
AHSP-VII-019
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.1000 Rp 70,000.00 Rp 7,000.00
Tukang kayu OH 0.0500 Rp 100,000.00 Rp 5,000.00
Kepala tukang OH 0.0050 Rp 100,000.00 Rp 500.00
Mandor OH 0.0050 Rp 110,000.00 Rp 550.00
Sub-Total ( 1 ) Rp 13,050.00
2 Bahan
Gypsum board 9 mm (120x240 cm) m' 0.3640 Rp 60,000.00 Rp 21,840.00
Paku skrup kg 0.1100 Rp 40,000.00 Rp 4,400.00
Sub-Total ( 2 ) Rp 26,240.00
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : KOSEN
Jenis Pembayaran : Profil Kosen Aluminium 4", Brown Anodized ex YKK
Satuan Pembayaran : M2
Harga Satuan : Rp 182,678.50 SNI 7393 (6.11) - 2008
AHSP-VIII-01A
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.0430 Rp 70,000.00 Rp 3,010.00
Tukang Allumunium OH 0.0430 Rp 90,000.00 Rp 3,870.00
Kepala tukang OH 0.0043 Rp 100,000.00 Rp 430.00
Mandor OH 0.0021 Rp 110,000.00 Rp 231.00
Sub-Total ( 1 ) Rp 7,541.00
2 Bahan
Profil kosen Allumunium 4", Brown Anodized ex YKK m' 1.1000 Rp 150,000.00 Rp 165,000.00
Skrup fixer bh 2.0000 Rp 600.00 Rp 1,200.00
Sealant m' 1.1000 Rp 8,125.00 Rp 8,937.50
Sub-Total ( 2 ) Rp 175,137.50
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : KOSEN
Jenis Pembayaran : Profil Kosen Aluminium 4", Brown Anodized ex Alexindo
Satuan Pembayaran : M2
Harga Satuan : Rp 100,178.50 SNI 7393 (6.11) - 2008
AHSP-VIII-01B
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.0430 Rp 70,000.00 Rp 3,010.00
Tukang Allumunium OH 0.0430 Rp 90,000.00 Rp 3,870.00
Kepala tukang OH 0.0043 Rp 100,000.00 Rp 430.00
Mandor OH 0.0021 Rp 110,000.00 Rp 231.00
Sub-Total ( 1 ) Rp 7,541.00
2 Bahan
Profil kosen Allumunium 4", Brown Anodized ex Alexindo m' 1.1000 Rp 75,000.00 Rp 82,500.00
Skrup fixer bh 2.0000 Rp 600.00 Rp 1,200.00
Sealant m' 1.1000 Rp 8,125.00 Rp 8,937.50
Sub-Total ( 2 ) Rp 92,637.50
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : KOSEN
Jenis Pembayaran : Profil Kosen Aluminium 3", Brown Anodized ex YKK
Satuan Pembayaran : M2
Harga Satuan : Rp 138,678.50 SNI 7393 (6.11) - 2008
AHSP-VIII-01C
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.0430 Rp 70,000.00 Rp 3,010.00
Tukang Allumunium OH 0.0430 Rp 90,000.00 Rp 3,870.00
Kepala tukang OH 0.0043 Rp 100,000.00 Rp 430.00
Mandor OH 0.0021 Rp 110,000.00 Rp 231.00
Sub-Total ( 1 ) Rp 7,541.00
2 Bahan
Profil kosen Allumunium 3", Brown Anodized ex YKK m' 1.1000 Rp 110,000.00 Rp 121,000.00
Skrup fixer bh 2.0000 Rp 600.00 Rp 1,200.00
Sealant m' 1.1000 Rp 8,125.00 Rp 8,937.50
Sub-Total ( 2 ) Rp 131,137.50
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : KOSEN
Jenis Pembayaran : Profil Kosen Aluminium 3", Brown Anodized ex Alexindo
Satuan Pembayaran : M2
Harga Satuan : Rp 94,678.50 SNI 7393 (6.11) - 2008
AHSP-VIII-01D
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.0430 Rp 70,000.00 Rp 3,010.00
Tukang Allumunium OH 0.0430 Rp 90,000.00 Rp 3,870.00
Kepala tukang OH 0.0043 Rp 100,000.00 Rp 430.00
Mandor OH 0.0021 Rp 110,000.00 Rp 231.00
Sub-Total ( 1 ) Rp 7,541.00
2 Bahan
Profil kosen Allumunium 3", Brown Anodized ex Alexindo m' 1.1000 Rp 70,000.00 Rp 77,000.00
Skrup fixer bh 2.0000 Rp 600.00 Rp 1,200.00
Sealant m' 1.1000 Rp 8,125.00 Rp 8,937.50
Sub-Total ( 2 ) Rp 87,137.50
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : KOSEN
Jenis Pembayaran : Frame Allumunium Pintu Kaca, Brown anodized ex YKK
Satuan Pembayaran : M2
Harga Satuan : Rp 171,678.50 SNI 7393 (6.11) - 2008
AHSP-VIII-02A
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.0430 Rp 70,000.00 Rp 3,010.00
Tukang Allumunium OH 0.0430 Rp 90,000.00 Rp 3,870.00
Kepala tukang OH 0.0043 Rp 100,000.00 Rp 430.00
Mandor OH 0.0021 Rp 110,000.00 Rp 231.00
Sub-Total ( 1 ) Rp 7,541.00
2 Bahan
Frame Allumunium Pintu kaca, Brown Anodized ex YKK m' 1.1000 Rp 140,000.00 Rp 154,000.00
Skrup fixer bh 2.0000 Rp 600.00 Rp 1,200.00
Sealant m' 1.1000 Rp 8,125.00 Rp 8,937.50
Sub-Total ( 2 ) Rp 164,137.50
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : KOSEN
Jenis Pembayaran : Frame Allumunium Pintu Kaca, Brown anodized ex Alexindo
Satuan Pembayaran : M2
Harga Satuan : Rp 97,428.50 SNI 7393 (6.11) - 2008
AHSP-VIII-02B
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.0430 Rp 70,000.00 Rp 3,010.00
Tukang Allumunium OH 0.0430 Rp 90,000.00 Rp 3,870.00
Kepala tukang OH 0.0043 Rp 100,000.00 Rp 430.00
Mandor OH 0.0021 Rp 110,000.00 Rp 231.00
Sub-Total ( 1 ) Rp 7,541.00
2 Bahan
Frame Allumunium Pintu kaca, Brown Anodized ex Alexindo m' 1.1000 Rp 72,500.00 Rp 79,750.00
Skrup fixer bh 2.0000 Rp 600.00 Rp 1,200.00
Sealant m' 1.1000 Rp 8,125.00 Rp 8,937.50
Sub-Total ( 2 ) Rp 89,887.50
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : KOSEN
Jenis Pembayaran : Frame Allumunium Jendela Kaca, Brown anodized ex YKK
Satuan Pembayaran : M2
Harga Satuan : Rp 127,678.50 SNI 7393 (6.11) - 2008
AHSP-VIII-03A
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.0430 Rp 70,000.00 Rp 3,010.00
Tukang Allumunium OH 0.0430 Rp 90,000.00 Rp 3,870.00
Kepala tukang OH 0.0043 Rp 100,000.00 Rp 430.00
Mandor OH 0.0021 Rp 110,000.00 Rp 231.00
Sub-Total ( 1 ) Rp 7,541.00
2 Bahan
Frame Allumunium Jendela kaca, Brown Anodized ex YKK m' 1.1000 Rp 100,000.00 Rp 110,000.00
Skrup fixer bh 2.0000 Rp 600.00 Rp 1,200.00
Sealant m' 1.1000 Rp 8,125.00 Rp 8,937.50
Sub-Total ( 2 ) Rp 120,137.50
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : KOSEN
Jenis Pembayaran : Frame Allumunium Jendela Kaca, Brown anodized ex Alexindo
Satuan Pembayaran : M2
Harga Satuan : Rp 86,428.50 SNI 7393 (6.11) - 2008
AHSP-VIII-03B
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.0430 Rp 70,000.00 Rp 3,010.00
Tukang Allumunium OH 0.0430 Rp 90,000.00 Rp 3,870.00
Kepala tukang OH 0.0043 Rp 100,000.00 Rp 430.00
Mandor OH 0.0021 Rp 110,000.00 Rp 231.00
Sub-Total ( 1 ) Rp 7,541.00
2 Bahan
Frame Allumunium Jendela kaca, Brown Anodized ex Alexindo m' 1.1000 Rp 62,500.00 Rp 68,750.00
Skrup fixer bh 2.0000 Rp 600.00 Rp 1,200.00
Sealant m' 1.1000 Rp 8,125.00 Rp 8,937.50
Sub-Total ( 2 ) Rp 78,887.50
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : KOSEN
Jenis Pembayaran : Profil Aluminium U Channel 30x20 mm, silver anodized
Satuan Pembayaran : M2
Harga Satuan : Rp 50,678.50
AHSP-VIII-004
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.0430 Rp 70,000.00 Rp 3,010.00
Tukang Allumunium OH 0.0430 Rp 90,000.00 Rp 3,870.00
Kepala tukang OH 0.0043 Rp 100,000.00 Rp 430.00
Mandor OH 0.0021 Rp 110,000.00 Rp 231.00
Sub-Total ( 1 ) Rp 7,541.00
2 Bahan
Profil Aluminium U Channel 30x20 mm, silver anodized m' 1.1000 Rp 30,000.00 Rp 33,000.00
Skrup fixer bh 2.0000 Rp 600.00 Rp 1,200.00
Sealant m' 1.1000 Rp 8,125.00 Rp 8,937.50
Sub-Total ( 2 ) Rp 43,137.50
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : KOSEN
Jenis Pembayaran : Kosen kayu Jati Jawa Timur (kelas I)
Satuan Pembayaran : M3
Harga Satuan : Rp 63,387,000.00 SNI 3434 (6.1) - 2008
AHSP-VIII-05A
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 7.0000 Rp 70,000.00 Rp 490,000.00
Tukang Kayu OH 21.0000 Rp 100,000.00 Rp 2,100,000.00
Kepala tukang OH 2.1000 Rp 100,000.00 Rp 210,000.00
Mandor OH 0.3500 Rp 110,000.00 Rp 38,500.00
Sub-Total ( 1 ) Rp 2,838,500.00
2 Bahan
Balok Jati Jawa Timur, Kelas-I m' 1.1000 Rp 55,000,000.00 Rp 60,500,000.00
Paku 10 cm kg 1.2500 Rp 14,800.00 Rp 18,500.00
Lem Kayu kg 1.0000 Rp 30,000.00 Rp 30,000.00
Sub-Total ( 2 ) Rp 60,548,500.00
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : KOSEN
Jenis Pembayaran : Kosen kayu Kamper Samarinda oven (kelas II)
Satuan Pembayaran : M3
Harga Satuan : Rp 14,190,500.00 SNI 3434 (6.2) - 2008
AHSP-VIII-05B
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 6.0000 Rp 70,000.00 Rp 420,000.00
Tukang Kayu OH 18.0000 Rp 100,000.00 Rp 1,800,000.00
Kepala tukang OH 1.8000 Rp 100,000.00 Rp 180,000.00
Mandor OH 0.3000 Rp 110,000.00 Rp 33,000.00
Sub-Total ( 1 ) Rp 2,433,000.00
2 Bahan
Kayu Balok Kamper Samarinda oven m' 1.2000 Rp 9,757,500.00 Rp 11,709,000.00
Paku 10 cm kg 1.2500 Rp 14,800.00 Rp 18,500.00
Lem Kayu kg 1.0000 Rp 30,000.00 Rp 30,000.00
Sub-Total ( 2 ) Rp 11,757,500.00
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : KOSEN
Jenis Pembayaran : Kaca Polos tebal 6 mm, ex Asahimas
Satuan Pembayaran : M2
Harga Satuan : Rp 182,743.00
AHSP-VIII-006
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.0165 Rp 70,000.00 Rp 1,155.00
Tukang kayu OH 0.1650 Rp 100,000.00 Rp 16,500.00
Kepala tukang OH 0.0165 Rp 100,000.00 Rp 1,650.00
Mandor OH 0.0008 Rp 110,000.00 Rp 88.00
Sub-Total ( 1 ) Rp 19,393.00
2 Bahan
Kaca polos 6 mm, ex Asahimas m2 1.1000 Rp 148,500.00 Rp 163,350.00
Sub-Total ( 2 ) Rp 163,350.00
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : KOSEN
Jenis Pembayaran : Kaca Polos tebal 8 mm, ex Asahimas
Satuan Pembayaran : M2
Harga Satuan : Rp 231,143.00
AHSP-VIII-007
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.0165 Rp 70,000.00 Rp 1,155.00
Tukang kayu OH 0.1650 Rp 100,000.00 Rp 16,500.00
Kepala tukang OH 0.0165 Rp 100,000.00 Rp 1,650.00
Mandor OH 0.0008 Rp 110,000.00 Rp 88.00
Sub-Total ( 1 ) Rp 19,393.00
2 Bahan
Kaca polos 8 mm, ex Asahimas m2 1.1000 Rp 192,500.00 Rp 211,750.00
Sub-Total ( 2 ) Rp 211,750.00
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : KOSEN
Jenis Pembayaran : Kaca Polos tebal 10 mm, ex Asahimas
Satuan Pembayaran : M2
Harga Satuan : Rp 341,286.00
AHSP-VIII-008
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.0330 Rp 70,000.00 Rp 2,310.00
Tukang kayu OH 0.3300 Rp 100,000.00 Rp 33,000.00
Kepala tukang OH 0.0330 Rp 100,000.00 Rp 3,300.00
Mandor OH 0.0016 Rp 110,000.00 Rp 176.00
Sub-Total ( 1 ) Rp 38,786.00
2 Bahan
Kaca polos 10 mm, ex Asahimas m2 1.1000 Rp 275,000.00 Rp 302,500.00
Sub-Total ( 2 ) Rp 302,500.00
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : KOSEN
Jenis Pembayaran : Kaca Polos tebal 12 mm, ex Asahimas
Satuan Pembayaran : M2
Harga Satuan : Rp 401,786.00
AHSP-VIII-009
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.0330 Rp 70,000.00 Rp 2,310.00
Tukang kayu OH 0.3300 Rp 100,000.00 Rp 33,000.00
Kepala tukang OH 0.0330 Rp 100,000.00 Rp 3,300.00
Mandor OH 0.0016 Rp 110,000.00 Rp 176.00
Sub-Total ( 1 ) Rp 38,786.00
2 Bahan
Kaca polos 12 mm, ex Asahimas m2 1.1000 Rp 330,000.00 Rp 363,000.00
Sub-Total ( 2 ) Rp 363,000.00
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : KOSEN
Jenis Pembayaran : Kaca Polos Tempered tebal 6 mm, ex Asahimas
Satuan Pembayaran : M2
Harga Satuan : Rp 292,633.00
AHSP-VIII-010
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.0165 Rp 70,000.00 Rp 1,155.00
Tukang kayu OH 0.1650 Rp 100,000.00 Rp 16,500.00
Kepala tukang OH 0.0165 Rp 100,000.00 Rp 1,650.00
Mandor OH 0.0008 Rp 110,000.00 Rp 88.00
Sub-Total ( 1 ) Rp 19,393.00
2 Bahan
Kaca polos Tempered 6 mm, ex Asahimas m2 1.1000 Rp 248,400.00 Rp 273,240.00
Sub-Total ( 2 ) Rp 273,240.00
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : KOSEN
Jenis Pembayaran : Kaca Polos Tempered tebal 8 mm, ex Asahimas
Satuan Pembayaran : M2
Harga Satuan : Rp 414,073.00
AHSP-VIII-011
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.0165 Rp 70,000.00 Rp 1,155.00
Tukang kayu OH 0.1650 Rp 100,000.00 Rp 16,500.00
Kepala tukang OH 0.0165 Rp 100,000.00 Rp 1,650.00
Mandor OH 0.0008 Rp 110,000.00 Rp 88.00
Sub-Total ( 1 ) Rp 19,393.00
2 Bahan
Kaca polos Tempered 8 mm, ex Asahimas m2 1.1000 Rp 358,800.00 Rp 394,680.00
Sub-Total ( 2 ) Rp 394,680.00
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : KOSEN
Jenis Pembayaran : Kaca Polos Tempered tebal 10 mm, ex Asahimas
Satuan Pembayaran : M2
Harga Satuan : Rp 539,726.00
AHSP-VIII-012
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.0330 Rp 70,000.00 Rp 2,310.00
Tukang kayu OH 0.3300 Rp 100,000.00 Rp 33,000.00
Kepala tukang OH 0.0330 Rp 100,000.00 Rp 3,300.00
Mandor OH 0.0016 Rp 110,000.00 Rp 176.00
Sub-Total ( 1 ) Rp 38,786.00
2 Bahan
Kaca polos Tempered 10 mm, ex Asahimas m2 1.1000 Rp 455,400.00 Rp 500,940.00
Sub-Total ( 2 ) Rp 500,940.00
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : KOSEN
Jenis Pembayaran : Kaca Polos Tempered tebal 12 mm, ex Asahimas
Satuan Pembayaran : M2
Harga Satuan : Rp 608,036.00
AHSP-VIII-013
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.0330 Rp 70,000.00 Rp 2,310.00
Tukang kayu OH 0.3300 Rp 100,000.00 Rp 33,000.00
Kepala tukang OH 0.0330 Rp 100,000.00 Rp 3,300.00
Mandor OH 0.0016 Rp 110,000.00 Rp 176.00
Sub-Total ( 1 ) Rp 38,786.00
2 Bahan
Kaca polos Tempered 12 mm, ex Asahimas m2 1.1000 Rp 517,500.00 Rp 569,250.00
Sub-Total ( 2 ) Rp 569,250.00
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : KOSEN
Jenis Pembayaran : Kaca Polos Tempered tebal 12 mm, ex Asahimas (khusus pintu)
Satuan Pembayaran : M2
Harga Satuan : Rp 867,476.50
AHSP-VIII-014
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.0330 Rp 70,000.00 Rp 2,310.00
Tukang kayu OH 0.3300 Rp 100,000.00 Rp 33,000.00
Kepala tukang OH 0.0330 Rp 100,000.00 Rp 3,300.00
Mandor OH 0.0016 Rp 110,000.00 Rp 176.00
Sub-Total ( 1 ) Rp 38,786.00
2 Bahan
Kaca polos Tempered 12 mm, ex Asahimas m2 1.1000 Rp 517,500.00 Rp 569,250.00
Pembuatan Lubang bh 2.0000 Rp 17,600.00 Rp 35,200.00
Gosok pinggir ml 2.8900 Rp 21,450.00 Rp 61,990.50
Coak Tepi bh 1.0000 Rp 66,550.00 Rp 66,550.00
Coak Pojok bh 2.0000 Rp 47,850.00 Rp 95,700.00
Sub-Total ( 2 ) Rp 828,690.50
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : KOSEN
Jenis Pembayaran : Kaca Stopsol tebal 6 mm, ex Asahimas
Satuan Pembayaran : M2
Harga Satuan : Rp 514,393.00
AHSP-VIII-015
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.0165 Rp 70,000.00 Rp 1,155.00
Tukang kayu OH 0.1650 Rp 100,000.00 Rp 16,500.00
Kepala tukang OH 0.0165 Rp 100,000.00 Rp 1,650.00
Mandor OH 0.0008 Rp 110,000.00 Rp 88.00
Sub-Total ( 1 ) Rp 19,393.00
2 Bahan
Kaca Stopsol tebal 6 mm, ex Asahimas m2 1.1000 Rp 450,000.00 Rp 495,000.00
Sub-Total ( 2 ) Rp 495,000.00
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : KOSEN
Jenis Pembayaran : Kaca Stopsol tebal 8 mm, ex Asahimas
Satuan Pembayaran : M2
Harga Satuan : Rp 651,893.00
AHSP-VIII-016
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.0165 Rp 70,000.00 Rp 1,155.00
Tukang kayu OH 0.1650 Rp 100,000.00 Rp 16,500.00
Kepala tukang OH 0.0165 Rp 100,000.00 Rp 1,650.00
Mandor OH 0.0008 Rp 110,000.00 Rp 88.00
Sub-Total ( 1 ) Rp 19,393.00
2 Bahan
Kaca Stopsol tebal 8 mm, ex Asahimas m2 1.1000 Rp 575,000.00 Rp 632,500.00
Sub-Total ( 2 ) Rp 632,500.00
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : KOSEN
Jenis Pembayaran : Kaca Stopsol tebal 10 mm, ex Asahimas
Satuan Pembayaran : M2
Harga Satuan : Rp 1,056,286.00
AHSP-VIII-017
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.0330 Rp 70,000.00 Rp 2,310.00
Tukang kayu OH 0.3300 Rp 100,000.00 Rp 33,000.00
Kepala tukang OH 0.0330 Rp 100,000.00 Rp 3,300.00
Mandor OH 0.0016 Rp 110,000.00 Rp 176.00
Sub-Total ( 1 ) Rp 38,786.00
2 Bahan
Kaca Stopsol tebal 10 mm, ex Asahimas m2 1.1000 Rp 925,000.00 Rp 1,017,500.00
Sub-Total ( 2 ) Rp 1,017,500.00
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : KOSEN
Jenis Pembayaran : Kaca Laminated 6 mm, (Kaca+PVB+Kaca)
Satuan Pembayaran : M2
Harga Satuan : Rp 557,436.00
AHSP-VIII-018
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.0330 Rp 70,000.00 Rp 2,310.00
Tukang kayu OH 0.3300 Rp 100,000.00 Rp 33,000.00
Kepala tukang OH 0.0330 Rp 100,000.00 Rp 3,300.00
Mandor OH 0.0016 Rp 110,000.00 Rp 176.00
Sub-Total ( 1 ) Rp 38,786.00
2 Bahan
Kaca polos laminated (tebal 6mm+0,38+6 mm) m2 1.1000 Rp 471,500.00 Rp 518,650.00
Sub-Total ( 2 ) Rp 518,650.00
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : KOSEN
Jenis Pembayaran : Kaca Laminated 8 mm, (Kaca+PVB+Kaca)
Satuan Pembayaran : M2
Harga Satuan : Rp 898,986.00
AHSP-VIII-019
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.0330 Rp 70,000.00 Rp 2,310.00
Tukang kayu OH 0.3300 Rp 100,000.00 Rp 33,000.00
Kepala tukang OH 0.0330 Rp 100,000.00 Rp 3,300.00
Mandor OH 0.0016 Rp 110,000.00 Rp 176.00
Sub-Total ( 1 ) Rp 38,786.00
2 Bahan
Kaca polos laminated (tebal 8mm+0,76+8 mm) m2 1.1000 Rp 782,000.00 Rp 860,200.00
Sub-Total ( 2 ) Rp 860,200.00
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : KOSEN
Jenis Pembayaran : Pintu Double Triplek 6 mm lapis HPL, rgk. Kamper
Satuan Pembayaran : M2
Harga Satuan : Rp 746,108.00 SNI 3434 (6.9) - 2008
AHSP-VIII-020
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.8000 Rp 70,000.00 Rp 56,000.00
Tukang kayu OH 2.4000 Rp 100,000.00 Rp 240,000.00
Kepala tukang OH 0.2400 Rp 100,000.00 Rp 24,000.00
Mandor OH 0.0400 Rp 110,000.00 Rp 4,400.00
Sub-Total ( 1 ) Rp 324,400.00
2 Bahan
Papan Kamper samarinda oven M3 0.0256 Rp 10,307,500.00 Rp 263,872.00
Multiplex 122x244x6 mm Lmbr 0.7000 Rp 77,000.00 Rp 53,900.00
HPL Lmbr 0.7000 Rp 135,000.00 Rp 94,500.00
Paku halus Kg 0.1000 Rp 19,360.00 Rp 1,936.00
Lem Kayu Kg 0.2500 Rp 30,000.00 Rp 7,500.00
Sub-Total ( 2 ) Rp 421,708.00
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : KOSEN
Jenis Pembayaran : Pintu Double Triplek 6 mm lapis HPL & Formika, rgk. Kamper
Satuan Pembayaran : M2
Harga Satuan : Rp 728,608.00 SNI 3434 (6.9) - 2008
AHSP-VIII-021
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.8000 Rp 70,000.00 Rp 56,000.00
Tukang kayu OH 2.4000 Rp 100,000.00 Rp 240,000.00
Kepala tukang OH 0.2400 Rp 100,000.00 Rp 24,000.00
Mandor OH 0.0400 Rp 110,000.00 Rp 4,400.00
Sub-Total ( 1 ) Rp 324,400.00
2 Bahan
Papan Kamper samarinda oven M3 0.0256 Rp 10,307,500.00 Rp 263,872.00
Multiplex 122x244x6 mm Lmbr 0.7000 Rp 77,000.00 Rp 53,900.00
HPL Lmbr 0.3500 Rp 135,000.00 Rp 47,250.00
Formika Lmbr 0.3500 Rp 85,000.00 Rp 29,750.00
Paku halus Kg 0.1000 Rp 19,360.00 Rp 1,936.00
Lem Kayu Kg 0.2500 Rp 30,000.00 Rp 7,500.00
Sub-Total ( 2 ) Rp 404,208.00
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : KOSEN
Jenis Pembayaran : Pintu Double Teakwood, rangka Kamper
Satuan Pembayaran : M2
Harga Satuan : Rp 635,133.30 SNI 3434 (6.8) - 2008
AHSP-VIII-022
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.7000 Rp 70,000.00 Rp 49,000.00
Tukang kayu OH 2.1000 Rp 100,000.00 Rp 210,000.00
Kepala tukang OH 0.2100 Rp 100,000.00 Rp 21,000.00
Mandor OH 0.0350 Rp 110,000.00 Rp 3,850.00
Sub-Total ( 1 ) Rp 283,850.00
2 Bahan
Papan Kamper samarinda oven M3 0.0250 Rp 10,307,500.00 Rp 257,687.50
Teakwood 122x244x4 mm Lmbr 0.7000 Rp 111,450.00 Rp 78,015.00
Paku halus Kg 0.0300 Rp 19,360.00 Rp 580.80
Lem Kayu Kg 0.5000 Rp 30,000.00 Rp 15,000.00
Sub-Total ( 2 ) Rp 351,283.30
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : KOSEN
Jenis Pembayaran : Pintu Panel solid, kayu Kamper Samarinda oven
Satuan Pembayaran : M2
Harga Satuan : Rp 819,300.00 SNI 3434 (6.5) - 2008
AHSP-VIII-023
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 1.0000 Rp 70,000.00 Rp 70,000.00
Tukang kayu OH 3.0000 Rp 100,000.00 Rp 300,000.00
Kepala tukang OH 0.3000 Rp 100,000.00 Rp 30,000.00
Mandor OH 0.0500 Rp 110,000.00 Rp 5,500.00
Sub-Total ( 1 ) Rp 405,500.00
2 Bahan
Papan Kamper samarinda oven M3 0.0400 Rp 10,307,500.00 Rp 412,300.00
Lem Kayu Kg 0.0500 Rp 30,000.00 Rp 1,500.00
Sub-Total ( 2 ) Rp 413,800.00
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : KOSEN
Jenis Pembayaran : Pintu / Jendela kaca, kayu Kamper Samarinda oven
Satuan Pembayaran : M2
Harga Satuan : Rp 559,180.00 SNI 3434 (6.6) - 2008
AHSP-VIII-024
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.8000 Rp 70,000.00 Rp 56,000.00
Tukang kayu OH 2.4000 Rp 100,000.00 Rp 240,000.00
Kepala tukang OH 0.0240 Rp 100,000.00 Rp 2,400.00
Mandor OH 0.0400 Rp 110,000.00 Rp 4,400.00
Sub-Total ( 1 ) Rp 302,800.00
2 Bahan
Papan Kamper samarinda oven M3 0.0240 Rp 10,307,500.00 Rp 247,380.00
Lem Kayu Kg 0.3000 Rp 30,000.00 Rp 9,000.00
Sub-Total ( 2 ) Rp 256,380.00
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : KOSEN
Jenis Pembayaran : Pintu / Jendela Krepyak, kayu Kamper Samarinda oven
Satuan Pembayaran : M2
Harga Satuan : Rp 1,080,180.00 SNI 3434 (6.7) - 2008
AHSP-VIII-025
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 1.0000 Rp 70,000.00 Rp 70,000.00
Tukang kayu OH 3.0000 Rp 100,000.00 Rp 300,000.00
Kepala tukang OH 0.3000 Rp 100,000.00 Rp 30,000.00
Mandor OH 0.0500 Rp 110,000.00 Rp 5,500.00
Sub-Total ( 1 ) Rp 405,500.00
2 Bahan
Papan Kamper samarinda oven M3 0.0640 Rp 10,307,500.00 Rp 659,680.00
Lem Kayu Kg 0.5000 Rp 30,000.00 Rp 15,000.00
Sub-Total ( 2 ) Rp 674,680.00
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : KOSEN
Jenis Pembayaran : Papan Jalusi Kosen, kayu Kamper Samarinda oven
Satuan Pembayaran : M2
Harga Satuan : Rp 925,104.00 SNI 3434 (6.10) - 2008
AHSP-VIII-026
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.6700 Rp 70,000.00 Rp 46,900.00
Tukang kayu OH 2.0000 Rp 100,000.00 Rp 200,000.00
Kepala tukang OH 0.2000 Rp 100,000.00 Rp 20,000.00
Mandor OH 0.3350 Rp 110,000.00 Rp 36,850.00
Sub-Total ( 1 ) Rp 303,750.00
2 Bahan
Papan 2/12, Kamper Samarinda oven M3 0.0600 Rp 10,307,500.00 Rp 618,450.00
Paku halus Kg 0.1500 Rp 19,360.00 Rp 2,904.00
Sub-Total ( 2 ) Rp 621,354.00
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : PARTISI
Jenis Pembayaran : Partisi Double Gypsum 12 mm, Rangka Metal Furing
Satuan Pembayaran : M2
Harga Satuan : Rp 207,075.00
AHSP-IX-001
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Tukang Allumunium OH 0.2000 Rp 90,000.00 Rp 18,000.00
Tukang gypsum OH 0.3000 Rp 90,000.00 Rp 27,000.00
Pekerja OH 0.2000 Rp 70,000.00 Rp 14,000.00
Mandor OH 0.0150 Rp 110,000.00 Rp 1,650.00
Sub-Total ( 1 ) Rp 60,650.00
2 Bahan
Metal Furing 75 mm btg 1.2500 Rp 37,700.00 Rp 47,125.00
Paku rivet bh 8.0000 Rp 250.00 Rp 2,000.00
Sekrup 6x1-1,5 bh 8.0000 Rp 500.00 Rp 4,000.00
Gypsumboard 120x240 cm 12 mm lbr 0.7000 Rp 76,000.00 Rp 53,200.00
Textile tape roll 0.2400 Rp 17,500.00 Rp 4,200.00
Compound gypsum kg 6.0000 Rp 4,500.00 Rp 27,000.00
Sekrup gypsum bh 24.0000 Rp 300.00 Rp 7,200.00
Amplas lbr 0.5000 Rp 3,400.00 Rp 1,700.00
Sub-Total ( 2 ) Rp 146,425.00
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : PARTISI
Jenis Pembayaran : Partisi Double Gypsum 12 mm, Rangka Hollow
Satuan Pembayaran : M2
Harga Satuan : Rp 192,450.00
AHSP-IX-002
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Tukang Allumunium OH 0.2000 Rp 90,000.00 Rp 18,000.00
Tukang gypsum OH 0.3000 Rp 90,000.00 Rp 27,000.00
Pekerja OH 0.2000 Rp 70,000.00 Rp 14,000.00
Mandor OH 0.0150 Rp 110,000.00 Rp 1,650.00
Sub-Total ( 1 ) Rp 60,650.00
2 Bahan
Hollow 40x40 mm galvanized (tebal standart) btg 1.2500 Rp 26,000.00 Rp 32,500.00
Paku rivet bh 8.0000 Rp 250.00 Rp 2,000.00
Sekrup 6x1-1,5 bh 8.0000 Rp 500.00 Rp 4,000.00
Gypsumboard 120x240 cm 12 mm lbr 0.7000 Rp 76,000.00 Rp 53,200.00
Textile tape roll 0.2400 Rp 17,500.00 Rp 4,200.00
Compound gypsum kg 6.0000 Rp 4,500.00 Rp 27,000.00
Sekrup gypsum bh 24.0000 Rp 300.00 Rp 7,200.00
Amplas lbr 0.5000 Rp 3,400.00 Rp 1,700.00
Sub-Total ( 2 ) Rp 131,800.00
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : PARTISI
Jenis Pembayaran : Partisi Single Gypsum 12 mm, Rangka Metal Furing
Satuan Pembayaran : M2
Harga Satuan : Rp 147,375.00
AHSP-IX-003
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Tukang Allumunium OH 0.2000 Rp 90,000.00 Rp 18,000.00
Tukang gypsum OH 0.2000 Rp 90,000.00 Rp 18,000.00
Pekerja OH 0.1500 Rp 70,000.00 Rp 10,500.00
Mandor OH 0.0100 Rp 110,000.00 Rp 1,100.00
Sub-Total ( 1 ) Rp 47,600.00
2 Bahan
Metal Furing 75 mm btg 1.2500 Rp 37,700.00 Rp 47,125.00
Paku rivet bh 8.0000 Rp 250.00 Rp 2,000.00
Sekrup 6x1-1,5 bh 8.0000 Rp 500.00 Rp 4,000.00
Gypsumboard 120x240 cm 12 mm lbr 0.3500 Rp 76,000.00 Rp 26,600.00
Textile tape roll 0.1200 Rp 17,500.00 Rp 2,100.00
Compound gypsum kg 3.0000 Rp 4,500.00 Rp 13,500.00
Sekrup gypsum bh 12.0000 Rp 300.00 Rp 3,600.00
Amplas lbr 0.2500 Rp 3,400.00 Rp 850.00
Sub-Total ( 2 ) Rp 99,775.00
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : PARTISI
Jenis Pembayaran : Partisi Single Gypsum 12 mm, Rangka Hollow
Satuan Pembayaran : M2
Harga Satuan : Rp 132,750.00
AHSP-IX-004
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Tukang Allumunium OH 0.2000 Rp 90,000.00 Rp 18,000.00
Tukang gypsum OH 0.2000 Rp 90,000.00 Rp 18,000.00
Pekerja OH 0.1500 Rp 70,000.00 Rp 10,500.00
Mandor OH 0.0100 Rp 110,000.00 Rp 1,100.00
Sub-Total ( 1 ) Rp 47,600.00
2 Bahan
Hollow 40x40 mm galvanized (tebal standart) btg 1.2500 Rp 26,000.00 Rp 32,500.00
Paku rivet bh 8.0000 Rp 250.00 Rp 2,000.00
Sekrup 6x1-1,5 bh 8.0000 Rp 500.00 Rp 4,000.00
Gypsumboard 120x240 cm 12 mm lbr 0.3500 Rp 76,000.00 Rp 26,600.00
Textile tape roll 0.1200 Rp 17,500.00 Rp 2,100.00
Compound gypsum kg 3.0000 Rp 4,500.00 Rp 13,500.00
Sekrup gypsum bh 12.0000 Rp 300.00 Rp 3,600.00
Amplas lbr 0.2500 Rp 3,400.00 Rp 850.00
Sub-Total ( 2 ) Rp 85,150.00
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : PARTISI
Jenis Pembayaran : Partisi Single Multiplex 12 mm, Rangka Metal Furing
finish lapis HPL
Satuan Pembayaran : M2
Harga Satuan : Rp 218,201.00
AHSP-IX-005
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Tukang Allumunium OH 0.2000 Rp 90,000.00 Rp 18,000.00
Tukang gypsum OH 0.2000 Rp 90,000.00 Rp 18,000.00
Pekerja OH 0.1500 Rp 70,000.00 Rp 10,500.00
Mandor OH 0.0100 Rp 110,000.00 Rp 1,100.00
Sub-Total ( 1 ) Rp 47,600.00
2 Bahan
Metal Furing 75 mm btg 1.2500 Rp 37,700.00 Rp 47,125.00
Paku rivet bh 8.0000 Rp 250.00 Rp 2,000.00
Sekrup 6x1-1,5 bh 8.0000 Rp 500.00 Rp 4,000.00
Multiplex 120x240 cm 12 mm lbr 0.3500 Rp 155,360.00 Rp 54,376.00
HPL lbr 0.3500 Rp 135,000.00 Rp 47,250.00
Lem kayu kg 0.5000 Rp 30,000.00 Rp 15,000.00
Amplas lbr 0.2500 Rp 3,400.00 Rp 850.00
Sub-Total ( 2 ) Rp 170,601.00
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : PARTISI
Jenis Pembayaran : Dinding Partisi Cubical, Toilet (CB-1)
Satuan Pembayaran : Unit
Harga Satuan : Rp 8,607,850.00
AHSP-IX-006
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Sub-Total ( 1 ) Rp -
2 Bahan
- Frontal & Devider panel, Plywood Lumberkoll 18 mm water m2 4.87 Rp 725,000.00 Rp 3,527,850.00
resistance finish HPL laminated, dengan frame allumunium.
- Door Panel Plywood Lumberkoll 18 mm ukuran 600mm x2000 mm, m2 2.40 Rp 1,700,000.00 Rp 4,080,000.00
water resistance finish HPL laminated, dengan frame allumunium,
lengkap termasuk Door Accessories stainless Steel.
- Pedestal Stainless steel 10 cm bh 4.00 Rp 250,000.00 Rp 1,000,000.00
Sub-Total ( 2 ) Rp 8,607,850.00
3 Peralatan
Sub-Total ( 3 ) Rp -
X. PEKERJAAN : BESI
Pekerjaan : BESI
Jenis Pembayaran : Grill / Tralis Allumunium hollow 20x40 mm
(Modul 1,2 x 0,72 = 0,86 M2)
Satuan Pembayaran : M2
Harga Satuan : Rp 327,600.00
AHSP-X-001
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Upah kerja lot 1.0000 Rp 65,016.00 Rp 65,016.00
Sub-Total ( 1 ) Rp 65,016.00
2 Bahan
Allumunium hollow 40x20 mm m' 8.6688 Rp 25,000.00 Rp 216,720.00
Sub-Total ( 2 ) Rp 216,720.00
3 Peralatan
Sub-Total ( 3 ) Rp -
A. T O T A L ( 1 + 2 + 3) Rp 281,736.00
B. HARGA SATUAN PEKERJAAN / M2 Rp 327,600.00
Pekerjaan : BESI
Jenis Pembayaran : Grill / Tralis Lovre Allumunium
(Modul 1 x 4,60 = 4,6 M2)
Satuan Pembayaran : M2
Harga Satuan : Rp 357,500.00
AHSP-X-002
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Upah kerja lot 1.0000 Rp 379,500.00 Rp 379,500.00
Sub-Total ( 1 ) Rp 379,500.00
2 Bahan
Allumunium louvre m' 46.00 Rp 27,500.00 Rp 1,265,000.00
Sub-Total ( 2 ) Rp 1,265,000.00
3 Peralatan
Sub-Total ( 3 ) Rp -
A. T O T A L ( 1 + 2 + 3) Rp 1,644,500.00
B. HARGA SATUAN PEKERJAAN / M2 Rp 357,500.00
Pekerjaan : BESI
Jenis Pembayaran : Tralis besi hollow 20x40 frame holoow 40x60 mm
(modul 7.5x0.90 = 6,75 m2)
Satuan Pembayaran : M2
Harga Satuan : Rp 659,094.10
AHSP-X-003
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Upah kerja lot 1.0000 Rp 1,153,414.67 Rp 1,153,414.67
Sub-Total ( 1 ) Rp 1,153,414.67
2 Bahan
- Frame besi hollow 60x40x2 mm m' 15.00 42,456.92 Rp 636,853.75
- Tralis besi hollow 20x40x1,8 mm m' 68.00 29,250.00 Rp 1,989,000.00
- Finishing pengecatan m2 13.55 49,418.21 Rp 669,616.75
Sub-Total ( 2 ) Rp 3,295,470.50
3 Peralatan
Sub-Total ( 3 ) Rp -
A. T O T A L ( 1 + 2 + 3) Rp 4,448,885.17
B. HARGA SATUAN PEKERJAAN / M2 Rp 659,094.10
Pekerjaan : BESI
Jenis Pembayaran : Tralis louvre besi, rangka hollow 50x100 mm
Modul : 4,20 x 0,60 m = 2,52 m2
Satuan Pembayaran : M2
Harga Satuan : Rp 716,249.86
AHSP-X-004
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Upah kerja lot 1.0000 Rp 467,949.91 Rp 467,949.91
Sub-Total ( 1 ) Rp 467,949.91
2 Bahan
- Frame besi hollow 50x100 m' 12.00 45,500.00 Rp 546,000.00
- Grill besi plat tebal 2 mm m2 2.52 167,987.40 Rp 423,328.25
- Finishing pengecatan m2 7.44 49,418.21 Rp 367,671.48
Sub-Total ( 2 ) Rp 1,336,999.73
3 Peralatan
Sub-Total ( 3 ) Rp -
A. T O T A L ( 1 + 2 + 3) Rp 1,804,949.64
B. HARGA SATUAN PEKERJAAN / M2 Rp 716,249.86
Pekerjaan : BESI
Jenis Pembayaran : Baja Profil WF
Satuan Pembayaran : Kg
Harga Satuan : Rp 21,167.50 SNI 7393 (6.2) - 2008
AHSP-X-005
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.0600 Rp 70,000.00 Rp 4,200.00
Tukang besi OH 0.0600 Rp 90,000.00 Rp 5,400.00
Kepala tukang OH 0.0060 Rp 100,000.00 Rp 600.00
Mandor OH 0.0030 Rp 110,000.00 Rp 330.00
Sub-Total ( 1 ) Rp 10,530.00
2 Bahan
Baja Profil WF Kg 1.1500 9,250.00 Rp 10,637.50
Sub-Total ( 2 ) Rp 10,637.50
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : BESI
Jenis Pembayaran : Railling Tangga Besi (Black Steel)
Satuan Pembayaran : M'
Harga Satuan : Rp 726,050.00
AHSP-X-006
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.8000 Rp 70,000.00 Rp 56,000.00
Tukang besi OH 0.8000 Rp 90,000.00 Rp 72,000.00
Kepala tukang OH 0.0800 Rp 100,000.00 Rp 8,000.00
Mandor OH 0.0800 Rp 110,000.00 Rp 8,800.00
Sub-Total ( 1 ) Rp 144,800.00
2 Bahan
- Railling besi bahan pipa besi hitam dia. 2" (hand rail) m' 1.0000 141,667 Rp 141,666.67
- Railling besi bahan pipa besi hitam dia. 1,5" (tiang) m' 1.0000 108,333 Rp 108,333.33
- Railling besi bahan pipa besi hitam dia. 1" (pembagi) m' 3.0000 62,500 Rp 187,500.00
- Base plate + baut angkur bh 4.0000 25,000.00 Rp 100,000.00
- Finishing pengecatan lot 1.0000 43,750.00 Rp 43,750.00
Sub-Total ( 2 ) Rp 581,250.00
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : ATAP
Jenis Pembayaran : Atap Gelombang Galvalume, Spandek Lysaght, 0,75 mm
Satuan Pembayaran : M2
Harga Satuan : Rp 212,472.50
AHSP-XI-001
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.0800 Rp 70,000.00 Rp 5,600.00
Tukang besi OH 0.0800 Rp 90,000.00 Rp 7,200.00
Kepala tukang OH 0.0100 Rp 100,000.00 Rp 1,000.00
Mandor OH 0.0100 Rp 110,000.00 Rp 1,100.00
Sub-Total ( 1 ) Rp 14,900.00
2 Bahan
Atap Gelombang GALVALUME, SPANDEK LYSAGHT, tbl 0,75 mm m2 1.0500 Rp 186,450.00 Rp 195,772.50
Skrup + ring Bh 4.0000 Rp 450.00 Rp 1,800.00
Sub-Total ( 2 ) Rp 197,572.50
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : ATAP
Jenis Pembayaran : Atap Gelombang Galvalume, Spandek Lysaght 0,50 mm
Satuan Pembayaran : M2
Harga Satuan : Rp 150,680.00
AHSP-XI-002
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.0800 Rp 70,000.00 Rp 5,600.00
Tukang besi OH 0.0800 Rp 90,000.00 Rp 7,200.00
Kepala tukang OH 0.0100 Rp 100,000.00 Rp 1,000.00
Mandor OH 0.0100 Rp 110,000.00 Rp 1,100.00
Sub-Total ( 1 ) Rp 14,900.00
2 Bahan
Atap Gelombang GALVALUME, SPANDEK LYSAGHT, tbl 0,50 mm m2 1.0500 Rp 127,600.00 Rp 133,980.00
Skrup + ring Bh 4.0000 Rp 450.00 Rp 1,800.00
Sub-Total ( 2 ) Rp 135,780.00
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : ATAP
Jenis Pembayaran : Listplank Galvalume Plate 0,75 mm, lebar 1,60 cm
Satuan Pembayaran : M'
Harga Satuan : Rp 151,170.00
AHSP-XI-003
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.1500 Rp 70,000.00 Rp 10,500.00
Tukang besi OH 0.2500 Rp 90,000.00 Rp 22,500.00
Kepala tukang OH 0.0250 Rp 100,000.00 Rp 2,500.00
Mandor OH 0.0100 Rp 110,000.00 Rp 1,100.00
Sub-Total ( 1 ) Rp 36,600.00
2 Bahan
Galvalume Plate 0,75 mm, lebar 1,60 cm m2 0.8000 139,837.50 Rp 111,870.00
Skrup + ring Bh 6.0000 450.00 Rp 2,700.00
Sub-Total ( 2 ) Rp 114,570.00
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : ATAP
Jenis Pembayaran : Flashing (Talang datar) Galvalume plate 0,75 mm
Satuan Pembayaran : M'
Harga Satuan : Rp 100,318.75
AHSP-XI-004
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.1000 Rp 70,000.00 Rp 7,000.00
Tukang besi OH 0.2000 Rp 90,000.00 Rp 18,000.00
Kepala tukang OH 0.0250 Rp 100,000.00 Rp 2,500.00
Mandor OH 0.0100 Rp 110,000.00 Rp 1,100.00
Sub-Total ( 1 ) Rp 28,600.00
2 Bahan
Galvalume Plate 0,75 mm, lebar 0,60 cm m2 0.5000 139,837.50 Rp 69,918.75
Skrup + ring Bh 4.0000 450.00 Rp 1,800.00
Sub-Total ( 2 ) Rp 71,718.75
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : ATAP
Jenis Pembayaran : Talang tegak PVC 3" class AW
Satuan Pembayaran : M'
Harga Satuan : Rp 82,700.00
AHSP-XI-005
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.1250 Rp 70,000.00 Rp 8,750.00
Tukang kayu OH 0.2500 Rp 90,000.00 Rp 22,500.00
Kepala tukang OH 0.0250 Rp 100,000.00 Rp 2,500.00
Mandor OH 0.0050 Rp 110,000.00 Rp 550.00
Sub-Total ( 1 ) Rp 34,300.00
2 Bahan
Pipa PVC 3" AW m' 1.1000 Rp 40,000.00 Rp 44,000.00
Sub-Total ( 2 ) Rp 44,000.00
3 Peralatan
Alat bantu lot 1.0000 4,400.00 Rp 4,400.00
Sub-Total ( 3 ) Rp 4,400.00
Pekerjaan : ATAP
Jenis Pembayaran : Lisplank GRC Board lebar 30 cm, rangka hollow
Satuan Pembayaran : M'
Harga Satuan : Rp 68,955.00
AHSP-XI-006
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja Oh 0.0600 Rp 70,000.00 Rp 4,200.00
Tukang kayu Oh 0.0900 Rp 90,000.00 Rp 8,100.00
Tukang alumunium Oh 0.0600 Rp 100,000.00 Rp 6,000.00
Mandor Oh 0.0045 Rp 110,000.00 Rp 495.00
Sub-Total ( 1 ) Rp 18,795.00
2 Bahan
Hollow 4x4 cm tbl 0.4 mm meni btg 0.3750 Rp 24,000.00 Rp 9,000.00
Hollow 2x4 cm tbl 0.35 mm btg 0.2400 Rp 18,000.00 Rp 4,320.00
Paku rivet bh 1.2000 Rp 250.00 Rp 300.00
Sekrup 6x1-1,5 bh 2.4000 Rp 500.00 Rp 1,200.00
GRC Board tebal 10 mm lbr 0.2250 Rp 130,000.00 Rp 29,250.00
Textile tape roll 0.0720 Rp 17,500.00 Rp 1,260.00
Compound GRC Kg 0.0360 Rp 60,000.00 Rp 2,160.00
Sekrup gypsum bh 7.2000 Rp 300.00 Rp 2,160.00
Amplas lbr 0.1500 Rp 3,400.00 Rp 510.00
Sub-Total ( 2 ) Rp 50,160.00
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : ATAP
Jenis Pembayaran : Scred Lantai 1 PC : 3 PS + Waterprofing membrane
Satuan Pembayaran : M2
Harga Satuan : Rp 154,958.38
AHSP-XI-007
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.3000 Rp 70,000.00 Rp 21,000.00
Tukang Batu OH 0.1500 Rp 90,000.00 Rp 13,500.00
Kep. Tukang Batu OH 0.0150 Rp 100,000.00 Rp 1,500.00
Tukang Waterprrofing OH 0.1500 Rp 90,000.00 Rp 13,500.00
Mandor OH 0.0150 Rp 110,000.00 Rp 1,650.00
Sub-Total ( 1 ) Rp 51,150.00
2 Bahan
Semen PC kg 20.4000 Rp 1,471.00 Rp 30,008.40
Pasir pasang M3 0.0390 Rp 183,700.00 Rp 7,164.30
Lapisan Coating PF Primer m2 1.1000 Rp 15,000.00 Rp 16,500.00
Waterproofing Membrane, Sopralene 180 4 S/P (4 mm) m2 1.1000 Rp 36,486.98 Rp 40,135.68
Sub-Total ( 2 ) Rp 93,808.38
3 Peralatan
Alat pembakar lot 1.0000 Rp 10,000.00 Rp 10,000.00
Sub-Total ( 3 ) Rp 10,000.00
Pekerjaan : ATAP
Jenis Pembayaran : Scred 1 PC : 3 PS (4 cm) + kawat ayam, pelindung waterproofing
Satuan Pembayaran : M2
Harga Satuan : Rp 79,772.70
AHSP-XI-008
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.2000 Rp 70,000.00 Rp 14,000.00
Tukang Batu OH 0.1000 Rp 90,000.00 Rp 9,000.00
Kep. Tukang Batu OH 0.0100 Rp 100,000.00 Rp 1,000.00
Mandor OH 0.0100 Rp 110,000.00 Rp 1,100.00
Sub-Total ( 1 ) Rp 25,100.00
2 Bahan
Semen PC kg 20.4000 Rp 1,471.00 Rp 30,008.40
Pasir pasang M3 0.0390 Rp 183,700.00 Rp 7,164.30
Kawat ayam / kawat loket m2 1.0000 Rp 17,500.00 Rp 17,500.00
Sub-Total ( 2 ) Rp 54,672.70
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : ATAP
Jenis Pembayaran : Kuda-kuda kayu kelas II (Kruing/Kamper Medan)
Satuan Pembayaran : M3
Harga Satuan : Rp 9,314,692.50 SNI 3434 (6.13) - 2008
AHSP-XI-009
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 4.0000 Rp 70,000.00 Rp 280,000.00
Tukang Kayu OH 12.0000 Rp 100,000.00 Rp 1,200,000.00
Kep. Tukang Kayu OH 1.2000 Rp 100,000.00 Rp 120,000.00
Mandor OH 0.2000 Rp 110,000.00 Rp 22,000.00
Sub-Total ( 1 ) Rp 1,622,000.00
2 Bahan
Balok kayu Kruing/Kamper Medan m3 1.1000 Rp 6,791,875.00 Rp 7,471,062.50
Besi strip tebal 5 mm kg 15.0000 Rp 9,250.00 Rp 138,750.00
Paku 12 cm kg 5.6000 Rp 14,800.00 Rp 82,880.00
Sub-Total ( 2 ) Rp 7,692,692.50
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : ATAP
Jenis Pembayaran : Gordeng kayu kelas II (Kruing/Kamper Medan)
Satuan Pembayaran : M3
Harga Satuan : Rp 8,627,412.50 SNI 3434 (6.15) - 2008
AHSP-XI-010
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 2.4000 Rp 70,000.00 Rp 168,000.00
Tukang Kayu OH 7.2000 Rp 100,000.00 Rp 720,000.00
Kep. Tukang Kayu OH 0.7200 Rp 100,000.00 Rp 72,000.00
Mandor OH 0.1200 Rp 110,000.00 Rp 13,200.00
Sub-Total ( 1 ) Rp 973,200.00
2 Bahan
Balok kayu Kruing/Kamper Medan m3 1.1000 Rp 6,791,875.00 Rp 7,471,062.50
Besi strip tebal 5 mm kg 15.0000 Rp 9,250.00 Rp 138,750.00
Paku 12 cm kg 3.0000 Rp 14,800.00 Rp 44,400.00
Sub-Total ( 2 ) Rp 7,654,212.50
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : ATAP
Jenis Pembayaran : Rangka Atap Genteng Keramik (Kruing/Kamper Medan)
Satuan Pembayaran : M2
Harga Satuan : Rp 137,547.00 SNI 3434 (6.16) - 2008
AHSP-XI-011
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.1000 Rp 70,000.00 Rp 7,000.00
Tukang Kayu OH 0.1000 Rp 100,000.00 Rp 10,000.00
Kep. Tukang Kayu OH 0.0100 Rp 100,000.00 Rp 1,000.00
Mandor OH 0.0050 Rp 110,000.00 Rp 550.00
Sub-Total ( 1 ) Rp 18,550.00
2 Bahan
Kasau 5x7 cm, kayu Kruing/Kamper Medan m3 0.0140 Rp 6,591,875.00 Rp 92,286.25
Reng 3x4 cm, kayu Kruing/Kamper Medan m3 0.0036 Rp 6,391,875.00 Rp 23,010.75
Paku 5 cm dan 10 cm kg 0.2500 Rp 14,800.00 Rp 3,700.00
Sub-Total ( 2 ) Rp 118,997.00
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : ATAP
Jenis Pembayaran : Listplank 3x20 cm, papan kayu Kamper Samarinda oven
Satuan Pembayaran : M'
Harga Satuan : Rp 115,930.00 SNI 3434 (6.21) - 2008
AHSP-XI-012
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.1000 Rp 70,000.00 Rp 7,000.00
Tukang Kayu OH 0.2000 Rp 100,000.00 Rp 20,000.00
Kep. Tukang Kayu OH 0.0200 Rp 100,000.00 Rp 2,000.00
Mandor OH 0.0050 Rp 110,000.00 Rp 550.00
Sub-Total ( 1 ) Rp 29,550.00
2 Bahan
Papan Kamper Samarinda oven m3 0.0080 Rp 10,612,500.00 Rp 84,900.00
Paku 5 cm dan 7 cm kg 0.1000 Rp 14,800.00 Rp 1,480.00
Sub-Total ( 2 ) Rp 86,380.00
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : ATAP
Jenis Pembayaran : Listplank 3x30 cm, papan kayu Kamper Samarinda oven
Satuan Pembayaran : M'
Harga Satuan : Rp 147,027.50 SNI 3434 (6.22) - 2008
AHSP-XI-013
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.1000 Rp 70,000.00 Rp 7,000.00
Tukang Kayu OH 0.2000 Rp 100,000.00 Rp 20,000.00
Kep. Tukang Kayu OH 0.0200 Rp 100,000.00 Rp 2,000.00
Mandor OH 0.0050 Rp 110,000.00 Rp 550.00
Sub-Total ( 1 ) Rp 29,550.00
2 Bahan
Papan Kamper Samarinda oven m3 0.0110 Rp 10,612,500.00 Rp 116,737.50
Paku 5 cm dan 7 cm kg 0.0500 Rp 14,800.00 Rp 740.00
Sub-Total ( 2 ) Rp 117,477.50
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : ATAP
Jenis Pembayaran : Atap Genteng Keramik KIA
Satuan Pembayaran : M2
Harga Satuan : Rp 148,350.00
AHSP-XI-014
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.2000 Rp 70,000.00 Rp 14,000.00
Tukang Batu OH 0.1000 Rp 90,000.00 Rp 9,000.00
Kep. Tukang Batu OH 0.0100 Rp 100,000.00 Rp 1,000.00
Mandor OH 0.0100 Rp 110,000.00 Rp 1,100.00
Sub-Total ( 1 ) Rp 25,100.00
2 Bahan
Genteng Keramik KIA Standart bh 14.5000 Rp 8,500.00 Rp 123,250.00
Sub-Total ( 2 ) Rp 123,250.00
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : ATAP
Jenis Pembayaran : Nok Genteng Keramik KIA
Satuan Pembayaran : M2
Harga Satuan : Rp 181,479.70
AHSP-XI-015
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.4000 Rp 70,000.00 Rp 28,000.00
Tukang Batu OH 0.2000 Rp 90,000.00 Rp 18,000.00
Kep. Tukang Batu OH 0.0200 Rp 100,000.00 Rp 2,000.00
Mandor OH 0.0200 Rp 110,000.00 Rp 2,200.00
Sub-Total ( 1 ) Rp 50,200.00
2 Bahan
Genteng Nok KIA Standart bh 5.0000 Rp 25,300.00 Rp 126,500.00
Semen PC kg 2.5000 Rp 1,471.00 Rp 3,677.50
Pasir pasang M3 0.0060 Rp 183,700.00 Rp 1,102.20
Sub-Total ( 2 ) Rp 131,279.70
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : ATAP
Jenis Pembayaran : Talang datar/jurai, seng BJLS 28 lbr 90
Satuan Pembayaran : M'
Harga Satuan : Rp 232,691.93 SNI 7393 (6.18) - 2008
AHSP-XI-016
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.2000 Rp 70,000.00 Rp 14,000.00
Tukang Kayu OH 0.4000 Rp 100,000.00 Rp 40,000.00
Kep. Tukang Kayu OH 0.0250 Rp 100,000.00 Rp 2,500.00
Mandor OH 0.0100 Rp 110,000.00 Rp 1,100.00
Sub-Total ( 1 ) Rp 57,600.00
2 Bahan
Papan kayu Kruing/Kamper medan m3 0.0190 Rp 6,991,875.00 Rp 132,845.63
Paku 3 cm dan 5 cm kg 0.0150 Rp 16,420.00 Rp 246.30
Seng plat BJLS 28 lebar 90 cm m' 1.0500 Rp 40,000.00 Rp 42,000.00
Sub-Total ( 2 ) Rp 175,091.93
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : ATAP
Jenis Pembayaran : Talang 1/2 lingkaran D-15 cm, seng BJLS 30 lbr 45 cm
Satuan Pembayaran : M'
Harga Satuan : Rp 83,418.60 SNI 7393 (6.19) - 2008
AHSP-XI-017
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.2000 Rp 70,000.00 Rp 14,000.00
Tukang Kayu OH 0.4000 Rp 100,000.00 Rp 40,000.00
Kep. Tukang Kayu OH 0.0250 Rp 100,000.00 Rp 2,500.00
Mandor OH 0.0100 Rp 110,000.00 Rp 1,100.00
Sub-Total ( 1 ) Rp 57,600.00
2 Bahan
Seng plat BJLS 30 lebar 90 cm m' 0.5250 Rp 40,000.00 Rp 21,000.00
Paku 1 cm - 3 cm kg 0.0100 Rp 19,360.00 Rp 193.60
Besi Strip kg 0.5000 Rp 9,250.00 Rp 4,625.00
Sub-Total ( 2 ) Rp 25,818.60
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : PENGECATAN
Jenis Pembayaran : Cat Tembok Dalam, ICI Dulux Pentalite
Satuan Pembayaran : M2
Harga Satuan : Rp 27,758.85
AHSP-XII-001
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja Oh 0.0300 Rp 70,000.00 Rp 2,100.00
Tukang Cat OH 0.0600 Rp 90,000.00 Rp 5,400.00
Kep. Tukang Cat OH 0.0060 Rp 100,000.00 Rp 600.00
Mandor OH 0.0030 Rp 110,000.00 Rp 330.00
Sub-Total ( 1 ) Rp 8,430.00
2 Bahan
Cat Tembok dalam, ICI Dulux Pentalite kg 0.3600 Rp 41,918.57 Rp 15,090.69
Plamur tembok m3 0.1000 Rp 9,360.00 Rp 936.00
Amplas besi m3 0.3000 Rp 3,400.00 Rp 1,020.00
Kuas Roll M3 0.0150 Rp 35,000.00 Rp 525.00
Sub-Total ( 2 ) Rp 17,571.69
3 Peralatan
Alat Bantu ls 1.0000 Rp 1,757.17 Rp 1,757.17
Sub-Total ( 3 ) Rp 1,757.17
Pekerjaan : PENGECATAN
Jenis Pembayaran : Cat Tembok Dalam, Catylac
Satuan Pembayaran : M2
Harga Satuan : Rp 21,059.10
AHSP-XII-002
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja Oh 0.0300 Rp 70,000.00 Rp 2,100.00
Tukang Cat OH 0.0600 Rp 90,000.00 Rp 5,400.00
Kep. Tukang Cat OH 0.0060 Rp 100,000.00 Rp 600.00
Mandor OH 0.0030 Rp 110,000.00 Rp 330.00
Sub-Total ( 1 ) Rp 8,430.00
2 Bahan
Cat Tembok dalam, Catylac kg 0.3600 Rp 25,000.00 Rp 9,000.00
Plamur tembok m3 0.1000 Rp 9,360.00 Rp 936.00
Amplas besi m3 0.3000 Rp 3,400.00 Rp 1,020.00
Kuas Roll M3 0.0150 Rp 35,000.00 Rp 525.00
Sub-Total ( 2 ) Rp 11,481.00
3 Peralatan
Alat Bantu ls 1.0000 Rp 1,148.10 Rp 1,148.10
Sub-Total ( 3 ) Rp 1,148.10
Pekerjaan : PENGECATAN
Jenis Pembayaran : Cat Tembok Dalam, Mowilex
Satuan Pembayaran : M2
Harga Satuan : Rp 26,009.10
AHSP-XII-003
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja Oh 0.0300 Rp 70,000.00 Rp 2,100.00
Tukang Cat OH 0.0600 Rp 90,000.00 Rp 5,400.00
Kep. Tukang Cat OH 0.0060 Rp 100,000.00 Rp 600.00
Mandor OH 0.0030 Rp 110,000.00 Rp 330.00
Sub-Total ( 1 ) Rp 8,430.00
2 Bahan
Cat Tembok Mowilex (Acrilyc Emulsion) kg 0.3600 Rp 37,500.00 Rp 13,500.00
Plamur tembok m3 0.1000 Rp 9,360.00 Rp 936.00
Amplas besi m3 0.3000 Rp 3,400.00 Rp 1,020.00
Kuas Roll M3 0.0150 Rp 35,000.00 Rp 525.00
Sub-Total ( 2 ) Rp 15,981.00
3 Peralatan
Alat Bantu ls 1.0000 Rp 1,598.10 Rp 1,598.10
Sub-Total ( 3 ) Rp 1,598.10
Pekerjaan : PENGECATAN
Jenis Pembayaran : Cat Tembok Luar, ICI Weathershield
Satuan Pembayaran : M2
Harga Satuan : Rp 35,134.86
AHSP-XII-004
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja Oh 0.0300 Rp 70,000.00 Rp 2,100.00
Tukang Cat OH 0.0600 Rp 90,000.00 Rp 5,400.00
Kep. Tukang Cat OH 0.0060 Rp 100,000.00 Rp 600.00
Mandor OH 0.0030 Rp 110,000.00 Rp 330.00
Sub-Total ( 1 ) Rp 8,430.00
2 Bahan
Cat Tembok luar, ICI Weathershield Kg 0.2200 Rp 65,000.00 Rp 14,300.00
Alkali Resistants Bh 0.1100 Rp 43,428.57 Rp 4,777.14
Amplas besi Bh 0.5000 Rp 3,400.00 Rp 1,700.00
Kuas Roll Bh 0.1000 Rp 35,000.00 Rp 3,500.00
Sub-Total ( 2 ) Rp 24,277.14
3 Peralatan
Alat Bantu ls 1.0000 Rp 2,427.71 Rp 2,427.71
Sub-Total ( 3 ) Rp 2,427.71
Pekerjaan : PENGECATAN
Jenis Pembayaran : Cat Tembok Luar, Mowilex (Water Coat)
Satuan Pembayaran : M2
Harga Satuan : Rp 30,476.36
AHSP-XII-005
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja Oh 0.0300 Rp 70,000.00 Rp 2,100.00
Tukang Cat OH 0.0600 Rp 90,000.00 Rp 5,400.00
Kep. Tukang Cat OH 0.0060 Rp 100,000.00 Rp 600.00
Mandor OH 0.0030 Rp 110,000.00 Rp 330.00
Sub-Total ( 1 ) Rp 8,430.00
2 Bahan
Cat Tembok Mowilex (Wather Coat) Kg 0.2200 Rp 45,750.00 Rp 10,065.00
Alkali Resistants Bh 0.1100 Rp 43,428.57 Rp 4,777.14
Amplas besi Bh 0.5000 Rp 3,400.00 Rp 1,700.00
Kuas Roll Bh 0.1000 Rp 35,000.00 Rp 3,500.00
Sub-Total ( 2 ) Rp 20,042.14
3 Peralatan
Alat Bantu ls 1.0000 Rp 2,004.21 Rp 2,004.21
Sub-Total ( 3 ) Rp 2,004.21
Pekerjaan : PENGECATAN
Jenis Pembayaran : Cat Antikarat permukaan baja, dengan zinchromate
Satuan Pembayaran : Kg
Harga Satuan : Rp 1,502.75
AHSP-XII-006
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.0035 Rp 70,000.00 Rp 245.00
Tukang cat OH 0.0045 Rp 90,000.00 Rp 405.00
Kepala tukang OH 0.0003 Rp 100,000.00 Rp 30.00
Mandor OH 0.0001 Rp 110,000.00 Rp 13.75
Sub-Total ( 1 ) Rp 693.75
2 Bahan
Cat zinchromate kg 0.0150 Rp 40,000.00 Rp 600.00
Minyak cat/ thinner ltr 0.0050 Rp 23,700.00 Rp 118.50
Amplas lbr 0.0200 Rp 3,400.00 Rp 68.00
kuas bh 0.0015 Rp 15,000.00 Rp 22.50
Sub-Total ( 2 ) Rp 809.00
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : PENGECATAN
Jenis Pembayaran : Cat Antikarat permukaan baja, dengan zinchromate
Satuan Pembayaran : M2
Harga Satuan : Rp 30,055.00
AHSP-XII-007
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.0700 Rp 70,000.00 Rp 4,900.00
Tukang cat OH 0.0900 Rp 90,000.00 Rp 8,100.00
Kepala tukang OH 0.0060 Rp 100,000.00 Rp 600.00
Mandor OH 0.0025 Rp 110,000.00 Rp 275.00
Sub-Total ( 1 ) Rp 13,875.00
2 Bahan
Cat zinchromate kg 0.3000 Rp 40,000.00 Rp 12,000.00
Minyak cat/ thinner ltr 0.1000 Rp 23,700.00 Rp 2,370.00
Amplas lbr 0.4000 Rp 3,400.00 Rp 1,360.00
kuas bh 0.0300 Rp 15,000.00 Rp 450.00
Sub-Total ( 2 ) Rp 16,180.00
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : PENGECATAN
Jenis Pembayaran : Pek Cat finish, permukaan baja
Satuan Pembayaran : Kg
Harga Satuan : Rp 1,603.58
AHSP-XII-008
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.0035 Rp 70,000.00 Rp 245.00
Tukang cat OH 0.0045 Rp 90,000.00 Rp 405.00
Kepala tukang OH 0.0003 Rp 100,000.00 Rp 30.00
Mandor OH 0.0001 Rp 110,000.00 Rp 13.75
Sub-Total ( 1 ) Rp 693.75
2 Bahan
Cat Kayu/besi (ICI Dulux Super Gloss) kg 0.0150 Rp 46,722.00 Rp 700.83
Minyak cat/ thinner ltr 0.0050 Rp 23,700.00 Rp 118.50
Amplas lbr 0.0200 Rp 3,400.00 Rp 68.00
kuas bh 0.0015 Rp 15,000.00 Rp 22.50
Sub-Total ( 2 ) Rp 909.83
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : PENGECATAN
Jenis Pembayaran : Pengecatan Cat Kayu / besi
Satuan Pembayaran : M2
Harga Satuan : Rp 49,418.21
AHSP-XII-009
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.1000 Rp 70,000.00 Rp 7,000.00
Tukang cat OH 0.1000 Rp 90,000.00 Rp 9,000.00
Kepala tukang OH 0.0050 Rp 100,000.00 Rp 500.00
Mandor OH 0.0050 Rp 110,000.00 Rp 550.00
Sub-Total ( 1 ) Rp 17,050.00
2 Bahan
Cat Kayu/besi (ICI Dulux Super Gloss) kg 0.4300 Rp 46,722.00 Rp 20,090.46
Dempul kayu / besi kg 0.1500 Rp 22,585.00 Rp 3,387.75
Minyak cat/ thinner ltr 0.2000 Rp 23,700.00 Rp 4,740.00
Amplas lbr 1.0000 Rp 3,400.00 Rp 3,400.00
Kuas bh 0.0500 Rp 15,000.00 Rp 750.00
Sub-Total ( 2 ) Rp 32,368.21
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : PENGECATAN
Jenis Pembayaran : Finishing Cat Duco
Satuan Pembayaran : M2
Harga Satuan : Rp 149,155.00
AHSP-XII-010
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.4000 Rp 70,000.00 Rp 28,000.00
Tukang cat OH 0.4000 Rp 90,000.00 Rp 36,000.00
Kepala tukang OH 0.0400 Rp 100,000.00 Rp 4,000.00
Mandor OH 0.0040 Rp 110,000.00 Rp 440.00
Sub-Total ( 1 ) Rp 68,440.00
2 Bahan
Cat Duco Nipple 2000 Kg 0.4000 Rp 55,575.00 Rp 22,230.00
Dempul Duco Kg 0.7500 Rp 30,300.00 Rp 22,725.00
Tinner Up ltr 0.8000 Rp 23,700.00 Rp 18,960.00
Amplas besi Bh 2.0000 Rp 3,400.00 Rp 6,800.00
Sub-Total ( 2 ) Rp 70,715.00
3 Peralatan
Alat semprot Ls 1.0000 Rp 10,000.00 Rp 10,000.00
Sub-Total ( 3 ) Rp 10,000.00
Pekerjaan : PENGECATAN
Jenis Pembayaran : Finishing Cat Melamik
Satuan Pembayaran : M2
Harga Satuan : Rp 134,673.55
AHSP-XII-011
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.3000 Rp 70,000.00 Rp 21,000.00
Tukang cat OH 0.3000 Rp 90,000.00 Rp 27,000.00
Kepala tukang OH 0.0300 Rp 100,000.00 Rp 3,000.00
Mandor OH 0.0030 Rp 110,000.00 Rp 330.00
Sub-Total ( 1 ) Rp 51,330.00
2 Bahan
Wood Filler Ultran Kg 0.250 Rp 50,000.00 Rp 12,500.00
Sending sealer Impra Kg 0.150 Rp 76,142.00 Rp 11,421.30
Cat warna Ultran Kg 0.150 Rp 58,500.00 Rp 8,775.00
Melamik Impra Kg 0.350 Rp 42,535.00 Rp 14,887.25
Tinner (High class) Kg 0.800 Rp 23,700.00 Rp 18,960.00
Amplas besi Bh 2.000 Rp 3,400.00 Rp 6,800.00
Sub-Total ( 2 ) Rp 73,343.55
3 Peralatan
Alat semprot Ls 1.0000 Rp 10,000.00 Rp 10,000.00
Sub-Total ( 3 ) Rp 10,000.00
Pekerjaan : SALURAN
Jenis Pembayaran : Saluran terbuka, pas bata + buis beton 1/2 ф 30 cm,
Satuan Pembayaran : M'
Harga Satuan : Rp 274,116.34
AHSP-XIII-001
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.5000 Rp 70,000.00 Rp 35,000.00
Tukang batu OH 0.1000 Rp 90,000.00 Rp 9,000.00
Kep. Tukang OH 0.0100 Rp 100,000.00 Rp 1,000.00
Mandor OH 0.0050 Rp 110,000.00 Rp 550.00
Sub-Total ( 1 ) Rp 45,550.00
2 Bahan
Dinding dari pas batu bata 1Pc : 5Ps M2 1.0000 Rp 100,655.78 Rp 100,655.78
Pas. Bata sambungan buis beton M2 0.1200 Rp 100,655.78 Rp 12,078.69
Plesteran dinding bata M2 1.0000 Rp 50,051.86 Rp 50,051.86
Buis beton 1/2 dia 30 cm, @ panjang 1 m bh 1.0000 Rp 65,780.00 Rp 65,780.00
Sub-Total ( 2 ) Rp 228,566.34
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : SALURAN
Jenis Pembayaran : Saluran tertutup, pas bata + buis beton 1/2 ф 30 cm, +
tutup plat beton 10 cm
Satuan Pembayaran : M'
Harga Satuan : Rp 328,456.04
AHSP-XIII-002
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.5000 Rp 70,000.00 Rp 35,000.00
Tukang Batu OH 0.1000 Rp 90,000.00 Rp 9,000.00
Kepala Tukang Batu OH 0.0100 Rp 100,000.00 Rp 1,000.00
Mandor OH 0.0050 Rp 110,000.00 Rp 550.00
Sub-Total ( 1 ) Rp 45,550.00
2 Bahan
Dinding dari pas batu bata 1Pc : 5Ps M2 1.0000 Rp 100,655.78 Rp 100,655.78
Pas. Bata sambungan buis beton M2 0.1200 Rp 100,655.78 Rp 12,078.69
Plesteran dinding bata M2 1.0000 Rp 50,051.86 Rp 50,051.86
Buis beton 1/2 dia 30 cm, @ panjang 1 m bh 1.0000 Rp 65,780.00 Rp 65,780.00
Tutup beton tulang tebal 10 cm M3 0.0600 Rp 905,661.72 Rp 54,339.70
Sub-Total ( 2 ) Rp 282,906.04
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : SALURAN
Jenis Pembayaran : Saluran tertutup, pas bata + buis beton 1/2 ф 30 cm, +
tutup plat beton 15 cm
Satuan Pembayaran : M'
Harga Satuan : Rp 355,625.89
AHSP-XIII-003
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.5000 Rp 70,000.00 Rp 35,000.00
Tukang Batu OH 0.1000 Rp 90,000.00 Rp 9,000.00
Kepala Tukang Batu OH 0.0100 Rp 100,000.00 Rp 1,000.00
Mandor OH 0.0050 Rp 110,000.00 Rp 550.00
Sub-Total ( 1 ) Rp 45,550.00
2 Bahan
Dinding dari pas batu bata 1Pc : 5Ps M2 1.0000 Rp 100,655.78 Rp 100,655.78
Pas. Bata sambungan buis beton M2 0.1200 Rp 100,655.78 Rp 12,078.69
Plesteran dinding bata M2 1.0000 Rp 50,051.86 Rp 50,051.86
Buis beton 1/2 dia 30 cm, @ panjang 1 m bh 1.0000 Rp 65,780.00 Rp 65,780.00
Tutup beton tulang tebal 15 cm M3 0.0900 Rp 905,661.72 Rp 81,509.55
Sub-Total ( 2 ) Rp 310,075.89
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : SALURAN
Jenis Pembayaran : Saluran Tertutup (U Ditch uk. 40x40x120 cm + tutup)
Satuan Pembayaran : M'
Harga Satuan : Rp 688,025.10
AHSP-XIII-004
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 1.0000 Rp 70,000.00 Rp 70,000.00
Tukang Batu OH 0.4000 Rp 90,000.00 Rp 36,000.00
Kepala Tukang Batu OH 0.0400 Rp 100,000.00 Rp 4,000.00
Mandor OH 0.0500 Rp 110,000.00 Rp 5,500.00
Sub-Total ( 1 ) Rp 115,500.00
2 Bahan
Saluran U Ditch uk. 40x40x120 cm bh 1.0000 Rp 197,472.00 Rp 197,472.00
Tutup saluran U.40 @ 60 cm HD bh 2.0000 Rp 89,500.00 Rp 179,000.00
Semen portland kg 91.6000 Rp 1,471.00 Rp 134,743.60
Pasir pasang m³ 0.2750 Rp 183,700.00 Rp 50,517.50
Pasir urug m³ 0.0800 Rp 134,900.00 Rp 10,792.00
Sub-Total ( 2 ) Rp 572,525.10
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : SALURAN
Jenis Pembayaran : Saluran Tertutup (U Ditch, uk. 40x60x120 cm + tutup)
Satuan Pembayaran : M'
Harga Satuan : Rp 801,281.10
AHSP-XIII-005
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 1.0000 Rp 70,000.00 Rp 70,000.00
Tukang Batu OH 0.4000 Rp 90,000.00 Rp 36,000.00
Kepala Tukang Batu OH 0.0400 Rp 100,000.00 Rp 4,000.00
Mandor OH 0.0500 Rp 110,000.00 Rp 5,500.00
Sub-Total ( 1 ) Rp 115,500.00
2 Bahan
Saluran U Ditch uk. 40x60x120 cm bh 1.0000 Rp 310,728.00 Rp 310,728.00
Tutup saluran U.40 @ 60 cm HD bh 2.0000 Rp 89,500.00 Rp 179,000.00
Semen portland kg 91.6000 Rp 1,471.00 Rp 134,743.60
Pasir pasang m³ 0.2750 Rp 183,700.00 Rp 50,517.50
Pasir urug m³ 0.0800 Rp 134,900.00 Rp 10,792.00
Sub-Total ( 2 ) Rp 685,781.10
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : SALURAN
Jenis Pembayaran : Saluran Terbuka (U Ditch, uk. 40x60x120 cm)
Satuan Pembayaran : M'
Harga Satuan : Rp 608,281.10
AHSP-XIII-05A
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.8000 Rp 70,000.00 Rp 56,000.00
Tukang Batu OH 0.4000 Rp 90,000.00 Rp 36,000.00
Kepala Tukang Batu OH 0.0400 Rp 100,000.00 Rp 4,000.00
Mandor OH 0.0500 Rp 110,000.00 Rp 5,500.00
Sub-Total ( 1 ) Rp 101,500.00
2 Bahan
Saluran U Ditch uk. 40x60x120 cm bh 1.0000 Rp 310,728.00 Rp 310,728.00
Semen portland kg 91.6000 Rp 1,471.00 Rp 134,743.60
Pasir pasang m³ 0.2750 Rp 183,700.00 Rp 50,517.50
Pasir urug m³ 0.0800 Rp 134,900.00 Rp 10,792.00
Sub-Total ( 2 ) Rp 506,781.10
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : SALURAN
Jenis Pembayaran : Saluran Tertutup (U Ditch, uk. 60x80x120 cm + tutup)
Satuan Pembayaran : M'
Harga Satuan : Rp 1,019,185.10
AHSP-XIII-006
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 1.0000 Rp 70,000.00 Rp 70,000.00
Tukang Batu OH 0.4000 Rp 90,000.00 Rp 36,000.00
Kepala Tukang Batu OH 0.0400 Rp 100,000.00 Rp 4,000.00
Mandor OH 0.0500 Rp 110,000.00 Rp 5,500.00
Sub-Total ( 1 ) Rp 115,500.00
2 Bahan
Saluran U Ditch uk. 60x80x120 cm bh 1.0000 Rp 434,632.00 Rp 434,632.00
Tutup saluran U.60 @ 60 cm HD bh 2.0000 Rp 136,500.00 Rp 273,000.00
Semen portland kg 91.6000 Rp 1,471.00 Rp 134,743.60
Pasir pasang m³ 0.2750 Rp 183,700.00 Rp 50,517.50
Pasir urug m³ 0.0800 Rp 134,900.00 Rp 10,792.00
Sub-Total ( 2 ) Rp 903,685.10
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : SALURAN
Jenis Pembayaran : Saluran Terbuka (U Ditch, uk. 60x80x120 cm)
Satuan Pembayaran : M'
Harga Satuan : Rp 732,185.10
AHSP-XIII-06A
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 0.8000 Rp 70,000.00 Rp 56,000.00
Tukang Batu OH 0.4000 Rp 90,000.00 Rp 36,000.00
Kepala Tukang Batu OH 0.0400 Rp 100,000.00 Rp 4,000.00
Mandor OH 0.0500 Rp 110,000.00 Rp 5,500.00
Sub-Total ( 1 ) Rp 101,500.00
2 Bahan
Saluran U Ditch uk. 60x80x120 cm bh 1.0000 Rp 434,632.00 Rp 434,632.00
Semen portland kg 91.6000 Rp 1,471.00 Rp 134,743.60
Pasir pasang m³ 0.2750 Rp 183,700.00 Rp 50,517.50
Pasir urug m³ 0.0800 Rp 134,900.00 Rp 10,792.00
Sub-Total ( 2 ) Rp 630,685.10
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : SALURAN
Jenis Pembayaran : Saluran Tertutup (U Ditch, uk. 80x100x120 cm + tutup)
Satuan Pembayaran : M'
Harga Satuan : Rp 1,339,121.10
AHSP-XIII-007
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 1.0000 Rp 70,000.00 Rp 70,000.00
Tukang Batu OH 0.4000 Rp 90,000.00 Rp 36,000.00
Kepala Tukang Batu OH 0.0400 Rp 100,000.00 Rp 4,000.00
Mandor OH 0.0500 Rp 110,000.00 Rp 5,500.00
Sub-Total ( 1 ) Rp 115,500.00
2 Bahan
Saluran U Ditch uk. 80x100x120 cm bh 1.0000 Rp 678,568.00 Rp 678,568.00
Tutup saluran U.80 @ 60 cm HD bh 2.0000 Rp 174,500.00 Rp 349,000.00
Semen portland kg 91.6000 Rp 1,471.00 Rp 134,743.60
Pasir pasang m³ 0.2750 Rp 183,700.00 Rp 50,517.50
Pasir urug m³ 0.0800 Rp 134,900.00 Rp 10,792.00
Sub-Total ( 2 ) Rp 1,223,621.10
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : SALURAN
Jenis Pembayaran : Saluran Tertutup (U Ditch, uk. 100x120x120 cm + tutup)
Satuan Pembayaran : M'
Harga Satuan : Rp 1,997,713.10
AHSP-XIII-008
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Pekerja OH 1.0000 Rp 70,000.00 Rp 70,000.00
Tukang Batu OH 0.4000 Rp 90,000.00 Rp 36,000.00
Kepala Tukang Batu OH 0.0400 Rp 100,000.00 Rp 4,000.00
Mandor OH 0.0500 Rp 110,000.00 Rp 5,500.00
Sub-Total ( 1 ) Rp 115,500.00
2 Bahan
Saluran U Ditch uk. 100x120x120 cm bh 1.0000 Rp 1,161,160.00 Rp 1,161,160.00
Tutup saluran U.100 @ 60 cm HD bh 2.0000 Rp 262,500.00 Rp 525,000.00
Semen portland kg 91.6000 Rp 1,471.00 Rp 134,743.60
Pasir pasang m³ 0.2750 Rp 183,700.00 Rp 50,517.50
Pasir urug m³ 0.0800 Rp 134,900.00 Rp 10,792.00
Sub-Total ( 2 ) Rp 1,882,213.10
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : SALURAN
Jenis Pembayaran : Bak Kontrol uk 40 x 40 cm
Satuan Pembayaran : Unit
Harga Satuan : Rp 307,623.57
AHSP-XIII-009
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Sub-Total ( 1 ) Rp -
2 Bahan
Beton K-250 m3 0.0960 Rp 905,661.72 Rp 86,943.52
Besi U39 kg 14.4000 Rp 9,904.33 Rp 142,622.35
Bekesting m2 0.6400 Rp 120,278.90 Rp 76,978.50
Pasir urug m3 0.0080 Rp 134,900.00 Rp 1,079.20
Sub-Total ( 2 ) Rp 307,623.57
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : SALURAN
Jenis Pembayaran : Bak Kontrol uk 60 x 60 cm
Satuan Pembayaran : Unit
Harga Satuan : Rp 692,153.04
AHSP-XIII-010
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Sub-Total ( 1 ) Rp -
2 Bahan
Beton K-250 m3 0.2160 Rp 905,661.72 Rp 195,622.93
Besi U39 kg 32.4000 Rp 9,904.33 Rp 320,900.29
Bekesting m2 1.4400 Rp 120,278.90 Rp 173,201.62
Pasir urug m3 0.0180 Rp 134,900.00 Rp 2,428.20
Sub-Total ( 2 ) Rp 692,153.04
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : SALURAN
Jenis Pembayaran : Bak Kontrol uk 80 x 80 cm
Satuan Pembayaran : Unit
Harga Satuan : Rp 1,230,494.29
AHSP-XIII-011
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Sub-Total ( 1 ) Rp -
2 Bahan
Beton K-250 m3 0.3840 Rp 905,661.72 Rp 347,774.10
Besi U39 kg 57.6000 Rp 9,904.33 Rp 570,489.41
Bekesting m2 2.5600 Rp 120,278.90 Rp 307,913.98
Pasir urug m3 0.0320 Rp 134,900.00 Rp 4,316.80
Sub-Total ( 2 ) Rp 1,230,494.29
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : SALURAN
Jenis Pembayaran : Bak Kontrol uk 100 x 100 cm
Satuan Pembayaran : Unit
Harga Satuan : Rp 1,922,647.33
AHSP-XIII-012
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Sub-Total ( 1 ) Rp -
2 Bahan
Beton K-250 m3 0.6000 Rp 905,661.72 Rp 543,397.03
Besi U39 kg 90.0000 Rp 9,904.33 Rp 891,389.70
Bekesting m2 4.0000 Rp 120,278.90 Rp 481,115.60
Pasir urug m3 0.0500 Rp 134,900.00 Rp 6,745.00
Sub-Total ( 2 ) Rp 1,922,647.33
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : SALURAN
Jenis Pembayaran : Ducting beton 2100x1800 tebal 12 cm
Satuan Pembayaran : M'
Harga Satuan : Rp 6,414,896.89
AHSP-XIII-013
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Sub-Total ( 1 ) Rp -
Bahan
1 Ducting Beton
Beton K-250 m³ 0.9810 Rp 905,661.72 Rp 888,454.14
Besi beton kg 99.5790 Rp 9,904.33 Rp 986,263.28
Bekisting dinding m2 10.2000 Rp 266,617.80 Rp 2,719,501.56
Pasir urug alas saluran m³ 0.1800 Rp 134,900.00 Rp 24,282.00
2 Bracket
Bracket besi siku 50.5.5 (6 unit/m') kg 18.0960 Rp 21,167.50 Rp 383,047.08
Finishing cat besi siku (zinkromate) m2 10.0800 Rp 30,055.00 Rp 302,954.40
Dinabolt 10 mm bh 24.0000 Rp 20,000.00 Rp 480,000.00
3 Beton tumbuk dudukan pipa m3 0.1200 Rp 669,953.56 Rp 80,394.43
4 Karet Rubbering pcs 1.0000 Rp 550,000.00 Rp 550,000.00
Sub-Total ( 2 ) Rp 6,414,896.89
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : SALURAN
Jenis Pembayaran : Ducting beton 2300x1800 tebal 20 cm
Satuan Pembayaran : M'
Harga Satuan : Rp 7,365,697.92
AHSP-XIII-014
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Sub-Total ( 1 ) Rp -
2 Bahan
1 Ducting Beton
Beton K-250 m³ 1.7650 Rp 905,661.72 Rp 1,598,492.93
Besi beton kg 102.3523 Rp 9,904.33 Rp 1,013,731.29
Bekisting dinding m2 11.0000 Rp 266,617.80 Rp 2,932,795.80
Pasir urug alas saluran m³ 0.1800 Rp 134,900.00 Rp 24,282.00
2 Bracket
Bracket besi siku 50.5.5 (6 unit/m') kg 18.0960 Rp 21,167.50 Rp 383,047.08
Finishing cat besi siku (zinkromate) m2 10.0800 Rp 30,055.00 Rp 302,954.40
Dinabolt 10 mm bh 24.0000 Rp 20,000.00 Rp 480,000.00
3 Beton tumbuk dudukan pipa ad 1 : 3 : 5 m3 0.1200 Rp 669,953.56 Rp 80,394.43
4 Karet Rubbering pcs 1.0000 Rp 550,000.00 Rp 550,000.00
Sub-Total ( 2 ) Rp 7,365,697.92
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : SALURAN
Jenis Pembayaran : Bak Kontrol Ducting beton Type persimpangan 2
Satuan Pembayaran : Unit
Harga Satuan : Rp 15,692,366.99
AHSP-XIII-015
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Sub-Total ( 1 ) Rp -
2 Bahan
1 Ducting Beton
Beton K-250 m³ 2.3080 Rp 905,661.72 Rp 2,090,267.24
Besi beton kg 275.7636 Rp 9,904.33 Rp 2,731,253.70
Bekisting dinding (2x pakai) m2 5.9550 Rp 266,617.80 Rp 1,587,709.00
Pasir urug alas saluran m³ 0.4410 Rp 134,900.00 Rp 59,490.90
2 Toping Ducting
Beton K-250 m³ 1.7280 Rp 905,661.72 Rp 1,564,983.44
Besi beton kg 162.3872 Rp 9,904.33 Rp 1,608,336.42
Bekisting dinding (2x pakai) m2 2.8800 Rp 266,617.80 Rp 767,859.26
3 Bracket
Bracket besi siku 50.5.5 (6 unit/m') kg 40.7160 Rp 21,167.50 Rp 861,855.93
Finishing cat besi siku (zinkromate) m2 22.6800 Rp 30,055.00 Rp 681,647.40
Dinabolt 10 mm bh 24.0000 Rp 20,000.00 Rp 480,000.00
4 Beton tumbuk dudukan pipa m3 0.2040 Rp 669,953.56 Rp 136,670.53
5 Tangga pipa GIP dia 2" bh 1.0000 Rp 1,000,000.00 Rp 1,000,000.00
6 Tutup Kontrol
Tutup bak kontrol, besi plat tebal 19 mm kg 98.4444 Rp 21,167.50 Rp 2,083,822.78
Finishing cat besi siku (zinkromate) m2 1.2800 Rp 30,055.00 Rp 38,470.40
Sub-Total ( 2 ) Rp 15,692,366.99
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : SALURAN
Jenis Pembayaran : Bak Kontrol Ducting beton Type persimpangan 3
Satuan Pembayaran : Unit
Harga Satuan : Rp 15,456,189.87
AHSP-XIII-016
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Sub-Total ( 1 ) Rp -
2 Bahan
1 Ducting Beton
Beton K-250 m³ 2.0213 Rp 905,661.72 Rp 1,830,568.74
Besi beton kg 279.7320 Rp 9,904.33 Rp 2,770,558.37
Bekisting dinding (2x pakai) m2 5.9550 Rp 266,617.80 Rp 1,587,709.00
Pasir urug alas saluran m³ 0.3240 Rp 134,900.00 Rp 43,707.60
2 Toping Ducting
Beton K-250 m³ 1.7280 Rp 905,661.72 Rp 1,564,983.44
Besi beton kg 162.3872 Rp 9,904.33 Rp 1,608,336.42
Bekisting dinding (2x pakai) m2 2.8800 Rp 266,617.80 Rp 767,859.26
3 Bracket
Bracket besi siku 50.5.5 (6 unit/m') kg 40.7160 Rp 21,167.50 Rp 861,855.93
Finishing cat besi siku (zinkromate) m2 22.6800 Rp 30,055.00 Rp 681,647.40
Dinabolt 10 mm bh 24.0000 Rp 20,000.00 Rp 480,000.00
4 Beton tumbuk dudukan pipa m3 0.2040 Rp 669,953.56 Rp 136,670.53
5 Tangga pipa GIP dia 2" bh 1.0000 Rp 1,000,000.00 Rp 1,000,000.00
6 Tutup Kontrol
Tutup bak kontrol, besi plat tebal 19 mm kg 98.4444 Rp 21,167.50 Rp 2,083,822.78
Finishing cat besi siku (zinkromate) m2 1.2800 Rp 30,055.00 Rp 38,470.40
Sub-Total ( 2 ) Rp 15,456,189.87
3 Peralatan
Sub-Total ( 3 ) Rp -
Pekerjaan : SALURAN
Jenis Pembayaran : Bak Kontrol Ducting beton Type persimpangan 4 (PIT)
Satuan Pembayaran : Unit
Harga Satuan : Rp 18,300,561.99
AHSP-XIII-016
Harga Satuan
No Komponen Satuan Volume Jumlah Harga (Rp)
(Rp)
1 Tenaga
Sub-Total ( 1 ) Rp -
2 Bahan
1 Ducting Beton
Beton K-250 m³ 3.7960 Rp 905,661.72 Rp 3,437,891.87
Besi beton kg 402.4526 Rp 9,904.33 Rp 3,986,023.36
Bekisting dinding (2x pakai) m2 5.9550 Rp 266,617.80 Rp 1,587,709.00
Pasir urug alas saluran m³ 0.4840 Rp 134,900.00 Rp 65,291.60
2 Toping Ducting
Beton K-250 m³ 1.7280 Rp 905,661.72 Rp 1,564,983.44
Besi beton kg 162.3872 Rp 9,904.33 Rp 1,608,336.42
Bekisting dinding (2x pakai) m2 2.8800 Rp 266,617.80 Rp 767,859.26
3 Bracket
Bracket besi siku 50.5.5 (6 unit/m') kg 40.7160 Rp 21,167.50 Rp 861,855.93
Finishing cat besi siku (zinkromate) m2 22.6800 Rp 30,055.00 Rp 681,647.40
Dinabolt 10 mm bh 24.0000 Rp 20,000.00 Rp 480,000.00
4 Beton tumbuk dudukan pipa m3 0.2040 Rp 669,953.56 Rp 136,670.53
5 Tangga pipa GIP dia 2" bh 1.0000 Rp 1,000,000.00 Rp 1,000,000.00
6 Tutup Kontrol
Tutup bak kontrol, besi plat tebal 19 mm kg 98.4444 Rp 21,167.50 Rp 2,083,822.78
Finishing cat besi siku (zinkromate) m2 1.2800 Rp 30,055.00 Rp 38,470.40
Sub-Total ( 2 ) Rp 18,300,561.99
3 Peralatan
Sub-Total ( 3 ) Rp -
T O T A L 266.17 m3
2 Galian tanah Tie Beam
- Tie-Beam TB-1 (400x800) 0.70 x 181.10 x 1.10 = 139.45 m3
- Tie-Beam TB-2 (400x800) 0.70 x 248.50 x 1.10 = 191.35 m3
- Tie-Beam TB-3 (400x900) 0.70 x 116.80 x 1.20 = 98.11 m3
T O T A L 330.79 m3
TULANGAN KOLOM
NO TYPE KOLOM TULANGAN RINCIAN BERAT / M' TTL BRT BESI
TULANGAN TANGGA
NO TYPE KOLOM TULANGAN RINCIAN BERAT / M' TTL BRT BESI
STOR Y DATA
54
457 0
54
457 0
54
457 0
54
457 0
54
408 0
56
445 0
326
2681 0
3007 0
THERMAL SHEAR
COEFF MODULUS
1.17E-05 76884615.4
9.90E-06 10342136.8
1.17E-05 76903068.8
9.90E-06 10342136.8
ALS
ERIALS
RENCANA ANGGARAN BIAYA