www.PDHcenter.com PDH Course M143 www.PDHonline.

org

Note: Equipment of equal size, tonnage or horsepower will have a lower amperage draw

if higher voltage models are used.

4
CERTIFICATION REQUIRMENTS
The clean room certification and acceptance procedures shall be in accordance with NEBB

Procedural Standards for Certified Testing of Clean rooms.

Qualified clean room performance testing (CPT) firm shall undertake the following tests for

certification.

#" Airflow Velocity and Uniformity Tests

#" HEPA Filter Installation Leak Tests

#" Room Particle Count Tests

#" Enclosure Pressurization Tests

#" Temperature and Humidity Uniformity Tests

#" Sound and Vibration Tests

#" Light Level and Uniformity Tests

#" Recovery Tests

#" Conductivity Tests

#" Particle Fallout Count Tests

#" Electrostatic Tests

System Design Example

Consider a manufacturing facility, which is divided into 3 separate zones according to

application and cleanliness requirements.

Page 32 of 61