800 KG (Car 1400 X 1350)

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

Vertical

Vertical Section B A
Section
Section A-A Section B-B

ACVF
Drive
Top Plan
BS=1875
1700

SG=147 BK=1400
HSK=3650

HSK=3650
Lcar-rail= 3100

Lcar_rail=3100
CBD
HK=2350

HK=2350
200
HT=2100

Drive

GBP

TS=1700
TKSW=900

1100
ACVF
COP

TSW=90
Controller LDU

TKS=30
HQ=

on top floor
A=120 BT=800 70

Permanent Lighting on the top floor


ceiling adjacent to controller.
Electric lighting on the basis of at least
CONSTRUCTIONAL ARRANGEMENT
200Lux
at floor level, light switch. Not supplied Contract No./Lift No.
by Schindler.
/
Type of Lift Schindler 3300 AP

Rated Capacity kg Rated Speed m/s

Shaft Rise m No.of Passengers

No. of Stops Stops

Plan
No. of Lifts

Motor Power kW Nominal Current A


Other landings
1st CWT guide rail length 4247

Metal pit ladder from pit Max.Starting Current A Heat From Single Elevator kcal/h
1st car guide rail length=4247

(Except top landing) floor. 1500mm above


FFL of first floor level. Main power fuse A/Unit Light power fuse A/Unit
BS=1875 Supplied by Schindler 20
SG=147 148 BKS=1460 SF=233 Load on the following points <N>

BK=1400
F1 F5 F9 68000 F18 31000
CWT. Screen=2250

>=1500
BSK=1025 F2 F6 F10 27000
F3 F7 F16 42000
HKP=100

F4 F8 42000 F17 31000


CLIENT
HGP=100

PROJECT
HSG=1200

HSG=1200
BGS=1030

TK=1350
TS=1700

TKA=105

Attention! Do Not Scale This Drawing.

380
Drawing No.
COP
270

HSS1=607
HSS2=125

Page Total
TS=1700 Myanmar Jardine Schindler
Limited
TSW=90

Drawing
TKS=30

70 BT=800 70 Review

Approved

Date
B A Modification

Date
ADF version:2012.06.20 by using ADF version
XML data and
3.2_Ae0 SchindlerDraw version:
Detail viewH BY CLIENT
3 lifting hooks on ceiling above 1. General requirement

100
Ventilation window with water
protected louver on the outside Vertical Section Lighting at the top shaft,
min. 200Lux, Other
F8, F9, F16, with safety working
load (SWL) 20kN, the hooks shall
be labeled SWL 20kN, or a label

150
of the shaft and mesh fixed with floors bottom up min. adjacent to the hooks. Not
grid no bigger than 25x25mm 50Lux, distance <=7 150 supplied by Schindler
from within the shaft. Area is not meters. Distance to
Landing Door Cut Out

L and Z bracket= 445


ceiling <= 500mm. Not
by architect supplied by Schindler
E Section
Top landing

400
Concrete

300
Detail view "H"
slab, for
L landing
door fixation

2215 Finished floor level

2215 Finished floor level


Bracket

240
2. Requirements to the power

150
HSK=3650

1100
F.F.L.
Finished

2055
180 floor level

60
E
2215

200
3. Requirements to the shaft

200
is +/-25mm.
600

398 1030 447


Other Floor

400
2000

LIN-H Cutout

35
Concrete
HQ=

110 80 slab, for

225
landing
door fixation

2215 Finished floor level

2215 Finished floor level


Fire Box Cutout, depth
110, on main floor only
EN81-1998

1738
150

1100
F.F.L.
Finished
floor level

200
448 980 447
HF2=1650
1st CWT guide rail length 4247

Pit Plan
1st car guide rail length=4247

Shaft light, no more than


500mm above pit floor. Not
supplied by Schindler
BS=1875
Drawing No.
295 BKS=1460 100
SG=147 3 lifting hooks on ceiling above F8, Contract No./Lift No.
F9, F16, with safety working load
(SWL) 20kN, the hooks shall be CLIENT
labeled SWL 20kN, or a label
adjacent to the hooks. Not supplied PROJECT
by Schindler
HSS2=125

F18
HSG=1200

Page Total
TS=1700

F9 Myanmar Jardine Schindler Limited


HSS1=607

F10 Drawing
Shaft light, no
more than F16 F8
500

Review
500mm above F10
900

340

pit floor. Not Approved


supplied by Metal pit ladder from pit floor.
F17 1500mm above FFL of first floor Date
Schindler
level. Supplied by Schindler Modification

Date

XML data and ADF version:2012.06.20 by using ADF version 3.2_Ae0 SchindlerDraw version: