100% found this document useful (3 votes)
2K views3 pages

Project Components and Operation Information PDF

This document provides details for a proposed livestock project that will have a maximum stock production of 51,500 animals per growing season. The project will include 6 cages or pens, facilities for gestating/nursery and hatchery purposes, support buildings, storage, waste management, and a drainage system. Utilities needed are electricity from the grid and generator, water from a local provider and well, with efficiency measures like rainwater collection. The project timelines include proposed dates for construction start and completion, commissioning, and commercial operation start. Initial investment cost estimates are provided in Philippine Pesos and U.S. Dollars.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (3 votes)
2K views3 pages

Project Components and Operation Information PDF

This document provides details for a proposed livestock project that will have a maximum stock production of 51,500 animals per growing season. The project will include 6 cages or pens, facilities for gestating/nursery and hatchery purposes, support buildings, storage, waste management, and a drainage system. Utilities needed are electricity from the grid and generator, water from a local provider and well, with efficiency measures like rainwater collection. The project timelines include proposed dates for construction start and completion, commissioning, and commercial operation start. Initial investment cost estimates are provided in Philippine Pesos and U.S. Dollars.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Initial Environmental Examination (IEE) Checklist Report Form for Livestock / Poultry Projects

LIVESTOCK ANIMAL INDUSTRY PROJECTS

I.2. PROJECT COMPONENTS

Maximum Stock Production (per growing season): FIFTY ONE THOUSAND FIVE HUNDRED (51,500)

Area
No. of
Facilities (sq./M)/ Specification/Description
Units
Capacity
Cages / Pens / Enclosures
6

1. Gestating/Nursery Compartment
/ Hatchery

2. Support Facilities (e.g. feeders,


generators, admin building,
workers’ quarter, etc.)

3. Storage facility

4. Water source / supply

5. Waste water management


Facility

6. Solid waste management facility

7. Drainage system

8. Others (please specify):

Use additional sheets, if necessary

I.3. UTILITIES/REQUIREMENTS (Operation Phase):

Estimated
Demand/ Projected Amount from
Utilities Source Breakdown
Consumption Source specified
(Total)
Grid KWh
Power/Electricity
KWh

Project Name: ____________________________________________________


Page 1 of 3
Initial Environmental Examination (IEE) Checklist Report Form for Livestock / Poultry Projects

Generator Set KWh

Others, please specify: KWh

Local Water Utility Provider m3/day

Well in: (specify location): m3/day

Spring in: (specify location): m3/day

Water
m3/day

River, Lake or other surface water : m3/day


(specify name & location)

Others, please specify: m3/day

Energy/Water Efficiency Measures (if any)

Proposed Efficiency/Conservation Estimated Savings for Estimated Total


Utilities
Measures each Measure Savings

Power/ Electricity KWh KWh

KWh

Water Rainwater collection system with total m3/day m3/day


capacity of

Project Name: ____________________________________________________


Page 2 of 3
Initial Environmental Examination (IEE) Checklist Report Form for Livestock / Poultry Projects

Others, please specify: m3/day

I.4. MANPOWER AND TIMELINES OF PROJECT PHASES

Proposed Start of Construction

Proposed Start of Commissioning

Proposed Start of Commercial Operation

Total Requirement
Phase Expertise/Skills Requirement per Expertise/Skill
per project phase
a. Construction

b. Operation

I.5. INDICATIVE PROJECT COST (Initial Investment)

PhP ______ ____ US $ ________ _____ (specify if with foreign investment)

Project Name: ____________________________________________________


Page 3 of 3

You might also like