Kamlshkumr KKSEPL

Download as pdf or txt
Download as pdf or txt
You are on page 1of 25

Kamlesh Kumar Singh Engineers Private Limited

Where Work Is Worship

H.No. 112, Refinery Township Road , Opp. Shiv Deep Public School,
VPO- Dadlana, Panipat-132140, Haryana
Tel. & Fax :- 91 1802577927
[email protected],[email protected]
Website :www.kksepl.com An ISO 9001:2008 Company
)

Introduction
01

Company Details
02

Key Personnel
03

Our Organisation
04

Our Services
05

List of Equipments
06

Our Credentials
07

Our Clients
08
01

Kamlesh Kumar Singh Engineers Private Limited Is incorporated under the


provision of the Companies Act 1956.

Our Company, Since Commencement of its Activities from 1989 executed


various project work to the entire satisfaction of the clients. The company
has earned a reputation of the Professional Competence, Business ethics and
courage in accepting the challenging works.

Strict Schedule Adherence

Skilled Manpower Quality Control as


per specification
3
2 4
Our Most economic
Maintaining HSE at
all front up to 1 Strength 5 price structure
s
standard
01

Our People

A
Our Team Consists many trained and
highly experienced engineers with
expertise in the fields of design,
planning, cost estimation , sourcing,
production, management and quality
assurance & control. They are ably
assisted by skilled technicians
spread across our locations.

Our Facilities
Our production facilities match the
best in the business. Among the key
in- house facilities we have Plasma
Arc Cutting Equipment, Pipe and
plate bending, dish end forming,
non-destructive testing, liquid
penetrate testing, magnetic particle
inspection, ultrasonic thickness
gauging Painting.
02

01 PAN AADCK5251H

02 GST 06AADCK5251H1ZO

03 PF ACC No. HR/KNL/36265

04 ESIC No. 13/45736/1001

05 Boiler Cert. IAH/0144/2009

Import Export
06 3309007812
Code

07 ISO 9001:2008 I/QSC-4574


03

Insert PIC Insert PIC Insert PIC

Kamlesh Kumar Singh Birendra Kumar Singh Anil Prasad Singh

Managing Director Director Operations Director - Technical

Bachelor of engineering
Graduated as a Bachelor
An Engineering graduate, worked with M/s Perton
of Engineering and work
founder of this company Engg. Construction Ltd
ing with this company
having more than 25 for 25 years and with IOT
since its inception. He is
years of experience in Engg. Projects Ltd for
having more than 25
Construction business more than 7 years. He
years of experience in the
successfully associated with this
field of project operation
company since 2013
03

Insert PIC

Saurav Kumar Singh

Director

An Engineering graduate,
having more than 6
years of experience in
Construction business
successfully
04

We have strong team of 550 professionally qualified staff and


6500 of total workmen highly skilled resources who are
distributed across firm
Managing Director

Director Operations Director

Business
Project Tender
Head HSE Developmen
Manager Management
t

Resident
Cons. HSE
Manager

Safety
Manager

Quality Human
Finance
Management Resource
04

Our financial records proves our company growth every year

INR
196,17,96,922

INR
128,85,88,484
INR 2019 -
107,46,69,000 2020
2017 -
2018 2018 -
2019
04

We strive through with strict policies and our employees are


well trained to adhere to these polices. Our organisation
flexible to follow our client policies as well
Health Safety & Environment (HSE) policy

▪ Deliver high quality Products & Services


conforming to specifications/ regulations of
national/ international standards through
continual improvement in Quality Management
System.
▪ Imparting Health, safety training and PPE to our
employees on the basis of site requirements to
ensure Zero Loss Time Injuries at site.

QA/QC Policy
▪ KKSEPL’s Quality Assurance and control function is
systematically applied by a cadre of highly trained and
qualified inspection personnel led by our corporate
examiner to ensure 100% compliance requirement
▪ During the last five years company has managed to
deliver quality products with zero defect as per
industrial standard up to the mark of various clients ,
Company strictly followed the QA/QC policy set-up
by their higher management , which is displayed here:
05

We offer range of services in mechanical, civil and electrical to


our clients and have large number of credentials for our work

Execution of Mechanical Work


The company is involved in executing grass root Mechanical work
related with fabrication erection of piping, installation and alignment of

1 rotary/ static equipment such as pumps, blowers, compressor, heat


exchangers etc, fabrication and erection of structural work related with
pipe rack and technological structure of plant. Major Such job
executed by us during recent past are listed for information elsewhere
in this presentation

Execution of Civil Work


M/s KKSEPL is also involved in executing civil work required for specific
2 plant. This Specific expertise of company avoid implementation of
multi agencies for individual plant and provides better coordination for
our Clients.

Execution of Heavy lift


Company During its experience has executed various critical lifts which
3 call for involvement of heavy duty crane, High standard rigging along
with précised lifting tackles.
05

Execution of Revamp Work


M/s KKSEPL has successfully executed few of revamp works, which are

4 Critically time bounded and directly related with Refinery Production ,


Such Revamp work involved multi discipline scope and massive
resource deployment related with Man- Power, Supervisors and Plant &
machineries.

Execution of Electrical & Instrumentation


M/s KKSEPL is also capable of executing E& I works required for
5 specific plant which excludes deployment of separate agency and
provides Single point coordination for Client.
05

Storage Tanks & Chimney


We fabricate and install highest quality storage tanks and proactive
6 services as per the specifications of our clients. We have got the
complete manufacturing facilities for all types of stainless steel
fabrication of the highest quality to meet any requirement of any plant
or project as per drawing and design in various shapes like:
Horizontal Storage tanks ( Floating Roof & Fixed Roof)
• Vertical Storage tanks
• Elliptical shaped Storage tanks
• Dished Shaped Storage tanks
• Flat Storage tanks
• Conical Head Storage tanks
Its further stainless steel equipment could be pressure vessels or any
other tanks required for industries.
We offer our clients a wide array of industry standard storage tanks
made from stainless steel , MS, Hastelloy, Titanium and Nickel. It is
available in wide capacities ranging from 500 liters to 70,000 liters. We
offer variety of storage tanks including Vertical and Storage Tanks.
Available in Various specifications, the collection is made available to
our clients as per their requirements . The Vertical Storage tanks are
variedly used in chemical and pharmaceutical industries.
06

We keep below machinery in-house to complete all types of project

Hydraulic Bundle Extractor – 40MT


1
Capacity
Hydraulic Excavator 3

Mobile Crane 320 1

Mobile Crane – 80 Ton Capacity 2

Pick & Carry Crane(F-15/equivalent) 45

Transit Mixer 2

Needle Vibrators - 6 Cu.m 6

Dumper – 6 Ton 2

Bar Cutting/ Bending Machine 4


06

Mixer Machine With Weigh Batcher 2

Water tankers 4

Total Station/Theodolite 2

Dumpy/Auto Level 4

Plate Compactor 3
Diesel Generator Set – Cap. 45 – 250
22
KVA
Hydraulic torque wrench;1.5’’
Square Drive with deep groove 5
socket of different sizes
Welding Machine 560

Grinding Machine 350


06

Hydraulic Jack 25

Hydro Testing Machine 50

Tractors & Tailors 25

Air Compressor 1

Plasma Cutting Machine 10

Office Containers 25

Torques Wrench 3
07

List of few works executed last ten years


Sr. Name of the Work & WO No. Client’s Name Contractor/PMC Executed Value Year Of
No. (LACs) Completion
1 Composite works for DHDS unit at IOCL, IOCL Thyssenkrupp 49,42,93,289 2018
Gujarat Refinery Industrial
Solution Service
India Pvt. Ltd.
2 Structural steel works for HURL Fertilizer, HURL Toyo Engineering 38,11,73,698 2020
Gorakhpur India Pvt. Ltd.
3 Composite works for Mechanical, Civil & IOCL 33,99,55,087 2016
structural jobs for Feed Preparation Unit
(FPU).
4 Composite works for BS-VI project at IOCL 41,50,60,896 2020
Mathura, UP
5 Reformer erection, reformer piping, IOCL Technip FMC 30,73,76,246 2020
equipment erection & balance piping,
structure and piping works for HGU at
Panipat, Haryana
6 Combined station work for conversion of IOCL 29,91,54,883 2018
existing UG piping in old tank farm to AG
piping alongwith associated at Vadinat
7 UG piping works at HURL, Gorakhpur HURL Toyo Engineering 21,75,22,243 2020
India Pvt. Ltd.
8 AG Piping & Mechanical works at Chambal Toyo Engineering 22,00,00,000 2018
CFCL,Gadepan Kota Fertilizer & India Pvt. Ltd.
Chemical Ltd.
07

List of few works executed last ten years

Sr. Name of the Work Client’s Contractor/ PMC Executed Value Year of
NO Name Completio
n
9 Civil & Strctural works for IOCL Thyssenkrupp 10,19,82,637 2018
SWS-VI unit for BS-IV project Industrial Solution
Service India Pvt. Ltd
10 Structure steel works at Chambal Toyo Engineering India 6,63,23,600 2018
CFCL,Gadepan Kota Fertilizer & Pvt. Ltd.
Rajasthan Chemical
Ltd.
11 Structure steel works at Chambal Toyo Engineering India 1,22,25,200 2018
CFCL,Gadepan Kota Fertilizer & Pvt. Ltd.
Rajasthan Chemical
Ltd.
12 Installation of flare stack Chambal Toyo Engineering India 27,05,040.00 2018
package at CFCL, Gadepan, Fertilizer & Pvt. Ltd.
Kota Rajasthan Chemical
Ltd.
13 Structure steel painting Chambal Toyo Engineering India 56,00,000 2018
works at CFCL,Gadepan Kota Fertilizer & Pvt. Ltd.
Rajasthan Chemical
Ltd.
14 Mechanical piping, Reliance 25,56,00,000 2017
equipment erection & Industries
associated work for MEG, C2 Ltd.
complex, J3 project
07

List of few works executed last ten years

Sr. Name of the Work Client’s Contractor/ PMC Executed Value Year of
NO Name Completio
n
15 Composite tender including IOCL Thyssenkrupp 24,15,48,947 2017
mechanical erection, piping, Industrial Solution
painting, insulation, Service India Pvt. Ltd.
electrical & instrumentation
work for DHDT unit for BS-
IV project
16 Composite works for piping, IOCL Technip FMC 20,78,62,388 2017
mechanical, civil &
structural, electrical &
instrumentation works for
DHDT revamp, NSU revamp,
FCC Gasoline
Desulfurization unit revamp,
PCK & LA unit
17 Structural steel & tankage Gujarat State Toyo Engineering India 8,24,09,870 2017
works for LNG Petrochemic Pvt. Ltd.
regassification project of al
M/s GSPC Corporation
18 Civil & Structural works for IOCL Engineers India Ltd. 8,22,00,000 2016
sub-station building works
07

List of few works executed last ten years

Sr. Name of the Work Client’s Contractor/ PMC Executed Value Year of
NO Name Completio
n
19 Site Fabricated cone rood IOCL 1,12,75,169 2016
DEG tank
20 Alloy steel piping works for IOCL Foster & wheeler 15,83,05,926 2015
LSTK-C of Paradip Refinery
21 AG piping works for PDR3 BASF Ltd. Toyo Engineering India 5,30,91,201 2015
project, PLL Pvt. Ltd.
22 Additional Structural steel IOCL Toyo Engineering India 40,42,85,975 2014
works for INDMAX (FCC) & Pvt. Ltd.
PRU (EPCM-4) at Paradip
23 Mechanical works for IOCL Engineers India Ltd. 17,14,69,412 2014
Butene-1 project at PNCP
24 Mechanical, Equipment & IOCL Technip FMC 13,26,79,942 2014
piping works for FCCU & PRU
Revamp project
25 AG Piping works at BASF, BASF Ltd. Toyo Engineering India 7,81,14,405 2014
Dahej Pvt. Ltd.
26 Equipment erection & piping IOCL Thyssenkrupp 15,11,36,630 2013
fabrication/erection work for Industrial Solution
reformer job at Praxair, Service India Pvt. Ltd.
Hydrogen plant
07

List of few works executed last ten years

Sr. Name of the Work Client’s Name Contractor/ PMC Executed Value Year of
NO Completio
n
27 AG piping works (ISBL)at SBR Indian Synthetic Toyo Engineering 10,03,86,388 2013
project Rubber Ltd. India Pvt. Ltd.
28 Structural works at SBR Indian Synthetic Toyo Engineering 5,39,90,870 2013
project Rubber Ltd. India Pvt. Ltd.
29 Civil & Structural works for IOCL Technip FMC 5,19,48,620 2013
FCCU & PRU revamp project
30 UG piping works at SBR Indian Synthetic Toyo Engineering 3,55,79,239 2013
project Rubber Ltd. India Pvt. Ltd.
31 AG piping works (OSBL)at Indian Synthetic Toyo Engineering 2,86,65,019 2013
SBR project Rubber Ltd. India Pvt. Ltd.
32 Mechanical work including IOCL IOT Engineering 23,51,00,000 2011
piping, structural, Projects Ltd.
equipment erection,
insulation & painting works
for CDU/VDU unit
07

List of concurrent projects


Sr. Name of the Work Client’s Name Contractor/ Order Value (Rs.) Completion
NO PMC stage

1 Mechanical, piping & Hindustan Urvarak Technip FMC 78,69,45,505 40%


structural work (Package 1 & Rasayan Ltd. Ltd.
&3) for HURL project Barauni
2 Mechanical, piping & str. Work Hindustan Urvarak Technip FMC 40,56,58,206 35%
(Package-3) for HURL project & Rasayan Ltd. Ltd.
Sindri, Jharkhand
3 Piping, mechanical, structure Indian Oil Technip FMC 61,41,75,356 95%
& other associated misc. Corporation Ltd.,
works for New NHT, CCR, NSU Barauni
& MS Blending units for BS-IV
project
4 Civil & str. Works for HGU at Indian Oil L&T 57,04,58,761 20%
Panipat Refinery Corporation Ltd.
5 Composite works at Mathura Indian Oil Engineers 9,03,10,159 20%
Refinery Corporation Ltd. India Ltd.
07

During the last five years company has managed to achieve 10


million zero loss of man-days in various projects spread out in
India. Few appreciation certificates are below
08

We have experience working with India we renowned clients


some are listed below

You might also like