Kamlshkumr KKSEPL
Kamlshkumr KKSEPL
Kamlshkumr KKSEPL
H.No. 112, Refinery Township Road , Opp. Shiv Deep Public School,
VPO- Dadlana, Panipat-132140, Haryana
Tel. & Fax :- 91 1802577927
[email protected],[email protected]
Website :www.kksepl.com An ISO 9001:2008 Company
)
Introduction
01
Company Details
02
Key Personnel
03
Our Organisation
04
Our Services
05
List of Equipments
06
Our Credentials
07
Our Clients
08
01
Our People
A
Our Team Consists many trained and
highly experienced engineers with
expertise in the fields of design,
planning, cost estimation , sourcing,
production, management and quality
assurance & control. They are ably
assisted by skilled technicians
spread across our locations.
Our Facilities
Our production facilities match the
best in the business. Among the key
in- house facilities we have Plasma
Arc Cutting Equipment, Pipe and
plate bending, dish end forming,
non-destructive testing, liquid
penetrate testing, magnetic particle
inspection, ultrasonic thickness
gauging Painting.
02
01 PAN AADCK5251H
02 GST 06AADCK5251H1ZO
Import Export
06 3309007812
Code
Bachelor of engineering
Graduated as a Bachelor
An Engineering graduate, worked with M/s Perton
of Engineering and work
founder of this company Engg. Construction Ltd
ing with this company
having more than 25 for 25 years and with IOT
since its inception. He is
years of experience in Engg. Projects Ltd for
having more than 25
Construction business more than 7 years. He
years of experience in the
successfully associated with this
field of project operation
company since 2013
03
Insert PIC
Director
An Engineering graduate,
having more than 6
years of experience in
Construction business
successfully
04
Business
Project Tender
Head HSE Developmen
Manager Management
t
Resident
Cons. HSE
Manager
Safety
Manager
Quality Human
Finance
Management Resource
04
INR
196,17,96,922
INR
128,85,88,484
INR 2019 -
107,46,69,000 2020
2017 -
2018 2018 -
2019
04
QA/QC Policy
▪ KKSEPL’s Quality Assurance and control function is
systematically applied by a cadre of highly trained and
qualified inspection personnel led by our corporate
examiner to ensure 100% compliance requirement
▪ During the last five years company has managed to
deliver quality products with zero defect as per
industrial standard up to the mark of various clients ,
Company strictly followed the QA/QC policy set-up
by their higher management , which is displayed here:
05
Transit Mixer 2
Dumper – 6 Ton 2
Water tankers 4
Total Station/Theodolite 2
Dumpy/Auto Level 4
Plate Compactor 3
Diesel Generator Set – Cap. 45 – 250
22
KVA
Hydraulic torque wrench;1.5’’
Square Drive with deep groove 5
socket of different sizes
Welding Machine 560
Hydraulic Jack 25
Air Compressor 1
Office Containers 25
Torques Wrench 3
07
Sr. Name of the Work Client’s Contractor/ PMC Executed Value Year of
NO Name Completio
n
9 Civil & Strctural works for IOCL Thyssenkrupp 10,19,82,637 2018
SWS-VI unit for BS-IV project Industrial Solution
Service India Pvt. Ltd
10 Structure steel works at Chambal Toyo Engineering India 6,63,23,600 2018
CFCL,Gadepan Kota Fertilizer & Pvt. Ltd.
Rajasthan Chemical
Ltd.
11 Structure steel works at Chambal Toyo Engineering India 1,22,25,200 2018
CFCL,Gadepan Kota Fertilizer & Pvt. Ltd.
Rajasthan Chemical
Ltd.
12 Installation of flare stack Chambal Toyo Engineering India 27,05,040.00 2018
package at CFCL, Gadepan, Fertilizer & Pvt. Ltd.
Kota Rajasthan Chemical
Ltd.
13 Structure steel painting Chambal Toyo Engineering India 56,00,000 2018
works at CFCL,Gadepan Kota Fertilizer & Pvt. Ltd.
Rajasthan Chemical
Ltd.
14 Mechanical piping, Reliance 25,56,00,000 2017
equipment erection & Industries
associated work for MEG, C2 Ltd.
complex, J3 project
07
Sr. Name of the Work Client’s Contractor/ PMC Executed Value Year of
NO Name Completio
n
15 Composite tender including IOCL Thyssenkrupp 24,15,48,947 2017
mechanical erection, piping, Industrial Solution
painting, insulation, Service India Pvt. Ltd.
electrical & instrumentation
work for DHDT unit for BS-
IV project
16 Composite works for piping, IOCL Technip FMC 20,78,62,388 2017
mechanical, civil &
structural, electrical &
instrumentation works for
DHDT revamp, NSU revamp,
FCC Gasoline
Desulfurization unit revamp,
PCK & LA unit
17 Structural steel & tankage Gujarat State Toyo Engineering India 8,24,09,870 2017
works for LNG Petrochemic Pvt. Ltd.
regassification project of al
M/s GSPC Corporation
18 Civil & Structural works for IOCL Engineers India Ltd. 8,22,00,000 2016
sub-station building works
07
Sr. Name of the Work Client’s Contractor/ PMC Executed Value Year of
NO Name Completio
n
19 Site Fabricated cone rood IOCL 1,12,75,169 2016
DEG tank
20 Alloy steel piping works for IOCL Foster & wheeler 15,83,05,926 2015
LSTK-C of Paradip Refinery
21 AG piping works for PDR3 BASF Ltd. Toyo Engineering India 5,30,91,201 2015
project, PLL Pvt. Ltd.
22 Additional Structural steel IOCL Toyo Engineering India 40,42,85,975 2014
works for INDMAX (FCC) & Pvt. Ltd.
PRU (EPCM-4) at Paradip
23 Mechanical works for IOCL Engineers India Ltd. 17,14,69,412 2014
Butene-1 project at PNCP
24 Mechanical, Equipment & IOCL Technip FMC 13,26,79,942 2014
piping works for FCCU & PRU
Revamp project
25 AG Piping works at BASF, BASF Ltd. Toyo Engineering India 7,81,14,405 2014
Dahej Pvt. Ltd.
26 Equipment erection & piping IOCL Thyssenkrupp 15,11,36,630 2013
fabrication/erection work for Industrial Solution
reformer job at Praxair, Service India Pvt. Ltd.
Hydrogen plant
07
Sr. Name of the Work Client’s Name Contractor/ PMC Executed Value Year of
NO Completio
n
27 AG piping works (ISBL)at SBR Indian Synthetic Toyo Engineering 10,03,86,388 2013
project Rubber Ltd. India Pvt. Ltd.
28 Structural works at SBR Indian Synthetic Toyo Engineering 5,39,90,870 2013
project Rubber Ltd. India Pvt. Ltd.
29 Civil & Structural works for IOCL Technip FMC 5,19,48,620 2013
FCCU & PRU revamp project
30 UG piping works at SBR Indian Synthetic Toyo Engineering 3,55,79,239 2013
project Rubber Ltd. India Pvt. Ltd.
31 AG piping works (OSBL)at Indian Synthetic Toyo Engineering 2,86,65,019 2013
SBR project Rubber Ltd. India Pvt. Ltd.
32 Mechanical work including IOCL IOT Engineering 23,51,00,000 2011
piping, structural, Projects Ltd.
equipment erection,
insulation & painting works
for CDU/VDU unit
07