Customization SD LE
Customization SD LE
Customization SD LE
Distribution channel: 01
Division: 01
Define plant:
Plant: Z003
SP: ZS01
Logistics general:
Ledger
Logistics execution:
Plant: Z003
Sales & distribution master data:
Common division:
Assign permitted order types to sales area: Transaction: OVAO, OVAM, OVAN, and OVAZ.
We always have to put reference sales org, dist channel, division as the same as the name given.
OVAZ:
Define pricing procedure:
Customer: 200000007.
Roles:
Conclusion:
Comes from material master data. Here it’s set as 0001 (On pallet).
1. Order type
2. Delivery type
3. Route
If we want to activate the route schedules, then mark the check-box in route schedule in configuration.
If the delivery is without any preceding document, then the route schedule determines nearest possible
path or route.
1. Service agent
2. Vendor
3. Plant
After putting all the configurations, route is determined automatically in sales order.
Output determination for sales order:
Assign the output determination procedure with order header (Order type).
Maintain condition record:
Transaction: VV11.
Logistics execution:
Here we will use TAN as it will be copied to delivery from sales order.
Delivery type + Item category group + higher level item category + Usage.
Delivery: 80000012
To create the material master first define the MRP controller in configuration:
Sales order: 60
Delivery: 80000014
Transaction: VKOA
Warehouse Management:
Define doors:
Create a new storage bin with the delivery number as it will act as destination bin.
TO 20000000 has been created.
Since it’s a fixed bin storage, so we have created the destination storage bin manually.
Document Flow:
Availability check, TOR and product allocation activate at schedule line level:
2. Combination of check in group for availability check and check in rule decide the procedure of
availability check.
3. Determine procedure for each delivery item category:
Basics:
It’s the material which is linked to the material master record. Basically packaging material is a material
which is basically used to pack the shipping material.
Warehouse Management:
While creating sales order for this material a Purchase Requisition will be created in back ground.
During creation of sales order Purchase requisition 10000094 will be created in back ground.
GR/IR clearing account for external procurement is updated with order value.
MIRO for vendor invoice:
Accounting document:
If anyone changes the PO quantity, the same will not be reflected in sales order.
Screenshot:
Material requirement planning (MRP):
Configuration:
Transaction: OPPR
Material: ALUMINIUM_SHEET
Configuration steps:
1. Material should be extended in both the plants, sales organization, distribution channel, division.
2. Assign sales organization, distribution channel vice versa.
3. SPRO SD Billing Intercompany billing Assign order types with intercompany billing.
Or < IV.
Do the PGI.
Accounting entry:
Create end customer billing document.
Do the IV billing.
In SAP free goods standard settings we can maintain 1 free good material against 1 main item i.e. there is
1:1 combination. We can play with material’s quantity but not with number of materials. If we get a
requirement from client that if customer buys 5 quantity of material A then he will get 1 quantity of
material B then it can be fulfill with standard free goods by maintaining it in VBN1. But if customer will
get 1 quantity of material B and 1 quantity of material C on buying 1 quantity of material A then we can
get this done by using Sales BOM.The settings for main item and sub item will be as follows. I am
assuming that you want to cumulate cost prices of sub items in main item at the time of billing. If you
don’t want this then simply don’t mark the check box in copy control from delivery to billing at item level
for cumulate cost. Also maintain BOM for master data in CS01 with usage 5.
Delivery: 80000052.
Material BOM:
1. Go to transaction CS01.
2. Create the sub-items with reference to main item.
Sales order: 82/10.
For MTS scenario, the MRP run will not work, since the stock is supposed to be dispatched from stock
directly.
New material: TESTCOMPUTER (General item category group: ERLA and strategy group: 10 [Make to
Order]).
TESTMOUSECOPY (General item category group: ERLA and strategy group: 20 [MTO scenario]).
And now create the order and do the delivery and billing.
Order: 88/10
-----------------------------------------------------------------------------------------------------------------------------
Item 10:
Item 20:
NOTE: Like HA00 is % based discount, we can also apply RB00 for value based discount.
Based on condition based value the discount value is getting divided proportionately.
Item 10:
Item 20:
Variant pricing:
Steps:
1. Create characteristics:
Characteristcs: ZCOLOR
Values: RED, BLUE
Characteristics: ZCOLSURCHARGE
Table name: SDCOM, Table field: VKOND
3. Create a material of type KMAT (Configurable material) and assign the class ZMOTORCYCLE in
it.
Material MOTORCYCLE is created.
Item 20:
Sales order: 94/10 contains one more character i.e: CC.
Links:
http://scn.sap.com/docs/DOC-49167
Material master costing 1 and costing 2 have the same function in sales order or material costing.
There are 6 tabs in the material cost estimate with quantity structure.
1. Costing data.
2. Dates.
3. Quantity structure.
4. Valuation.
5. History.
6. Costs.
Quantity structure:
Create BOM:
Create routing:
Overhead cost flows from the costing sheet and overhead key.
Transaction: OKTZ.
Costing variant:
Costing type:
Valuation variant:
Create plan:
Transaction: MC87
Sales, production, stock level, Target stock level, Range of coverage, Target day’s supply Key
figures/KPI. It would be always INR (Value) or EA (Quantity).
Now once I will create a sales plan for month of December, 2017 and January, 2018, bassed on my initial
stock level, all the other period stock figures will go in negative.
After this the sales plan/Rough cut plan to be passed on to the regional managers/demand management
and they will pass on these requirements to MRP.
After transfer it will open the screen for planned independent requirement screen (MD61).
Steps:
MS70
Transaction: MCEC
So outcome is: