Functional Specification Document (FSD) : A. Requirements
Functional Specification Document (FSD) : A. Requirements
CR 12643
Project SAP
Title Global safety notice on PM Operation control ticket
CO FI MM PP SD
A. Requirements
1. Business Case
The Plant Maintenance Team is looking for areas to improve the newly installed PM Module
with our upgrade to SAP HEC we have found the opportunity to utilize the SAP FIORI PM
Mobility App. to improve our plant technician’s productivity while conducting PM
Maintenance activities.
2. Current Functionality in brief
Currently there is no mobile applications active for Plant Maintenance. All work is done on
desktop.
Page 1 of 16
1. IW38 – Change PM Orders – List
2. IW32 – Change Work Order
4. Assumptions
As the requirement is for the T Codes IW32 & IW38, the remaining steps of the business
process are to be executed from desktop i.e. Creation of Notification (IW21), change /
approval of notification (IW22), time confirmations (IW41), cost settlement (KO88) and any
other transation except IW32 / IW38 are to be executed from desktops.
B. Solution Summary
1. Summary
Technicians will need the ability to pull up a list of Outstanding and or In Process work orders with
the following criteria:
Order number , Order Type, Functional location, Equipment, Main. Work center,
Priority, created by
Maintenance Plant
Output:
Main. Plant, Priority, Notification, Order No., Description, Order Type, basic start date, Functional
location, Equipment, Equip. Desc. Main, work center, cost center, Plant selection, System Status,
entered/created by.
Page 2 of 16
PM Tech. will need the ability to manage the following in a work order.
1. Change/update the following
Technicians will need ability to release a work order
Technician needs to be able to technically complete works orders
Header Data Tab
• Order Desc.
• Maint. Work center
• PMActType
• SystCond.
• Basic Start and Fin. date
• Priority
• Functional location
• Equipment
Operations Tab
• Operation Description
• long text
• Work (hours to perform operation)
• Number of Persons working on operation
• Duration (total number of hours to complete operation)
• Should also be able to add an operation as needed
Components Tab
• Add or update components (spare parts) and Reqmt Qty as needed
OUTPUT:
Should look similar to, IW32 screen desk top view. With above items available to add, edit…
Should also include a ref. to the notification if work order was created from an approved
notification.
Proposed Solution :
Page 3 of 16
1. IW38 – Change PM Orders – List
It is proposed to use the existing standard FIORI app F2175 - Find Maintenance Order. On
clicking on the work order number it should redirect to IW32 (Change Work order) app.
It is proposed to develop a new custom FIORI app to meet the requirement and the details
are as below.
On pressing the search help, the user should be able to filter with below fields
(similar to the app ID F2175)
Order No
Order type
Priority
Funtional Location
Equipment
Start date
End Date
Work Center
Maintenance Plan
Maintenance Item
Order Status
Page 4 of 16
Upon entering the required filter criteria, below output to be displayed
On selecting a perticular work order, below change work order screen to be displayed which will be silar
to IW38 screen below
Page 5 of 16
PM Tech. will need the ability to manage the following in a work order.
Change/update the following
Technicians will need ability to modify the header status, and Description
Header Data Tab
• Maint. Work center
• PMActType
• SystCond.
• Basic Start and Fin. date
• Priority
• Functional location
• Equipment
Page 6 of 16
Operations Tab
• Operation Description
• long text
• Work (hours to perform operation)
• Number of Persons working on operation
• Duration (total number of hours to complete operation)
• Should also be able to add an operation as needed
External sub tab
o Operation Qty
o Price
o Currency
o Material Group
o Cost Element
o Agreement
o Vendor
o Requisitioner
Actual data sub tab
o Requision number & Item Number
o GR Qty
o PO Exist (Check box)
Page 7 of 16
External sub tab
Page 8 of 16
Components Tab
• Add or update components (spare parts) and Reqmt Qty as needed
Item
Component
Description
Item Category
Requirement Qty
UOM
Storage location
Plant
Operation number
Batch
Purchasing data – sub tab
o Requirement Qty
o Price
o Currency
o Material Group
o G/L Account
o Agreement
o Vendor
o Requisitioner
Page 9 of 16
Purchasing data - Sub tab
Page 10 of 16
C. Key-user / Business Analyst Information
1. Country Specific Considerations
NA
2. Dependencies
NA
3. Test Scenarios
test scnarios
ID Test Scenario Expected Results Comments Regr
(Y/N)
4. User Interaction
N/A
Page 11 of 16
5. Execution Frequency (select all that apply)
Page 12 of 16
6. High Level Cut-Over Plan
NA
7.1 Overview
N/A
9. Open Issues
N# Issue Date Issue Title / Description Priority Assigned To Resolved
Date
N/A
REPORTS Yes No
Page 13 of 16
INTERFACES / CONVERSIONS Yes No
ENHANCEMENTS Yes No
FORMS
Yes ● No
Yes No
Page 14 of 16
Section II - Additional Details
Yes No
A. Configuration
1. Custom Tables
NA
2.2.Table Type
Customizing Table Application Table
Maintenance Screen Volume (expected records)
Page 15 of 16
2. Detailed Processing Logics / Processing Steps
B. Security/Authorization Requirements
Role Role Description Tcode Impact
C. Basis Activities
1. Servers / Folders
NA
2. Batch jobs
NA