100% found this document useful (1 vote)
1K views7 pages

DXC 700 AU Competency Checklist

This document is a competency checklist for operating a DxC 700 AU Chemistry analyzer. It lists tasks related to reagents, calibration, and quality control, along with the resources and methods for evaluating competency on each task. Trainees and trainers must initial each item to verify the trainee has achieved the task.

Uploaded by

James
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
1K views7 pages

DXC 700 AU Competency Checklist

This document is a competency checklist for operating a DxC 700 AU Chemistry analyzer. It lists tasks related to reagents, calibration, and quality control, along with the resources and methods for evaluating competency on each task. Trainees and trainers must initial each item to verify the trainee has achieved the task.

Uploaded by

James
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

Competency Checklist

DxC 700 AU Chemistry


Achieved? Trainee Trainer
Task Resources How Measured? N/A Date
Y N Initial Initial
Reagents
 Direct Observation
 Check reagent status  Test   
 Other __________
DXC 700 AU Instructions for Use
 Direct Observation
 Load reagent bottles in the Chapter 2 Daily Startup
 Test   
refrigerators  Monitor the Reagent Status
 Other __________
 Replace the Reagents  Direct Observation
 Perform a reagent check  Test   
 Other __________
DXC 700 AU Instructions for Use
Chapter 5 System Monitoring and
 Direct Observation
 Load reagent(s) in MEASURE Results
 Test   
mode  Reagent Management
 Other __________
 Replace or Add Reagents
in MEASURE Mode
DXC 700 AU Instructions for Use  Direct Observation
 Check ISE reagent status Chapter 2 Daily Startup  Test   
 Perform the ISE Startup  Other __________
 Inspect the ISE Reagents  Direct Observation
 Load ISE reagents  Replace the ISE  Test   
Reagents  Other __________
DXC 700 AU Instructions for Use
Chapter 5 System Monitoring and
 Direct Observation
 Load ISE reagent(s) in Results
 Test   
MEASURE Mode  ISE Reagent Management
 Other __________
 Replace ISE Reagents in
MEASURE Mode
DXC 700 AU Instructions for Use
Chapter 5 System Monitoring and  Direct Observation
 Assign a reagent to a fixed Results  Test   
position  Reagent Management  Other __________
 Assign a Reagent Position
Beckman Coulter Website:
 Direct Observation
Technical Documents - Reagent
 Identify reagent preparation Instructions for Use
 Test   
 Other __________
 Reagent Preparation
DxC 700 AU, Customer, Competency Checklist Page 1 of 7
Version 1.0 (April 2017) Beckman Coulter Professional Development
Competency Checklist

DxC 700 AU Chemistry


Calibration
DXC 700 AU Instructions for Use  Direct Observation
 Determine analyzer calibration Chapter 2 Daily Startup  Test   
status  Monitor the Reagent Status  Other __________
DXC 700 AU Instructions for Use
Chapter 2 Daily Startup
 Calibrate Tests and Process  Direct Observation
 Perform analyzer calibration Quality Control from the STAT  Test   
using Racks Table (Standalone)  Other __________
 Order and Perform
Calibration from the Racks
DXC 700 AU Instructions for Use
Chapter 2 Daily Startup  Direct Observation
 Perform ISE calibration  Perform the ISE Startup  Test   
(Option)  Other __________
 Calibrate the ISE
DXC 700 AU Instructions for Use
Chapter 2 Daily Startup
 Calibrate Tests and Process
 Direct Observation
 Perform analyzer calibration Quality Control from the STAT
 Test   
using the STAT table Table (Standalone)
 Other __________
 Order and Perform
Calibration from the STAT
Table

DxC 700 AU, Customer, Competency Checklist Page 2 of 7


Version 1.0 (April 2017) Beckman Coulter Professional Development
Competency Checklist

DxC 700 AU Chemistry


Achieved? Trainee Trainer
Task Resources How Measured? N/A Date
Y N Initial Initial
Process QC
DXC 700 AU Instructions for Use  Direct Observation
 Perform QC using Racks Chapter 2 Daily Startup  Test   
 Calibrate Tests and Process  Other __________
Quality Control from the Racks
(Standalone)  Direct Observation
 Order and process QC for  Test   
 Order and Perform Quality
specific tests using Racks Control (QC) from the  Other __________
Racks
 Direct Observation
 Perform QC using the STAT DXC 700 AU Instructions for Use
 Test   
Chapter 2 Daily Startup
table  Calibrate Tests and Process  Other __________
Quality Control from the STAT
 Order and process QC for Table (Standalone)  Direct Observation
specific tests using the STAT  Order and Perform Quality  Test   
table Control (QC) from the  Other __________
STAT Table
Process Patient Samples
 Identify correct sample racks DXC 700 AU Instructions for Use  Direct Observation
and containers for sample Chapter 4 Sample Programming  Test   
and Processing  Other __________
processing  Sample Preparation
 Direct Observation
 Process bar coded samples in  Place the Sample Cups or
 Test   
racks Tubes in the Rack
 Placing Racks on the Rack  Other __________
 Direct Observation
 Manually order samples for Input Area
 Test   
 Order for Routine and
processing in racks Emergency Samples  Other __________
 Direct Observation
 Process bar coded samples in DXC 700 AU Instructions for Use  Test   
the STAT table Chapter 4 Sample Programming  Other __________
and Processing  Direct Observation
 Manually order a sample for  Test   
 Priority STAT Samples
processing in the STAT table  Other __________

DxC 700 AU, Customer, Competency Checklist Page 3 of 7


Version 1.0 (April 2017) Beckman Coulter Professional Development
Competency Checklist

DxC 700 AU Chemistry


Review Results
DXC 700 AU Reference Manual  Direct Observation
 Review Calibration Monitor Chapter 4 System Monitoring and  Test   
Results  Other __________
 Monitor the Reagent Blank and  Direct Observation
 Review QC Monitor Calibration  Test   
 Monitor QC  Other __________

DXC 700 AU Instructions for Use


Chapter 5 System Monitoring and  Direct Observation
 Monitor Sample Status Results  Test   
 Monitoring Analysis  Other __________
 Sample Status Screen

DXC 700 AU Instructions for Use


Chapter 4 Sample Programming
 Direct Observation
and Processing
 Print results  Search for Results to View,
 Test   
 Other __________
Print or Send to LIS
 Print Results
 Direct Observation
DXC 700 AU Instructions for Use
 Identify flags Chapter 7 Flags
 Test   
 Other __________

DxC 700 AU, Customer, Competency Checklist Page 4 of 7


Version 1.0 (April 2017) Beckman Coulter Professional Development
Competency Checklist

DxC 700 AU Chemistry


Achieved? Trainee Trainer
Task Resources How Measured? N/A Date
Y N Initial Initial
Maintenance
 Direct Observation
 Perform Daily Inspections and DXC 700 AU Instructions for Use
 Test   
Preparations Chapter 2 Daily Startup
 Other __________
 Perform Daily Inspections and
 Direct Observation
Preparations
 Perform the ISE Clean (Daily)  Perform ISE Startup (Options)
 Test   
 Other __________
 Direct Observation
 Perform ISE Weekly  Test   
Maintenance DXC 700 AU Instructions for Use
Chapter 6 Maintenance  Other __________
 Direct Observation
 Perform ISE Every Two Weeks  ISE Weekly Maintenance
 Test   
Maintenance  ISE Every Two Weeks
 Other __________
Maintenance or Every 3,000
 Perform ISE Maintenance Samples  Direct Observation
Monthly, Every Two Months or  ISE Maintenance Monthly,  Test   
Every Three Months Every Two Months or Every  Other __________
Three Months  Direct Observation
 Perform ISE Every Two Months  ISE Maintenance Every Two  Test   
Maintenance Months or Every 20,000  Other __________
Samples
 Direct Observation
 Perform ISE Every Three  ISE Every Three Months  Test   
Months Maintenance Maintenance or Every 20,000  Other __________
Samples
 Perform ISE Six-Month  ISE Six-Month Maintenance or  Direct Observation
Every 40,000 Samples  Test   
Maintenance  Other __________

 Direct Observation
 Perform Analyzer Weekly DXC 700 AU Instructions for Use  Test   
Maintenance Chapter 6 Maintenance  Other __________
 Weekly Maintenance
 Monthly Maintenance  Direct Observation
 Perform Analyzer Monthly  Test   
Maintenance  Other __________

DxC 700 AU, Customer, Competency Checklist Page 5 of 7


Version 1.0 (April 2017) Beckman Coulter Professional Development
Competency Checklist

DxC 700 AU Chemistry


Achieved? Trainee Trainer
Task Resources How Measured? N/A Date
Y N Initial Initial
Maintenance, continued
DXC 700 AU Instructions for Use
 Direct Observation
 Perform Analyzer Every Three Chapter 6 Maintenance
 Test   
Months Maintenance  Every Three Months  Other __________
Maintenance
 Quarterly Maintenance  Direct Observation
 Perform Analyzer Six-Month  Six-Month Maintenance  Test   
Maintenance  Other __________
Additional Procedures
DXC 700 AU Instructions for Use  Direct Observation
 Set a new index Chapter 2 Daily Startup  Test   
 Set a New Index  Other __________
DXC 700 AU Instructions for Use
 Program the Operator Name Chapter 6 Maintenance    
 Program the Operator Name
DXC 700 AU Instructions for Use  Direct Observation
 Check Analyzer Status Chapter 2 Daily Startup  Test   
 Inspect the Analyzer Status  Other __________
DXC 700 AU Instructions for Use
Chapter 5 System Monitoring and  Direct Observation
 Perform an System Shutdown Results  Test   
(End Process)  System Shutdown (End  Other __________
Process)
DXC 700 AU Instructions for Use
Chapter 5 System Monitoring and
 Direct Observation
 Perform and recover from an Results
 Test   
ANALYZER STOP  Power Off the System by
 Other __________
Pressing the ANALYZER STOP
button
 Direct Observation
  Test   
 Other __________
 Direct Observation
  Test   
 Other __________

DxC 700 AU, Customer, Competency Checklist Page 6 of 7


Version 1.0 (April 2017) Beckman Coulter Professional Development
Competency Checklist

DxC 700 AU Chemistry


Achieved? Trainee Trainer
Task Resources How Measured? N/A Date
Y N Initial Initial
 Direct Observation
  Test   
 Other __________
 Direct Observation
  Test   
 Other __________
 Direct Observation
  Test   
 Other __________
 Direct Observation
  Test   
 Other __________

DxC 700 AU, Customer, Competency Checklist Page 7 of 7


Version 1.0 (April 2017) Beckman Coulter Professional Development

You might also like