Sto. Domingo Minalin Road Program Revised
Sto. Domingo Minalin Road Program Revised
PROVINCE OF PAMPANGA
City of San Fernando
OFFICE OF THE PROVINCIAL ENGINEER
PROGRAM OF WORK
NUMBER
Description of Work to be done % Wt. Equipment Description
Needed Available
PROVISION OF FIELD OFFICE FOR THE ENGINEER (Rental Basis) 0.29 Elf Tuck 1
PROJECT BILLBOARD / SIGNAGE 0.02 Lowber Trailer with 1
OCCUPATIONAL SAFETY AND HEALTH PROGRAM 0.30 Prime Mover
TRAFFIC MANAGEMENT 1.14 Pay Loader 1
MOBILIZATION / DEMOBILIZATION 0.17 Dump Truck 1
INDIVIDUAL REMOVAL OF TREES 0.07 Backhoe with Breaker 1
REMOVAL OF ACTUAL STRUCTURES / OBSTRUCTION (PCCP) 0.56 Road Grader 1
STRUCTURE EXCAVATION (Common Soil) 1.73 Road Roller 1
EMBANKMENT 1.15 Concrete Saw 1
CRACK AND SEAT 2.15 Bar Bender 1
AGGREGATE SUBBASE COURSE 8.32 Water Truck 2
PCC PAVEMENT, 250mm thk. (RMC 3500psi at 14 days) 41.51 Concrete Screeder with 1
STRUCTURAL CONCRETE 19.03 Vibrator
Sub-Total for A P
Name and Capacity No. of Units No. of Hours Hourly Rate Amount
B. Equipment
Sub-Total for B P
C. Total ( A + B ) P
D. Output per Hour = 1.00 month
E. D irect Uni t Co st ( C ÷ D ) P
Name and Specifications Quantity Unit Unit Cost Amount
F. Materials
(Rental Basis)
Ren ta l of temp orary fie ld o ffice wi th comfort 1 month P 17,500.00 P 17,500.00
room, 1 air co nd ition uni t, w ater sup ply and
lig hting s i nclu din g cha irs and tab les
0
DETAILED UNIT PRICE ANALYSIS (DUPA)
Sub-Total for B P
C. Total ( A + B ) P 115.00
D. Output per Hour = 1.00 each
E. D irect Uni t Co st ( C ÷ D ) P 115.00
Name and Specifications Quantity Unit Unit Cost Amount
F. Materials
8"x8" Tarpaulin 1.00 set P 2,000.00 P 2,000.00
8pcs.-2"x3"x8' Form Lumber 32.00 bd.ft. 50.00 1,600.00
Assorted Common Wire Nails 1.00 kgs. 65.00 65.00
Sub-Total for B P
C. Total ( A + B ) P 120,000.00
D. Output per Hour = n/a lump-sum
E. D irect Uni t Co st ( C ÷ D ) P 120,000.00
Name and Specifications Quantity Unit Unit Cost Amount
F. Materials
Safety Shoes 10.00 pairs P 500.00 P 5,000.00
Working Gloves 15.00 pairs 100.00 1,500.00
Safety Helmet 10.00 pcs. 250.00 2,500.00
Safety Vest 10.00 pcs. 200.00 2,000.00
Rubber Boots 5.00 pairs 350.00 1,750.00
Sub-Total for B P
C. Total ( A + B ) P 448,920.00
D. Output per Hour = n/a lump-sum
E. D irect Uni t Co st ( C ÷ D ) P 448,920.00
Name and Specifications Quantity Unit Unit Cost Amount
F. Materials
Tarpaulins/Warning Signs/Bollards 1.00 lot P 20,000.00 P 20,000.00
100pcs.-2"x3"x12' Form Lumber 600.00 bd.ft. 50.00 30,000.00
Assorted CW Nails 20.00 kgs. 65.00 1,300.00
Sub-Total for F P -
G. Direct Cost Unit Cost ( E + F ) P 80,280.00
H. Overhead, Contingencies and Miscellaneous (OCM) 12% of G P
I. Contractor's Profit 8% of G P
J. Value Added Tax (VAT) 5% of (G+H+I) P 4,014.00
K. Total Cost (G+H+I+J) P 84,294.00
PART C: EARTHWORK
Sub-Total for F P -
G. Direct Cost Unit Cost ( E + F ) P 109.92
H. Overhead, Contingencies and Miscellaneous (OCM) 12% of G P 13.19
I. Contractor's Profit 8% of G P 8.79
J. Value Added Tax (VAT) 5% of (G+H+I) P 6.60
K. Total Unit Cost (G+H+I+J) P 138.50
PART C: EARTHWORK
Sub-Total for F P -
G. Direct Cost Unit Cost ( E + F ) P 91.09
H. Overhead, Contingencies and Miscellaneous (OCM) 12% of G P 10.93
I. Contractor's Profit 8% of G P 7.29
J. Value Added Tax (VAT) 5% of (G+H+I) P 5.47
K. Total Unit Cost (G+H+I+J) P 114.78
PART C: EARTHWORK
Sub-Total for F P -
G. Direct Cost Unit Cost ( E + F ) P 237.09
H. Overhead, Contingencies and Miscellaneous (OCM) 12% of G P 28.45
I. Contractor's Profit 8% of G P 18.97
J. Value Added Tax (VAT) 5% of (G+H+I) P 14.23
K. Total Unit Cost (G+H+I+J) P 298.73
DETAILED UNIT PRICE ANALYSIS (DUPA)
PART C: EARTHWORKS
Installation of Formworks
Skilled Laborer 2.00 1.00 65.00 130.00
Unskilled Laborer 4.00 1.00 50.00 200.00
PART C: EARTHWORK
BACK-UP COMPUTATION
TRAFFIC MANAGEMENT
Lump-sum
MOBILIZATION / DEMOBILIZATION
Lump-sum
EMBANKMENT
Volume = 1132.00 cubic meters
STRUCTURAL CONCRETE
Volume = ((1.10m x 0.20m) + (1.10m x 0.15m) +(1.15m x 0.15m x 2)) x (2120.00m)
1547.60 cubic meters
REINFORCING STEEL
16mm dia. RSB
A. ((2120m / 0.25m) x (1.50m + 1.10m +1.50m)) / 5.50 6321.45 pcs.
B. ((11pcs x (1.10m + 1.10m +0.30m +0.30m)) x 605.7143pcs fixed cover) / 5.50 3392.00 pcs.
C. ((1.10m + 1.10m + 0.30m + 0.30m) x 3pcs x 1809.019944pcs movable cover) / 5.50 2762.866824 pcs.
12476.316824 pcs.
weight in kgs. 12476.316824pcs x 1.579 x 6.00m 118200.6256 kgs.
12mm dia. RSB
A. (2120m x 15pcs) / 5.50 5781.82 pcs.
B. ((6pcs x (2.00m +2.00m + 0.30m 0.30m)) x 605.7143pcs fixed cover) / 5.50 3039.58 pcs.
C. (6pcs x (0.50m + 0.50m 0.30m =0.30m) x 1817.14286pcs movable cover) / 5.50 3171.74 pcs.
11993.14 pcs.
weight in kgs. 11993.14pcs x 0.888 x 6.00m 63899.47 kgs.
Total Weight in Kgs. 182100.0956 kgs.
Prepared by:
RUSSEL L. HERNANDEZ
Engineer III
Republic of the Philippines
PROVINCE OF PAMPANGA
City of San Fernando
OFFICE OF THE PROVINCIAL ENGINEER
REHABILITATION / IMPROVEMENT OF STO. DOMINGO - MINALIN ROAD
PROJECT NAME :
(STA. MARIA SECTION)
LOCATION : Sta. Maria, Minalin, Pampanga
DESCRIPTION : Aggregate Sub Base Coarse
SEGMENT 1
AVERAGE DISTANCE
STATION CUT / FILL END AREA M2 VOLUME REMARKS
AREA BET. STA.
M2 M M3 Cumulative
254 1.800000
2.125 26.00 55.25 55.25
280 2.450000
2.555 40.00 102.20 157.45
320 2.660000
2.425 40.00 97.00 254.45
360 2.190000
2.450 40.00 98.00 352.45
400 2.710000
2.475 40.00 99.00 451.45
440 2.240000
2.490 40.00 99.60 551.05
480 2.740000
2.325 40.00 93.00 644.05
520 1.910000
2.200 40.00 88.00 732.05
560 2.490000
2.490 40.00 99.60 831.65
600 2.490000
2.490 40.00 99.60 931.25
640 2.490000
2.455 40.00 98.20 1029.45
680 2.420000
2.730 40.00 109.20 1138.65
720 3.040000
2.755 40.00 110.20 1248.85
760 2.470000
2.480 40.00 99.20 1348.05
800 2.490000
2.490 40.00 99.60 1447.65
840 2.490000
2.490 40.00 99.60 1547.25
880 2.490000
2.500 40.00 100.00 1647.25
920 2.510000
2.325 40.00 93.00 1740.25
960 2.140000
2.550 40.00 102.00 1842.25
1000 2.960000
2.715 40.00 108.60 1950.85
1040 2.470000
2.490 40.00 99.60 2050.45
1080 2.510000
2.325 40.00 93.00 2143.45
1120 2.140000
2.550 40.00 102.00 2245.45
1160 2.960000
2.715 40.00 108.60 2354.05
1200 2.470000
2.495 40.00 99.80 2453.85
1240 2.520000
2.375 40.00 95.00 2548.85
1280 2.230000
2.430 40.00 97.20 2646.05
1320 2.630000
2.215 40.00 88.60 2734.65
1341 1.800000
1341 1.800000
0.900 21.00 18.90 2753.55
SEGMENT 2
AVERAGE DISTANCE
STATION CUT / FILL END AREA M2 VOLUME REMARKS
AREA BET. STA.
M2 M M3 Cumulative
1720 1.390000
1.450 40.00 58.00 58.00
1760 1.510000
1.510 40.00 60.40 118.40
1800 1.510000
1.510 40.00 60.40 178.80
1840 1.510000
1.510 40.00 60.40 239.20
1880 1.510000
1.620 40.00 64.80 304.00
1920 1.730000
1.400 40.00 56.00 360.00
1960 1.070000
1.290 40.00 51.60 411.60
2000 1.510000
1.510 40.00 60.40 472.00
2040 1.510000
1.510 40.00 60.40 532.40
2080 1.510000
1.510 40.00 60.40 592.80
2120 1.510000
1.725 40.00 69.00 661.80
2160 1.940000
1.940 40.00 77.60 739.40
2200 1.940000
1.920 40.00 76.80 816.20
2240 1.900000
1.900 40.00 76.00 892.20
2280 1.900000
1.900 40.00 76.00 968.20
2320 1.900000
1.900 40.00 76.00 1044.20
2360 1.900000
1.900 40.00 76.00 1120.20
2400 1.900000
1.900 40.00 76.00 1196.20
2440 1.900000
2.200 40.00 88.00 1284.20
2480 2.500000
2.070 40.00 82.80 1367.00
2520 1.640000
1.640 40.00 65.60 1432.60
2560 1.640000
1.640 40.00 65.60 1498.20
2600 1.640000
1.640 40.00 65.60 1563.80
2640 1.640000
1.625 40.00 65.00 1628.80
2680 1.610000
1.645 40.00 65.80 1694.60
2720 1.680000
1.670 40.00 66.80 1761.40
2760 1.660000
1.665 40.00 66.60 1828.00
2800 1.670000
1.670 40.00 66.80 1894.80
2840 1.670000
1.670 40.00 66.80 1961.60
2880 1.670000
1.732 40.00 69.28 2030.88
2897 1.794000
0.897 17.00 15.25 2046.13
SEGMENT 1 2753.55
SEGMENT 2 2046.13
4799.68
4799.68
cu.m.
Prepared by:
RUSSEL L. HERNANDEZ
Engineer III
Republic of the Philippines
PROVINCE OF PAMPANGA
City of San Fernando
OFFICE OF THE PROVINCIAL ENGINEER
REHABILITATION / IMPROVEMENT OF STO. DOMINGO - MINALIN ROAD
PROJECT NAME :
(STA. MARIA SECTION)
LOCATION : Sta. Maria, Minalin, Pampanga
DESCRIPTION : Embankment
SEGMENT 1
AVERAGE DISTANCE
STATION CUT / FILL END AREA M2 VOLUME REMARKS
AREA BET. STA.
M2 M M3 Cumulative
1568 0.000000
0.000 32.00 0.00 0.00
1600 1.100000
1.100 40.00 44.00 44.00
1640 1.100000
1.100 40.00 44.00 88.00
1680 1.100000
1.100 40.00 44.00 132.00
1720 1.100000
1.100 40.00 44.00 176.00
1760 1.100000
1.100 40.00 44.00 220.00
1800 1.100000
1.100 40.00 44.00 264.00
1840 1.100000
1.100 40.00 44.00 308.00
1880 1.100000
1.100 40.00 44.00 352.00
1920 1.100000
1.100 40.00 44.00 396.00
1960 1.100000
1.100 40.00 44.00 440.00
2000 1.100000
1.100 40.00 44.00 484.00
2040 1.100000
1.100 40.00 44.00 528.00
2080 1.100000
1.100 40.00 44.00 572.00
2120 1.100000
0.550 40.00 22.00 594.00
2133 0.000000
0.000 13.00 0.00 594.00
SEGMENT 2
AVERAGE DISTANCE
STATION CUT / FILL END AREA M2 VOLUME REMARKS
AREA BET. STA.
M2 M M3 Cumulative
2133 0.000000
0.270 27.00 7.29 7.29
0.270 27.00 7.29 7.29
2160 0.540000
0.540 40.00 21.60 28.89
2200 0.540000
0.545 40.00 21.80 50.69
2240 0.550000
0.545 40.00 21.80 72.49
2280 0.540000
0.545 40.00 21.80 94.29
2320 0.550000
0.550 40.00 22.00 116.29
2360 0.550000
0.550 40.00 22.00 138.29
2400 0.550000
0.545 40.00 21.80 160.09
2440 0.540000
0.545 40.00 21.80 181.89
2480 0.550000
0.549 40.00 21.94 203.83
2520 0.547000
0.549 40.00 21.94 225.77
2560 0.550000
0.545 40.00 21.80 247.57
2600 0.540000
0.535 40.00 21.40 268.97
2640 0.530000
0.530 40.00 21.20 290.17
2680 0.530000
0.535 40.00 21.40 311.57
2720 0.540000
0.540 40.00 21.60 333.17
2760 0.540000
0.540 40.00 21.60 354.77
2800 0.540000
0.540 40.00 21.60 376.37
2840 0.540000
0.540 40.00 21.60 397.97
2880 0.540000
0.540 40.00 21.60 419.57
2920 0.540000
0.545 40.00 21.80 441.37
2960 0.550000
0.540 40.00 21.60 462.97
3000 0.530000
0.530 40.00 21.20 484.17
3040 0.530000
0.530 40.00 21.20 505.37
3080 0.530000
0.540 40.00 21.62 526.99
3120 0.550800
0.275 40.00 11.02 538.00
3123 0.000000
0.000 23.00 0.00 538.00
SEGMENT 1 594.00
SEGMENT 2 538.00
1132.00
1132.00
cu.m.
Prepared by:
RUSSEL L. HERNANDEZ
Engineer III
PROGRAM EVALUATION AND REVIEW TECHNIQUE - CRITICAL PATH METHOD (PERT - CPM)
Project Name : REHABILITATION / IMPROVEMENT OF STO. DOMINGO - MINALIN ROAD (STA. MARIA SECTION)
Location : Sta. Maria, Minalin, Pampanga
Project Duration : 233 CALENDAR DAYS
0 233 233 DAYS
0 233 PROVISION OF FIELD OFFICE FOR THE ENGINEER (Rental Basis)
0 6 6 DAYS
227 233 MOBILIZATION / DEMOBILIZATION
89 96 7 DAYS
226 233 REFLECTORIZED THERMOPLASTIC PAVEMENT MARKINGS YELLOW
A B C
0 75 75 DAYS 89 180 91 DAYS
14 89 REMOVAL OF ACTUAL STRUCTURES / OBSTRUCTION (PCCP) 142 233 AGGREGATE BASE COARSE
ES EF ES - EARLY START
LS LF EF - EARLY FINISHED CRITICAL PATH
LS - LATE START
LS - LATE START
LF - LATE FINISHED
FROM THE OFFICE OF: PROJECT TITLE: PREPARED BY: CHECKED AND SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET No.
1st Month 2nd Month 3rd Month 4th Month 5th Month 6th Month 7th Month 8th Month 9th Month 10th Month
DESCRIPTION % Wt. ESTIMATED TOTAL
COST START FINISH
WEEKS 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th 11th 12th 13th 14th 15th 16th 17th 18th 19th 20th 21st 22nd 23rd 24th 25th 26th 27th 28th 29th 30th 31st 32nd 33rd 34th 35th
PROVISION OF FIELD OFFICE FOR THE 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009
A.1.1 (8) 0.29 P 147,000.00 1ST 34th 34
ENGINEER (Rental Basis)
0.017
B.5 PROJECT BILLBOARD / SIGNAGE 0.02 P 8,573.04 1ST 1ST 1
OCCUPATIONAL SAFETY AND HEALTH 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009
B.7 (2) 0.30 P 150,538.50 1ST 34th 34
PROGRAM
0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033
B.8(2) TRAFFIC MANAGEMENT 1.14 P 567,249.48 1ST 34TH 34
0.085 0.085
B.9 MOBILIZATION / DEMOBILIZATION 0.17 P 84,294.00 1ST 34TH 2
REMOVAL OF ACTUAL STRUCTURES / 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051
101(3) b2 0.56 P 277,000.00 4TH 14TH 11
OBSTRUCTION (PCCP)
STRUCTURE EXCAVATION (Common 0.133 0.133 0.133 0.133 0.133 0.133 0.133 0.133 0.133 0.133 0.133 0.133 0.133
103(1) a 1.73 P 864,464.87 1ST 13TH 13
Soil)
0.088 0.088 0.088 0.088 0.088 0.088 0.088 0.088 0.088 0.088 0.088 0.088 0.088
104(2) a EMBANKMENT 1.15 P 571,456.24 10TH 22ND 13
0.134 0.134 0.134 0.134 0.134 0.134 0.134 0.134 0.134 0.134 0.134 0.134 0.134 0.134 0.134 0.134
210(1) CRACK AND SEAT 2.15 P 1,069,749.60 9TH 24TH 16
0.520 0.520 0.520 0.520 0.520 0.520 0.520 0.520 0.520 0.520 0.520 0.520 0.520 0.520 0.520 0.520
200 (1) AGGREGATE SUBBASE COURSE 8.32 P 4,147,979.45 10TH 25TH 16
PCC PAVEMENT, 250mm thk. (RMC 1.977 1.977 1.977 1.977 1.977 1.977 1.977 1.977 1.977 1.977 1.977 1.977 1.977 1.977 1.977 1.977 1.977 1.977 1.977 1.977 1.977
311(1) d1 41.51 P 20,695,298.71 14TH 34TH 21
3500psi at 14 days)
0.793 0.793 0.793 0.793 0.793 0.793 0.793 0.793 0.793 0.793 0.793 0.793 0.793 0.793 0.793 0.793 0.793 0.793 0.793 0.793 0.793 0.793 0.793 0.793
405(1)a2 STRUCTURAL CONCRETE 19.03 P 9,486,416.58 5TH 28TH 24
1.061 1.061 1.061 1.061 1.061 1.061 1.061 1.061 1.061 1.061 1.061 1.061 1.061 1.061 1.061 1.061 1.061 1.061 1.061 1.061 1.061
404(1)a REINFORCING STEEL 22.28 P 11,104,463.83 4TH 24TH 21
0.049 0.049
605(1) WARNING SIGNS (600mm Triangle) 0.10 P 48,988.80 33RD 34TH 2
NOTE: S-CURVE WAS BASED ON OUR CALENDAR DAYS INCLUDING SATURDAY AND PREDETERMINED UNWORKABLE DAYS (ASSUME), HOLIDAYS AND SUNDAYS Project Duration 179 days
Unworkable Days Unworkable Days Unworkable Days Unworkable Days Pre-Determined 19 days
SUNDAY WHICH HAS 4 WEEKS / MONTH ONLY WITH EQUIVALENT OF 28 DAYS Month Holidays Pre-determined Sundays Month Holidays Pre-determined Sundays Month Holidays Pre-determined Sundays Month Holidays Pre-determined Sundays Holidays 9 days
DURATION : 233 CALENDAR DAYS October 1 6 5 January 1 1 5 Sundays 26 days
NO. OF MONTHS : 9 MONTHS November 2 5 4 February 1 1 4 Total Calendar Days 233 days
December 4 5 4 March 0 1 4
7 16 13 2 3 13 *Total Calendar Days = Project Duration + Pre-
TOTAL HOLIDAYS AND PRE-DETERMINED : 28 Determined + Holidays + Sundays
TOTAL SUNDAYS : 26
FROM THE OFFICE OF: PROJECT TITLE: PREPARED BY: CHECKED AND SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY:
HON. DENNIS G. PINEDA
REPUBLIC OF THE PHILIPPINES Governor
REHABILITATION / IMPROVEMENT OF STO. DOMINGO - MINALIN ROAD (STA. MARIA SECTION) By the Authority of the Governor:
PROVINCE OF PAMPANGA
FROM THE OFFICE OF: PROJECT TITLE: PREPARED BY: CHECKED AND SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET NO.
Hon. DENNIS G. PINEDA
Governor
REHABILITATION / IMPROVEMENT OF By the Authority of the Governor:
REPUBLIC OF THE PHILIPPINES STO. DOMINGO - MINALIN ROAD (STA.
PROVINCE OF PAMPANGA MARIA SECTION)
RUSSEL L. HERNANDEZ WILFREDO A. MANALILI OLIMPIO M. PANGAN ATTY. CHARLIE G. CHUA 1
PROVINCIAL ENGINEER'S OFFICE
Engineer III Acting Assistant Provincial Provincial Engineer Provincial Administrator
CAPITOL COMPOUND, STO. NINO, CSFP Sta. Maria, Minalin, Pampanga Engineer
1
Annex A
Republic of the Philippines
PROVINCIAL GOVERNMENT OF PAMPANGA
City of San Fernando, Pampanga
OBLIGATION REQUEST No.
Payee
Office Provincial Engineer's Office
Address Capitol Compound, Sto. Ñino, City of San Fernando, Pampanga
Responsibility
Particulars F.P.P. Account Code Amount
Center
REHABILITATION / IMPROVEMENT OF STO. DOMINGO - MINALIN ROAD (STA. MARIA SECTION)
P 49,850,349.53
To supply Labor, Materials and
Necessary Equipment for the
REHABILITATION / IMPROVEMENT OF
STO. DOMINGO - MINALIN ROAD (STA.
MARIA SECTION) at Sta. Maria, Minalin,
Pampanga.
OLIMPIO M. PANGAN
Provincial Engineer
TOTAL P 49,850,349.53
A. Certified : B. Certified :
Signature
Printed Name Hon. DENNIS G. PINEDA
Position Governor Printed Name RIMA K. BONDOC
By the Authority of the Governor: Position Provincial Budget Officer
Signature Head, Budget Unit/Authorized Representative
Unit of Estimated
Quantity Item Description Estimated Cost
Issue Unit Cost
Items to be Accomplished:
7240 0.000
0.000 40.00 0.00 2813.63
7280 0.000
0.000 40.00 0.00 2813.63
7320 0.000
0.000 40.00 0.00 2813.63
7360 0.000
0.000 40.00 0.00 2813.63
7400 0.000
0.000 40.00 0.00 2813.63
7440 0.000
0.000 40.00 0.00 2813.63
7480 0.000
0.000 40.00 0.00 2813.63
7520 0.000
0.000 40.00 0.00 2813.63
7560 0.000
0.000 40.00 0.00 2813.63
7600 0.000
8260 Road 3 0.000
0.000 20.00 0.00 2813.63
8280 0.000
0.000 40.00 0.00 2813.63
8320 0.000
0.000 40.00 0.00 2813.63
8360 0.000
0.000 10.00 0.00 2813.63
8370 0.000
AVERAGE DISTANCE
STATION CUT / FILL END AREA M2 VOLUME REMARKS
AREA BET. STA.
M2 M M3 Cumulative
2025 Road 1A 0.000
0.450 40.00 18.00 18.00
0.450 40.00 18.00 18.00
2065 0.900
0.900 40.00 36.00 54.00
2105 0.900
0.900 40.00 36.00 90.00
2145 0.900
0.900 40.00 36.00 126.00
2185 0.900
0.900 40.00 36.00 162.00
2225 0.900
0.900 40.00 36.00 198.00
2265 0.900
0.900 40.00 36.00 234.00
2305 0.900
0.900 40.00 36.00 270.00
2345 0.900
0.900 40.00 36.00 306.00
2385 0.900
0.900 40.00 36.00 342.00
2425 0.900
342.00
cu.m.
cu.m.
Prepared by:
RUSSEL L. HERNANDEZ
Engineer III
1970.4
area
0.915
1735
1610.4
150.625
6000
150
175
206.5
8240
207
400
2655
6,025.00
7,600.00
8,260.00
8,370.00