Bill of Materials: TOTAL COST: Php. 183,102.16

This document is a bill of materials for residential dwelling owned by Jasper B. Gementiza located in Brgy. San Policarpo Calbayog City. It includes 30 items needed for electrical work with descriptions and costs totaling PHP 102,256.01. Additional expenses are PHP 25,564 for labor, PHP 12,782 for contingency, PHP 35,150.50 for overhead and profit, and PHP 7,349.65 for VAT. The total cost of the project is PHP 183,102.16.

Uploaded by

JasperGementiza
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
83 views2 pages

Bill of Materials: TOTAL COST: Php. 183,102.16

This document is a bill of materials for residential dwelling owned by Jasper B. Gementiza located in Brgy. San Policarpo Calbayog City. It includes 30 items needed for electrical work with descriptions and costs totaling PHP 102,256.01. Additional expenses are PHP 25,564 for labor, PHP 12,782 for contingency, PHP 35,150.50 for overhead and profit, and PHP 7,349.65 for VAT. The total cost of the project is PHP 183,102.16.

Uploaded by

JasperGementiza
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Residential Dwelling:

Owner: Jasper B. Gementiza


Address: Brgy. San Policarpo Calbayog City

BILL OF
Item
MATERIALS Unit price:
Description: Quantity: Total:(Php)
No.: (Php)
1 Chandelier 1 29248 29248
2 Compact fluorescent lamp 9 260 2340
3 2 Gang Convenience Outlet 11 116 1276
4 2 Gang Range Outlet 2 138 276
5 Special Purpose Outlet 5 138 690
6 1 Gang Single Switch Set 10 75 750
7 1 Gang Three Way Switch Set 2 87.5 175
8 Wall Lamp 1 350 350
9 Junction Box 10 34.75 347.5
10 Utility Box 30 26.75 802.5
11 Power Receptacle 10 27.5 275
12 Awg#14 THW black wire 150 21 3150
13 Awg#14 THW white wire 150 21 3150
14 Awg#14 THW green wire 35 21 735
15 Awg#12 THW black wire 160 34 5440
16 Awg#12 THW white wire 160 34 5440
17 Awg#10 THW black wire 85 56 4760
18 Awg#10 THW white wire 85 56 4760
19 Awg#6 THHN black wire 15 95 1425
20 Awg#6 THHN white wire 15 95 1425
21 Conduit pipe (PVC) 338 77 26026
22 Rigid Metalic Conduit 25 mm² 10 100 1000
23 15 A circuit breaker 2 391.25 782.5
24 20 A circuit breaker 3 466.67 1400.01
25 30 A circuit breaker 6 513 3078
26 Panel Board (12 branches) 1 500 500
27 Electrical tape 10 30.75 307.5
28 Entrance cap 1 72 72
29 Kw-hr. Meter 1 1325 1325
30 55 A Circuit breaker 1 950 950
Total: 102256.01
Labor cost: 25564
Contingency: 12782
Overhead &
35150.5
profit:
VAT: 7349.65

TOTAL COST: Php. 183,102.16


Prepared by : Gementiza, Jasper B.

Labor Cost:
Contingency:

Php. 25564 Overhead & Profit:

Php. 12782 VAT:

Php. 35150.5 Total Cost:

Php. 7349.65
Total Cost: