Feb 2017 Buildability Site
Feb 2017 Buildability Site
SG>
<[email protected] cc: "[email protected]" <[email protected]>
ov.sg> Fax to:
Subject: RE: Feb 2017 Buildability Site Check - A1369-02177-2014 (HDB Sembawang N3C7 at Sembawang Crescent) (Part 9 of 9)
26/04/2017 10:19 AM
We spoke. Please submit the revised constructability score form together with its supporting documents to ensure that the documents are tag
to the project reference number.
Thank you.
Should you have any queries, feel free to contact the undersigned.
Privileged/Confidential information may be contained in this message. If you are not the intended recipient, you must not copy,
distribute or use it for any purpose, nor disclose its contents to any other person. Please delete the email and notify the sender
immediately if you receive this in error. Check out our website at www.bca.gov.sg.
Dear Fu Cai,
The system prompt successful submission; enclosed please find the system message for your easy reference.
I will call you shortly to clarify further. Thanks for the feedbacks.
Best regards,
LC&T Builder (1971) Pte Ltd
Please upload the c score form together with the supporting documents. If not the system will prompt rejection. Anyway, you should have some amendments
to the constructability form as well.
Kindly re-submit.
We are pleased to inform that we have uploaded the revised C-Score and the supporting documents to C Score portal.
Thank you.
Best regards,
LC&T Builder (1971) Pte Ltd
Use of statrapid load test will be awarded 2 points in this project. Please revise and upload the constructability score form and its supporting documents to the
c score portal.
In turn, please get back to us for the ES submission numbers for our reference .
Dear Fu Cai,
We are pleased to enclose herewith block pile layout plans indicating StatRapid and Kentledge Test for your easy reference please.
(See attached file: BLK-364A Locations - PDF.pdf)(See attached file: BLK-364B Locations - PDF.pdf)(See attached file: BLK-365 MSCP-1
Locations - PDF.pdf)(See attached file: BLK-365 MSCP-2 Locations - PDF.pdf)(See attached file: BLK-365A Locations - PDF.pdf)(See
attached file: BLK-365B Locations - PDF.pdf)(See attached file: BLK-365C Locations - PDF.pdf)(See attached file: BLK-366A Locations -
PDF.pdf)(See attached file: BLK-366B Locations - PDF.pdf)(See attached file: Test Pile Location Table.pdf)
Thank you.
Best regards,
LC&T Builder (1971) Pte Ltd
Dear Fu Cai,
We are pleased to re-submit herewith updated C-Score forms and Statrapid Load Test productivity computation sheet for your easy reference please.
Thank you.
Best regards,
LC&T Builder (1971) Pte Ltd
1) Structure Innovation, Use of Statrapid Load Test – Under assumptions, to add in the amount of load used to test and the number of man hours
used per day. To provide information over the time taken to test the loads between the two methods.
2) Good Industry Practices – To remove the points for CCTV for real-time monitoring on site.
In addition, please check through the form for spelling errors on innovation items and to include full description on the use of system formwork.
Thank you.
Dear Fu Cai,
We refer to our tele-discussion and tele-clarification last evening pertinent to the captioned matter.
We are pleased to re-submit herewith the updated documents for your easy reference please.
1) Structure Innovation – Site gantry with precast works to be awarded with 1 point (1 point added)
2) Structure Innovation – To remove points on tower crane for tip-load more than 10 ton at Blk 364A and Blk 365. (points removed at Blk 364A & Blk
365)
3) Structure Innovation, MSCP – Ride on troweler to be awarded with 2 points. (2 points added to MSCP)
4) Structure Innovation – To provide supporting documents for comparison of conventional pile load testing with statrapid load test. To list down the
assumptions made, sequence of work activities and their respective man hours for comparison. (please refer to enclosed Rapid Load Test productivity
computation worksheet)
5) Good Industry Practices – To remove trade productivity monitoring system points as there are no figures showing productivity improvement in
comparison with Sengkang project. (rental block and BTO blocks classification added to the respective blocks worksheet as per discussion and
clarification)
6) Good Industry Practices – To showcase how concrete monitoring will improve the work process on site, as well as if there are minimum wastage
shown in the excel table. To PDF the excel table for our review. (Some precast database report enclosed for your easy reference; this is claim under
Good Industry Practice - Real Time Monitoring)
7) Good Industry Practices – To provide method statement for false ceiling. (As attached)
8) Good Industry Practices – To provide CCTV images showing construction cycle of the project. (We do not have CCTV images)
(See attached file: BEV_CS01_V1.8.pdf)(See attached file: Good Industry Practice - Real Time Monitoring (Precast Database
Report).pdf)(See attached file: Good Industry Practice - Trade Productivity Monitoring System.pdf)(See attached file: MOS -
ALUMINIUM TILE CLIP-IN CEILING SYSTEM (False Ceiling).pdf)(See attached file: Productivity Computation Worksheet (Stat
Rapid Load Test).pdf)
Should you need further clarification, I can be contacted via mobile at 9188 8075.
Thank you.
Best regards,
LC&T Builder (1971) Pte Ltd
Please find our remaining comments for constructability on project reference: A1369-02177-2014.
1) Structure Innovation – Site gantry with precast works to be awarded with 1 point.
2) Structure Innovation – To remove points on tower crane for tip-load more than 10 ton at Blk 364A and Blk 365.
3) Structure Innovation, MSCP – Ride on troweler to be awarded with 2 points.
4) Structure Innovation – To provide supporting documents for comparison of conventional pile load testing with statrapid load test. To list down the
assumptions made, sequence of work activities and their respective man hours for comparison.
5) Good Industry Practices – To remove trade productivity monitoring system points as there are no figures showing productivity improvement in
comparison with Sengkang project.
6) Good Industry Practices – To showcase how concrete monitoring will improve the work process on site, as well as if there are minimum wastage
shown in the excel table. To PDF the excel table for our review.
7) Good Industry Practices – To provide method statement for false ceiling.
8) Good Industry Practices – To provide CCTV images showing construction cycle of the project.
Privileged/Confidential information may be contained in this message. If you are not the intended recipient, you must not copy,
distribute or use it for any purpose, nor disclose its contents to any other person. Please delete the email and notify the sender
immediately if you receive this in error. Check out our website at www.bca.gov.sg.
Dear Fu Cai,
We are pleased to submit herewith constructablility (C-Score) documents for your reference please.
a) Part 1 - C-Score Form version 1.8 and Structural System (External Access)
b) Part 2 - Structural System (Formwork System) Part 1 of 2
c) Part 3 - Structural System (Formwork System) Part 2 of 2
d) Part 4 - Structrual Innovative Methods (Tower Crane)
e) Part 5 - Structrual Innovative Methods (Rapid Load Test, Ride On Power Trowel, Onsite Precast Yard with Gangtry Crane, Hydraulic Placing Boom)
f) Part 6 - Architectural and MEP System (Spray Painting, scissor lift and boom lift)
g) Part 7 - Good Industry Practice (BIM)
h) Part 8 - Good Industry Practice (Trade Productivity Monitoring, Monthly Working Session, Tool Box Meeting and Real Time Monitoring)
i) Part 9 - Good Indusctry Practice (MOS on various Wet Trades)
(See attached file: SBW N3C7 - Method statement of Waterproofing.pdf)(See attached file: SBW N3C7 - Trade Demo Report for Dry Wall
Installation.pdf)(See attached file: SBW N3C7 - Trade Demo Report for Window Installation.pdf)
Thank you.
Best regards,
LC&T Builder (1971) Pte Ltd
Dear Fu Cai,
We are pleased to submit herewith constructablility (C-Score) documents for your reference please.
a) Part 1 - C-Score Form version 1.8 and Structural System (External Access)
b) Part 2 - Structural System (Formwork System) Part 1 of 2
c) Part 3 - Structural System (Formwork System) Part 2 of 2
d) Part 4 - Structrual Innovative Methods (Tower Crane)
e) Part 5 - Structrual Innovative Methods (Rapid Load Test, Ride On Power Trowel, Onsite Precast Yard with Gangtry Crane, Hydraulic Placing Boom)
f) Part 6 - Architectural and MEP System (Spray Painting, scissor lift and boom lift)
g) Part 7 - Good Industry Practice (BIM)
h) Part 8 - Good Industry Practice (Trade Productivity Monitoring, Monthly Working Session, Tool Box Meeting and Real Time Monitoring)
i) Part 9 - Good Indusctry Practice (MOS on various Wet Trades)
Thank you.
Best regards,
LC&T Builder (1971) Pte Ltd
Dear Fu Cai,
We are pleased to submit herewith constructablility (C-Score) documents for your reference please.
a) Part 1 - C-Score Form version 1.8 and Structural System (External Access)
b) Part 2 - Structural System (Formwork System) Part 1 of 2
c) Part 3 - Structural System (Formwork System) Part 2 of 2
d) Part 4 - Structrual Innovative Methods (Tower Crane)
e) Part 5 - Structrual Innovative Methods (Rapid Load Test, Ride On Power Trowel, Onsite Precast Yard with Gangtry Crane, Hydraulic Placing Boom)
f) Part 6 - Architectural and MEP System (Spray Painting, scissor lift and boom lift)
g) Part 7 - Good Industry Practice (BIM)
h) Part 8 - Good Industry Practice (Trade Productivity Monitoring, Monthly Working Session, Tool Box Meeting and Real Time Monitoring)
i) Part 9 - Good Indusctry Practice (MOS on various Wet Trades)
Thank you.
Best regards,
LC&T Builder (1971) Pte Ltd
Dear Fu Cai,
We are pleased to submit herewith constructablility (C-Score) documents for your reference please.
a) Part 1 - C-Score Form version 1.8 and Structural System (External Access)
b) Part 2 - Structural System (Formwork System) Part 1 of 2
c) Part 3 - Structural System (Formwork System) Part 2 of 2
d) Part 4 - Structrual Innovative Methods (Tower Crane)
e) Part 5 - Structrual Innovative Methods (Rapid Load Test, Ride On Power Trowel, Onsite Precast Yard with Gangtry Crane, Hydraulic Placing Boom)
f) Part 6 - Architectural and MEP System (Spray Painting, scissor lift and boom lift)
g) Part 7 - Good Industry Practice (BIM)
h) Part 8 - Good Industry Practice (Trade Productivity Monitoring, Monthly Working Session, Tool Box Meeting and Real Time Monitoring)
i) Part 9 - Good Indusctry Practice (MOS on various Wet Trades)
Thank you.
Best regards,
LC&T Builder (1971) Pte Ltd
Dear Fu Cai,
We are pleased to submit herewith constructablility (C-Score) documents for your reference please.
a) Part 1 - C-Score Form version 1.8 and Structural System (External Access)
b) Part 2 - Structural System (Formwork System) Part 1 of 2
c) Part 3 - Structural System (Formwork System) Part 2 of 2
d) Part 4 - Structrual Innovative Methods (Tower Crane)
e) Part 5 - Structrual Innovative Methods (Rapid Load Test, Ride On Power Trowel, Onsite Precast Yard with Gangtry Crane, Hydraulic Placing Boom)
f) Part 6 - Architectural and MEP System (Spray Painting, scissor lift and boom lift)
g) Part 7 - Good Industry Practice (BIM)
h) Part 8 - Good Industry Practice (Trade Productivity Monitoring, Monthly Working Session, Tool Box Meeting and Real Time Monitoring)
Thank you.
Best regards,
LC&T Builder (1971) Pte Ltd
Dear Fu Cai,
We are pleased to submit herewith constructablility (C-Score) documents for your reference please.
a) Part 1 - C-Score Form version 1.8 and Structural System (External Access)
b) Part 2 - Structural System (Formwork System) Part 1 of 2
c) Part 3 - Structural System (Formwork System) Part 2 of 2
d) Part 4 - Structrual Innovative Methods (Tower Crane)
e) Part 5 - Structrual Innovative Methods (Rapid Load Test, Ride On Power Trowel, Onsite Precast Yard with Gangtry Crane, Hydraulic Placing Boom)
f) Part 6 - Architectural and MEP System (Spray Painting, scissor lift and boom lift)
g) Part 7 - Good Industry Practice (BIM)
h) Part 8 - Good Industry Practice (Trade Productivity Monitoring, Monthly Working Session, Tool Box Meeting and Real Time Monitoring)
Thank you.
Best regards,
LC&T Builder (1971) Pte Ltd
Dear Fu Cai,
We are pleased to submit herewith constructablility (C-Score) documents for your reference please.
a) Part 1 - C-Score Form version 1.8 and Structural System (External Access)
b) Part 2 - Structural System (Formwork System) Part 1 of 2
c) Part 3 - Structural System (Formwork System) Part 2 of 2
d) Part 4 - Structrual Innovative Methods (Tower Crane)
e) Part 5 - Structrual Innovative Methods (Rapid Load Test, Ride On Power Trowel, Onsite Precast Yard with Gangtry Crane, Hydraulic Placing Boom)
f) Part 6 - Architectural and MEP System (Spray Painting, scissor lift and boom lift)
g) Part 7 - Good Industry Practice (BIM)
h) Part 8 - Good Industry Practice (Trade Productivity Monitoring, Monthly Working Session, Tool Box Meeting and Real Time Monitoring)
Thank you.
Best regards,
LC&T Builder (1971) Pte Ltd
Dear Fu Cai,
We are pleased to submit herewith constructablility (C-Score) documents for your reference please.
a) Part 1 - C-Score Form version 1.8 and Structural System (External Access)
b) Part 2 - Structural System (Formwork System) Part 1 of 2
c) Part 3 - Structural System (Formwork System) Part 2 of 2
d) Part 4 - Structrual Innovative Methods (Tower Crane)
e) Part 5 - Structrual Innovative Methods (Rapid Load Test, Ride On Power Trowel, Onsite Precast Yard with Gangtry Crane, Hydraulic Placing Boom)
f) Part 6 - Architectural and MEP System (Spray Painting, scissor lift and boom lift)
g) Part 7 - Good Industry Practice (BIM)
h) Part 8 - Good Industry Practice (Trade Productivity Monitoring, Monthly Working Session, Tool Box Meeting and Real Time Monitoring)
Thank you.
Best regards,
LC&T Builder (1971) Pte Ltd
ONG Lai Seong
Project Manager
Tel: 6363 3422 Fax: 6367 4429
Dear Fu Cai,
We are pleased to submit herewith constructablility (C-Score) documents for your reference please.
a) Part 1 - C-Score Form version 1.8 and Structural System (External Access)
b) Part 2 - Structural System (Formwork System) Part 1 of 2
c) Part 3 - Structural System (Formwork System) Part 2 of 2
d) Part 4 - Structrual Innovative Methods (Tower Crane)
e) Part 5 - Structrual Innovative Methods (Rapid Load Test, Ride On Power Trowel, Onsite Precast Yard with Gangtry Crane, Hydraulic Placing Boom)
f) Part 6 - Architectural and MEP System (Spray Painting, scissor lift and boom lift)
g) Part 7 - Good Industry Practice (BIM)
h) Part 8 - Good Industry Practice (Trade Productivity Monitoring, Monthly Working Session, Tool Box Meeting and Real Time Monitoring)
i) Part 9 - Good Indusctry Practice (MOS on various Wet Trades)
Thank you.
Best regards,
LC&T Builder (1971) Pte Ltd
Dear all,
Please see the attached file for the comments regarding the above-mentioned for your retention and actions.
th
Please submit through email the revised buildable design score and constructability score to us by 6 March 2017.
Privileged/Confidential information may be contained in this message. If you are not the intended recipient, you must not copy,
distribute or use it for any purpose, nor disclose its contents to any other person. Please delete the email and notify the sender
immediately if you receive this in error. Check out our website at www.bca.gov.sg.
Dear Mr Toh,
Attached plan indicating entrance to site office for your easy reference.
Best Regards,
clement
92349176
www.ong-ong.com
You may contact Mr Toh Fu Cai at 680 44227 if you need clarifications.
Privileged/Confidential information may be contained in this message. If you are not the intended recipient, you must not copy,
distribute or use it for any purpose, nor disclose its contents to any other person. Please delete the email and notify the sender
immediately if you receive this in error. Check out our website at www.bca.gov.sg.