Notice Inviting E-Bid: Central Public Works Department
Notice Inviting E-Bid: Central Public Works Department
Notice Inviting E-Bid: Central Public Works Department
भारत सरकार
GOVERNMENT OF INDIA
Name of Work
Designing, Developing and Implementation of Web based IT
application for project life cycle management including
Accounting system for Self Financed Redevelopment works
under RPZ, CPWD, New Delhi. (Second call)
Office of
The Chief Project Manager
Redevelopment Project Zone
Central Public Works Department
Room No. 145, D-Wing, Vidyut Bhawan, New Delhi–110001
[2]
INDEX
Section-A
1. Information and Instructions for bidders 5
2. Evaluation criteria for first stage pre-qualification 5
3. List of mandatory documents to be uploaded 10
4. Evaluation Criteria 12
Section-B
5. Glossary 19
6. Scope of work 20
7. Approach for Standard ERP Implementation 53
Section-C
8. Project milestones and Deliverables 61
9. Schedule of Payment 62
10. Service Level Agreement 64
11. General Conditions for Financial bid 66
12. Commercial Bid Evaluation Considerations 66
13. Deviations and Exclusions 66
14. Special Conditions of Contract 67
Section-D
15. Form of Performance Security (Guarantee) 71
16. Integrity Pact 74
17. Technical Bid Covering Letter 75
18. Integrity Agreement and form of Agreement 76
19. Letter of Transmittal 83
20. From A to K 84-95
[3]
SECTION- A
[5]
The Executive Engineer, Redevelopment Project Division-I, CPWD, Room No. 141, Vidyut
Bhawan, New Delhi – 110001 (Telephone No: 011-23411136, FAX No: 011-23412356, e-
mail: [email protected]) on behalf of President of India invites online lump sum bids in
two bid system from eligible Firms for the Designing, Developing and Implementation of Web
based IT application for project life cycle management including Accounting system for Self-
Financed Redevelopment works under RPZ, CPWD, New Delhi.
Date of presentation of Technical Bid Date and time shall be notified separately to
successful bidders.
1. Initial Criteria for Eligibility: Firms who fulfil the following requirements shall be eligible
to apply. Joint ventures are not accepted.
Prequalification Criteria:
LLP Act 2008 / Partnership Act 1932 and should Certificate (s)
have been operating for the last five years as on
the date of publishing of Tender notice
(including name change/impact of mergers or
acquisitions).
2. Should not have incurred any loss (in more than Certificate from CA firm for
two years) during the last five consecutive average annual financial
Financial years ending March 2018 duly audited turnover and no loss certificate
and certified by the Chartered Accountant for the years:-
4. During last 7 years ending last day of month Details of similar work in Form-
previous to the one in which applications are B given in this document.
invited: - Past experience in similar
The Bidder must have successfully completed nature of work should be
three similarly Offered standard ERP projects supported by certificates issued
within India, costing not less than the amount by the client in the format given
equal to Rs.150 lakh each in Form-C.
OR In case the work experience is
Two similar contracts of Offered standard ERP of Private sector the completion
supply and Implementation within India, costing certificate shall be supported
not less than the amount equal to Rs. with copies of Corresponding
225 lakh each TDS certificates.
OR The value of executed works
shall be brought to current
One similar contract of Offered standard ERP
costing level by enhancing the
supply and Implementation within India, costing
actual value of work at simple
not less than the amount equal to Rs.300 lakh
interest rate of 7% per annum,
Similar work shall mean Design, Development, calculated from the date of
Implementation and maintenance of completion to previous day of
standard Enterprise Resource Planning last date of submission of bid.
(ERP) application within India.
The determination of order value
or else etc. shall be based on
“exchange rate” of the currency
as on the last day of bid
submission.
5. The Bidder and OEM should not be blacklisted Self-declaration from the bidder
[7]
6. The Bidder should have at least 30 technically Self- certified letter signed by
qualified professionals (software developers) on the Authorized signatory / CS as
the payroll of the company. per Form-G
8. The Bidder should have ISO 9001:2008 OR ISO Valid copy of certificate at the
20000 or latest. time of bidding.
9. The Firm should have his own office in Affidavit that they will have
Delhi/NCR for proper functioning and presence in Delhi /NCR
coordination of work or will have to set up an
office in Delhi/NCR during execution of work.
2. Earnest Money of Rs. 10 Lakh only, in form of Treasury Challan or Demand Draft or
Pay Order or Banker’s Cheque or Deposit at Call receipt or Fixed Deposit receipt of
scheduled bank drawn in favour of Executive Engineer, RPD-I, CPWD, New Delhi.
Receipt of the EMD shall be scanned and uploaded to the e-tendering website within the
period of bid submission.
The bidder can deposit original EMD either in the office of Executive Engineer inviting
bids or division office of any Executive Engineer, CPWD within the period of bid
submission. The bidder shall obtain the receipt of EMD from the office of Executive
Engineer, RPD-I, CPWD, Room No. 141, Vidyut Bhawan, New Delhi or any
Executive Engineer of CPWD in the prescribed format uploaded with NIT. The Bid
Document as uploaded can be viewed and downloaded free of Cost by anyone
including intending bidder. But the bid can only be submitted after uploading the
[8]
But the bid can only be submitted after deposition of original EMD either in the office of
Executive Engineer inviting bids or division office of any Executive Engineer, CPWD
within the period of bid submission and uploading the mandatory scanned documents
such as Demand Draft or Pay order or Banker’s Cheque or Deposit at call Receipt or
Fixed Deposit Receipts of any Scheduled Bank towards EMD in favour of Executive
Engineer as mentioned in NIT, receipt for deposition of original EMD to division office of
any Executive Engineer, CPWD and other documents as specified.
Interested bidder who wishes to participate in the bid has to make applicable e-bid
processing fee to M/s ITI Ltd. through their gateway by credit/debit card, internet
banking or RGTS/ NEFT facility.
Details of Beneficiary:
3. The intending Bidder must read the terms and conditions of this document carefully. He
should only submit his bid if he considers himself eligible and he is in possession of all
the documents required.
4. Information and instructions for bidders posted on website shall form part of bid
documents.
5. The bid document consisting of scope of work, the set of terms and conditions of the
contract to be complied with and other necessary documents can be seen and
downloaded from website www.tenderwizard.com/CPWD or www.eprocure.gov.in free of
cost.
[9]
6. The bid can only be submitted after deposition of original EMD either in the office of
Executive Engineer inviting bids or Division office of any Executive Engineer, CPWD
with in the period of bid submission and uploading the copy of receipt of documents
such as Demand Draft/or Pay Order or Banker’s cheque or Deposit Receipts in favour of
Executive Engineer as mentioned in NIT (as per proforma “E” in NIT) and other
documents as specified.
7. Those Bidders not registered on the website mentioned above, are required to get
registered beforehand. If needed, they can be imparted training on online bidding
process as per details available on the website.
8. The intending bidder must have valid Class-III digital signature to submit the bid.
9. On opening date of Financial Bid, which will be intimated after the screening process of
Technical Bids, the Bidder can login and see the bid opening process. After opening of
financial bids, he will receive the competitor’s bid sheets.
10. Bidder can upload documents in the form of JPG format and PDF format.
11. Certificate of Financial Turnover: At the time of submission of bid, bidder may upload
affidavit/Certificate from registered CA mentioning Financial Turnover of last 5 years or
for the period as specified in the bid document. Further details if required may be asked
from the bidder after opening of technical bids. There is no need to upload entire
voluminous balance sheet.
12. Bidder must ensure to quote rate of each item. The column meant for quoting rate in
figures appears in pink colour and the moment rate is entered, it turns sky blue. In
addition to this, while selecting any of the cells a warning appears that if any cell is left
blank the same shall be treated as “0”. Therefore, if any cell is left blank and no rate is
quoted by the bidder, rate of such item shall be treated as “0” (Zero).
13. The eligibility (Technical) bid shall be opened first on due date and time as mentioned
above. The time and date of opening of financial bid of bidders qualifying the eligibility
(Technical) bid shall be communicated to them at a later date.
14. Pre-bid conference shall be held with the eligible and intending bidders to clear the
doubt of intending bidders, if any. Bidders should send all their queries by email,
before pre-bid conference, latest by 17.00 Hrs. on 21.08.2019 to the office of the
Executive Engineer, RPD-I CPWD (Telephone No: 011-23411136, FAX No: 011-
23412356, e-mail: [email protected]). Because of pre-bid conference, certain
modifications may be issued to all eligible bidders by the Engineer-in-Charge by e-mail,
if felt necessary by him. If further pre-bid conferences are required for complete and
effective interactions, the date and time of same will be communicated at the end of 1st
[10]
15. The Department reserves the right to reject any prospective application without
assigning any reason and to restrict the list of qualified bidders/ implementing agency/
Firm(s) to any number deemed suitable by it, if too many bids are received satisfying the
laid down criterion.
16. After submission of the bid the agency can re-submit revised bid any number of times
but before last time and date of submission of bid as notified.
17. While submitting the revised bid, agency can revise the rate of one or more item(s) any
number of times (he need not re-enter rate of all the items) but before last time and date
of submission of bid as notified.
18. The bid submitted shall become invalid and e-bidding processing fee shall not be
refunded if:
(i) The bidder is found ineligible.
(ii) The bidder does not deposit EMD with division office of any Executive Engineer,
CPWD.
(iii) The bidder does not upload all the documents (including GST Registration, PAN
card) as stipulated in the bid document.
(iv) If any discrepancy is noticed between the documents as uploaded at the time of
submission of bid and hard copies as submitted physically by the bidder in the office
of bid opening authority.
19. List of mandatory Documents to be scanned and uploaded within the period of bid
submission:
• Treasury Challan / Demand Draft / Pay order or Banker`s Cheque /Deposit at
Call Receipt against EMD.
• Letter of transmittal.
• Certificate of Incorporation/ Copy of Registration Certificate(s) under the
Indian Companies Act 1956/ LLP Act 2008.
• Certificate of financial turnover and no loss certificate from CA in Form-A.
• Details of all works of similar nature completed during the last five years in
Form -B
• Experience Certificate from Client in Form –C
• Undertaking for Organizational Structure as per Form-D
[11]
EVALUATION CRITERIA
1. Technical Criteria:
a. The technical bid submitted by the Bidder will be evaluated only if they fulfill the Pre-
Qualifying eligibility criteria. The Technical Proposal shall provide the information
indicated in the following paras, and the bidder shall submit the details in the formats
given in this document.
i. A brief description of the Bidder’s organization.
ii. Service provider should have capabilities/expertise in all requirements described in
the scope of work.
iii. Bidder should be able to substantiate the experience claimed in their proposal.
b. Based on the responses furnished by the Bidder against the Scope of Work
requirement, the Committee shall evaluate the technical proposal as indicated
below in Technical Evaluation Framework and award marks to each bidder.
CPWD reserves the right to check/validate the authenticity of the information provided in the
pre-qualification and Technical evaluation criteria and requisite support must be provided by
the bidder.
Only those bidders who are first stage pre-qualified after evaluation of documents /details
submitted by them will be asked to submit presentation as part of technical bid at the notified
date, time and place before the evaluation committee. In the next stage, presentation of the
bidders shall be evaluated.
[13]
Evaluation of this part of Technical Bids shall be carried out by the evaluation committee
formed by the competent authority of the Employer/Client/Department.
The following sections explain how the bidders will be evaluated on technical evaluation
criteria.
S. Criteria Details Documentary Max.
No. Evidence Marks
1. Feasibility of The standard ERP is to have Work Order/
proposed minimum 5 active implementations Purchase Order 100
Standard in Government / PSU / Utilities with supported by
ERP more than 1000 transactional users Customer
Application of the proposed standard ERP Completion /
(OEM) for modules Product Acceptance
CPWD The references / certificates should Certificate OR
clearly state users / Reference letter
implementations that are actively from customers
being used as on last day of tender stating modules
submission. implemented and
active users
1. For Citations =5 65 marks
2. For Citations >5&<10 80marks
3. For Citations >= 10 100 marks
2. Bidder Prior Experience: Citation shall Copy of work order
Experience in be from last 7 years ending last + Completion 100
Application day of month previous to the one in Certificates from the
Development which applications are invited: client; OR
* At least one (1) citation should be Work Order + Self
successfully completed of the Certificate of
proposed Standard ERP in Completion
government departments/public (Certified by
sector units CS/independent
auditor of the
* 2 citations (at least 1 should be
bidding entity);
successfully completed) = 100,
* 1 citation (successfully
completed) = 65
Wherever there is problem in
providing name or cost of project
due to Non-disclosure agreements
with the clients, the bidder can
provide a certificate from an
independent auditor or Company
Secretary. The certificate should
[14]
Bidders Final Technical score Final Commercial score Final Score (70:30)
SECTION- B
[19]
GLOSSARY
LD Liquidated Damages
PQ Pre-Qualification Criteria
1.1 Objective:
The detailed Scope of Work (technical and Functional Requirements) is given below:
General
2. The system shall enable definition of workflow for the process and easy
configuration of user interface by the administrator.
3. The system should provide access to only authenticated and authorized users.
4. The system should provide provision for automatically sending the alerts/messages
as defined by the process requirement and sent to the concerned recipients by
email/SMS.
5. The system should have the capability of creation of reports based on various
parameters, as per the requirement of the process. These reports should be
available at the click of a button.
6. The system should have the capability of exporting these report in a number of
format like Doc(x), Xls(x), Pdf etc. or as desired by the user.
7. The system shall have provision for alerts to be automatically raised, as defined by
the process requirement.
10. System should be able to capture the data pertaining to all aspects of the project
that will contain details like technical details, financial aspects of the contracts,
advance payments, repayments, work-orders, physical progress, completion
schedules, expenditure incurred under various heads, targets for key milestones
and analysis for deviation of actual achievement against these targets
11. System should have ability to allow searching and retrieving information related to
relevant projects quickly from various sources of data etc.
[21]
13. The System shall enable the ability to add approvers/reviewers to the approval
path; restricted ability for requesters or approvers to override approvals.
14. The System shall enable reminder notices for late approvals - request for
notification if no action is defined number of days.
15. The system shall facilitate to define the project in the system, specifying the plan
head fund source, abstract estimate, date of sanction, overall time frame etc.
16. The system should allow creation of new projects by using templates of an existing
project
17. The system shall facilitate the concern official to make decision for allocation of
work to Project Implementation Unit based on nature and geography of work.
18. The system shall facilitate the concerned official to prepare proposal for allocation
of work to a project unit and get approval from all concern authorities
19. Once the approval is received system shall facilitate to prepare office orders and
forward it to all concern officials specifying the project unit responsible for the
execution of the project.
20. The system should enable definition of project, its governance structure/ WBS
21. The system shall facilitate to define Project Governance Team, roles and
responsibilities to support decision-making in the project.
22. The system shall facilitate CPM to nominate project director and same is configured
in the system.
23. The system shall facilitate CPM to inform the respective department (Civil,
Electrical and Horticulture) about allocation of work to the project unit.
24. The system should enable preparation of the Work Breakdown Structure (WBS) by
selecting work items from existing projects/templates
25. The system should provide customizable templates and business workflow for
definition of project program. It should allow to capture multiple parameters required
for the project initiation
26. The system shall facilitate Project Director to define project milestones, along with
timelines, for implementation of the project.
[22]
27. The project director defines the project program by specifying milestones in the
system. The system shall provide configurable pre-defined project program
template for definition of the project program. The structure of the initial project
program could be as follows.
i. Conduct Field Location Survey (FLS)
a) Selection of FLS consultant
b) Approval of Detailed Design
c) Approval of Submitted FLS Report
ii. Preparation of Detailed Estimate
a) Detailed Estimate for Civil, HORTICULTURE and Electrical
b) Approval of Detailed Estimate
c) The estimate shall be prepared block section wise and station wise and
should be able to be consolidated.
iii. Selection of Project Management Consultant
a) Issuance of tender
b) Evaluation of Bids
c) Finalisation of Consultant
iv. Selection of Works Contractor
a) Issuance of tender
b) Evaluation of Bids
c) Finalisation of Contractor
v. Commencement of Work
vi. Testing of equipment and service.
vii. Commissioning of Work
viii. Intimation of shortcomings and defects and compliance
28. The system should enable updation and versioning of project program.
30. The system should provide the functionality to define a workflow matrix specific to a
contract.
31. The system should provide the functionality to be able to enter milestones,
[23]
milestone dates and Key Performance Indicators in the system specific to the
contracts
32. The system should provide the functionality to enable consolidation of all
information/data of all the contracts of a particular project in project management
module
35. Ability to create approved budget details (activity wise/ Item wise)
39. The system should provide the functionality of allocating / distributing project
budget over the project period as per needs of project phases
40. Ability to define project Work Breakdown Structure / Work Scheduling (WBS) by
breaking down to Networks and activities
42. Ability to create a repository covering all the packages containing defined
parameters like progress status of all the billable/ no billable items, Bill of Quantities
(BOQ) having quantum of work and unit rates, status of quality checks etc.
43. The system shall facilitate concerned officer to request the representative of other
departments in Project Governance Team to provide detailed estimates for their
department (Civil, Electrical and Horticulture). The system shall forward the relevant
tentative drawings received from FLS to the respective departments through
system.
44. The system should provide customizable templates for preparation of detailed
estimates.
45. The system should allow access of relevant drawings and enable viewing the
drawings.
46. The system should allow access to the database of items in BOQ and additional
items required for detailed estimate, not in BOQ.
[24]
47. The system shall allow the concern officer to define different subheads of the
detailed estimates by selecting work items from
BOQ and
BOQ
48. The system shall provide access to relevant items for that particular sub-head from
these databases while creating estimates for each component
49. The system shall provide access to other previously performed detailed estimates
to support the process of estimation.
50. The system should provide access to the central repository with previously
performed detailed estimates and historical data related to detailed estimates.
51. The system should allow specifying Non-Schedule (NS) items and their rates and
allow uploading of scanned supporting documents.
52. The system shall forward the detailed estimate to concern departments for
technical and financial vetting once the detailed estimates are prepared.
53. The system shall facilitate preparation of the BOQ for single/multiple package
based on drawings.
54. The system should allow access of relevant drawings and enable viewing the
drawings.
55. The system should allow access to the database of items in BOQ and NS items.
56. The system should provide access to the central repository with previously
prepared BOQs and historical data
57. Facility to forward the BOQ to concerned officer of respective department (Civil /
HORTICULTURE / Electrical) for technical vetting.
58. The system should provide tracking of drawings / designs related to a project
through the approval process along with the due dates in the workflow.
59. The system should allow access of relevant drawings, enabling viewing and
facilitating comments / remarks
60. The system should allow maintaining and identifying drawings, specifications and
other supporting documentation in the Drawing Log.
61. Facility to forward the drawings and designs to the concerned officer (CPWD-PIU /
PMC) for checking and approval once the error is rectified and also
62. The system facilitates the concerned officer (CPWD) to check the submitted
drawings / designs for completeness and correctness.
[25]
63. The system shall provide access to relevant documents, specifications, manuals,
drawings and designs required for checking the drawings / designs.
64. Provision to forward the comments given by the officer who checks the drawings /
designs and may advise alterations, if required.
65. The system shall forward the drawings / designs to the next level for approval, if
required
66. The system shall facilitate the concerned PIU officer to provide approval after
verification of inclusion of the changes.
67. The system shall track the status of the approval of drawings and send alert if
delays occurred.
68. The system should allow viewing and collaboration on all document types
69. The system should allow viewing and access to engineering documents
70. The system should allow access to relevant documents, specifications, manuals,
drawings and designs required for checking the documents.
72. The system shall provide templates to enter Detailed Works Programme, for
different Plan Heads.
73. The system shall allow CPM to define/modify the project team by selecting
members from list of concerned CPWD PIU‘s project staff, assign team members
their respective roles that would define the project‘s Organization structure and the
tenure of each project team member on the project.
74. The system shall be able to link up the time recording to man-days booked by the
PMC staff in a month, and would be used to aid PMC‘s invoicing process, as per
PMC Contract‘s Payment terms and conditions.
75. The system shall be able to record the Works progress data entered by the Project
Engineers
76. The System shall be able to check the Quantities against the Contract and given an
appropriate message if the Contract quantities are exceeding
77. Facility to create the Invoice against Measurement Book (Service Entry Sheet)
78. The System shall automatically calculate the invoice value by picking the price from
the Contract and quantity of items consumed for the amount of work done, from the
Measurement Book data (BOQ being an integral base of it).
79. Once the invoice is created, the same shall be approved by the PMC. The invoice
will then be forwarded to the concerned CPWD official for processing.
[26]
80. The system shall be able to Record the purchase data which shall update the
Materials inventory / at Site Stores managed by the CONTRACTOR. Items added
to or issued from the Stores would employ a streamlined Materials issue and
receipt practice, enabled through the System.
81. The System shall also raise in advance, replenishment notices/alerts to the
CONTRACTOR and PMC so that the items which are low on inventory or could go
below threshold value, are procured in time.
82. The System shall be able to send user defined alerts on infringements, slippages,
project delays or cost overruns. In case the infringements, slippages, project delays
should amount to deductions in payment for the contractor/PMC, the same would
be checked for and applied during invoicing process initiated by the PMC
83. The System shall operate on predefined/configured approval workflows for all
changes to be made in procurement / inclusion of NS items, alignment, drawings or
designs etc.
84. The System shall provide an integrated Incident logging and tracking system for
both the Contractor and PMC. These incidents could refer to events or activities
pertaining to project execution.
85. The system should have a real time cost sheet where project cost information is
available for drilldown by work package or for the entire project.
86. The system should provide real-time cost sheets to manage information around
Budgets, Forecast, Commits, Change Commits, Spends, Variances, Trends, and
more.
87. The system should have powerful Engine to enforce cost and funding controls.
88. The system should allow for configuring the approval workflows based on the
Delegation of Power at CPWD. The system should also allow for configuring other
approval workflows for changes to schedule, designs & drawings, activity plan,
alignment etc.
89. The System should be able to generate various MIS reports for project monitoring
and control on the following heads, but not limited to them:
I. Monthly progress (Timelines, Percentage of Completion)
II. Financial progress (Planned Revenue Vs Actual)
III. Budget (Planned Vs Actual)
IV. Costs (Planned Vs Actual)
V. Approved payments to contractor / PMC
VI. Pending payments to contractor / PMC
VII. Vendor payment history
VIII. Stores inventory status
[27]
90. The system should enable recording of resource (Material, Labour& Equipment)
consumption against each activity/project
91. The system should enable recording of duration wise, unit wise and physical
progress for each task.
92. The system should provide analysis of the project, based on Earned Value Analysis
and Critical Path Analysis etc.
93. The system should provide report templates and enable configurable reports to
exhibit project related information.
94. The system should provide predefined project management reports and
dashboards based on global project management best practices and ability to
automatically drill down into more information
96. The system shall track each activity and project based on:
I. Budgeted Cost
II. Actual cost for a period
III. Actual cost to date
IV. Percentage completed
V. Cost to complete
VI. Cost at completion
97. The system should enable to prepare ad hoc report layouts by grouping, sorting,
filtering projects, project activities etc. on various parameters like location,
department, responsible person etc.
99. The system should be able to conduct critical path method (CPM) scheduling, using
the activity durations, relationships between activities and calendars to calculate a
schedule for the project projecting finish dates automatically.
100. The system should be capable to manage complex projects without any limitation
on number of activities. It should be capable of managing such multiple complex
projects
[28]
101. The system should help identify and reviewing the critical path of activities (those
activities that affect the completion date for the project or an intermediate deadline,
and if delayed will delay the whole project)
102. The system should enable schedule analysis by enabling the Critical path data pre-
filtered in dashboards.
103. The system should allow conducting Multiple Float Path Analysis to identify multiple
critical paths within a project to help avoid potential delays before they occur and to
help visualize an activity's importance to overall project plan.
104. Should be able to prepare detailed project plan in accordance with the BOQ
105. The system should be able to provide the scheduling of Material procurement plan.
106. The system shall be able to create consolidated financial statements per project
and CONTRACTOR / vendor.
108. The system shall be able to track project cost across project offices and time
periods
109. The system shall be able to track vendor invoices and their payments with respect
to advances, job competitions, outstanding dues against other projects etc.
110. The system shall be able to allow for splitting of an expense item across multiple
project
111. The system shall be able to calculate the percentage completion of the project
using the following measurement techniques:
I. Start-finish rule (i.e. percentage completion of the project is based on the
number of activities completed)
II. Time proportionality (i.e. percentage completion is defined by the time spent
on the project to the total time allotted for the project)
III. Milestone technique (i.e. milestones are defined for the project, completion of
which would be used to compute the total completion of the project)
113. The system should allow preparing multiple baselines to capture the initial project
plan and revisions. The system should also enable to keep multiple versions of the
baseline and categorize them accordingly, e.g., initial plan, approved, latest catch-
up etc.
114. The system should allow benchmarking current project against any baseline and
make the entire team aware of how the project is performing.
[29]
115. The system should allow restoring baseline and do controlled update to baselines
to accommodate scope changes
116. The System should be able to perform complete variance analysis with respect to
planned duration, schedule, cost and efforts at different level of project WBS.
118. System should provide the provision to revise the list of Project BOQ items during
various project’s execution when some unidentified items being purchased for
Works execution or some NS items getting repeated in different projects.
119. System should provide the provision to ―Newly identified items‖ when the new and
/ or repetitive set of BOQ items (as well as Non Scheduled items) get identified
during projects execution.
120. Project BOQ should be updated in the System after negotiation with bidder.
121. In case of items which are not available in BOQ but required specifically for the
project and some of the items which are available in Standard BOQ but the rates of
these items are dependent upon lead of input materials received in the System, the
System should provide the provision to aid the concerned official of PIU in
analyzing the rates for arriving at estimated rates to be adopted for each project
separately.
122. The rates adopted in the BOQ should be updated on an annual basis for each
Schedule on an overall basis through the System, considering the latest market
rates that were obtained over the BOQ rates for each schedule in recently awarded
tenders.
123. After receiving these changes through the System, Manager of concerned
Department should be able to send it to Competent Authority for approval through
the System.
124. System should be able to send notification to all PIU on the updates made to the
BOQ, SBD. This version of BOQ and SBD should become the version to be used
by CPWD for all future tenders.
General
2. Flexibility to define fiscal year including start month and end month
4. Provision for separate logical periods for the purpose of annual closing activities
7. Allows to keep multiple periods open across financial years or within financial year
9. Ability to define exchange rates within multiple currencies vis-à-vis base currency.
10. Flexibility options for posting of these differences meet criteria defined by the Indian
Accounting Standards
11. Ability to draw complete set of books of accounts such as profit and loss account,
balance sheet for the legal entity, each circle, division, Zone etc.
15. Numbering sequence for all documents is reset per fiscal year.
16. Flexibility to control posting to specific ledger accounts with specific documents
18. Record and tracking of audit objections and corrective actions taken
20. Support definition of Organization structure as legal entity, its Zonal, Regional,
circles, divisional offices etc.
21. Support definition of country, regions, sub-regions to meet legal requirements such
as GST, TDS, state taxes and local corporation taxes & duties
23. The scanned copies of submitted bills and other documents shall be kept with high
standards of security for record-keeping and audit.
24. Receipt of electronic submissions, including the date and time of submission, shall
be acknowledged immediately, and shall also be sent electronically
25. The system shall enable creation of detailed reports based on the various
parameters as per the requirement. These reports shall be available at the click of a
button.
[31]
26. The system shall enable exporting these report in different formats like Doc, Xls, Pdf
etc. or as desired by the user
27. The system shall have provision for alerts to be automatically raised, as defined by
the process requirement and sent to the concerned recipients by email/SMS. These
alerts can be of confirmation, status update or escalation.
28. The system shall enable definition of workflow for the process and easy
configuration of user interface by the administrator
Financial Vetting
29. Provision shall be made to pre define the areas that needs to be vetted for each
category.
32. Detailed estimates are prepared by system hence using approved rates and
quantities available in system. Hence there is no scope of arithmetical inaccuracy.
Finance will generate reports from system to
I. Validate unit rates w.r.t. BOQ, rate analysis, quantity etc.
Validate variations for escalation & other than escalations factors against
abstract estimate
II. Validate Budget Outlay for the current financial year in the project concerned
35. The System will give provision to authorize finance official to ask clarification if
required for vetting from the concern person.
36. There should be a provision for fetching the earlier vetted proposals and the
comments made on them.
Payment to Contractor/PMC
37. The system shall allow raising of invoice and options to upload scanned documents.
38. The system will provide templates for raising the invoice to the for different types of
work:
i. Mobilization advance
ii. Provisional Payment
iii. Payment against Measurement Book
iv. Final payment
v. Payment against Price variation etc
39. All the invoices will be raised by the PMC. All the invoices will be raised through the
system.
40. The system shall aid in generating the invoices by fetching the rates from the
contract and the quantity from the measurement book.
41. The system shall confirm whether the bill is approved by the competent authority.
42. The system then shall facilitate to make the following checks:
i. Check bills as per agreement/contract and Measurement Books
ii. Check rates are taken as per contract or approved rates.
iii. Check that quantity claimed is within the approved quantity in BOQ or NS items.
iv. Check all mandatory tests done. Check Test Certificate provided by agency.
v. Check date of completion (DOC)
vi. Check if all the required certificates like certificate and acceptance by the
employer, certificate of payment signed by CPM/project director/CA, have been
recorded
vii. Check the calculations and recoveries like TDS, CONTRACTORT (Work
Contract tax), Labour cess, Royalty, Mobilization advance, Interest on
mobilization advance etc.
viii. Refer validity of related documents, bank guarantee and insurance available on
[33]
date.
43. In case of final bills the system shall facilitate to check the following additional things
i. No claim certificate has been submitted by the Contractor
ii. Work has been completed as per contract
iii. Quantities claimed were as approved in variation statement if any.
iv. Final corrigendum/addendum is approved by CA after finance vetting
v. Material reconciliation statement is signed by contractor. (Material issued to
contractor is consumed or returned by contractor.)
vi. All the free material supplied to contractor is accounted for Scrap is submitted
by contractor if applicable.
vii. Check the certificate from employer stating that all material supplied to
contractor is reconciled
viii. Checked that nothing is due against contractor
44. System shall allow authorised users to access invoices, approved rates, quantities,
required certificates, RFI etc. to check/validate invoice manually.
45. System shall have option for mobilization advance payments, recovery, with holding
of payment etc.
46. CPM shall be provided option to issue certificates related to work completion etc.
47. System should have provision to manage Bills/ vouchers, available with Finance
Department for record keeping. All these documents should be available in form of
invoices in system.
48. Once approved by the competent authority, the system shall make necessary
entries in the books of accounts
49. Once accounting entries are made, the system shall allow the payment process.
System should provide provision to Banking Official of Finance for selecting mode of
payment with suggestion for selection of these modes on the basis of account
details available in Invoice. Following modes should be available for payment.
i. Payment Advice
ii. NEFT
iii. RTGS
iv. Cheque
The preferable mode of payment will be NEFT (upto 2 lakhs) or RTGS (> 2 lakhs)
50. System should be able to auto generate the payment instruction file; Competent
Authority should be able to review the auto generated file and should be able to edit
the file if required.
51. System should provide provision to make payments through cheques also.
[34]
52. Cheques should be printed through System and System should provide provision for
digital signature by the Competent Authority. There should also be a provision to
assign a system generated number on the cheque.
53. System should generate a list of payment on the basis of Printed cheques, which
should be reviewed and reconciled with the bank statement received online/ in soft
copy.
54. System should provide provision to make payments to all government organizations,
statutory authorities for TDS, CONTRACTORT/ labour cess, service tax etc.
55. After payments, mode of payment/reference numbers are captured along with the
paid bills/vouchers for record keeping and system also gets updated with these
details/reference numbers.
56. System shall make the payments on First in First Out (FIFO) basis
57. System shall provide overriding authority to select authorized official to overrule
FIFO method, but mandatorily ask for the reason for the same
58. System shall also support exception scenario such as cheque revalidation,
cancellation, duplicate cheque printing, etc.
60. System shall facilitate the user in matching of the cheque issued/ ECS or NEFT
Transaction Id against the cheque realized/ ECS or NEFT executed based on the
information received from the bank. Provision shall be made to receive statement
from the bank in the soft format through the portal and do auto reconciliation.
61. System shall generate an exception report to settle differences with the Bank
subsequent to the reconciliation process
62. The system should be able to categorise project based on the funding agency and
should provide the statements needed by these agencies to support the demand of
funds.
System should be able to generate project wise Report for
i. Expenditure during the year till date of demand including management fees and
common expenses (pro rata booking of common expenditure)
ii. Revised/ Latest estimated cost of project (including expected Price variation)
iii. Status of physical progress of the project
iv. Revised completion target
v. Management fees as per agreement
[35]
63. System should be able to calculate balance funds available for project expenditure.
65. Concerned official should be able to update the status of demand request when
Funds directly credited to CPWD‘s specific current account.
66. System should be able to prepare Receipt Vouchers for funds and accounts should
be updated accordingly.
67. System should have provision to send an advice to CPWD and notification through
email as well.
68. Contractor should be able to furnish Details of Insurance and Bank Guarantee (BG)
in a pre- defined format through the System and original documents should be
submitted to finance department of PIU.
69. System should provide provision to upload scanned copies of BG and Insurance
documents. System should send a notification to Finance department about
uploading of documents.
70. System should be able to check whether Insurance and BG are as per contractor
not e.g. amount, date of validity, Project name, number & location, date of
submission of documents etc. The system shall auto assign the Bank Guarantee to
respective project.
71. System should provide provision to CPM/Project director for verification and
approval of details of Bank Guarantee (BG) and Insurance documents.
72. System should provide the checklist for verification for the same.
73. System should provide provision to the Contractor to make covering letter for BG
with the help of templates available in the System.
74. After pre-screening, in case of BG, System should be able to record the confirmation
about genuineness of BG with relevant details. System should provide provision to
finance official for file confirmation letter received from bank in case of BG and
upload scanned copy of letter on system.
75. System should provide intimation (email/SMS) to Finance Official and concerned
CPM before 2 months of expiration of BG or Insurance. Also in case of BG
intimation goes to Bank as well.
76. CPM should be able to raise a request for extension of date of BG, if required
[36]
77. System should provide provision for approval of extension Request of BG.
78. If BG extension received then concerned official should be able to update extension
details of BG in the System.
79. System should provide provision to CPM to raise a request to release BG in system.
Financial Accounting & Taxation: Maintenance of Accounts data and Bank reconciliation
82. The System should provide for the following Global settings to be defined for
Finance and Accounts
84. The system should be able to capture common expenditure pertaining to projects
like:
i. Distribution of common expenses between/among projects and then sub-heads.
ii. Distribution of management fee being changes on the projects as per the
specified percentages on those specific projects.
iii. Calculation of depreciation on assets on any specific date may be provided by
the system.
iv. The assets should be linked with the user
v. All dues/outstanding of any customer/contractor/vendor and employee should
be available on a single window as status at any point of time.
85. Ability to define Legal entity, HQ, Regional office, other units etc. with automatic
General Ledger level consolidation
86. Ability to support flexible Chart of Accounts design for capturing information to meet
various reporting and analysis requirements of CPWD without duplication of data.
87. Ability to view & maintain the chart of accounts online with the provision to prevent
deletion ofany data.
88. Ability to support future expansion in operations of CPWD for e.g. additional
Location (PIU wise, account wise) etc.
89. Ability to provide parent, child, sub child and further relations between various
[37]
accounts in a chart of accounts. System should not allow posting to the parent
account.
90. Ability to define rules that ensures validity of various combinations of chart of
accounts.
91. Set up security by various user groups to restrict access for those account ranges
that belong to a different departments/groups
92. Account level security by user should be available. e.g.: The system should restrict
user entering or reviewing balances for certain account or range of account
93. Ability to restrict an account posting to a specific cost center or project etc.
94. Ability to create account only for budgeting purposes and for limited periods.
95. Centralized account maintenance capability. This will ensure that any addition or
change in the account code in the master chart of account will be available
automatically in all the ledgers/books.
96. Ability to group the accounts by different types (user defined) e.g. assets, liabilities,
etc.
97. Ability to drill down on any Ledger A/c in the chart of A/c to see the details of the
Ledger
98. Ability to define more than one Chart of Accounts, if required by CPWD
99. Ability to support multiple GAAP representations to meet statutory and regulatory
requirements.
102. The System should be able to handle creation, edit and deletion of Voucher entries
for Ledger Accounting. The following Accounting Vouchers would get automatically
maintained:
i. Journal Voucher (requires Plan head, Source of fund, Name of project, Head of
expenditure, Ledger heads) (Plan Head, source of fund, Name of Project
combined makes a cost centre)
ii. Payment Voucher
iii. Contra Voucher
iv. Receipt Voucher
103. The System should be able to generate Expenditure statements of PIUs along with
the comparison with budget.
104. The System should be able to convert Bank Statement extracts to relevant Ledger
[38]
105. The System should be able to handle reconciliation of Debit & Credit entries
106. The System should be able to generate the Bank Reconciliation Report
107. The System should be able to generate MIS reports for all Ledger accounting
transactions, as required by CPWD without having the need for separate Data
warehouse and Business Intelligence systems
108. System should be able to provide approved invoice/bills with uploaded supported
documents by different departments of CPWD.
109. System should be able to capture expenditure details of PIUs with supported
documents/vouchers on weekly basis.
110. On the basis of expenditure details received from PIUs and approved invoice/bills,
System should be able to maintain following Accounting Vouchers (voucher entries
performed) for Accounting:
i. Journal Voucher (requires Plan head, Source of fund, Name of project, Head of
expenditure, Ledger heads) (Plan Head, source of fund, Name of Project
combined makes a cost centre)
ii. Payment Voucher
iii. Contra Voucher
iv. Receipt Voucher
111. System should be able to take care for following validations while making Voucher
entries:
113. System should be able to take care of proper head of allocation according to chart of
accounts is written on it.
114. System should provide Code (According to chart of accounts) for allocation to a
particular project.
115. System should be able to provide voucher details with supported bills/challan/office
order for payment.
116. Payments would be processed post scrutiny concerned F&A staff, on the basis of
the delegation of power.
117. The approval workflow of the system shall be able to send the electronic payment
vouchers to AM / Manager, Banking Operation (BO) for payment.
[39]
118. System should provide Vouchers related to payment in following voucher types:
i. Cheque Pay Voucher (For electronic cheque printing)
ii. Payment – Head Office (HO) (For manual cheques)
iii. Payment RTGS (For funds transfer, where account of beneficiary is in any bank
other than transferor bank)
iv. Payment Advice (Funds transfer to accounts of beneficiary, where account is
maintained in same bank)
119. The system shall allow execution of the payment process for online transfer of
money (RTGS, NEFT). An electronic payment advice would be generated by the
System which will be sent to the Bank
120. System should be able to check that every entry should pass in such a way that
every credit and debit to a particular party/employee can be traced with the entry.
121. The system should provide the facility prints would be taken from the System of the
electronic vouchers along with their supporting vouchers and would be kept in the
space provided by CPWD
122. System should provide every ledger head in accounts department based on the
Chart of Accounts. The Chart of Accounts should be compiled with a view to
systemize the maintenance of accounts ledgers in CPWD by providing a meaningful
nomenclature and (10 digit) numeric codes to each ledger. The numeric codes
should assigned taking into consideration the requirements of preparation of
accounts in conformity with Revised Schedule VI of Companies Act, 1956 and
International Financial Reporting Standards (IFRS)
123. In System, The Chart of Accounts should also accompanied by a scheme of cost
centres that helps to identify expenses on a particular project and branch.
124. After making posting entries on respective Ledger heads, System should send
vouchers online to concerned official for payment. System should be able to make
payments related to PIUs/branches directly, after payments entries are passed in
System.
125. System should provide facility to scrutiny of vouchers and vouchers should be print
(at month end), affixed with supporting and System should provide safely storage of
Vouchers in a file.
126. For periodic Bank reconciliations of debit and credit entries, Manager (F&A) (BO)
should be able to extracts Bank Statement either from Banking person or through
the Bank‘s website
127. The finance official should be able to match the deposits & payments on the Bank
Statement with those recorded in the Bank books.
[40]
128. The finance official should be able to trace the entries which should be entered in
System but not realized by Bank and vice versa. The finance official then should be
able to reconciles the difference(s) between Bank and System
129. Once the pending debits & credits should clear Manager (F&A) (BO) should
reconciles those items and should prepares the Bank Reconciliation Report.
130. The System should be able to extract Ledger Account entries for Trial Balance
131. The system shall alert the concern F& A official on predefined time to perform trial
balance.
132. The system shall send alert to all concern approval authorities for finalization of
accounts
134. The System should be able to initiate Audit of Accounts and capture results of the
Audit
135. The System should allow revision of Ledger Accounts data for Financial Statements
preparation
136. The System should be able to trigger approval workflows for Finalization of Accounts
137. The System should be able to prepare account in predefined template of Forms
23AC and23ACA for filing returns.
Accounts Receivables
139. System should be able to maintain an Accounts Receivable master record with the
following details:
i. Customer Code
ii. Customer Name
iii. Customer Address
iv. Customer phone no.
v. Customer e-mail id
vi. Customer Credit
vii. Customer payment terms
viii. Customer Bank Account details
ix. Prior Payment History
x. Description
xi. Invoice Number and Date
[41]
140. Should generate alerts / reminders based on the Payment terms with the customer
143. Should be able to change the code for a service in future by adding suffixes
144. Should be able to change the code for a service in future by adding prefixes
146. Should be able to perform all transactions related to a customer with reference to its
customer code
148. Should be able to use user defined formats for the invoices
149. Should be able to generate reminders and alerts for invoiced and due from
customers
151. Should be able to automatically update the accounting records as soon as the
receipt is generated
152. Should be able to generate reminders to clients for payments before 180 days
153. Should be able to send across the certificate to the vendor through electronic mail
154. Should be able to record reasons against late payments made by customers
156. Should maintain and generate reports on Outstanding from customer with reasons
and action plan
157. Should be able to separate the creation and approval of customer invoices and
modifications
161. Should show account balances for the Previous year‘s figure and the YTD figure
163. Should be able to generate trend analysis based on the customer hierarchy
164. Should be able to generate a list of inactive customers and then delete it after
necessary approval
169. Should have the provision of trail balance, aging reports and accounts receivables
action reports
170. Should be able to allocate cash receipts to invoices including the ability to hold
unallocated reports
Accounts Payable
177. Should be able to receive, electronically, with digital signatures, invoices from
contractors, consultants
181. Should be able to make recurring payments at a frequency other than month
182. Should be able to perform release - approval hierarchy for Invoice approval
183. Should be able to provide the following fields in the transaction record:
i. vendor code
ii. vendor reference invoice number
iii. unique transaction reference for internal use
iv. invoice type, terms, invoice date, invoice receipt date, posting date, due date,
period
v. gross amount, discount/deductions, penalty deducted for late delivery
vi. other deductions, net amount, quantity, unit price, transaction currency,
currency rates
vii. payment method e.g. cheque, telex transfer
viii. bank details
ix. narrative
x. GL code
xi. hold information
xii. status code
xiii. flag prepaid for items
xiv. whereabouts of invoice for tracking
184. Should enforce additional check for verification for period specified invoices
185. Should alert at the time of invoice receipt and entry as to whether the invoice is
duplicate
186. Should be able to reference GRN under which the items were received
190. Should alert and stop transaction if the invoice has already been paid
[44]
192. Should be able to copy details automatically from the purchase order to the invoice
193. Should be able to edit copied details from the purchase order
194. Should be able to prevent (access rights) users from changing details copied from
the purchase order GL distribution codes should be validated:
i. in the AP
ii. interactively in a GL
iii. only when interface files are input to a GL Validation should be on-line and/or in
batch.
iv. Invalid transactions should be rejected or posted to suspense
195. Should check that the total recorded against the distribution lines equals the total
invoice sum
196. Should be able to capture data for printing cheque automatically from the system
i. Vendor
ii. Amount
iii. Other details
198. During the cheque printing routine, should print asterisks or wild characters to fill up
the numeric and description blocks not being used in the amount and word fields of
the cheque. There should be a provision for printing system generated number on
the cheques printed for tracking.
200. Should be able to process invoices with both debit and credit lines
202. Memo postings should be made immediately such that they would be available for
inquiry purposes
i. Posting should update:
ii. accounts payable
iii. general ledger
iv. purchase order processing
v. if the bill passed amount is different than the PO amount, the effect will go to
store ledgers
203. Should be able to save supporting detail associated with the suspended item in the
same format as it was originally entered, and transferred to the proper code when a
correction is made
204. Transaction types should be by default AP voucher for all transaction through AP.
208. Should post discounts automatically to the correct general ledger account for
discounts
209. Should be able to process more than one accounting period typically previous and
future periods
210. Should be able to handle accruals with automatic reversal in the next period
212. Should be able to match invoices to goods and services received which have
generated, on receipt, an accrued liability
[46]
215. Should distinguish between types of prepaid advances & adjustment of same while
passing the bill
216. Should be able to select bank accounts for disbursements, including reviewing
multiple bank accounts to determine the proper account to issue checks from
218. Should be able to process unmatched GRN at the end of any date/month
221. Should generate liability statement for transporters invoices as against materials
already received by CPWD
223. Should be able to maintain open items in both local and foreign currency
224. Should be able to maintain standard currency exchange rates for each foreign
currency
225. Should be able to handle multiple standard exchange rates for a given currency
based upon effective dates
226. Should be able to override standard currency exchange rate with each input
transaction When the standard exchange rate is overridden, output report generated
should show:
i. the standard exchange rate
[47]
227. All postings and account balances should be maintained in both local currency and
user- defined foreign currencies
231. Should be able to post foreign exchange gains and losses to a user defined general
ledger code:
i. at payment generation
ii. after revaluation against the new exchange rate
iii. after reconciliation of a payment
232. Should be able to handle payments in currency other than that of the original invoice
234. Should be able to handle voucher preparation and cheque preparation as two stage
activity manual cheques should close `open payable' items Cheque no. should be
entered for manual cheque
235. Should be able to display manual cheques appear on the cheque register
239. Should be able to make recurring payments at a frequency other than monthly
240. Should be able to make recurring payments after editing the data for the current
months modifications if any
241. Should be able to pay vendor on one cheque for more than one invoice
242. Should be able to handle multiple bank accounts in the same processing run
244. Should be able to make payment during the same processing cycle that the invoice
was entered
246. Should be able to pay invoices as specified without regard to the payment
scheduled date
247. Should be able to make a cheque on a different date than the payment voucher date
and if both dates fall in different accounting periods than in which period the effect
will be taken
249. Should list in advance all individual items to be paid on the next payment date of the
cheque processing cycle
252. Should be able to specify individual general ledger codes for each Bank account
253. Should be able to handle advance payments with and without invoice
254. Should be able to make advance payments without a purchase order but based on a
Letter of Intent
255. Should be able to pass cheque reference numbers into the general ledger to assist
with bank reconciliation's
256. Should display balance is lying in the party account at the time of making payment
and the detail of the balance can be drilled down from payment screen.
257. Should be able to identify duplication of cheque no. used with reference to payment
voucher No. In case of posted payment being voided, GL posting should be
automatically reversed
General Ledger
258. Should be able to maintain multiple chart of accounts, if required in the case of
Projects.
259. Should maintain project codes, contract codes, and job codes or assigned cost
centres.
260. Should be able to maintain task codes or activity codes assigned within projects.
261. System shall allow user to define various budget heads and allow grouping of
budget heads. Capital Budget and Revenue budget heads should be provided.
262. Should be able to create and maintain accounts and account information on-line
263. Should be able to delete inactive accounts in-line if date of last activity is in the prior
year and the account balance is zero
[49]
264. Should be able to create memo accounts for collecting non-financial statistical
information
265. Should be able to make multiple accounting periods to be open at one time
266. Should be able to post pre-payments like depreciation, internal charges for
manpower, fixed assets depreciation, etc.
269. Should be able to terminate a recurring journal entry based on the automatic
accumulation of all payments equalling total commitment
270. Should be able to set starting and ending period/year for recurring entries
271. Should be able to enter and maintain statistical information either along with or
independently of journal entries
272. Should be able to make journal entries for current and future period
273. Should be able to transfer or consolidate accounts and automatically combine all
details
274. Should be able to record settlements and adjustments through journal entries
275. Should be able to look-up by account number and description during entry
276. Should be able to close a batch of journal entry transactions that is not balanced
278. Should be able to create automatic recurring entries that allocate one account
balance among several others based on ratios
281. Should be able to sort information from a header record in each transaction
282. Should be able to repeat details from the previous journal (e.g. date, description)
while at the same time preventing duplication of journal entry
283. Should be able to debit or credit a control account by the same journal Voucher
284. Should be able to enter description for each detail line of a journal
286. Should be able to create multiple batches of journal entry at one time
287. Should be able to automatically accept and post journal entries from Account
Payable, Accounts Receivable, etc.
290. Should be able to check before a period close that all the vouchers have been
authorized and posted and Should give a warning if some unauthorized /un-posted
voucher remains in the system
291. Should ensure at year-end close that all entries are in balance and that all periods
have been closed
292. Should identify and process accruals with automatic reversal in the next accounting
period
293. Should be able to automatically post accrual/reversal entries after closing Should
automatically roll-up detail accounts to summary accounts
294. Should be able to calculate and maintain current, prior, and previous year
comparative information
297. Should be able to post errors to different suspense codes according to the source
299. Should be able to save and transfer all supporting detail of the suspended item as
originally entered when a correction is made
301. Should be able to generate Bank Payment vouchers based on these settlement
expenses
302. Should be able to generate Cash Payment vouchers based on these settlement
expenses
303. Should be able to maintain Bank required formats for Employee payment advice
305. Should be able to generate unlimited number of financial reports for balance sheet,
income statement, supporting schedule, cash flow and other specific account
analysis
[51]
306. Should be able to perform statistical calculations such as percent to total, or other
statistical analysis of accounts
308. Should be able to specify the contents of each column with no restriction i.e. current
month, current budget, year to date, budget to date, last year to date
Cash/Bank Management
309. Should be able to capture petty cash transactions in different locations on areal time
basis
310. Should be able to maintain the following information on the Bank record:
i. Bank code, Branch name and address, Type of Account
ii. Account No
iii. Fund based Limit
iv. LC limit
v. Bank Guarantee Limit
vi. Signatories authorize to operate the account
vii. Relevant GL code
viii. Name of the contact person
ix. Telephone No
x. Balance as per Bank
311. Should be able to add and maintain the cheque book No. issued by the bank
312. Should be able to generate a projected cash flow statement, monthly (10th of every
month)
313. Should include Bill discounting and other Bank Loans for projecting cash flows
314. Should generate a report before the payments run to list payments to each vendor
315. Should be able generate payment forecast for the specified periods
320. Should generate comprehensive cash requirements reports as defined by the user
321. Should be able to generate cash requirements for an individual vendor and
displayed on-line
322. Should take cash requirements reports and inquiries into account:
i. registered, but unapproved invoices
ii. projected payments in respect of goods received, but not invoiced
iii. projected payments in respect of goods on order, but not received
323. Should be able to carry out voucher preparation and cheque perpetration as two
stage activity
325. Should be able to make recurring payments after editing the data for the current
month's modifications if any
326. Should be able to make payment on more than one invoice for a vendor on one
cheque
327. Should be able to use multiple bank accounts in the same processing run
329. Should be able to make payment during the same processing cycle as that the
invoice was entered
330. Should be able to make payments on invoices as specified without regard to the
payment scheduled date
332. Should be able to make a cheque on a different date than the payment voucher date
and if both dates fall in different accounting periods than in which period the effect
will be taken
334. Should display all individual items to be paid on the next payment date in advance of
the cheque processing cycle
337. Should be able to specify individual general ledger codes for each bank account
338. Should be able to make advance payments with and without invoice
339. Should be able to pay advance without a purchase order but on a letter of intent
[53]
340. Should pass cheque number reference into the general ledger to assist with bank
reconciliation's
341. Should be able to make multiple payment runs per accounting period
342. Should show the balance lying in the party account at the time of making payment
and the detail of the balance should be able to be drilled down from payment screen
343. Should identify duplication of cheque no used with reference to payment voucher
No. Account Payable/GL
345. Should perform automatic bank reconciliation every 15 days or as set by the user
354. Should be able to import the bank statements for the purpose of bank Reconciliation
agree on the scope, format, and content of each of the major deliverables for
that stage/phase. The agreements made during this meeting will be captured
in a Deliverable Review Document (DRD) for each deliverable.
d. CPWD team will give a go ahead to move from one project milestone to the
other project milestone only after the deliverables of a particular project
milestone are accepted by the concerned authority. Hence, the protocol for
submission, review, revision and acceptance will be established at the
beginning of the project. The bidder is required to propose the details of this
protocol as a part of the proposal.
1.3.5 Project Standards: the bidder to provide Project Standards for various
activities/documentation. Following is a minimum list where standards have to
be set by the bidder:
a. Test cases
b. Test scenarios
c. Business Process Design
d. Functional design specs,
e. Technical design specs
f. Transporting objects
g. Change control
h. Reporting defects
1.3.6 Project Success Criteria: The finished standard ERP solution meets planned
scope and specifications
a. No issues pending at the end of support period
b. “on-line” transactions of all implemented modules – No backlog / offline
transaction data entry during the last month of support
c. The project is completed on time & All Users adopt the software according to
plan
1.3.7 Change Requests – Since this is a fixed price project with clearly identified
scope of solution and services, the bidder is expected to complete the project
without raising any requests for change and seeking the payments for them. If
there is a genuine change to the scope of work, CPWD will raise or accept
change requests and pay for them based on the efforts estimated for them and
the cost of manpower indicated by the bidder in the commercial proposal. The
genuineness of the change will be established based on the process,
deliverables, solution capability and the validation of it by CPWD
1.4 Project plan
1.4.1 The work Plan: Other than the management of resources/deployment of experts
and management of timeline, the project management will focus on The Work
[58]
Plan containing a detailed set of phases, work packages, activities, and tasks
preferably from the standard ERP solution implementation Roadmap.
1.4.2 Issue Management: An issue is a formally identified matter that may hinder
progress on a project or program and about which no agreement has yet been
reached. Often it can be difficult to determine which questions should be
documented as issues and which can be resolved directly without impeding the
project flow. Those items that require documentation, formal investigation and
approval should be managed as issues and this Issue management
methodology has to be proposed by the SI.
1.4.3 Scope Management: Scope of the project will be managed through a formal
scope change management process. Project management is essential to
ensure that changes to the scope of the program do not adversely affect the
program objectives. Change management documentation of project scope and
approval procedures provide a visible decision-making process for the project
and provide a clear audit trail of scope changes and the corresponding cost
benefit appraisal and has to be proposed by the bidder in the Project
Management Methodology.
1.4.4 Project structure: bidder is required to propose a Project structure based on
their own experience of successfully implementing similar solution.
1.4.5 Project Steering Committee: The steering committee would form the apex body
on various issues relating to finalization of Functional Policies and Procedures,
Requirements Definition and other policy issues. The committee will comprise of
the senior executives of CPWD. The steering committee will carry out the
following activities:
a. Mobilize the resources necessary for Project Execution
b. Standardization of processes and procedures across the company
c. Only authority to approve deviations in Scope, Project Time Lines and
Budgets
d. Meets fortnightly to review project progress & resolve issues, if any
1.4.6 Project Manager: The Project Manager assumes overall responsibility for the
assignment and ensures that all resources required are made available and the
engagement is carried out according to agreed plans. He shall function as the
primary channel of communication for all CPWD requirements to the
implementation team.
1.5 Hosting Requirements:
1.5.1 Bidder shall be responsible for hosting the standard ERP application and web
portal on the cloud platform on Platform as a Service (PaaS) model. All
prevailing guidelines of MeitY, GOI for hosting applicable to government
departments and certifications therein shall be followed before deployment.
1.5.2 Bidderwill be responsible for installation of all the software required for the
successful hosting of the standard ERP application.
[59]
1.5.3 In case there is any requirement of application specific server at any point of
time, the supplier shall be required to provide the same also without any
additional cost to the CPWD.
1.5.4 Cloud platforms should provide sufficient capacity in terms of data processing,
data storage and network bandwidth to handle the overall load and traffic
coming to the standard ERP application without compromising the overall
performance of the system.
1.5.5 It will be the responsibility of the Bidder to prepare the specification for cloud
platform i.e. CPUs, RAM, storage, required software, other equipment and the
network requirements for running the standard ERP application efficiently.
Whatever infrastructure is needed shall be clearly accounted in the bid
document.
1.5.6 Appropriate redundancies shall be built in the IT infrastructure as per standard
industry practices. The cost of cloud platform should also include cost of
Disaster Recovery (DR) site as well. The location for the DR site shall be in a
different seismic zone as that of Primary Data Centre.
1.5.7 The Bidder shall formulate an effective Back-up Strategy and Disaster Recovery
Plan and take sign-off from the CPWD. Bidder shall be responsible for the
implementation of approved Back-up and Disaster Recovery plan.
1.5.8 The Bidder shall also ensure that the hosting services should be portable to
another vendor without any changes to environment.
1.5.9 It is mandatory for the Bidder to host the standard ERP solution on the MeitY
empanelled CSPs.
1.5.10 Security and Firewall shall be as per MeitY, GOI guidelines.
[60]
SECTION-C
[61]
Amount to be
Time allowed withheld in
S.No. Milestone Deliverable in days (from case of Non-
date of start) achievement
of milestone
Fee Schedule
4 Integration Testing
- Integration Test Report 20% 55%
- Load Test Report
- WBT Content
- Assessment Modules, as applicable,
ILT Feedback
7 Go-Live
- Data Migration Sign-off 25% 100%
- User Acceptance
1. Annual Maintenance and support Cost shall be paid on half yearly basis at the end of it.
Note:
Agency will raise the invoice as per payment schedule and the payment will be made on the
basis of invoice after duly checked by CPWD.
1.5 Security
i. All access to the data center should be enabled with proximity readers, while the
access to server room should be provided only through fingerprint scanners/ retinal
scans Physical Access Control Policies need be documented
ii. Physical Access to facilities needs to be centrally controlled and all logs to be
stored for min. 90 days
iii. Access control lists need to be reviewed on a regular basis
iv. Entire data center should be monitored 24X7 through surveillance cameras
v. Redundant fire suppression and detection devices should be available
vi. Application servers Operating Systems should be protected with anti-virus software
[65]
1.8 Services
i. Services to ensure the business applications and databases up-to-date by following
a patching cycle
ii. Services to include at least 1 DR Drills per year in presence of CPWD officials
iii. To have provisioning flexibility for on-demand temporary systems within mutually
agreed timelines
[66]
1.15 Non-Disclosure:
All CPWD’s technical information, data, details, applications, papers, statements,
drawings, business/customer information and other related documents forming part of
order which may be communicated to or come to the knowledge of Bidder and /or its
employees during the project shall be treated as absolutely confidential and Bidder and
its employees shall keep the same secret and confidential and not disclose the same, in
whole or in part to any third party without the prior written permission of CPWD. In the
event of any breach of this provision, the Bidder shall indemnify the CPWD against any
loss, cost or damage or claim by any party in respect of such breach. The bidder should
execute the NDA (to be provided by CPWD with LOA) within 15 days from the date of
the LOA/PO.
and disclosure shall extend only so far as may be necessary for the purposes of such
performance.
Any document shall remain the property of CPWD and all copies thereof shall be
returned to CPWD on termination of the Contract.
The bidder shall not, without CPWD’s prior written consent, make use of any document
or information above except for the purposes of performing the Contract.
1.17 Privacy and Security Safeguards:
The successful bidder shall not publish or disclose in any manner, without the CPWD's
prior written consent, the details of any security safeguards designed, developed, or
implemented by the successful bidder under this contract or existing at any CPWD
location. The successful bidder shall develop procedures and implementation plans to
ensure that IT resources leaving the control of the assigned user (such as being
reassigned, removed for repair, replaced, or upgraded) are cleared of all CPWD data
and sensitive application software. The successful bidder shall also ensure that all its
employees and associated staff who are involved in providing such security safeguards
or part of it shall not publish or disclose in any manner, without the CPWD's prior written
consent, the details of any security safeguards designed, developed, or implemented by
the successful bidder under this contract.
1.18 Confidentiality:
This document contains information confidential and proprietary to the CPWD.
Additionally, the bidder will be exposed by virtue of the contracted activities to internal
business information of the CPWD, affiliates, and/ or business partners. Disclosure of
receipt of any part of the aforementioned information to parties not directly involved in
providing the services requested could result in the disqualification of the bidder,
premature termination of the contract, or legal action against the bidder for breach of
trust. The information provided/ which will be provided is solely for the purpose of
undertaking the services effectively.
No news release, public announcement, or any other reference to this tender/ RFP or
any program there under shall be made without written consent of CPWD. Reproduction
of this tender, by photographic, electronic, or other means is strictly prohibited.
1.19 Exit Management:
a) This clause sets out the provisions, which will apply on expiry, withdrawal by the
bidder or termination of the Agreement.
b) It is the prime responsibility of the bidder to ensure continuity of Services at all times
of the Agreement including exit management period and in no way any
facility/service shall be affected/degraded. Further, Bidder is also responsible for all
activities required to train and transfer the knowledge to the Replacement SI / CPWD
to ensure similar continuity and performance of the Services post expiry of the
Agreement. The SI will be required to carry out a gap analysis of the proposal made
by the Replacement SI and specifically inform CPWD. The Parties shall ensure that
[69]
their respective associated entities carry out their respective obligations set out in
this Exit Management Schedule.
c) In case of contract being terminated by CPWD, CPWD reserves the right to ask SI to
continue running the project operations for a period of 6 months after termination
orders are issued. The payment for such extended period shall be as per the rate
quoted by bidder in Financial Quote part –B (1) on pro rata basis.
d) Upon service of a notice under this Clause the following provisions shall apply:
i All risk in and title to the Assets, if any, to be transferred / to be purchased by
CPWD pursuant to this Clause shall be transferred to CPWD, on the last day of
the exit management period.
ii Payment to the outgoing Bidder shall be made to the tune of last set of completed
services / deliverables, subject to SLA requirements.
iii The outgoing Bidder will pass on to CPWD and/or to the Replacement SI, the
subsisting rights in any leased properties/ licensed products on terms not less
favorable to CPWD/ Replacement SI, than that enjoyed by the outgoing SI.
e) During the exit management period:
i. The SI will allow CPWD access to information reasonably required to define the
then current mode of operation associated with the provision of the services to
enable CPWD to assess the existing services being delivered;
ii. Promptly on reasonable request by CPWD, the SI shall provide access to and
copies of all information held or controlled by them which they have prepared or
maintained in accordance with this agreement relating to any material aspect of
the services provided by the SI. CPWD shall be entitled to copy of all such
information. Such information shall include details pertaining to the services
rendered and other performance data. The SI shall permit CPWD to have
reasonable access to its employees and facilities as reasonably required by
CPWD to understand the methods of delivery of the services employed by the SI
and to assist appropriate knowledge transfer.
f) The SI will promptly on the commencement of the exit management period supply to
CPWD the following:
i. All current and updated data as is reasonably required by CPWD for the
purposes of transitioning the services to its Replacement SI in a readily available
format;
ii. all other information (including but not limited to documents, records and
agreements) relating to the services reasonably necessary to enable CPWD , or
its Replacement SI to carry out due diligence in order to transition the provision of
the Services to CPWD , or its Replacement SI (as the case may be).
iii. All Intellectual Property Rights related to the Project and /or documentation
relating to Project’s Intellectual Property Rights.
iv. Project Data and Confidential Information.
[70]
g) Before the expiry of the exit management period, the SI shall deliver to CPWD all
new or up-dated materials from the categories set out in Schedule above and shall
not retain any copies thereof, except that the SI shall be permitted to retain one copy
of such materials for archival purposes only.
h) On request by CPWD, the SI shall affect such assignments, transfers, licenses and
sub-licenses as CPWD may require in favor of CPWD or its Replacement SI in
relation to any equipment lease, maintenance or service provision agreement
between SI and third party lessors, vendors, and which are related to the services
and reasonably necessary for the carrying out of replacement services by CPWD or
its Replacement SI.
1.20 The bidder shall share with CPWD the license document signed with OEM. The draft
document before signing the license agreement with OEM shall also be shared by the
bidder with CPWD.
[71]
3. We, the said bank further undertake to pay the Government any money so demand
notwithstanding any dispute or disputes raised by the bidder(s) in any suit or proceeding
pending before any court or Tribunal relating thereto, our liability under this present being
absolute and unequivocal.
The payment so made by us under this bond shall be a valid discharge of our liability for
payment there under and the bidder(s) shall have no claim against us for making such
payment.
during the period that would be taken for the performance of the said agreement and that
it shall continue to be enforceable till all the dues of the Government under or by virtue of
the said Agreement have been fully paid and its claim satisfied or discharged or till
Engineer-in-Charge on behalf of the Government certifies that the terms and conditions of
the said Agreement have been fully and properly carried out by the said bidder(s)
accordingly discharges this guarantee.
6. This guarantee will not be discharged due to the change in the constitution of the Bank or
the bidder(s).
and
c) We are liable to pay the guaranteed amount or any part thereof under this Bank
guarantee only and only if you serve upon us a written claim or demand on or
before_____________ .
INTEGRITY PACT
To,
…………………………..
…………………………..
…………………………...
……………………………
Dear Sir,
It is hereby declared that CPWD is committed to follow the principle of transparency, equity
and competitiveness in public procurement. The subject Notice Inviting Bid (NIT) is an
invitation to offer made on the condition that the Bidder will sign the integrity Agreement,
which is an integral part of bid documents, failing which the bidder will stand disqualified from
the bidding process and the bid of the bidder would be summarily rejected.
This declaration shall form part and parcel of the Integrity Agreement and signing of the
same shall be deemed as acceptance and signing of the Integrity Agreement on behalf of the
CPWD.
Yours faithfully
Executive Engineer
[75]
Dear Sir,
I/We acknowledge that CPWD is committed to follow the principles thereof as enumerated in
the Integrity Agreement enclosed with the bid/bid document.
I/We agree that the Notice Inviting Bid (NIT) is an invitation to offer made on the condition
that I/We will sign the enclosed integrity Agreement, which is an integral part of bid
documents, failing which I/We will stand disqualified from the biding process. I/We
acknowledge that THE MAKING OF THE BID SHALL BE REGARDED AS AN
UNCONDITIONAL AND ABSOLUTE ACCEPTANCE of this condition of the NIT.
I/We confirm acceptance and compliance with the Integrity Agreement in letter and spirit and
further agree that execution of the said Integrity Agreement shall be separate and distinct
from the main contract, which will come in to existence when bids finally accepted by CPWD.
I/We acknowledge and accept the duration of the Integrity Agreement, which shall be in the
line with Article1 of the enclosed Integrity Agreement.
I/We acknowledge that in the event of my/our failure to sign and accept the Integrity
Agreement, while submitting the bid, CPWD shall have unqualified, absolute and unfettered
right to disqualify the bidder and reject the bid in accordance with terms and conditions of the
bid.
Yours faithfully
INTEGRITY AGREEMENT
BETWEEN
President of India represented through Executive Engineer, Redevelopment Project Division-
I, CPWD, Room No. 141, Vidyut Bhawan, New Delhi here in after referred as the
Principal/Owner’, which expression shall unless repugnant to the meaning or context thereof
include its successors and permitted assigns)
AND
............................................................................................................
(Name and Address of the Individual / firm/ Company)
Through.................................................................... …………………… (Hereinafter referred
to as the (Details of duly authorized signatory)
“Bidder” and which expression shall unless repugnant to the meaning or context here of
include its successors and permitted assigns)
Preamble:
AND WHEREAS the Principal/Owner values full compliance with all relevant laws of the land,
rules, regulations, economic use of resources and of fairness/ transparency in its relation with
its Bidder(s). AND WHEREAS to meet the purpose aforesaid both the parties have agreed to
enter in to this Integrity Agreement (hereinafter referred to as “Integrity Pact” or “Pact”), the
terms and conditions of which shall also be read as integral part and parcel of the Bid / Bid
documents and Contract between the parties.
NOW, THEREFORE, in consideration of mutual covenants contained in this Pact, the parties
hereby agree as follows and this Pact witnesses as under:
[77]
2) If the Principal/Owner obtains information on the conduct of any of its employees which
is a criminal offence under the Indian Penal code (IPC) / Prevention of Corruption Act,
1988 (PC Act) or is in violation of the principles here in mentioned or if there be a
substantive suspicion in this regard, the Principal/Owner will inform the Chief Vigilance
Officer and in addition can also initiate disciplinary actions as per its internal laid down
policies and procedures.
2) The Bidder(s) commit himself to take all measures necessary to prevent corruption. He
commits himself to observe the following principles during his participation in the Bid
process and during the Contract execution:
(a) The Bidder(s) will not, directly or through any other person or firm, offer, promise or
give to any of the Principal/Owner’s employees involved in the Bid process or
execution of the Contract or to any third person any material or other benefit which
he/she is not legally entitled to, in order to obtain in exchange any advantage of any
kind whatsoever during the Bid processor during the execution of the Contract.
(b) The Bidder(s) will not enter with other Bidder(s) into any undisclosed agreement or
understanding, whether formal or informal. This applies in particular to prices,
specifications, certifications, subsidiary contracts, submission or non-submission of
[78]
3) The Bidder(s) will not instigate third persons to commit offences outlined above or be an
accessory to such offences.
4) The Bidder(s) will not, directly or through any other person or firm indulge in fraudulent
practice means a willful misrepresentation or omission of facts or submission of fake /
forged documents in order to induce public official to act in reliance thereof, with the
purpose of obtaining unjust advantage by or causing damage to justified interest of
others and/or to influence the procurement process to the detriment of the Government
interests.
5) The Bidder(s) will not, directly or through any other person or firm use Coercive Practices
(means the act of obtaining something, compelling an action or influencing a decision
through intimidation, threat or the use of force directly or indirectly, where potential or
actual injury may be fall upon a person, his /her reputation or property to influence their
participation in the biding process).
1) If the Bidder(s), either before award or during execution of Contract has committed a
transgression through a violation of Article 2 above or in any other form, such as to put
his reliability or credibility in question, the Principal/ Owner after giving 14 days’ notice to
the Bidder(s) shall have powers to disqualify the Bidder(s) from the Bid process or
terminate / determine the Contract, if already executed or exclude the Bidder from future
contract award processes. The imposition and duration of the exclusion will be
determined by the severity of transgression and determined by the Principal/Owner.
Such exclusion may be forever or for a limited period as decided by the Principal/Owner.
2) If the Bidder makes incorrect statement on this subject, he can be disqualified from the
Bid process or action can be taken for banning of business dealings / holiday listing of
the Bidder as deemed fit by the Principal/Owner.
3) If the Bidder can prove that he has resorted / recouped the damage caused by him and
has installed a suitable corruption prevention system, the Principal/Owner may, at its
own discretion, revoke the exclusion prematurely.
2) The Principal/Owner will enter into Pacts on identical terms as this one with all Bidders
and implementing agency/ Firm(s).
3) The Principal/Owner will disqualify Bidders, who do not submit, the duly signed Pact
between the Principal/Owner and the bidder, along with the bid or violate its provisions at
any stage of the bid process, from the Bid process.
2) Changes and supplements need to be made in writing. Side agreements have not been made.
3) If the bidder is a partnership or a consortium, this Pact must be signed by all the partners or by
one or more partner holding power of attorney signed by all partners and consortium members.
In case of a Company, the Pact must be signed by a representative duly authorized by board
resolution.
4) Should one or several provisions of this Pact turn out to be invalid; the remainder of this Pact
remains valid. In this case, the parties will strive to come to an agreement to their original
intensions.
5) It is agreed term and condition that any dispute or difference arising between the parties with
regard to the terms of this Integrity Agreement / Pact, any action taken by the Owner / Principal
in accordance with this Integrity Agreement / Pact or interpretation there of shall not be subject
to arbitration.
[81]
...............................................................
(For and on behalf of Principal/Owner)
.................................................................
(For and on behalf of Bidder)
WITNESSES:
1..............................................
(Signature, name and address)
2................................................
(Signature, name and address)
Place:
Dated:
[82]
FORM OF AGREEMENT
The agreement made on this……………………….day of month……………….year Two
Thousand fifteen between the President of India, on the one hand hereinafter known as the
President, which shall include his duly authorized representatives and officers of the Central
Public works Department, Government of India and ……………….(name of bidder/firms) on
the other hand, hereinafter known as the implementing agency, a firm carrying the business
of rendering services from the premises located ………………….. (Address of firm(s)), which
includes its authorized representatives, and legal heirs each of which will be finally and
severally liable to the President for all the obligations under this agreement.
…………………………. ………………………….
2. Witness:
[83]
Letter of Transmittal
To,
The Executive Engineer,
Redevelopment Project Division-I,
CPWD, Room No. 141, Vidyut Bhawan,
Shankar Market, New Delhi – 110001
FORM - A
FINANCIAL INFORMATION
(i) Gross Annual turnover for the last three consecutive years ending March 2018
(ii) Profit/Loss for the last five consecutive years ending March 2018.
FORM - B
NIT No: - 03/CPM/RPZ/NIT/2019-20
Name of Work: Designing, Developing and Implementation of Web based IT
application for project life cycle management including Accounting
system for Self-Financed Redevelopment works under RPZ, CPWD,
New Delhi.(Second call).
Details of all works of similar nature completed during the last five years ending previous day of last
date of submission of bid (As per Eligibility Criteria)
S. Name of Name of Cost of Date of Details of Stipulat Actu Litigation/ Name Rema
No. Work Clients work in commenc works. ed date al arbitration and rks
/project Lakh of ement as (a) Project of date cases address
and rupees per description in complet of pending/ in /
location contract brief. ion com progress with telepho
pleti details ne
(b) Location
on number
of the project
of office
site.
to
(c)Was any whom
unique referenc
problem e may
faced? If so be
please made
specify in for
brief including verificati
remedial on.
action taken
to resolve the
problem.
Services
included in the
Project.
1 2 3 4 5 6 7 8 9 10 11
Signature of Bidders
Note: Supporting documents like Certificate from Client in support of each of the above
projects to be furnished.
[86]
FORM - C
3 Agreement Amount
5 Date of Start
(b) Resourcefulness
Date:
Note: - All the information sought in Form-‘C’ may be provided by agency in different format.
However, they must be duly certified by the client. The performance report (certified by client)
if available shall be provided. In absence of such performance report, CPWD shall evaluate
the performance which shall be acceptable to the bidders.
[87]
FORM - D
STRUCTURE & ORGANIZATION
NIT No: - 03/CPM/RPZ/NIT/2019-20
Name of Work: Designing, Developing and Implementation of Web based IT
application for project life cycle management including Accounting
system for Self-Financed Redevelopment works under RPZ, CPWD,
New Delhi.(Second call).
FORM - E
iii) Last date of submission of bid: 15:00 Hrs. 9th Sept 2019
Signature, Name and Designation of EMD receiving officer (EE/AE(P)/AE/AAO along with
Office stamp.
[89]
FORM - F
PROFORMA FOR NOT BEING BLACKLISTED
(To be submitted on the Letterhead of the Bidder and OEM separately)
To,
The Executive Engineer,
Redevelopment Project Division-I,
CPWD, Room No. 141, Vidyut Bhawan,
Shankar Market, New Delhi – 110001
Dear Sir,
We confirm that our company is not blacklisted in any manner whatsoever by any
State Government, Central Government or any other Public sector undertaking or a
Corporation or any other Autonomous organization of Central or State Government as
on Bid submission date.
It is hereby confirmed that I/We are entitled to act on behalf of our company/ corporation/ firm/
organization and empowered to sign this document as well as such other documents, which
may be required in this connection.
[On behalf of Bidder Name]
Authorized Signature [In full and initials]:
Name and Title of Signatory:
Name of Firm:
Address:
Seal/Stamp of Bidder:
(Place)
(Date)
[90]
FORM - G
UNDERTAKING FOR AVAILABILITY OF SUFFICIENT AND COMPETENT MANPOWER
[To be submitted on Bidder Company’s Letterhead]
Date:
To:
The Executive Engineer,
Redevelopment Project Division-I,
CPWD, Room No. 141, Vidyut Bhawan,
Shankar Market, New Delhi – 110001
Dear Sir,
In accordance with eligibility requirements of this tender process, we
_________<Name of the Bidding firm>__________________ wish to declare that, we have
more than _______<number of employees> full time employees on our own payroll,
competent to support CPWD’s Project to execute and deliver the services as per the
envisaged scope of work.
Yours faithfully,
FORM - H
DECLARATION BY THE OEM
Name of Work: - Designing, Developing and Implementation of Web based IT
application for project life cycle management including Accounting system for Self-
Financed Redevelopment works under RPZ, CPWD, New Delhi.(Second call). NIT No.-
03/CPM/RPZ/NIT/2019-20
This is to certify that I/We am/are the Original Equipment Manufacturer in respect of the
products listed below.
I/We confirm that <Name of the Bidder> have due authorization from us to provide services,
to CPWD that are based on our product(s) listed below as per bidding document relating to
providing of the Solution Implementation, and System Integration services to CPWD.
S.No. Product Name Remarks
M\s hereby gives an undertaking that the proposed standard ERP Application has been
implemented by us at following sites:
It is also confirmed that we, M\s_______are only employing M\s /Mr __________as our
Authorized Representative/Agent and that except for M\s / Mr___________, we are not
employing any other middleman, sales consultant or advisor to influence the outcome of the
contract through any means.
FORM - I
DETAILS OF CRITERIA FOR TECHNICAL EVALUATION
Name of work: Designing, Developing and Implementation of Web based IT
application for project life cycle management including Accounting
system for Self-Financed Redevelopment works under RPZ, CPWD,
New Delhi. (Second call).
S.No. Criteria (for details refer section 1.1: Technical Detail Documentary
Evaluation Framework) evidence
uploaded as
5. Certification Valid
certificate copy
The bidder should at least be CMMi L3 certified.
[94]
FORM - J
UNDERTAKING FOR BEING CMMI CERTIFIED
[To be submitted on Bidder Company’s Letterhead]
Date:
To:
The Executive Engineer,
Redevelopment Project Division-I,
CPWD, Room No. 141, Vidyut Bhawan,
Shankar Market, New Delhi – 110001
Dear Sir,
In accordance with eligibility requirements of this tender process, we
_________<Name of the Bidding firm>__________________ wish to declare that, we have
CMMI certification competent to support CPWD’s Project to execute and deliver the services
as per the envisaged scope of work.
The details of the CMMI certification are:
Description
Maturity Level
Certificate ID/No.-
Valid upto:-
Authorised Appraiser ID:-
Yours faithfully,
FORM-K
Note: Compliance Performa should be signed and stamped by OEM of standard ERP
Product which is being proposed by the bidder for this work. Bidder shall not be
allowed to change the OEM at the later stage. However, in exceptional situations if it
becomes necessary, the due approval of CPWD shall be obtained by the bidder.
[96]
CLAUSES OF CONTRACT
1. Performance Guarantee:
1.1 The Bidder shall submit an irrevocable Performance Guarantee of 5% (Five
percent) of the Bid amount (Quoted in Financial Quote) in addition to other
deposits mentioned elsewhere in the contract for his proper performance of the
contract agreement, (not withstanding and/or without prejudice to any other
provisions in the contract) within 10 days from the date of issue of letter of
acceptance. This period can be further extended by the Engineer-in-Charge up to
a maximum period of 7 days with late fees on written request of the Bidder stating
the reason for delays in procuring the Performance Guarantee, to the
satisfaction of the Engineer-in-Charge. This guarantee shall be in the form of
Cash (in case guarantee amount is less than Rs. 10,000/-) or Deposit at
Call receipt of any scheduled bank/Banker’s Cheque of any scheduled
bank/Demand Draft of any scheduled bank/Pay Order of any scheduled bank (in
case guarantee amount is less than Rs. 1,00,000/-) or Government Securities
or Fixed Deposit Receipts or Guarantee Bonds of any Scheduled Bank or
the State Bank of India in accordance with the form annexed hereto. In case
a fixed deposit receipt of any Bank is furnished by the Bidder to the Government
as part of the performance guarantee and the Bank is unable to make payment
against the said fixed deposit receipt, the loss caused thereby shall fall on
the Bidder and the Bidder shall forthwith on demand furnish additional security to
the Government to make good the deficit.
1.2 The Performance Guarantee shall be initially valid for 180 days + 1150days. In
case the time for completion of work gets enlarged, the Bidder shall get the
validity of Performance Guarantee extended to cover such enlarged time for
completion of work. After recording of the completion certificate for the work by
the competent authority, the performance guarantee shall be returned to the
Bidder, without any interest.
1.3 The Engineer-in-Charge shall not make a claim under the performance guarantee
except for amounts to which the President of India is entitled under the
contract (not withstanding and/or without prejudice to any other provisions in the
contract agreement) in the event of:
(a) Failure by the Bidder to extend the validity of the Performance
Guarantee as described herein above, in which event the Engineer-in-
Charge may claim the full amount of the Performance Guarantee.
(b) Failure by the Bidder to pay President of India any amount due, either as
agreed by the Bidder or determined under any of the Clauses/Conditions
of the agreement, within 30 days of the service of notice to this effect by
Engineer-in-Charge.
(c) Failure to execute any subcomponent for which action to get it done at “Risk
[97]
and cost of the bidder” is taken as per the relevant clause of this agreement.
1.4 In the event of the contract being determined or rescinded under provision of any
of the Clause/Condition of the agreement, the performance guarantee shall
stand forfeited in full and shall be absolutely at the disposal of the President of
India.
1A. Recovery of Security Deposit:
The person/persons whose bid(s) may be accepted (hereinafter called the Bidder)
shall permit Government at the time of making any payment to him for work done under
the contract to deduct a sum at the rate of 5% of the gross amount of each
running and final bill till the sum deducted, will amount to security deposit of 5% of the
bided value of the work. Such deductions will be made and held by Government by way
of Security Deposit unless he/they has/have deposited the amount of Security at the
rate mentioned above in cash or in the form of Government Securities or fixed
deposit receipts. In case a fixed deposit receipt of any Bank is furnished by the Bidder to
the Government as part of the security deposit and the Bank is unable to make payment
against the said fixed deposit receipt, the loss caused thereby shall fall on the Bidder
and the Bidder shall forthwith on demand furnish additional security to the Government
to make good the deficit.
All compensations or the other sums of money payable by the Bidder under the terms of
this contract may be deducted from, or paid by the sale of a sufficient part of
his security deposit or from the interest arising there from, or from any sums which may
be due to or may become due to the Bidder by Government on any account whatsoever
and in the event of his Security Deposit being reduced by reason of any such
deductions or sale as aforesaid, the Bidder shall within 10 days make good in cash
or fixed deposit receipt bided by the State Bank of India or by Scheduled Banks
or Government Securities (if deposited for more than 12 months) endorsed in favor of
the Engineer-in-Charge, any sum or sums which may have been deducted from, or
raised by sale of his security deposit or any part thereof. The security deposit shall be
collected from the running bills of the Bidder at the rates mentioned above.
Earnest money deposited at the time of bids will be refunded after receipt of
Performance Guarantee.
The security deposit as deducted above can be released against bank guarantee issued
by a scheduled bank, on its accumulations to a minimum of Rs. 5 lakh subject to the
condition that amount of such bank guarantee, except last one, shall not be less than
Rs. 5 lakh. Provided further that the validity of bank guarantee including the one given
against the earnest money shall be in conformity with provisions contained in various
clauses and which shall be extended from time to time depending upon extension of
contract granted under provisions of various clauses
Note-1: Government papers bided as security will be taken at 5% (five per cent) below
its market price or at its face value, whichever is less. The market price of
Government paper would be ascertained by the Divisional Officer at the
[98]
powers:
a) To determine the contract as aforesaid (of which termination notice in
writing to the Bidder under the hand of the Engineer-in-Charge shall be
conclusive evidence). Upon such determination, Security Deposit already
recovered and Performance Guarantee under the contract shall be liable
to be forfeited and shall be absolutely at the disposal of the Government.
b) After giving notice to the Bidder to measure up the work of the Bidder and to
take such whole, or the balance or part thereof, as shall be un-executed out of
his hands and to give it to another Bidder to complete the work. The Bidder,
whose contract is determined as above, shall not be allowed to participate in
the Bidding process for the balance work.
In the event of above courses being adopted by the Engineer-in-Charge, the
Bidder shall have no claim to compensation for any loss sustained by him
by reasons of his having purchased or procured any materials or entered
into any engagements or made any advances on account or with a view to the
execution of the work or the performance of the contract. And in case action is
taken under any of the provision aforesaid, the Bidder shall not be entitled to
recover or be paid any sum for any work thereof or actually performed under this
contract unless and until the Engineer-in-Charge has certified in writing the
performance of such work and the value payable in respect thereof and he
shall only be entitled to be paid the value so certified.
In case, the work cannot be started due to reasons not within the control of
the bidder within 1/8th of the stipulated time for completion of work or one month
whichever is more, either party may close the contract. In case bidder wants to
close the contract, he shall give notice to the department stating the failure on the
part of department. In such eventuality, the Performance Guarantee of the bidder
shall be refunded.
4. Time and Extension for Delay:
The agency shall start the work within 15 days after issue of Acceptance letter by
CPWD. The time allowed for execution of the work as specified or the extended time in
accordance with these conditions shall be the essence of the Contract. The execution of
the standard ERP works shall commence from such time period or from the date of
handing over of the records/Performa etc. whichever is later. If the Bidder commits
default in commencing the execution of the work as aforesaid, Government shall
without prejudice to any other right or remedy available in law, be at liberty to
forfeit the performance guarantee and security deposit absolutely.
4.1 If the work(s) be delayed by:-
(i) Force majeure, or
(ii) Serious loss or damage by fire, or
[101]
5. Foreclosure of Agreement :
If at any time after acceptance of bid, Engineer-in-Charge shall decide to the
abandonment or reduction of scope of the work due to any reason whatsoever do not
require the whole or any part of the work to be carried out, the Engineer-in-charge shall
give notice in writing to that effect to the bidder and the bidder shall act accordingly in
the matter. The bidder shall have no claim to any payment of compensation or
otherwise whatsoever in account of any profit or advantage which he might have
derived for the execution of work in full but which he did not derive inconsequence of
the foreclosure of the whole or part of the work. In such circumstances, the bidder shall
be paid at contract rates full amount for works carried out by him and accepted by the
department, security deposit and the Performance guarantee of the bidder shall be
refunded, but no payment on account of interest, loss of profit or damages etc. shall be
payable at all.
[102]
Para (i) above, disputes or difference shall be referred for adjudication through
arbitration by a sole arbitrator appointed by the Chief Engineer/Chief Project
Manager, CPWD, in charge of the work or if there be no Chief Engineer/Chief
Project Manager, the Additional Director General of the concerned region of CPWD
or if there be no Additional Director General, the Director General, CPWD. If the
arbitrator so appointed is unable or unwilling to act or resigns his appointment or
vacates his office due to any reason whatsoever, another sole arbitrator shall
be appointed in the manner aforesaid. Such person shall be entitled to proceed
with the reference from the stage at which it was left by his predecessor.
It is a term of this contract that the party invoking arbitration shall give a list of
disputes with amounts claimed in respect of each such dispute along with the
notice for appointment of arbitrator and giving reference to the rejection by
the Chief Engineer/Chief Project Manager of the appeal.
It is also a term of this contract that no person, other than a person
appointed by such Chief Engineer/Chief Project Manager, CPWD or Additional
Director General or Director General, Works, CPWD, as aforesaid, should act as
arbitrator and if for any reason that is not possible, the matter shall not be referred to
arbitration at all.
It is also a term of this contract that if the Bidder does not make any
demand for appointment of arbitrator in respect of any claims in writing as aforesaid
within 120 days of receiving the intimation from the Engineer-in-charge that the
final bill is ready for payment, the claim of the Bidder shall be deemed to have
been waived and absolutely barred and the Government shall be discharged
and released of all liabilities under the contract in respect of these claims.
The arbitration shall be conducted in accordance with the provisions of the
Arbitration and Conciliation Act, 1996 (26 of 1996) the Jammu & Kashmir
Arbitration & Conciliation Act 1937 (35 of 1997) as the case may be or any statutory
modifications or re-enactment thereof and the rules made there under and for the
time being in force shall apply to the arbitration proceeding under this clause.
It is also a term of this contract that the arbitrator shall adjudicate on only such
disputes as are referred to him by the appointing authority and give separate award
against each dispute and claim referred to him and in all cases where the total
amount of the claims by any party exceeds Rs.1,00,000/-, the arbitrator shall give
reasons for the award.
It is also a term of the contract that if any fees are payable to the arbitrator, these
shall be paid equally by both the parties.
It is also a term of the contract that the arbitrator shall be deemed to have entered
on the reference on the date he issues notice to both the parties calling them
to submit their statement of claims and counter statement of claims. The venue of
the arbitration shall be such place as may be fixed by the arbitrator in his sole
discretion. The fees, if any, of the arbitrator shall, if required to be paid before
[104]
the award is made and published, be paid half and half by each of the parties.
The cost of the reference and of the award (including the fees, if any, of the
arbitrator) shall be in the discretion of the arbitrator who may direct to any by whom
and in what manner, such costs or any part thereof shall be paid and fix or settle the
amount of costs to be so paid.
the bidder for making changes and modifications or other documents rendering major
part or the whole of his work in fructuous, the bidder may then be compensated for such
extra services and expenses on quantum merit basis at mutually agreed rates and other
terms and conditions, unless such changes, alterations are due to its own commissions
and /or discrepancies including changes proposed by bidders. The decision of the
department shall be final and binding on whether the deviations and additions are
substantial and required any compensation to be paid to the bidder. However, for the
minor modification or alteration which does not affect the entire design, planning etc. no
extra amount will be payable.
[106]
Financial Quote
ABSTRACT
Designing, Developing and Implementation of Web based IT application for project life
cycle management including Accounting system for Self-Financed Redevelopment
PART ‘A’ works under RPZ, CPWD, New Delhi. (Second call).
SH: Original Work
Designing, Developing and Implementation of Web based IT application for project life
cycle management including Accounting system for Self-Financed Redevelopment
PART ‘B’ works under RPZ, CPWD, New Delhi. (Second call).
SH: Maintenance Work
Financial Quote
PART-A
Name of Work: Designing, Developing and Implementation of Web based IT application for project life cycle management
including Accounting system for Self-Financed Redevelopment works under RPZ, CPWD, New Delhi. (Second
call).
SH: Original Work
Total
Note: The price quoted above by the bidder is inclusive of GST/Service Tax or any other applicable taxes.
[108]
Financial Quote
PART-B
Name of Work: Designing, Developing and Implementation of Web based IT application for project life cycle management
including Accounting system for Self Financed Redevelopment works under RPZ, CPWD, New Delhi. (Second
call)
SH: Maintenance Work
Total
Note: The price quoted above by the bidder is inclusive of GST/Service Tax or any other taxes applicable.