Final Commissioning Plan

Chapter 1

Project Name: _________________________________________________________________________________


Project Address: _______________________________________________________________________________
Permit Number: ________________________________________________________________________________
Commissioning Provider #: _______________________________________________________________________
Item No. Final Commissioning Plan Items Included? Y/N
1 General Project Information
Chapter 2

Update the overview of the Commissioning Process and goals developed specifically for each
phase of the project if changes are necessary.
2 Roles and Responsibilities
Update the roles and responsibilities for the Commissioning and Construction Teams. The
responsibilities must delineate the names and detailed duties of the CxPs, specialists, inspectors,
contractors, suppliers, and other agencies.
Chapter 3

3 Communication Channels
Update the documentation and communication channels, including the distribution of the Cx Plan
during the construction process, with specific assignments.
4 Documentation and Submittal Review
Update and expand the detailed description of Commissioning Process Activities, the schedule of
activities, and the list of operations, systems, and assemblies that will be commissioned or
Chapter 4

inspected. Evaluation procedures and performance criteria shall be included for all commissioned
systems and assemblies.
5 Systems Manual and Training Plans
Update the requirements and assign responsibilities for the Systems Manual and training plans.
6 Checklists, Forms, Logs, and Reports Formats
Update the listings and formats for Commissioning Process evaluation checklists, testing forms,
Chapter 5

issues and resolution log, and Commissioning Progress Reports.


7 Construction Testing Checklists, Forms, Logs, and Reports
After final equipment selection and approval and before installation, detailed testing procedures
and checklists for installation observation, functional testing, and performance testing for all
commissioned systems and assemblies should be developed and included in the final Cx Plan.
Conditions under which the testing will be performed should be included where relevant.
Appendix A

Verification of sequences of operation should be included.


8 Resolution Process
Update the procedures to follow whenever Commissioning Process evaluation does not meet the
OPR or construction document requirements.
9 Occupancy and Operation
Provide a general description of Commissioning Process Activities that will occur during initial
Appendix B

occupancy and operations.


Commissioning Provider Acknowledgment
I have reviewed the documents and verified that they meet the Owner’s Project Requirements:
Name: _______________________________________________________________________________________
Company Name: _______________________________________________________________________________
Appendix B

Signature: ______________________________________________________________ Date: _________________


Owner/Owner’s Representative Acknowledgment
The project documents include the items listed on this form and have been approved by the Owner or Owner’s
representative:
Name: _______________________________________________________________________________________
 Owner  Owner’s Representative
Company Name: _______________________________________________________________________________
Signature: ______________________________________________________________ Date: _________________
The final commissioning plan checklist is intended for plan verification prior to final project testing and commissioning. This checklist is a summary of the preliminary
plan and all the changes and additions to include the final testing plan, verification checklists, functional checklists, and performance checklists.