CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: 5/10/2017

Company Name: Red Viper Ventures and Construction Corporation Submittal No: 01601/JEG-001

Date Issued for


Drawing/ Date Comment Date
Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

CSI Company
Profile
Proposed Concrete Supplier SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: 5/10/2017

Company Name: Red Viper Ventures and Construction Corporation Submittal No: 01601/JEG-002

Date Issued for


Drawing/ Date Comment Date
Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

E.B Testing Proposed Material Testing Laboratory -


Center Inc. SPM
Company Profile (E.B Testing Center Inc.)

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:


Contractor IN Signature: Date: Savills Out Signature: Date:
CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: 5/10/2017

Company Name: Red Viper Ventures and Construction Corporation Submittal No: 01601/JEG-003

Date Issued for


Drawing/ Date Comment Date
Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Worldwide
Proposed Steel Rebars Supplier (Worldwide
SteelGroup. Inc.
SteelGroup. Inc. Company Profile)
SPM
Company Profile

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:


Contractor IN Signature: Date: Savills Out Signature: Date:
CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: 5/11/2017

Company Name: Red Viper Ventures and Construction Corporation Submittal No: 01601/JEG-004

Date Issued for


Drawing/ Date Comment Date
Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Worldwide
Proposed Bored Pile Details for PDA Test
SteelGroup. Inc.
(Shop Drawing)
SPM
Company Profile

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Consultant Out Signature: Date:

AI Nr: MCI Nr:


Consultant IN Signature: Date: Savills Out Signature: Date:
CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: 5/12/2017

Company Name: Red Viper Ventures and Construction Corporation Submittal No: 01601/JEG-005

Date Issued for


Drawing/ Date Comment Date
Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

CEAN Concrete
Proposed Concrete Supplier - Alternative 1
Solution -
(CEAN Company Profile)
SPM
Company Profile

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:


Contractor IN Signature: Date: Savills Out Signature: Date:
CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: 5/12/2017

Company Name: Red Viper Ventures and Construction Corporation Submittal No: 01601/JEG-006

Date Issued for


Drawing/ Date Comment Date
Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:
JLR REGNER
CONCRETE Proposed Concrete Supplier - Alternative
AGGREGATES - SPM
COMPANY 2 (JLR Company Profile)
PROFILE

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:


Contractor IN Signature: Date: Savills Out Signature: Date:
CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: 5/12/2017

Company Name: Red Viper Ventures and Construction Corporation Submittal No: 01601/JEG-007

Date Issued for


Drawing/ Date Comment Date
Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Certificates of Equipment Third Party Certificate of


SPM
Inspection Inspection

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:


Contractor IN Signature: Date: Savills Out Signature: Date:
CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: 5/12/2017

Company Name: Red Viper Ventures and Construction Corporation Submittal No: 01601/JEG-008

Date Issued for


Drawing/ Date Comment Date
Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Megatesting Proposed Material Testing Laboratory -


Center Inc. - SPM
Company Profile Alternative 1 (Megatesting Center Inc.)

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:


Contractor IN Signature: Date: Savills Out Signature: Date:
CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: 5/16/2017

Company Name: Red Viper Ventures and Construction Corporation Submittal No: 01601/JEG-009

Date Issued for


Drawing/ Date Comment Date
Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

As-Built Survey Plan


and Proposed Test AS-BUILT SURVEY PLAN SPM
Pile for PDA

COORDINATED TEST PILE LOCATION

PROPOSED TEST PILE LOCATION

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Consultant Out Signature: Date:

AI Nr: MCI Nr:


Consultant IN Signature: Date: Savills Out Signature: Date:
CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: 5/16/2017

Company Name: Red Viper Ventures and Construction Corporation Submittal No: 01601/JEG-010

Date Issued for


Drawing/ Date Comment Date
Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

SHOP DRAWING BORED PILING SITE DEVELOPMENT


#1 SPM
PLAN

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Consultant Out Signature: Date:

AI Nr: MCI Nr:


Consultant IN Signature: Date: Savills Out Signature: Date:
CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: 5/16/2017

Company Name: Red Viper Ventures and Construction Corporation Submittal No: 01601/JEG-011

Date Issued for


Drawing/ Date Comment Date
Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

32mm, 28mm, Mill Test Certificate and Deformed bar


16mm, 12mm, def. SPM
Bar Test Result Test Result Advance Copy

32mm & 28mm def.


Bar Mill Test Result

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:


Contractor IN Signature: Date: Savills Out Signature: Date:
CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: 5/16/2017

Company Name: Red Viper Ventures and Construction Corporation Submittal No: 01601/JEG-012

Date Issued for


Drawing/ Date Comment Date
Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Materials
Technical Data JEDPOL 30 - Polymer SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:


Contractor IN Signature: Date: Savills Out Signature: Date:
CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: 5/17/2017

Company Name: Red Viper Ventures and Construction Corporation Submittal No: 01601/JEG-013

Date Issued for


Drawing/ Date Comment Date
Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Certificate of
Certificates of Safety Personnel,
Safety SPM
Personnel Operators and Rigger

Certificate of
Operator

Certificate of
Rigger

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:


Contractor IN Signature: Date: Savills Out Signature: Date:
CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: 5/17/2017

Company Name: Red Viper Ventures and Construction Corporation Submittal No: 01601/JEG-014

Date Issued for


Drawing/ Date Comment Date
Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Work Schedule and Mobilization SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:


Contractor IN Signature: Date: Savills Out Signature: Date:
CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: 5/17/2017

Company Name: Red Viper Ventures and Construction Corporation Submittal No: 01601/JEG-015

Date Issued for


Drawing/ Date Comment Date
Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Test Pile Mobilization Schedule SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:


Contractor IN Signature: Date: Savills Out Signature: Date:
CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: 5/19/2017

Company Name: Red Viper Ventures and Construction Corporation Submittal No: 01601/JEG-016

Date Issued for


Drawing/ Date Comment Date
Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Project
Requirements Table of Organization SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:


Contractor IN Signature: Date: Savills Out Signature: Date:
CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: 5/19/2017

Company Name: Red Viper Ventures and Construction Corporation Submittal No: 01601/JEG-017

Date Issued for


Drawing/ Date Comment Date
Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Method
Statement Method of Safety for Bored Piling SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:


Contractor IN Signature: Date: Savills Out Signature: Date:
CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: 5/19/2017

Company Name: Red Viper Ventures and Construction Corporation Submittal No: 01601/JEG-018

Date Issued for


Drawing/ Date Comment Date
Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Schedule 3 Weeks Look Ahead Activity Schedule SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:


Contractor IN Signature: Date: Savills Out Signature: Date:
CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: 5/19/2017

Company Name: Red Viper Ventures and Construction Corporation Submittal No: 01601/JEG-019

Date Issued for


Drawing/ Date Comment Date
Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Safety and Healthy Plan Program for


Safety Plan SPM
Bored Piling

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:


Contractor IN Signature: Date: Savills Out Signature: Date:
CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: 5/22/2017

Company Name: Red Viper Ventures and Construction Corporation Submittal No: 01601/JEG-020

Date Issued for


Drawing/ Date Comment Date
Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

16mm & 12mm


def. Bar Mill Mill Test Certificate SPM
Test Certificate

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:


Contractor IN Signature: Date: Savills Out Signature: Date:
CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: 5/22/2017

Company Name: Red Viper Ventures and Construction Corporation Submittal No: 01601/JEG-021

Date Issued for


Drawing/ Date Comment Date
Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Shop drwg Proposed Test Pile for PDA


02 SPM
No. 03 (1 of 2) (As-Built Survey Plan)

Shop drwg Proposed Test Pile for PDA


No. 03 (2 of 2)
02 SPM
(Test Pile Location)

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Consultant Out Signature: Date:

AI Nr: MCI Nr:


Consultant IN Signature: Date: Savills Out Signature: Date:
CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: 5/22/2017

Company Name: Red Viper Ventures and Construction Corporation Submittal No: 01601/JEG-022

Date Issued for


Drawing/ Date Comment Date
Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Shop drwg
No. 01 (1 of 2)
01 Proposed Bored Pile Details for PDA Test SPM

Shop drwg
No. 01 (2 of 2)
00 Proposed Bored Pile Details for PDA Test SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Consultant Out Signature: Date:

AI Nr: MCI Nr:


Consultant IN Signature: Date: Savills Out Signature: Date:
CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: 5/25/2017

Company Name: Red Viper Ventures and Construction Corporation Submittal No: 01601/JEG-023

Date Issued for


Drawing/ Date Comment Date
Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Test Pile Loc.


Plan
Weekly Progress Acc. / Report SPM

3 Weeks look ahead with N arratvive


SPM
Report

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:


Contractor IN Signature: Date: Savills Out Signature: Date:
CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: 6/5/2017

Company Name: Red Viper Ventures and Construction Corporation Submittal No: 01601/JEG-024

Date Issued for


Drawing/ Date Comment Date
Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Incident / Accident / Near Miss Report


RVDC-0001 0 For Copy
"Damaged Manhole"

Incident / Accident / Near Miss Report


5-31-002 0 For Copy
"Fire Incident at back of field office"

Incident / Accident / Near Miss Report


6-1-003 0 "Over flow of water in the waste water pond
outside of the job site"

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:


Contractor IN Signature: Date: Savills Out Signature: Date:
CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: 5/6/2017

Company Name: Red Viper Ventures and Construction Corporation Submittal No: 01601/JEG-025

Date Issued for


Drawing/ Date Comment Date
Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Shop drwg Proposed Bored Pile Details for PDA Test


2 SPM
No. 01 (Shop Drawing)

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Consultant Out Signature: Date:

AI Nr: MCI Nr:


Consultant IN Signature: Date: Savills Out Signature: Date:
CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: 5/6/2017

Company Name: Red Viper Ventures and Construction Corporation Submittal No: 01601/JEG-026

Date Issued for


Drawing/ Date Comment Date
Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Shop drwg Proposed Test Pile for PDA (AS-


2 SPM
No. 01 BUILT SURVEY PLAN)

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Consultant Out Signature: Date:

AI Nr: MCI Nr:


Consultant IN Signature: Date: Savills Out Signature: Date:
CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: 5/6/2017

Company Name: Red Viper Ventures and Construction Corporation Submittal No: 01601/JEG-027

Date Issued for


Drawing/ Date Comment Date
Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Shop drwg Proposed Test Pile for PDA (AS-


2 SPM
No. 01 BUILT SURVEY PLAN)

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Consultant Out Signature: Date:

AI Nr: MCI Nr:


Consultant IN Signature: Date: Savills Out Signature: Date:
CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: 5/6/2017

Company Name: Red Viper Ventures and Construction Corporation Submittal No: 01601/JEG-028

Date Issued for


Drawing/ Date Comment Date
Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Performance Bond SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:


Contractor IN Signature: Date: Savills Out Signature: Date:
CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: 6/6/2017

Company Name: Red Viper Ventures and Construction Corporation Submittal No:

Date Issued for


Drawing/ Date Comment Date
Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Shop drwg
No. 05
0 Additional Bored Up SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:


Contractor IN Signature: Date: Savills Out Signature: Date:
CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: 6/6/2017

Company Name: Red Viper Ventures and Construction Corporation Submittal No: 01601/JEG-030

Date Issued for


Drawing/ Date Comment Date
Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

1 Waste Management and Spill Plan For Copy

1 Major Incident Plan For Copy

1 Job Site Fire Evacuation Plan For Copy

SAVILLS/EHS-
NCR-2017-001 Non - Compliance Report For Copy

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:


Contractor IN Signature: Date: Savills Out Signature: Date:
CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: 6/8/2017

Company Name: Red Viper Ventures and Construction Corporation Submittal No: 01601/JEG-031

Date Issued for


Drawing/ Date Comment Date
Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Bill of Quantities SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:


Contractor IN Signature: Date: Savills Out Signature: Date:
CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: 6/8/2017

Company Name: Red Viper Ventures and Construction Corporation Submittal No: 01601/JEG-032

Date Issued for


Drawing/ Date Comment Date
Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

WEEKLY REPORT - WEEK 1 SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:


Contractor IN Signature: Date: Savills Out Signature: Date:
CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: 6/8/2017

Company Name: Red Viper Ventures and Construction Corporation Submittal No: 01601/JEG-033

Date Issued for


Drawing/ Date Comment Date
Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

WEEKLY REPORT - WEEK 2 SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:


Contractor IN Signature: Date: Savills Out Signature: Date:
CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: 6/8/2017

Company Name: Red Viper Ventures and Construction Corporation Submittal No: 01601/JEG-034

Date Issued for


Drawing/ Date Comment Date
Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

WEEKLY REPORT - WEEK 3 SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:


Contractor IN Signature: Date: Savills Out Signature: Date:
CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: 6/8/2017

Company Name: Red Viper Ventures and Construction Corporation Submittal No: 01601/JEG-035

Date Issued for


Drawing/ Date Comment Date
Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

WEEKLY REPORT - WEEK 4 SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:


Contractor IN Signature: Date: Savills Out Signature: Date:
CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: 6/9/2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-036

Date Issued for


Drawing/ Date Comment Date
Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Weeks look ahead Schedule


SPM
(from drilling to PDA)

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:


Contractor IN Signature: Date: Savills Out Signature: Date:
CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: 6/10/2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-037

Date Issued for


Drawing/ Date Comment Date
Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

EB Testing Certificate of Calibration


(Universal Testing Machine and SPM
Compression Machine)

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:


Contractor IN Signature: Date: Savills Out Signature: Date:
CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: 6/23/2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-052

Date Issued for


Drawing/ Date Comment Date
Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

RFI No.1
Shop Drawing for pile section, showing
SPM (see attached request letter)
pile cap elevation with respect to NGL
(per grid)

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Consultant IN Signature: Date: Consultant Out Signature: Date:


Contractor IN Signature: Date: Savills Out Signature: Date:
0
CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: 6/30/2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-053

Date Issued for


Drawing/ Date Comment Date
Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Reconciled Unit Rates and Duration for


SPM
Additional Board-up Fence

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


0
CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: July 22, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-064

Date Issued for


Drawing/ Date Comment Date
Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Concrete Mix Design for TP-6 SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


0
CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: July 21, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-065

Date Issued for


Drawing/ Date Comment Date
Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Weekend Activity Plan SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


0
CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: July 25, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-067

Date Issued for


Drawing/ Date Comment Date
Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Logistic Plan
SPM
(Traffic Management Plan)

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


0
CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: July 25, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-068

Date Issued for


Drawing/ Date Comment Date
Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

TP - 5 Bored Pile Record / Report SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


0
CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: July 25, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-069

Date Issued for


Drawing/ Date Comment Date
Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

TP - 6 Bored Pile Record / Report SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


0
CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: July 26, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-070

Date Issued for


Drawing/ Date Comment Date
Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Bentonite Technical Data SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


0
CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: July 26, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-071

Date Issued for


Drawing/ Date Comment Date
Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Daily Activity Report (Week 11) SPM

Weekly Manpower Loading SPM

Erosion and Sedimentation Conctrol


SPM
Checklist

Weekly Safety Permits SPM

Progress Photos SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:


Contractor IN Signature: Date: Savills Out Signature: Date:
0
CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: July 26, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-072

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Weekly Accomplishment (S-Curve) SPM

Weekly Cash Flow SPM

Three Weeks Look Ahead SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: July 26, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-073

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Shop Drawing
No.9
Waste Water Drainage Plan SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: July 31, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-075

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Rectification of TP-4 SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: July 31, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-076

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Shop Drwg
No.2
Drilling and Concreting Operation SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: August 2, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-077

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Daily Activity Report (Week12) SPM

Weekly Manpower Loading


Erosion and Sedimentation Control
Checklist
Weekly Safety Report

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


0
CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: August 2, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-078

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Weekly Accomplishment (S-Curve) SPM

Weekly Cash Flow SPM

Three Weeks Look Ahead SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


0
CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: August 2, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-079

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:
Video Documentary of Bored Piling
SPM
Methodology

SPM

SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


0
CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: August 3, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-080

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:
Video Documentary of Bored Piling
SPM
Methodology (no background music)

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


0
CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: August 4, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-081

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

As Built Drawing of (TP-04) SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: August 7, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-082

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:
QA/QC Concrete Pouring Checklist and
SPM
Monitoring Form

Bored Pile Record Form SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: August 7, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-083

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

As-Built Drawing for Test Pile


SPM
(TP-1, TP-2, TP-3, TP-4, TP-5, TP-6)

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: August 10, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-084

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Weekly Accomplishment (S-Curve) SPM

Weekly Cash Flow SPM

Three Weeks Look Ahead SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: August 16, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-085

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Weekly Accomplishment (S-Curve) SPM

Weekly Cash Flow SPM

Three Weeks Look Ahead SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: August 16, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-086

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

SPM

SPM

SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: August 23, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-089

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Request for Information-002 PCD Slump 8"-10" with aggregate size of


SPM
Subject:Concrete Works 3/4

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: August 23, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-090

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Request for Information-003


SPM
Subject:Concrete Works

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: August 23, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-091

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Request for Information-004


SPM
Subject:Reference Elevation

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: August 31, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-094

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Daily Activity Report Week 15 & Week 16 SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: August 31, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-094

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Monitoring and Scheduling (Rev.01) SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: August 31, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-096

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Request for Information-005


Subject:Concrete Works
SPM Slump 6"-8"

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: August 31, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-097

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Request for Information-006


Subject:PIT Location
SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: September 2, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-098

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Table of Organization SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: September 2, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-099

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Construction Plan Rev.01 SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: September 2, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-100

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Shop Drawing No.17 - Proposed Bored


PileDetails at -1.45m
SPM

Shop Drawing No.17 - Proposed Bored


PileDetails at -1.80m
SPM

Shop Drawing No.17 - Proposed Bored


PileDetails at -7.5m
SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: September 2, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-101

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

RFI 005 - Slump 6"-8" SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: September 2, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-101

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Daily Activity Report Week 17 SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: September 8, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-104

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

RFI No. 007 - Existing Concrete Fence @


Grid 1
SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: September 8, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-105

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

CVI-001 Bored Piles waiting for verification SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: September 8, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-106

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:
SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:


Contractor IN Signature: Date: Savills Out Signature: Date:
CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: September 11, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-107

Drawing/ Date Date Issued for Date


Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:
PC-1 BP2-4 SPM
PC-1 BP2-6 SPM
PC-1 BP2-5 SPM
PC-1 BP2-8 SPM
PC-1 BP2-21 SPM
PC-1 BP2-23 SPM
PC-2 BP2-22 SPM
PC-2 BP2-20 SPM
PC-2 BP2-24 SPM
PC-2 BP2-27 SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:


Contractor IN Signature: Date: Savills Out Signature: Date:
CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: September 11, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-107

Drawing/ Date Date Issued for Date


Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:
PC-2 BP2-29 SPM
PC-2 BP2-25 SPM
PC-2 BP2-17 SPM
PC-2 BP2-26 SPM
PC-2 BP2-16 SPM
PC3 BP2-28 SPM
PC3 BP2-31 SPM
PC3 BP2-30 SPM
PC3 BP2-10 SPM
PC3 BP2-13 SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:


Contractor IN Signature: Date: Savills Out Signature: Date:
CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: September 11, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-107

Drawing/ Date Date Issued for Date


Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:
PC3 BP2-14 SPM
PC3 BP2-9 SPM
PC3 BP2-11 SPM
PC3 BP2-7 SPM
PC4 TP4 SPM
PC4 BP1-5 SPM
PC4 BP3-3 SPM
PC4 BP1-2 SPM
PC-5 BP3-23 SPM
PC-5 BP3-17 SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:


Contractor IN Signature: Date: Savills Out Signature: Date:
CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: September 11, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-107

Drawing/ Date Date Issued for Date


Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:
PC5 BP3-19 SPM
PC5 BP3-21 SPM
PC5 BP3-24 SPM
PC5 BP2-18 SPM
PC5 BP1-11 SPM
PC5 BP2-19 SPM
PC5 BP3-22 SPM
PC5 TP3 SPM
PC5 TP1 SPM
PC5 BP3-15 SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:


Contractor IN Signature: Date: Savills Out Signature: Date:
CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: September 11, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-107

Drawing/ Date Date Issued for Date


Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:
PC5 BP3-20 SPM
PC5 BP3-25 SPM
PC5 BP1-9 SPM
PC5 BP1-10 SPM
PC6 BP3-9 SPM
PC6 BP3-14 SPM
PC6 BP1-8 SPM
PC6 BP3-12 SPM
PC6 BP3-16 SPM
PC6 BP3-18 SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:


Contractor IN Signature: Date: Savills Out Signature: Date:
CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: September 11, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-107

Drawing/ Date Date Issued for Date


Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:
PC6 BP3-10 SPM
PC6 BP3-13 SPM
PC6 BP3-26 SPM
PC6 BP3-6 SPM
PC6 BP3-11 SPM
PC6 BP2-15 SPM
PC6 BP3-4 SPM
PC6 BP3-7 SPM
PC6 TP5 SPM
PC6 TP6 SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:


Contractor IN Signature: Date: Savills Out Signature: Date:
CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: September 11, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-107

Drawing/ Date Date Issued for Date


Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:
PC6 BP2-12 SPM
PC6 BP1-7 SPM
PC7 BP3-2 SPM
PC7 BP3-8 SPM
PC7 BP3-5 SPM
PC7 BP1-6 SPM
PC7 BP1-4 SPM
PC7 BP1-3 SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: September 12, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-108

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Mill Certificate of 12mm diameter deformed


bar
SPM

Mill Certificate of 16mm diameter deformed


bar
SPM

Mill Certificate of 20mm diameter deformed


bar
SPM

Mill Certificate of 28mm diameter deformed


bar
SPM

Mill Certificate of 32mm diameter deformed


bar
SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: September 12, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-109

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Reference Drawing: S-JT01-201 SPM

Reference Drawing: S-JT01-202 SPM

Reference Drawing: S-JT01-203 SPM

RFI: REF No.RVDC-RFI-C+A/SY²--004 SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: September 18, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-125

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Teddy
Fernandez CV
Proposed Project Manager SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: September 18, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-126

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Roderick John Proposed Construction Manager


N. Adams CV (Day Shift)
SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: September 18, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-127

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Marquiz Ira S. Proposed Site/Company Nurse


Enriquez CV (Day Shift)
SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: September 18, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-128

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Joseph B. Proposed Project In-Charge


Brion CV (Night Shift)
SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: September 18, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-129

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Cornelio O. De Proposed Sr. Rebar Engineer


Paz, Jr. CV (Day Shift)
SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: September 18, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-130

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Gleizel B. Proposed QA/QC Engineer


Misoles CV (Day Shift)
SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: September 18, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-131

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Richard Neil B. Proposed Site Engineer


Catubig CV (Night Shift)
SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: September 18, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-132

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Julius A. Arca Proposed Safety Officer


CV (Day Shift)
SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: September 18, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-133

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Charlie G. Su Proposed Site Admin


CV (Night Shift)
SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: September 18, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-134

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Christian H. Proposed Surveyor


Mosa CV (Day Shift)
SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: September 18, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-135

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Erwin C. Proposed QA/QC Engineer


Obenza CV (Night Shift)
SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: September 18, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-136

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Reymark L. Proposed Site Admin/Safety Officer


Arsolon CV (Day Shift)
SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: September 18, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-137

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:
Shop Drawing no.
19 Sheet 1/7 Proposed P.I.T. For (BP3-19) SPM

Shop Drawing no.


19 Sheet 2/7 Proposed P.I.T. For (BP1-9) SPM

Shop Drawing no.


19 Sheet 3/7 Proposed P.I.T. For (BP2-21) SPM
Shop Drawing no.
19 Sheet 4/7 Proposed P.I.T. For (BP2-30) SPM
Shop Drawing no.
19 Sheet 5/7 Proposed P.I.T. For (BP3-11) SPM
Shop Drawing no.
19 Sheet 6/7 Proposed P.I.T. For (BP2-13) SPM

Shop Drawing no.


19 Sheet 7/7 Proposed P.I.T. For (BP3-5) SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: September 18, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-138

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:
Shop Drawing no.
18 Sheet no. 1/1 Proposed Build-up Details For TP-4 SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:


Contractor IN Signature: Date: Savills Out Signature: Date:
CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: September 20, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-139

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Daily Activity Report (Week19) SPM

Weekly Manpower Loading SPM

Erosion and Sedimentation Control


SPM
Checklist
Weekly Safety Report SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: September 20, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-140

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Weekly Accomplishment (S-Curve) SPM

One Week look Ahead SPM

Weekend Activity Plan SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: September 21, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-141

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:
Weekend Activity Plan
SPM
(September 23 and 24, 2017)

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: September 21, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-142

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Shop drawing No.


20/1 Proposed Demolition of Existing Concrete SPM
Fence & Installation of Bored-up Fence

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: September 21, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-143

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Shop drawing No.


10/1 Proposed New Site Development Plan SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: September 22, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-144

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

RVDC/JDC/SPM/J
EG-024 Site Progress And Updates SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: September 25, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-145

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Proposed Demolition Of Existing


Shop Drawing No.
20/1 Concrete Fence & Installation Of Bored- SPM
up Fence

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: September 27, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-153

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Daily Activity Report (Week22) SPM

Weekly Manpower Loading SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: September 27, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-154

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:
RVDC-FRI-
C+ASY²- PDA Proposed New Location SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: September 27, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-155

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:
Shop Drawing No.
1/3 Additional For PDA Bored Pile (BP2-17) SPM

Shop Drawing No.


2/3 Additional For PDA Bored Pile (BP3-16) SPM

Shop Drawing No.


3/3 Additional For PDA Bored Pile (BP2-17) SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: September 27, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-156

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Weekly Accomplishment (S-Curve) SPM

Keyplan SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: September 27, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-157

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Look Ahead Plan SPM

Weekend Activity Plan SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: September 28, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-158

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:
Shop Drawing No.
1/7 1 Proposed P.I.T. For (BP3-19) At PC-5 SPM
Shop Drawing No.
2/7 1 Proposed P.I.T. For (BP1-9) At PC-5 SPM
Shop Drawing No.
3/7 1 Proposed P.I.T. For (BP2-21) At PC-1 SPM
Shop Drawing No.
4/7 1 Proposed P.I.T. For (BP2-30) At PC-3 SPM
Shop Drawing No.
5/7 1 Proposed P.I.T. For (BP2-13) At PC-3 SPM
Shop Drawing No.
6/7 1 Proposed P.I.T. For (BP3-11) At PC-6 SPM
Shop Drawing No.
7/7 1 Proposed P.I.T. For (BP3-5) At PC-7 SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:


Contractor IN Signature: Date: Savills Out Signature: Date:
CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: September 29, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-159

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:
Shop Drawing No.
17 (Sht. No. 3 Proposed Shop Drawing for (BP 3-9) at PC-6 SPM
42/63)
Shop Drawing No.
Proposed Shop Drawing for (BP 3-12) at PC-
17 (Sht. No. 3 SPM
43/63) 6

Shop Drawing No. Proposed Shop Drawing for (BP 2-23) at PC-
17 (Sht. No. 1/63) 3 SPM
1
Shop Drawing No.
Proposed Shop Drawing for (BP 2-16) at PC-
17 (Sht. No. 3 SPM
15/63) 3
NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: September 29, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-160

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:
Shop Drawing no. Proposed Shop Drawing For (BP2-31) At PC-
17 Sheet no. 16/63 3 SPM
3
Shop Drawing no. 17 Proposed Shop Drawing For (BP2-28) At PC-
3 SPM
Sheet no. 17/63 3
Shop Drawing no. 17 Proposed Shop Drawing For (BP2-30) At PC-
3 SPM
Sheet no. 18/63 3
Shop Drawing no. 17 Proposed Shop Drawing For (BP3-23) At PC-
3 SPM
Sheet no. 28/63 5
Shop Drawing no. 17 Proposed Shop Drawing For (BP3-17) At PC-
Sheet no. 30/63 3 SPM
5
Shop Drawing no. Proposed Shop Drawing For (BP3-14) At PC-
17 Sheet no. 47/63 3 SPM
6
Shop Drawing no. Proposed Shop Drawing For (BP3-18) At PC-
17 Sheet no. 54/63 3 SPM
6
Shop Drawing no. Proposed Shop Drawing For (BP3-26) At PC-
17 Sheet no. 55/63 3 SPM
6
NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:


Contractor IN Signature: Date: Savills Out Signature: Date:
CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: October 3, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-161

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Letter From Golden Prince Hotel

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:


Contractor IN Signature: Date: Savills Out Signature: Date:
CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: October 5, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-162

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Shop Drawing 1/63 As-Built Drawing For (BP2-23) At PC-1 SPM

Shop Drawing 7/63 As-Built Drawing For (BP2-22) At PC-2 SPM

Shop Drawing 8/63 As-Built Drawing For (BP2-20) At PC-2 SPM

Shop Drawing 29/63 As-Built Drawing For (BP1-11) At PC-5 SPM

Shop Drawing 44/63 As-Built Drawing For (BP3-10) At PC-6 SPM

Shop Drawing 49/63 As-Built Drawing For (BP3-13) At PC-6 SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:


Contractor IN Signature: Date: Savills Out Signature: Date:
CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: October 5, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-163

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Weekly Accomplishment (S-Curve) SPM

One Week Look Ahead SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: October 6, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-164

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Weekend Activity Schedule SPM

Weekly Manpower Loading SPM

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: October 5, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-165

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:
Shopdrawing No. Proposed Rebars Splicing Shop Drawing
47/63 3 SPM
(BP3-14) At PC-6
Shopdrawing No. Proposed Rebars Splicing Shop Drawing
30/63 3 SPM
(BP3-17) At PC-5
Shopdrawing Proposed Rebars Splicing Shop Drawing
No.54/63 3 SPM
(BP3-18) At PC-6

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued: October 5, 2017

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-165

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

Weekly Manpower Loading SPM

Proposed Rebars Splicing Shop Drawing


SPM
(BP3-17) At PC-5

SPM

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


CONTRACTOR SUBMITTAL RECORD

Package No: CP-02 Package Title: Foundation /Bored Piling works Date Issued:

Company Name: Red Viper Ventures and Development Corporation Submittal No: 01601/JEG-000

Date Issued for


Drawing/ Date Date
Comment Status
Document Rev. Description received Received Comments
A/B/C
No. from con from DT
ACTION COPY:

NOTE TO ALL CONTRACTORS: All drawings, documents and samples must have a unique number and be prefixed with the S/C package number.

Approval Status “A”=No Comment “B”=Comment as Noted “C”=Rejected - Resubmit

Savills IN Signature: Date: Contractor Out Signature: Date:

AI Nr: MCI Nr:

Contractor IN Signature: Date: Savills Out Signature: Date:


CLIENT: PROJECT MANAGEMENT: