Process Design Calc

The document provides design calculations for a 900 KLD sewage treatment plant. It details calculations for the size and design of various treatment units including a bar screen chamber, raw sewage sump, and fine screen chamber. Design flow rates, retention times, required volumes, pump capacities and other parameters are calculated. Water quality parameters for raw and treated effluent are also provided.

Uploaded by

kiran raghukiran
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
702 views9 pages

Process Design Calc

The document provides design calculations for a 900 KLD sewage treatment plant. It details calculations for the size and design of various treatment units including a bar screen chamber, raw sewage sump, and fine screen chamber. Design flow rates, retention times, required volumes, pump capacities and other parameters are calculated. Water quality parameters for raw and treated effluent are also provided.

Uploaded by

kiran raghukiran
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 9

SEWERAGE TREATMENT PLANT 900 KLD

Project : Sewage Treatment Plant for


Client :
Contractor:

PROCESS DESIGN CALCULATION


MLD Cu.m/Hr. Cu.m/Sec.
Design Average Flow MLD 0.900 37.500 0.010
Peak Flow Factor (As per CPHEEO Manual) 3.00
Peak Flow MLD 2.700 112.500 0.031

Raw & Treated Effluent + Sewage characteristics


Parameters Unit Inlet Outlet
pH 5.5 - 9.0 6.5 -7.50
BOD mg/l 200.00 ≤ 10
TSS mg/l 250.00 ≤ 10
COD mg/l 450.00 50
Total Nitrogen mg/l 60.00 ≤ 10
Ammonical Nitrogen (NH3-N ) mg/l 50.00
Nitrate Nitrogen (NO3-N) mg/l 5.00
Total Phosphorus mg/l 10.00 ≤2
Oil & Grease mg/l 45.00 Nil
Total Coliform Organism MPN/100ml ≤ 10
Fecal Coliform Organism MPN/100ml <100 /100 ml

UNIT SIZING - COLLECTION SYSTEM


BAR SCREEN CHAMBER Manual
No of Units 1.00 No.
Design Flow 2.700 MLD
Design Flow/Unit 2.700 MLD
112.500 Cu.m/Hr.
0.031 Cu.m/Sec
Clear Opening of Screen 20.00 mm
Width of Screen Flat 6.00 mm
Design Velocity through Screen 0.90 m/sec.
Area Required for Flow 0.035 Sq.m
Effective Area required 0.0451 Sq.m
Width 0.600 m
Depth Required 0.075 m
Depth Provided 0.080 m
Approach Velocity 0.65 m/sec.
Velocity of flow through screen 0.85 m/sec.
Head loss through clean screen 0.021 m
Drop in Screen Chamber Floor 0.100 m
Applying Bernoulis Equation between U/S & D/s of Screen
Z1 + d1 + V1 2 / 2g = Z2 + d2 + V2 2/2g + Hl
Solving by Trial & Error
d2 = 0.181 m
v2 = 0.288 m/sec

When Screen is 50% Clogged


Applying Bernoulis Equation between U/S & D/s of Screen
Z1 + d1 + V1 2 / 2g = Z2 + d2 + V2 2/2g + Hl
Solving by Trial & Error
d1 = 0.141 m
v1 = 0.370 m/sec
Velocity through 50% Clogged Screen 0.961
Approach Velocity at 50% Clogged Condition 0.370
Head Loss through 50% clogged screen = 0.0729*(V1^2-V2^2) 0.057 m
Head Loss in the System at 50% Clogging 0.060 m
Say 0.100 m
Head Buildup on U/S Side at 50% Clogging 0.061 m
Say 0.120 m
Depth Required 0.141 m
Depth Provided 0.150 m
Angle of Inclination of Screen 60.0 Deg
Length Required 1.00 m
Length Provided 1.00 m
FGL of Coarse Screen Chamber area m
Top Level of Coarse Screen Chamber m
Invert Level of Incoming Sewer m
Free fall in receiving chamber 0.15 m
MWL of Screen Channel m
Free Board 0.00 m
Total Depth 0.25 m

RAW SEWAGE SUMP


No of Units 1.00 No.
Inlet Sewage Flow 0.9000 MLD
PROCESS DESIGN SHEETS 1 of 9
Filtrate Return Flow @ 1.5% 0.0135 MLD
PSF& ACF Back Wash Flow @ 2% 0.0180 MLD
Retention Time for Sewage 60.00 Min As per CPHEEO
Retention Time for Filtrate 16.00 Hrs.
Retention Time for PSF Back Wash 1.00 Wash
Volume Required for Sewage 37.50 Cu.m
Volume Required for Filtrate 9.00 Cu.m
Volume Required for PSF Backwash 18.00 Cu.m
Total Volume Required 64.50 Cu.m
Liquid Depth of Sump 3.00 m
Size of Sump required 4.64 m
Size of Sump Provided 4.90 m

FGL of Raw Sewage Sump 100.00 m


Top Level of Sump 100.50 m
Head Loss for flow from Screen Chamber to Sump 0.25 m
MWL of Sump -0.25 m
Extra Height for Submersible Pump 0.75 m
Invert Level of Sump -4.00 m
Total depth of raw sewage sump 104.50 m

Type of Pump Ver Submersible


No. of Working Pumps 2.00 Nos.
No. of Standby Pumps 1.00 Nos.
Total number of pumps 3.00 Nos.
Capacity of Each Raw Sewage Pump 56.91 Cu.m/Hr.
Say 64.00 Cu.m/Hr.
TREATMENT PLANT
FINE SCREEN CHAMBER Mechanical Manual
Standby Working
No of Units 1.00 No. 1.00
Design Flow 2.7315 MLD 2.7315
Design Flow/Unit 2.7315 MLD 2.7315
113.813 Cu.m/Hr. 113.813
0.032 Cu.m/Sec 0.032
Clear Opening of Screen 6.00 mm 10.00
Width of Screen Flat 3.00 mm 6.00
Design Velocity through Screen 1.00 m/sec. 1.00
Area Required for Flow 0.032 Sq.m 0.0316
Effective Area required 0.047 Sq.m 0.0506
Width 0.500 m 0.500
Depth Required 0.095 m 0.101
Depth Provided 0.110 m 0.110
Approach Velocity 0.57 m/sec. 0.57
Velocity of flow through screen 0.86 m/sec. 0.92
Head loss through clean screen 0.030 m 0.038
Drop in Screen Chamber Floor 0.100 m 0.100
Applying Bernoulis Equation between U/S & D/s of Screen
Z1 + d1 + V1 2 / 2g = Z2 + d2 + V2 2/2g + Hl
Solving by Trial & Error
d2 = 0.186 m 0.176 0.2268403279
v2 = 0.339 m/sec 0.359 0.2223317352
0.0045085927
When Screen is 50% Clogged
Applying Bernoulis Equation between U/S & D/s of Screen
Z1 + d1 + V1 2 / 2g = Z2 + d2 + V2 2/2g + Hl
Solving by Trial & Error
d1 = 0.177 m 0.180 0.192264677
v1 = 0.357 m/sec 0.352 0.2096109995
Velocity through 50% Clogged Screen 1.070 1.127 -0.017346323
Approach Velocity at 50% Clogged Condition 0.357 0.352
Head Loss through 50% clogged screen = 0.0729*(V1^2-V2^2) 0.074 m 0.083
Head Loss in the System at 50% Clogging 0.091 m 0.103
Say 0.150 m 0.150
Head Buildup on U/S Side at 50% Clogging 0.067 m 0.070
Say 0.140 m 0.140
Depth Required 0.177 m 0.180
Depth Provided 0.250 m 0.250
Angle of Inclination of Screen 75.00 Deg 45.00
Length Required 2.201 m 2.750
Length Provided 2.800 m 2.800
Free Board 0.500 m 0.500
Total Depth 0.850 m 0.850

GRIT CHANNEL
No of Units 1.00 No.
Design Flow 2.73 MLD
Design Flow/Unit 2.73 MLD
Particle Size 0.15 mm
Specific Gravity of Grit 2.65
Settling Velocity 0.02 m/sec
Surface Loading Rate 1555.00 Cu.m/Day/Sq.m
Performance Efficiency Factor 0.60
Design Surface Loading Rate 933.0 Cu.m/Day/Sq.m

PROCESS DESIGN SHEETS 2 of 9


Surface Area required 2.93 Sq.m
Length to Width Ratio 2.50
Width of Grit Chamber 1.08 m
Say 0.75 m
Length of Grit Chamber 1.00 m
Retention Time 20 Sec
Volume Required 0.63 Cu.m
Depth Required 0.84 m
Depth Provided 0.30 m
Free Board 0.25 m
Total Depth 0.55 m

OIL & GREASE TRAP


No of Units 1.00 No.
Design Flow 2.73 MLD
Design Flow/Unit 2.73 MLD
Retention Time 5.00 Min
Volume Required 9.48 Cu.m
Depth Provided 0.50 m
Area Required 18.97 Sq.m
Length to Width Ratio 2.00
Width of O & G Trap 3.08 m
Say 1.80 m
Length of O & G Trap 10.54 m
Say 4.00 m
Free Board 0.50 m
Total Depth 1.00 m

EQUALISATION TANK
No of Units 1.0 No.
Total Flow 0.93 MLD
Design Flow/Unit 0.93 MLD
Retention Time 6.00 Hrs. (MAXIMUM 8 HOURS )
Volume Required 232.88 Cu.m
Depth Provided 3.50 m
Area 66.54
Length of Chamber 9.50 m
Width required 7.00 m
Width Provided 7.00 m
Free Board 0.50 m
Total Depth 4.00 m

Air Requirment Calculation for Mixing (Based on Volume of Tank)


Volume of Equ Tank 232.8 Cu.m
Air Requirment for Mixing 12.50 Cu.m/1000 Cu.m/min
Capacity of Blower Required for Mixing 174.6 Cu.m/Hr.
Say 180.00 Cu.m/Hr.

Flow per Diffuser (Fine Bubble Tubular Diffuser) 7.00 m3/Hr.


No. of Diffusers required per Tank 25.71 Nos.
Say 35.00 Nos.

Type of Pump Ver Submersible


No. of Working Pumps 3.00 Nos.
No. of Standby Pumps 1.00 Nos.
Total number of pumps 4.00 Nos.
Capacity of Each Raw Sewage Pump 12.94 Cu.m/Hr.
Say 13.00 Cu.m/Hr.

MOVING BED BIO REACTOR (MBBR) TANK


No of Units 1.00 No.
Design Flow 0.932 MLD
Design Flow/Unit 0.932 MLD

(The First Tank 2/3 of the


Design BOD Removal 133.33 mg/l BOD)
MLSS 4000.00
F/M 0.16
Aeration Tank Volume Required 200.32 Cu.m
Depth of Tank 4.30 m
Area Required (For One Tank) 46.59 Sq.m
Length of Each Tank 9.00 m
(Width 6.00 m We have
Width of Each Tank 5.18 m Provided )
Surface Area Provided (For Each Tank) 46.59 Sq.m
Free Board 0.60 m
Total Depth 4.90 m

PROCESS DESIGN SHEETS 3 of 9


Volume of Tank 200.32 Cu.m
Retention Time 5.16 Hrs.

BOD Removed in Each Aeration Tank 124.20 Kg/Day

BOD Loading Rate 0.620 Kg BOD/m3.d


Recommended BOD Loading Rate for MBBR (As per Metcalf &
Eddy Page No. 955, CPHEEO Manual Page No.5 -208) 1.0 to 1.4 Kg BOD/m3.d

Organic Loading Rate for MBBR Media 0.75 Kgs of BOD/100 m2 of media /day
Surface area of media required for each tank 16560 Sq.m
Unit Surface area of media 400.00 Sq.m/Cu.m of Media
Volume of Media Required 41.400 m3

% of media Volume 20.667 %

Sludge Production from BOD Removal 0.30 Kg/ Kg of BOD As per CPHEEO
Quantity of Sludge per Day for BOD Removal on Dry Weight Basis 37.26 Kg/Day
Total Quantity of Sludge on Dry Weight Basis 37.26 Kg/Day

Sludge Age 100.00 Days

OXYGEN CALCULATIONS :
Volume of Sewage treated 900.00 m3/day
Theoretical Kg O2 required per Kg BOD as per Sewage Manual 1.20 Kg/Kg BOD
Inlet BOD5 200 mg/l
Outlet BOD5 0.00 mg/l
BOD5 removed 200 mg/l
Kg of BOD removed in a day 180.00 Kg/day
Kg O2 reqd. for BOD load 216 Kg/day
Inlet Total Kjeldhal Nitrogen 50 mg/l
Outlet Ammoniacal Nitrogen 0.00 mg/l
Nitrogen assimilated in during BOD removal (@ 5% of Inlet BOD) 10 mg/l
Outlet Nitrate Nitrogen 5.00 mg/l
NH3-N removed in a day 40 mg/l
Kg O2 required per Kg of NH3-N 4.60 Kg/ Kg of NH3-N
Kg of NH3-N removed in a day 36.00 Kg/day
Kg O2 reqd. for NH3-N removal 165.6 Kg/day
Kg O2 released per Kg of Nitrate-Nitrogen during denitrification 2.86 -
Kg of Nitrate-Nitrogen generated 27.00 Kg/day
Assuming 75% of Nitrification
Kg of Nitrate Nitrogen in the treated sewage 4.50 Kg/day
Quantity of Nitrate Nitrogen that is denitrified 22.50 Kg/day
Kg O2 released during denitrification 64.35 Kg/day
Total Kg O2 required/day 317.25 Kg/day

AIR REQUIREMENT CALCULATIONS:


Total actual Kg O2 required per day (AOR) 317.25 Kg/day

T = Field Temperature 40 °C 18
H = Altitude of site 138.00 m

Properties of Air
g 9.81 m/ s2
M = Mole of Air 28.97 kg / kg-Mole
R =Universal Gas Constant 8314.00 kg.m2/s2.kg.mole.k
Pa = Atmospheric Pressure 101.325 KN/m2
Oxygen by Weight in air 23.180 %
Ot = % Oxygen Concentration leaving tank 19.00 18 to 20
C = Oxygen Concentration in Tank 2.00

α = Oxygen Transfer Correction Factor 0.65 -


As per Metcalf & Eddy - Page No. 711 - Example 8.2
β = Salinity Surface Tension Correction Factor 0.95 -
F = Fouling Factor 0.9 -

Aeration Depth 4.00 m

Relative Pressure (Pb/Pa)


exp (- g M (Zb - Za) / RT) 0.9850 0.9839
For 20 Deg C

DO Concentration (As per Table D 1 of App D, Metcalf & Eddy) 6.410 9.450 9.080
Specific Weight (As per Table C 1 of App C, Metcalf & Eddy) 9.730 9.793 9.789

Oxygen Concentration at specified temp & altitude (C STH) 6.314 9.298


Atmospheric Pressure at Specified Elevation & Temp in m 10.258 10.181

C' S T H
(C STH) (1/2) (((Patm,h + Pw, eff depth)/Patm,h) +(Ot / 21)) 7.2446 10.6820

Oxygen required under Standard Conditions (SOTR)

PROCESS DESIGN SHEETS 4 of 9


= AOTR ÷ [((βC'STH – C) ÷ CS20) x 1.024(T – 20) x α x F] 627.63 Kg/day 633.71

Hence, SOR 627.63 Kg/day 633.71


No. of Basins 1 Nos. 1
Standard O2 required at Field Conditions per Basin 627.63 Kg/day/Basin 633.71

Top Water Level (TWL) in Basin 4.30 m 4.30


Bottom Water Level (BWL) in Basins 0.00 m 0.00
Liquid level in Basin 4.30 m 4.30
Height at which Diffusers are kept 0.30 m 0.30
Effective Aeration Depth 4.00 m 4.00

OTE for Diffusers per m depth of submergence 6.00 %


SOTE for the above Effective Aeration Depth 24.000 % 24.00
Fraction of O2 in Air 23.18 % 23.18
Specific Gravity of Air at field Condition
ra = (PM/RT)*(Pb/Pa) 1.111 1.193

Air required at Field Conditions per Basin 10158.27 Nm3/day/ Basin 9546.88
Hours of Aeration per Basin per day 24.00 hr/day/Basin 24
Air required per hour per Basin = M / N 423.26 Nm3/hr/ Basin 397.79
No. of Operating Air Blowers per Basin 1.00 Nos. 1
Capacity of Air Blowers required = O / P 423.26 Nm3/hr 397.79
Safety Factor in Blower Capacity 5.00 % 5
Capacity of Air Blowers with Safety Factor = Q x (1 + R) 444.42 Nm3/hr 417.68
Capacity of Air Blowers provided 450.00 Nm3/hr 420.00

Air Requirment Calculation for Mixing (Based on Surface Area of Tank)


Area of One Reactor Tank 46.6 Sq.m
Air Requirment for Mixing 2.25 Cu.m/Hr./Sq.m
Capacity of Blower Required for Mixing (For One Tank) (On Area Ba 104.8 Cu.m/Hr.

Air Requirment Calculation for Mixing (Based on Volume of Tank)


Volume of One Reactor Tank 200.3 Cu.m
Air Requirment for Mixing 12.50 Cu.m/1000 Cu.m/min
Capacity of Blower Required for Mixing (For One Tank) (On Volume 150.2 Cu.m

Capacity of Blower Required For Each Tank 450 Nm3/Hr.


No of Working Blowers for two Tanks 1.00 Nos.
Capacity of each Blower Required 450 Nm3/Hr.
Say 450.00 Cum/Hr
Head for Blower 5.30 MWC
Number of Working Blowers 1.00 Nos.
Number of Standby Blowers 1.00 Nos.
Total number of Blowers 2.00 Nos.
Type of Blower Twin Lobe

Flow per Diffuser (Fine Bubble Tubular Diffuser) 9.00 m3/Hr.


No. of Diffusers required per Tank 50.00 Nos.
Say 55.00 Nos.

TUBE SETTLER
No of Units 1.00 No.
Design Flow 0.932 MLD
Design Flow/Unit 0.932 MLD
Surface Loading Rate 18 Cu.m/Day/Sq.m
Surface Area required 51.75 Sq.m

Retention Time 2.50 Hrs.


Volume Required 97.03 Cu.m
Depth Required 2.00 m
Depth Provided 2.50 m
Free Board 0.70 m
Total Depth 3.20 m
Velocity of flow in launder 0.60 m/sec.
Area of Launder Required 0.009 Sq.m
Width of Launder 0.30 m
Liquid Depth in Launder 0.03 m
Wall Tk of launder 0.10 m

INTERNAL RECRICULATION (NITRIFIED LIQUOR)


Recirculation 25 %
Volume of Recirculation per Day 225 Cu.m/Day
Capacity of Pump Required 9.38 Cu.m/Hr.
No. of Working Pumps 1.00 Nos.
No of Pumps provided (1W+1S) 2.00 Nos.
Type of Pump Submersible
Capacity of Each Pump Required 9.38 Cu.m/Hr.

SLUDGE RECRICULATION

PROCESS DESIGN SHEETS 5 of 9


Sludge Recirculation 25 %
Volume of Recirculation per Day 225 Cu.m/Day
Volume of Sludge per Day 6.75 Cu.m/Day
Capacity of Pump Required 9.66 Cu.m/Hr.
No. of Working Pumps 1.00 Nos.
No of Pumps provided (1W+1S) 2.00 Nos.
Type of Pump Centrifugal
Capacity of Each Pump Required 9.66 Cu.m/Hr.

FILTER FEED SUMP


No of Units 1.00 No.
Design Inlet 0.9180 MLD
Retention Time 3.00 Hr.
Volume Required 114.75 Cu.m
Depth Provided 3.80 m
Length of Chamber 5.00 m
Width required 6.04 m
Width Provided 6.00 m
Free Board 0.30 m
Total Depth 4.10 m

Filter Feed Pump


From Tube settlrer to Filter Feed 0.87 MLD
Filter Feed Tank Retention Time 3.00 Hours
Volume of tank 114.75
Capacity of Pump Required 38.25 Cu.m/Hr.
No. of Working Pumps 3.00 Nos.
No of Pumps provided (2W+1S) 3.00 Nos.
Type of Pump Centrifugal
Capacity of Each Pump Required 19.13 Cu.m/Hr.
20.00 Cu.m/Hr.

PROCESS DESIGN SHEETS 6 of 9


PRESSURE SAND FILTER
No of Units 1.00 No.
Total Flow 0.92 MLD
Design Flow/Unit 0.918 MLD
Hours of Operation 23.00 Hrs
Flow Rate 39.91 Cu.m/Hr.
Filtration Rate 15.00 Cu.m/Hr./Sq.m
Area of Filter Required 2.66 Sq.m
No of Units 1.00 Nos.
Area of Each Filter Required 2.66 Sq.m
Dia of Filter Required 1.84 m
Say 2.00 m

ACTIVATED CARBON FILTER


No of Units 1.00 No.
Total Flow 0.92 MLD
Design Flow/Unit 0.92 MLD
Hours of Operation 23.00 Hrs
Flow Rate 39.91 Cu.m/Hr.
Filtration Rate 15.00 Cu.m/Hr./Sq.m
Area of Filter Required 2.66 Sq.m
No of Units 1.00 Nos.
Area of Each Filter Required 2.66 Sq.m
Dia of Filter Required 1.84 m
Say 2.00 m

TREATED SEWAGE SUMP


No of Units 1.00 No.
Design Flow 0.90 MLD
Design Flow/Unit 0.90 MLD
Retention Time 7.00 Hrs.
Volume Required 262.50 Cu.m
Depth Provided 4.00 m
Length of Chamber 11.20 m
Width required 5.86 m
Width Provided 6.00 m
Free Board 0.30 m
Total Depth 4.30 m

SLUDGE TREATMENT
SLUDGE QUANTITY FROM TUBE SETTLER
Sludge Production from BOD Removal 0.30 Kg/ Kg of BOD As per CPHEEO
Quantity of Sludge per Day for BOD Removal on Dry Weight Basis 54.00 Kg/Day
Total Quantity of Sludge on Dry Weight Basis 54.00 Kg/Day
Sludge Concentration 0.80 %
Volume of Sludge per Day 6.75 Cu.m/Day

SLUDGE DEWATERING
Volume of Sludge 1.80 Cu.m
Total dry sludge per day 54.0 kg/day
Dewatered sludge solids concentration 20 %
Total dewatered wet sludge per day 270 kg/day
Total volume of dewatered wet sludge per day 270 Lit/day 6480
Size of Filter Plate 610 x 610
Volume of Each Chamber 10.60 Lit
No. of chambers required 25.47 Nos.
No. of chambers provided 20.00 Nos.
No. of batches per day 3.00 No.
Hours of operation per day 12.0 Hrs

PE Dosing System
PE Dosing Rate 2.00 Kg/Ton of Dry Solids
PE Required per day 0.11 Kg.
Solution Strength 0.1 %
Volume of PE Prep tank 108.00 Lit
0.108 Cu.m
Providing a dosing tank for 12 Hrs.
Vol of tank required 54.00 Ltrs
Say 50.00 Ltrs
Capacity of Dosing Pump 9.00 Ltrs/Hr.
No of Dosing Pumps 1.00 Nos.
Capacity of each Dosing Pump 9.00 Ltrs/Hr.
Say 9.00 Ltrs/Hr.

PROCESS DESIGN SHEETS 7 of 9


SODIUM HYPO CHLORITE DOSING SYSTEM
Chlorine Dosage 5.00 PPM
Design flow 0.90 MLD
Chlorine Required per Day 4.50 Kgs.
0.188 Kgs./Hr.
Solution Strength as procured in % 5.00
Available strength at point of use in % 4.00
Volume of solution needed liters / Hr. 4.69 Lit/Hr.
112.50 Lit.Day
Providing a dosing tank for 24.00 Hrs.
Vol of tank required 112.50 Ltrs
Say 100 Ltrs
Capacity of Dosing Pump 4.69 Ltrs/Hr.
No of Dosing Pumps 1 Nos.
Capacity of each Dosing Pump 4.69
Say 5.00 Ltrs/Hr.

FERRIC CHLORIDE Dosing System


Phosporous to be removed 8.0 mg/l
Total phosporous to be removed per day 7.2 Kg.
FeCl Dosing Rate 2.30 kg/kg of P
FeCl Required per day 16.56 Kg.
Solution Strength 10 %
Volume of FeCl Prep tank 165.6 Lit
0.1656 Cu.m
Dosing Tank Volume required per hour 6.90 Ltrs.
Providing a dosing tank for 24 Hrs.
Vol of tank required 165.6 Ltrs
Say 200 Ltrs
Capacity of Dosing Pump 6.90 Ltrs/Hr.
Say 7.00 Ltrs/Hr.

PROCESS DESIGN SHEETS 8 of 9


0.90 MLD SEWAGE TREATEMENMT PLANT FOR ………….
Project : 0.90 MLD Sewage Treatment Plant
Client :
Contractor:

CIVIL UNITS LIST


Sl.No. Name of the Unit Qty Size
1 BAR Screen Chamber 1.00 3.60m x 1.0m x 0.50m LD
2 Grit Channel (1W+1S) 1.00 2.5m x 1.0m x 1.50m SWD
3 Oil & Grease Trap 1.00 1.60m x0.60m x 0.1.0m LD
4 Equalisation Tank 1.00 9.50m x 9.50m x3.0m LD
5 Aeration Tank 1.00 9.00m x 7.0m x 4.00m LD
6 Tube Settler 1.00 6.20m x 7.00m x3.60m SWD
7 Filter Feed Sump 1.00 5.0m x 7.00m x3.60m LD
8 Treated Sewage Sump 1.00 11.20m x7.00m x 4.00m LD
9 Sludge Holding Tank 1.00 4.00 m x7.00m x 4.00m Ht.
10 Fencing 1.00 To Suit
11 Pathways 1.00 To Suit

9 of 9