Project Engineering Deliverables: Functional Responsibility Description Type of Deliverable Cost (L.E.)

The document outlines engineering deliverables for a project including project controls, general engineering, mechanical engineering, and piping deliverables. It lists 17 specific deliverables such as a project controls plan, work breakdown structure, piping design criteria, piping calculations, and piping isometric drawings. The total estimated cost for all deliverables is 30,500 L.E. Additional information is requested including a project execution plan, fire hazard zone drawing, HAZOP study, PFDs, P&IDs, and plant layout drawings.

Uploaded by

MJ Magdy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
281 views

Project Engineering Deliverables: Functional Responsibility Description Type of Deliverable Cost (L.E.)

The document outlines engineering deliverables for a project including project controls, general engineering, mechanical engineering, and piping deliverables. It lists 17 specific deliverables such as a project controls plan, work breakdown structure, piping design criteria, piping calculations, and piping isometric drawings. The total estimated cost for all deliverables is 30,500 L.E. Additional information is requested including a project execution plan, fire hazard zone drawing, HAZOP study, PFDs, P&IDs, and plant layout drawings.

Uploaded by

MJ Magdy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Project Engineering Deliverables 

Functional Responsibility Description Type of Cost


Deliverable (L.E.)
       
       
 Project Controls 
 
  *Project Controls Plan  *Document  500 
*Project Cost Reports *Report  500 
 

  *Work Breakdown Structure  *Chart  1500 


*Schedule  2000 
  *Project Schedule 
   
 
 
       
     
 Engineering ‐ General *List of Codes, Standards, &  * List  1000 
 

Regulations     
*Design Philosophies  *Document  2000 
   
 
       
       
Mechanical Engineering *Mechanical Equipment Design     
  *Document  1000 
Criteria  
   
*Mechanical Equipment  *Document  3000 
Specifications     
*Mechanical Equipment List  * List  2000 
   
       
       
Piping    *Piping Design Criteria  *Document  1000 
 
   *Piping Calculations  *Document  3000 
   *Tie‐In List  * List  1000 
 *General Arrangement     
* Drawings  5000 
Drawings 
   
*Pipe Support Standard 
* Drawings  2000 
Drawings 
   
 *Piping Isometric Drawings  * Drawings 
 

5000 
 
Total Cost = 30500 L.E
Information needed 
Project Execution Plan 

Fire Hazard Zone Drawing 

Hazard and Operability Analysis (HAZOP) 

Process Flow Diagrams (PFD's) 

Piping and Instrumentation Diagrams (P&ID's)

Plant Layout, Site and Plot Plans 

Line Designation Tables 

 
 