This document summarizes the initial pile load test report for a pile foundation project in Haryana, India. It describes conducting a load test on a 1200mm diameter bored pile to a depth of 23 meters using the anchor method. Based on observations of gross displacement of 3.24mm and net displacement of 3.635mm under 2.5 times the design load, the concluded safe operational load carrying capacity of the tested pile is 118.49 metric tons.

Uploaded by

Shakti Sharma
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
451 views8 pages

Initial Pile Load Test Report Anchor Method

This document summarizes the initial pile load test report for a pile foundation project in Haryana, India. It describes conducting a load test on a 1200mm diameter bored pile to a depth of 23 meters using the anchor method. Based on observations of gross displacement of 3.24mm and net displacement of 3.635mm under 2.5 times the design load, the concluded safe operational load carrying capacity of the tested pile is 118.49 metric tons.

Uploaded by

Shakti Sharma
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 8

Initial Pile Load Test Report

______________________________________________________

Anand Infraequip LLP

Project Name: Six Lanning and Strengthening of new NH-248A from existing
Km. 11+682 to Existing Km 24+400 in the State of Haryana under NHDP
phase-4 on hybrid annuity mode.

Constructed By: H.G. Infra Engineering Limited

Initial Pile Load Test No: TP-01 (1200mm-DIA)

Test Conducted By: M/S Anand Infraequip LLP

Submitted: 07th June 2019


Initial Pile Load Test Report
______________________________________________________

Anand Infraequip LLP

Acknowledgement

M/S Anand Infraequip LLP acknowledge with thanks all the assistance provided to us by all officers and staff of

M/s H.G. Infra Engineering Limited local Civil authorities without whose help it may not have been possible to

accomplish this assignment.

For Anand Infraequip LLP


Initial Pile Load Test Report
______________________________________________________

Anand Infraequip LLP


1.0 INTRODUCTION

The H.G. Infra Engineering Limited- project is Six Lanning and Strengthening of new NH-248A from existing
Km. 11+682 to Existing Km 24+400 in the State of Haryana under NHDP phase-4 on hybrid annuity mode. Pile
foundations of 1200mm dia and 23m depth with a designed capacity of ------------00.0000000 MT. This report
presents the results of the Initial pile vertical load test with anchor method conducted on at Major Structure at
project to monitor the behavior and settlement of the pile along with safe load calculation.

2.0 METHODOLOGY

Vertical load test

The testing of the pile was done as per I.S.2911 part-iv, using reaction pile method arrangement for anchor test
by maintain load method. The Compression load shall be applied to the pile top by means of a hydraulic jack
against suitable load frame which is capable of providing reaction and settlement is recorded by suitable dial
gauges. Pile head was chipped cut off to horizontal plane, projecting steel shall be cut or bent and top finished
smooth and leveled with material as specified to give a plane surface which is normal to the axis of the pile. A
bearing plate with a hole at the center was placed on the head of pile for the jackets to rest. A proper loading
arrangement platform was installed as specified. It was ensured that when the hydraulic jack and load
measuring device are mounted on pile head the whole system will be stable on the maximum specified load
The anchor method load was 25% more than the test load. For single pile four dial gauges shall be fixed to the
pile and be equidistant from the pile axis having 0.01mm sensitivity. The test is carried out by applying a series
of downward incremental load (25% of safe load on pile). In this method application of increment of test load
and taking of measurement or displacement in each stage is maintained till the rate of displacement is either
0.1mm in first 30 minutes or 0.2mm in first one hour or 2 hours, whichever occurs first. The test load is
maintained for 24 hours. After completion of 24 hrs with test load, load is decreased in equivalent each
increment loads after every 15 min. Rebounds reading were taken immediately after unloading and 30 min later
for each stage of decrement.
Initial Pile Load Test Report
______________________________________________________

Anand Infraequip LLP


ANALYSIS:

Safe load on single pile for initial test is least of the following;

 2/3rd Load at which the total displacement attains value of 12 mm safe load should be corresponding to
total displacement permissible.
 50% of the final load at which the total displacement attains equal to 10% pile dia meter.

2.5 OBSERVATION

On application of 2.5 times the design load, the gross displacement of the pile is 3.24 mm and net displacement
is 3.635 mm. The sheet of load settlement relationship, load displacement graph and the field readings are
attached as annexure.

4.0 CONCLUSION

On conclusion write down the following:-

Based on the above observation and as per IS-2911 part-4, the safe operational load carrying capacity of the
tested piles is 118.49MT.

For AnandInfraequip LLP

Name of Project Six Lanning and Strengthening of new NH-248A


Initial Pile Load Test Report
______________________________________________________

Anand Infraequip LLP


from existing Km. 11+682 to Existing Km 24+400 in
the State of Haryana under NHDP phase-4 on
hybrid annuity mode.

Type of Structures Pile foundation for Major Structure Bridge No-

Name of Contractor M/S H.G. Infra Engineering Limited

Name of Client National Highway Authority of India

Pile ID No TP-01

Location Bridge No.---------

Type of Pile Bored Cast in Situ

Depth of Pile 23mtrs.

Dia of Stem 1200 mm

Cut-off Level -------------------------------

Founding Level ------------------------------

Grade of Concrete M-35

Date of Casting -----------------------------------------

Date of Testing ----------------------------------------

Type of Test Anchor Method Pile Load Test

Method of Test Maintained Load Method


Initial Pile Load Test Report
______________________________________________________

Anand Infraequip LLP

Designed safe Capacity 00.0000 MT

Tools Specifications:
Total Nos. of Jack 2 Nos.

Capacity of Hydraulic Jack 600Tonn

Ram Dia of Jack 363mm

Area of Ram (1034.38x2) cm2

Pressure of pump 2068.77x10/10000

One division load 20.68MT

Total no of gauge 04

L.C. of dial gauge 0.01mm


Initial Pile Load Test Report
______________________________________________________

Anand Infraequip LLP

Loading Chart

Division Pressure Kg/cm2 Load MT


4 40 82.72
8 80 165.44
12 120 248.16
16 160 330.38
20 200 413.60
24 240 496.32
28 280 597.04
32 320 661.76
36 360 744.48
40 400 827.20
44 440 909.92
48 480 992.64
53.2 532 1100

Note: Original Load Test Reading data in your office.