It Is: Project Initiation Workshop Sample Agenda

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 2

Project Initiation Workshop

SAMPLE AGENDA

What it is
The Project Initiation Workshop (PIW) sample agenda guides participants through a structured meeting designed
to initiate a project.

Why it’s useful


The PIW sample agenda guides participants through the necessary steps to conduct a Project Initiation Workshop
and answer the question, “What are we doing?” The benefits of such a workshop include creating a
communication device whereby all key stakeholders agree on what the project will do and why they are doing it.
The workshop includes the opportunity to obtain organizational expertise and experience to further define the
project, and it establishes ownership to plan the project.

The initiation process typically includes six steps:

 Draft the Project Opportunity and Goal with Sr. Management, create “straw” sections
 Establish the workshop goals and attendees, formalize the agenda/timing, establish roles
 Plot major project scope sections, send meeting notice/handouts, ensure key attendance, prep room
 Establish the foundation of the project, obtain “buy-in” of the organization, build the planning team
 Finalize the Project Opportunity Statement (POS) and get sponsor signature, document RAID, and
document planning team members
 Communicate ‘the project” to all stakeholders

How to use it
The agenda template should not be considered absolute when it comes to planning your PIW meeting. The
agenda should be modified to meet unique project requirements. Feel free to revise wording and timing of items;
delete steps you do not require, add steps relevant to your project.

Watch for those agenda items that are considered “mandatory” - they should never be skipped!

Copyright © 2010 by Management Concepts, Inc. All rights reserved. This material appears in Project Team Dynamics: Enhancing
Performance, Improving Results, by Lisa DiTullio (Vienna, VA: Management Concepts, 2010). For more resources from the author, see
also www.yourprojectoffice.com.
Project Initiation Workshop
SAMPLE AGENDA
Date, Time, Location, Conference Room

DURATION AGENDA TOPIC WHO GOAL


10 min Introductions, workshop purpose, review Facilitator Understand why we are here &
agenda & ground rules * the workshop approach
Throughout Project risks, assumptions, issues, & decisions will Facilitator Document & track important
Meeting be simultaneously captured elements of the project
30 min Review the Business Opportunity and Project Project Communicate the rationale and
Goal * Manager intent of the project
30 min Determine Project Scope Facilitator Understand and document the
ALL boundaries of the project
15 min Conduct Stakeholder Analysis Facilitator Agreement on the project’s
ALL stakeholders
15 min Break
45 min Determine Project Deliverables * Facilitator Agreement on major project
ALL deliverables, what constitutes
their completion and timing
20 min Determine Expected Business Outcomes by Facilitator Agreement on Expected
their success metrics * ALL Business Outcomes (impact on
specific metrics in the
operational environment)
10 min Validate that deliverables are aligned with the Facilitator Ensure deliverables will
Business Outcomes and the Project Goal ALL accomplish specified outcomes
and goal
1 hour Lunch
20 min Determine high level Milestones Facilitator Document the high level series
ALL of events that must occur for
(This activity could be done in the PPW.)
project completion
15 min Complete the Flexibility Matrix Facilitator Understand the constraints and
flexibility of various project
attributes
10 min Determine Planning Team Members * Facilitator Agreement on who will be
ALL required/assigned to plan the
project in the next phase
15 min Determine Next Steps: Assign owners and Facilitator Understand what will be done
dates to risks, assumptions and issues; PM in the short term and who owns
specify/schedule next meeting * those steps
10 min Workshop Evaluation Facilitator Understand what worked/did
ALL not and collect suggestions for
improvement
* these agenda topics should be considered mandatory

Copyright © 2010 by Management Concepts, Inc. All rights reserved. This material appears in Project Team Dynamics: Enhancing
Performance, Improving Results, by Lisa DiTullio (Vienna, VA: Management Concepts, 2010). For more resources from the author, see
also www.yourprojectoffice.com.

You might also like