Agccc & DBB: JV/DM/F/VR

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 2

AGCCC & DBB

Joint Venture
DUBAI U.A.E.

REPORT NO. : JV/DM/F/VR-

VISUAL INSPECTION REPORT INSPECTION DATE :

PAGE 1 OF 1

PROJECT : THE DUBAI MALL LOCATION : Near Material storage Yard in Dubai Mall
CLIENT : EMAAR ELEVATION : GROUND LEVEL

ITEM INSPECTED : :

RESULT

100 % Visual Inspection was carried out on above Item and the result is found
Satisfactory.

OTHER REMARKS ( IF ANY )

Reference : BS 5289

AGCCC & DBB CONSULTANT

NAME

SIGNATURE

DATE

Doc. No.:JV/FR/08/001 Rev. No.:0 Date:04.04.08


AGCCC & DBB
Joint Venture
DUBAI U.A.E.

REPORT NO. : JV/DM/F/VR- 001

VISUAL INSPECTION REPORT INSPECTION DATE : 04.04.08

PAGE 1 OF 1

PROJECT : THE DUBAI MALL LOCATION : Near Material storage Yard in Dubai Mall
CLIENT : EMAAR ELEVATION : GROUND LEVEL

ITEM INSPECTED : : BEAMS:- B1005,(1/2, 2/2), B-1006, B-1007

: CLOUMN :- C1001, C1003, C1008, C1009

: VERTICAL BRACING :- VB1004, VB1006, VB1008, VB1010

: LOOSE BRACKET 10 Nos. & STUB 8 Nos.

RESULT

100 % Visual Inspection was carried out on above Item and the result is found
Satisfactory.

OTHER REMARKS ( IF ANY )

Reference : BS 5289

AGCCC & DBB CONSULTANT

NAME Mr. EHAB FADEL

SIGNATURE

DATE 04.04.08

Doc. No.:JV/FR/08/001 Rev. No.:0 Date:04.04.08