0% found this document useful (0 votes)
26 views1 page

Assignemnt 7

This document outlines questions for a mid-term assignment on project management. It asks about stakeholder registers, stakeholder engagement levels, identifying and categorizing stakeholders for an Orange Line Train project using a power/interest grid, the scope of a project and steps for scope management, and work breakdown structures (WBS) including why they are used.

Uploaded by

Qalab E Abbas
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
26 views1 page

Assignemnt 7

This document outlines questions for a mid-term assignment on project management. It asks about stakeholder registers, stakeholder engagement levels, identifying and categorizing stakeholders for an Orange Line Train project using a power/interest grid, the scope of a project and steps for scope management, and work breakdown structures (WBS) including why they are used.

Uploaded by

Qalab E Abbas
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Mid-Term Assignment Project Management

1. What is a stakeholder register? Why it is advisable to maintain a


stakeholder register?
2. What are different stake holder engagement levels?
3. Identify all the stake holder involved in Government of Punjab’s Project of
Orange Line Train and categorize them using Power/Interest Grid.
4. What is scope of a project and what are the steps involved in Scope
Management?
5. What meant by WBS? Why is it used?

You might also like