Electrical Work Checklist: Saline Water Desalination Plant On The West Coast
A checklist was provided for inspecting electrical work at a desalination plant on the West Coast. The checklist identifies risks like electrocution, arc flash, and falling objects. It ensures safe distances are maintained from power lines, isolation of power sources through locking and tagging, that tools are tested, and proper PPE like helmets and gloves are used. The inspection results in approving or not approving the electrical work based on meeting these safety requirements.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
366 views1 page
Electrical Work Checklist: Saline Water Desalination Plant On The West Coast
A checklist was provided for inspecting electrical work at a desalination plant on the West Coast. The checklist identifies risks like electrocution, arc flash, and falling objects. It ensures safe distances are maintained from power lines, isolation of power sources through locking and tagging, that tools are tested, and proper PPE like helmets and gloves are used. The inspection results in approving or not approving the electrical work based on meeting these safety requirements.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1
Saline Water Desalination plant on the West Coast
ELECTRICAL WORK CHECKLIST
PTW Ref. No. Contractor Name: Date of Inspection:
Project Name Work Location:
Identify risk associated with Electrical
Electrocution Arc Flash Flying particles Noise Falling Objects Protruding objects, parts Tripping / Slipping Electric shock Fire Manual handling Electric Burn Near Overhead lines Other(Specify): Precaution require to complete the work safely Yes No N/A Is the safe distance maintained? Yes No Voltage........................... Distance...................... Does the work require access to confined spaces? If yes, obtain a confined space entry permit Have all possible sources of electrical power been isolated, locked and properly tagged (LOTO)? Is below mentioned any one of Isolation in place and the isolation followed as per procedure? Switch Out Lockout/ Tag out Has it been confirmed by testing, that the lines / equipment are de-energized? Have tools and devices to be used been tested and adjusted? Appropriate fire extinguisher should be provided. All the Electrical equipment should be in good working condition. Electrical equipment checklist should be provided. Sign board indicating Electrical Hazard is to be sufficiently installed. Ensure good site housekeeping in the work area is maintained. Is the safe distance maintained? Yes No Voltage........................... Distance...................... Other (specify): The following areas / items have been inspected by issuer and receiver Fire Extinguisher Type...................... Quantity................ Size.................... Access/Escape Route Danger/Waning Sign Lighting Safety Barriers Stick Portable Radio Other (specify) PPE Required for the activity Helmet Safety Shoes Electrical Gloves Half Mask Safety goggles Reflective Vest Dust Mask Safety clothes Face shield Arc flash cover all Safety Ear Plugs/muff Arc Flash Face shield
INSPECTION RESULT: NOT APPROVED APPROVED
Remarks:
Inspected and attested by: Sub-Contractor Representative ASRF