Piping Fabrication Installation QCP On Site
Piping Fabrication Installation QCP On Site
Piping Fabrication Installation QCP On Site
1.2 Review QCP/ITP with Client inspection team As per Specification DS R&A Y
2 PRE FABRICATION
3 INSPECTION
4 FIELD INSTALLATION
4.3 Visual inspection after completed welds and record As per WPS H S Y
4.6 Line check(punch list accord to iso drg/line no)pre hydro Senet specification H S NA
Carry out Pressure/Hydro test at correct test pressure
4.7 indicated on the applicable isometric / Check Sheet As per Approved Procedure H W Y
5 FINAL PAINTING
6 Handover Package
5.1 Carry out final review of the QC data pack As per Client Requirement DS R/A Y
Legends
Approvals
T Third party
CIA: CIA: Client Inspection Authority ATC QC Name: Signature: Initial as used in this document:
S: Surveillance
V: Verify
H: Hold
R: Review
A: Approval
Date:
Page 1 of 1