Hydraulic Calculation of Minor Bridge at Ch. 1+800: Reconstruction
Hydraulic Calculation of Minor Bridge at Ch. 1+800: Reconstruction
Hydraulic Calculation of Minor Bridge at Ch. 1+800: Reconstruction
RECONSTRUCTION
Project: Hydraulic calculation of High Level Bridge on Begumganj - Sultanganj on NH-46 at RD 1+800
Hydraulic Report
High Level Bridge on Begumganj - Sultanganj on NH-46 at RD 1+800
Hydraulic Report
Project: Hydraulic calculation of High Level Bridge on Begumganj - Sultanganj on NH-46 at
RD 1+800
Flood Estimation
I Emperical formula
Hydraulic Report
Discharge calculation by Synthetic Unitgraph Method
1 Description
Name and Number of Subzone = Betwa 1c
Name of Site = Rly bridge 761/1225
Name of Place = Jhansi-Manikpur(CR)
Name of Stream = Barma
Shape of the Catchment = Fan
Location = Lat 23°-36'-11.27"
= Long78°-21'-49.88"
Topography = Moderate Steep Slope
2 Design data
Catchment Area (A) = 173.65 sqkm from Toposheet
Length of Longest Stream (L) = 35.49 km from Toposheet
Length of Longest Stream from cg to site (Lc) = 16.05 km
Unit Duration of Unitgraph (tr) = 1.00 hr
(Table no-4) from central
=
Loss Rate 2.30 mm/hr water comission report
2.3
3 Computation of Equivalent Stream Slope (S) (table T-1) from central water comission report zone betwa1c
Li
Sl. No. Reduced distance Reduced levels Di Di-1 + Di Li(Di-1 + Di)
(kms) (m) (kms) (m) (m) (mxkm)
1 2 3 4 5 6 7
1 0.000 480.000 0.000 0 0 0
2 5.243 500.000 5.243 20.00 20.00 104.86
3 16.041 520.000 10.798 40.00 60.00 647.88
4 26.249 540.000 10.208 60.00 100.00 1020.80
6 31.351 560.000 31.351 80.00 140.00 4389.14
7 35.202 580.000 3.851 100.00 180.00 693.18
8 35.486 600.000 0.284 120.00 220.00 62.48
x Sum 17942.92
Li(Di-1+Di)
Slope (S) = S = 14.25 m/km
L2
4 Determination of Synthetic 1-hr Unitgraph Parameters
L/ S = 2.490
tr = 1.0 hr
Time lag from center of unit rainfall duration to Peak of unit hydrograph in hrs.
qp =1.331(L/S)-0.492 0.850 cumec/sqkm
Unit rain fall duration in hrs.
tp =2.195(qp)^(-0.944) = 2.561 hr 2.50 say
Peak discharge of unit hydrograph per unit area per sq.km. in cumecs
W50 = 2.040(qp)-1.265 = 2.412 hrs
Width of UH at 50% of peak discharge (Qp) in hrs.
W75 = 1.250(qp) -0.864 = 1.44 hrs
Width of UH at 75% of peak discharge (Qp) in hrs.
WR50 = 0.739(qp)-0968 = 0.87 hrs
Width of UH at 50% of Qp bet. Raisign limb and Qp ordinate in hrs.
WR75 =0.500(qp)-0.813 = 0.57 hrs
Width of UH at 75% of Qp bet. Raisign limb and Qp ordinate in hrs.
TB =5.04537(tp)0.71637 = 9.70 hrs 10.00 say
Base Period of UH in hrs.
tm = tp + tr/2 = 3.00 hrs
Time from start of raising limb to peak of UH in hrs.
Qp = qp x A = 147.53 cumec
Peak discharge of unit hydrograph in hrs.
UG Ordinates from above formulaes
X-value Y-value
0 0.00 0 0.00
tm-WR50 2.13 Qp*0.5 73.77
tm-WR75 2.43 Qp*0.75 110.65
tm 3.00 Qp*1.0 147.53
tm+W75-WR75 3.87 Qp*0.75 110.65
tm+W50-WR50 4.55 Qp*0.5 73.77
TB 10.00 0 0.00
Q in Cumecs
160.00
140.00 f(x) = 14.1677486507549 x² + 7.5696901279205 x − 0.234062640606144
f(x) = − 119.524039743573 ln(x) + 270.283958429898
120.00
100.00
80.00
60.00
40.00
20.00
0.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00
Time in hrs
Q in Cumecs
0.4 5.06 135
0.5 7.09 120
0.6 9.41 105 110.02
1 21.50 90 89.74
2 71.58 75 71.58
2.920647148716 142.73 60
3.84 110.02 45
4.55 89.74 30
9.25 4.96 15
21.50
9.41
7.09
9.28 4.57 0 5.06
0.66
0.00 4.96
4.57
4.44
3.04
1.39
1.14
0.77
0.52
0.27
9.29 4.44 0 5 10 15
9.4 3.04 Time in hours
9.53 1.39
9.55 1.14
9.58 0.77
9.6 0.52
9.62 0.27
9.641849381541 0.00
Total 478.90
9 Time Distribution of input storm from fig. 11 of CWC Publication for sub zone 3(d)
and hourly effective rainfall increments
Rainfall Loss rate/
Distribution Storm rainfall in Effective hourly
increments in hour (in
coefficient Cm rain fall
Time cm cm)
1 2 3 4 5 6
1.00 0.50 9.20 9.20 0.230 8.97
2.00 0.69 12.70 3.50 0.230 3.27
3.00 0.80 14.72 2.02 0.230 1.79
4.00 0.88 16.20 1.47 0.230 1.24
5.00 0.92 16.93 0.74 0.230 0.51
6.00 0.97 17.853 0.92 0.230 0.69
7.00 1 18.405 0.55 0.230 0.32
Design Base flow = 0.018 cumec/m2 Table no- 5 from central water comission report
Rainfall Excess
Time in hours SUG ordinates ordinates Direct runoff
Arrangement
0 0.00 0.00 0.00
1.00 9.41 0.51 4.762
2.00 21.50 0.69 14.843
2.92 71.58 1.79 128.449
3.84 142.73 8.97 1280.647
4.55 110.02 3.27 359.418
9.25 89.74 1.24 111.496
9.28 4.96 0.51 2.509
II Rational Formula
Catchment Area (A)
= 174.137 sqkm
Coefficient of Runoff (C)
= 14.000 Clause 4.2 SP-13
Percentage Coeficient of Runoff for the Catchment Characteristics (P)
Clause 4.9, Table 2,
= 0.700
SP-13
tc = (.87 X L3 / H).385
= 4.686 hours Clause 4.7, SP 13
Rainfall in cm (F)
= 7.00 cm Ref SP:13 record
Time in hr (T)
= 1.0 hr
Critical Intensity of Rainfall in cm per hr (Ic)
Ic =F/T*((T+1)F/T*((T+1)/(tc+1))
= 2.462 cm/hr Clause 4.8, SP 13
Calculation of Discharge By Dicken's Formula
1
Q = C*( A )3/4 = 671.11 cumecs
II Calculation of Discharge By Rational Formula
Q =0.028*P*A*Ic*100
= 840.32 cumecs
Project: Hydraulic calculation of High Level Bridge on Begumganj - Sultanganj on NH-46 at RD 1+800
Chainage in m
Hydraulic Report
Project: Hydraulic calculation of High Level Bridge on Begumganj - Sultanganj on NH-46 at RD 1+800
S.No. H.F.L Length (m) Bed Level D.O.F A.D.O.F Distance Area W.P
1 503.942 37.5 503.553 0.389 0.000 0.000 0.000 0.000
2 503.942 32.1 501.964 1.978 1.183 5.357 6.338 5.588
3 503.942 26.8 501.241 2.701 2.339 5.357 12.531 5.406
4 503.942 21.4 500.585 3.357 3.029 5.357 16.225 5.397
5 503.942 16.1 499.060 4.882 4.119 5.357 22.067 5.570
6 503.942 10.7 499.056 4.886 4.884 5.357 26.164 5.357
7 503.942 5.4 498.987 4.955 4.921 5.357 26.360 5.358
8 503.942 0.0 498.942 5.000 4.977 5.357 26.665 5.357
9 503.942 5.4 498.943 4.999 5.000 5.357 26.783 5.357
10 503.942 10.7 498.946 4.996 4.998 5.357 26.773 5.357
11 503.942 16.1 498.967 4.975 4.986 5.357 26.709 5.357
12 503.942 21.4 499.445 4.497 4.736 5.357 25.372 5.378
13 503.942 26.8 500.234 3.708 4.103 5.357 21.978 5.415
14 503.942 32.1 501.492 2.450 3.079 5.357 16.495 5.503
15 503.942 37.5 503.637 0.305 1.378 5.357 7.380 5.771
Total (Cross sectional Area, A) = 287.840 sq. m
Wetted Perimeter, R in m = 76.171
Abbreviations
Hydraulic Radius, R=A/P= 3.779 m H.F.L. - High Flood Level
Velocity, V = 1 2 1
Ref:-(IRC SP-13.2014 cl.no.-(5.4))
R 3
V 2
n
= 3.779^(2/3) x (0.0015^0.5)/0.035) D.O.F. - Depth Of Flow
= 2.68 m/sec A.D.O.F.- Average Depth Of Flow
Discharge, Q = A*V W.P. - Wetted Perimeter
= 287.84 x 2.6847 = 772.764 cumecs L.B.L. - Lowest Bed Level
505.000
HFL
Bed Level
504.000
503.000
502.000
501.000
500.000
499.000
498.000
497.000
496.000
Chainage in m
Hydraulic Report
Project: Hydraulic calculation of High Level Bridge on Begumganj - Sultanganj on NH-46 at RD 1+800
S.No. H.F.L Length (m) Bed Level D.O.F A.D.O.F Distance Area W.P
1 503.192 40.0 503.037 0.155 0.000 0.000 0.000 0.000
2 503.192 32.0 500.737 2.455 1.305 8.000 10.440 8.000
3 503.192 24.0 499.537 3.655 3.055 8.000 24.440 8.089
4 503.192 16.0 498.792 4.400 4.027 8.000 32.220 8.035
5 503.192 8.0 498.194 4.998 4.699 8.000 37.592 8.022
6 503.192 4.0 498.193 4.999 4.999 4.000 19.994 4.000
7 503.192 0.0 498.192 5.000 5.000 4.000 19.998 4.000
8 503.192 4.0 498.193 4.999 5.000 4.000 19.998 4.000
9 503.192 8.0 498.195 4.997 4.998 4.000 19.991 4.000
10 503.192 16.0 498.261 4.931 4.964 8.000 39.710 8.000
11 503.192 24.0 498.266 4.926 4.928 8.000 39.428 8.000
12 503.192 32.0 500.246 2.946 3.936 8.000 31.489 8.241
13 503.192 40.0 502.600 0.592 1.769 8.000 14.153 8.339
499.419 Total (Cross sectional Area, A) = 309.452 sq. m
3.77328462 Wetted Perimeter, R in m = 80.727
Abbreviations
Hydraulic Radius, R=A/P= 3.833 m H.F.L. - High Flood Level
Velocity, V = 1 2 1
Ref:-(IRC SP-13.2014 cl.no.-(5.4))
R 3
V 2
n
= 3.8333^(2/3) x (0.0015^0.5)/0.035) D.O.F. - Depth Of Flow
= 2.71 m/sec A.D.O.F.- Average Depth Of Flow
W.P. - Wetted Perimeter
Discharge, Q = A*V L.B.L. - Lowest Bed Level
= 309.452 x 2.71 = 838.739 cumecs
504.0
Bed Level
503.0
502.0
501.0 HFL
500.0
499.0
498.0
497.0
496.0
495.0
Chainage in m
Hydraulic Report
Project: Hydraulic calculation of High Level Bridge on Begumganj - Sultanganj on NH-46 at RD 1+800
S.No. H.F.L Length (m) Bed Level D.O.F A.D.O.F Distance Area W.P
1 502.442 37.5 502.019 0.423 0.000 0.000 0.00 0.000
2 502.442 32.1 500.173 2.269 1.346 5.357 7.21 5.666
3 502.442 26.8 499.210 3.232 2.751 5.357 14.74 5.443
4 502.442 21.4 498.854 3.588 3.410 5.357 18.27 5.369
5 502.442 16.1 498.519 3.923 3.755 5.357 20.12 5.368
6 502.442 10.7 498.093 4.349 4.136 5.357 22.16 5.374
7 502.442 5.4 497.778 4.664 4.506 5.357 24.14 5.366
8 502.442 0.0 497.442 5.000 4.832 5.357 25.89 5.368
9 502.442 5.4 497.444 4.998 4.999 5.357 26.78 5.357
10 502.442 10.7 497.446 4.996 4.997 5.357 26.77 5.357
11 502.442 16.1 497.500 4.942 4.969 5.357 26.62 5.357
12 502.442 21.4 497.852 4.590 4.766 5.357 25.53 5.369
13 502.442 26.8 498.210 4.232 4.411 5.357 23.63 5.369
14 502.442 32.1 498.886 3.556 3.894 5.357 20.86 5.400
15 502.442 37.5 501.951 0.491 2.024 5.357 10.84 6.172
Total (Cross sectional Area, A) = 293.559 sq. m
Wetted Perimeter, R in m = 76.335
Abbreviations
Hydraulic Radius, R=A/P= 3.846 m H.F.L. - High Flood Level
Velocity, V = 1 2 1
Ref:-(IRC SP-13.2014 cl.no.-(5.4))
R 3
V 2
n
= 3.8457^(2/3) x (0.0015^0.5)/0.035) D.O.F. - Depth Of Flow
= 2.72 m/sec A.D.O.F.- Average Depth Of Flow
W.P. - Wetted Perimeter
Discharge, Q = A*V L.B.L. - Lowest Bed Level
= 293.559 x 2.716 = 797.306 cumecs
Bed Level
503.0 HFL
502.0
501.0
500.0
499.0
498.0
497.0
496.0
495.0
494.0
Chainage in m
Hydraulic Report
Project: Hydraulic calculation of High Level Bridge on Begumganj - Sultanganj on NH-46 at RD 1+800
1 Afflux Calculations
Au 2
Afflux = V2
0.015 1
17.89 Ae
Afflux = ((2.7104^2)/17.89)+0.015)x(((309.452/269.968776)^2)-1)
Hydraulic Report
Project: Hydraulic calculation of High Level Bridge on Begumganj - Sultanganj on NH-46 at RD 1+800
1 Scour Depth: