Topic:-California Bearing Ratio Test
Topic:-California Bearing Ratio Test
Topic:-California Bearing Ratio Test
Topic:-
CALIFORNIA BEARING RATIO TEST
(cbr test)
SUMBITTED BY:-
UJASH B. PATEL
CIVIL-2
ER NO:-156290306544
2
The CBR apparatus consists of:-
1.Mould :-150mm diameter & 175 height
2.Plunger:-50mm dia meter
3.Base plate
4.Collar
5.Loading frame
6.Proving ring
7.Dial gauges
3
4
Calculate the CBR value using following formula.
Corrected Load Value
CBR% - x 100
Standard Load
2.5 1370 70
STANDARD
IS: 2720 (Part 16) 1979.
DEFINITION
California bearing ratio is the ratio of force per unit area required to penetrate in
to a soil mass with a circular plunger of 50mm diameter at the rate of 1.25mm /
min.
6
It is the ratio of force per unit area required to penetrate a soil mass with standard circular
piston at the rate of 1.25 mm/min. to that required for the corresponding penetration of a
standard material.
The following table gives the standard loads adopted for different penetrations for the
standard material with a C.B.R. value of 100.
Penetration of plunger (mm) Standard load (kg)
2.5 1370
5.0 2055
7.5 2630
10.0 3180
12.5 3600
7
REMOULDED SPECIMEN:-
Prepare the remoulded specimen at Proctors maximum dry density or any other
at which C.B.R is required.
Maintain the specimen at optimum moisture content or the field moisture as required.
The material used should pass 20 mm I.S. sieve but it should be retained on 4.75 mm
sieve. Prepare the specimen either by dynamic compaction or by static compaction.
8
PENETRATION TEST:-
Place the mould assembly with the surcharge weights on the penetration
test machine.
Seat the penetration piston at the center of the specimen with the smallest
possible load, but in no case in excess of 4 kg so that full contact of the
piston on the sample is established.
Set the stress and strain dial gauge to read zero. Apply the load on the
piston so that the penetration rate is about 1.25 mm/min.
Record the load readings at penetrations of 0.5, 1 .0, 1.5, 2.0, 2.5, 3.0, 4.0,
5.0, 7.5, 10 and 12.5 mm.
9
LOAC-PENETRATION ON CURVE:-
Thank you