Bridge Management Practice
Bridge Management Practice
Management Practice
1
INTRODUCTION
Worldwide shift in focus of
attention from building new bridges
to maintaining existing ones
1) Bridges are coming of age
2) Fund is low
3) Public outcries over occurrence
of a number of catastrophic
bridge failures
2
Statistic of Malaysian Bridges
3
Bridge On Federal Roads By Deck Types
(Until Dec 2006)
Concrete, 6322
Cavity formed
to underside of
abutment
7
Disruption to Traffic
JAMBATAN FT007/018/10, OVER
SG. JERLUN (KG. KEMBOJA),
KUBANG PASU, KEDAH
8
Disruption to Traffic
JAMBATAN FT007/018/10, OVER SG. JERLUN (KG.
KEMBOJA), KUBANG PASU, KEDAH
Ke Kangar Dari Alor Setar
Span-3 Span-1
Abut-B Span-2 Abut-A
Pier-2 Pier-1
Medium Cracks
Very Severe Deflection at at M id-span
Mid-span With Vertical
Sagging of 30mm-60mm
Deep and Cracks Shown Very Sever Spalling
With Re-bars Shown
11
Disruption to
Traffic
Condition of the bridge
after collapsed
Jambatan Sg Udang ke Paya – 12/06/2003
Rumput Jaya
12
Disruption to Traffic
Collapse of
Bailey bridge
due to
overloaded
lorry
(Dec. 2001)
Foto 3 – Pandangan dekat paip air Foto 4 – Bracket kekuli yang kelihatan
UPVC drainwater downpipe yang baik berkarat
14
KEROSAKAN PAIP AIR UPVC (RAINWATER DOWNPIPE) DI
JEJAMBAT MRR2 AMPANG POINT (JAMBATAN NO. FT28/026/00)
15
In USA, failure of Silver Bridge
at Point Pleasant (1967)
20
Flood Level
No r m
al Lev
el
PIPE
INADEQUATE SIZE
CULVERT
CROSS SECTIONAL VIEW
PLAN VIEW
WASHOUT
PIPE
CULVERT
21
Disruption to Traffic Jambatan FT091/057/00 ,
(Hydraulic Effect-Scouring) Di Jalan Kluang-Kota Tinggi,
Daerah Klaung,
Negeri Johor.
22
Disruption to Traffic Jambatan FT091/057/00 ,
(Hydraulic Effect-Scouring) Di Jalan Kluang-Kota Tinggi,
Daerah Klaung,
Negeri Johor.
23
HYDRAULIC
HYDRAULIC ACTION
ACTION -- SCOUR
SCOUR
• Jambatan FT130/018/00
Bridge over Sg. Salor, Jalan
Pasir Mas- Kota Bharu,
Daerah Kota Bharu,
Kelantan.
• Scoured pier with
exposed pile
24
Hydraulic
Hydraulic Action
Action -- Erosion
Erosion
27
Disruption to Traffic - Effect of Accident
Bridge collapsed in Oakland, California on Sunday 29-04-2007.
28
BRIDGE FAILURES
The Motivation – Planning, design and
construction
– Inspection and
assessment of current
bridge performance
level
Rawang – Maintenance, repair
and rehabilitation
– Operation and control
Sg. Pahang 29
Silver Bridge Collapse (1967)
• National Bridge Inspection (1968)
• Special Bridge Replacement (1970)
• Interest in computerised bridge
management system (BMS)
(1980’s)
• Mandatory requirement of every
state to operate 6 management
systems including BMS (ISTEA
1991)
In Malaysia NALS (1985-88), JKR BMS (1990)
30
Collapse of Songsu Bridge
in Korea (Oct. 1994)
31
Annual Mandatory
Bridge Inspection (AMBI)
• Since 1995
• To decentralise bridge inspection
• Inventorisation of new bridges
• Updating of bridge condition status
• Scheduling of maintenance and
rehabilitation programs
• Bridge inspection courses for Engineers,
Technical Assistants and Technicians
32
Legend : - UPPJ
UPPJ Penyelenggaraan
Inform CA
Jalan for the
Inform UPPJ
CA Concessionaire if serious installation
defects of proper
detected signboard
UPPJ
Inform JD for
immediate
action
JD
Inform CSFJ
immediately if the 1.Inform general public if closure
bridge is in critical Inform JD for the
of bridge is involved.
condition installation of Bailey
2.Carry out detail inspection and
bridge if the bridge is
prepare report
structurally unsound or
unsafe for road users.
Inform CFSJ
and discuss for *Bailey Bridge Centre for
further action the Eastern Regional
Centre is located at JKR
Temerloh)
CSFJ
UPJ UJ
• Monitor status
• Analyse records in BMS & plan for refurbishment/replacement
35
SISTEM PENGURUSAN JAMBATAN (JKR-BMS)
Continues….. 36
What is a BMS ?
Activities: Rules
• a tool to assist highway andAnd
Construction
Inspection
bridge agencies
Maintenance Regulations
Software
• encompasses all engineering
System
and management functions
EDP programs Database
37
Bridge Maintenance Activities
Bridge Operation & Maintenance Phase
BMS Content - the bridge management
system in the operational phase
consists of :
• A series of connected activities
• A set of management rules and
regulations for the activities
• A database in which frequent used
data are stored
• A set of EDP programs for
processing the data
38
Structure of a BMS
Inventory Funding
Constraints
Inspection Costs
Output
Data Base
Maintenance
BMS Needs
Bridge
Construction Analytical Predictions
Conditions
Process Options
Traffic surveys Costs
Engineering Input
39
Bridge Maintenance Activities
BMS EDP Programs (JKRBMS)
JKR-BMS includes a Windows-based EDP tool for managing the
activities connected with operation and maintenance of
structures.
JKR-BMS includes a number of software modules and programs
that are used in connection with;
• Inventory
• Principal inspection
• Special Inspection
• Recurrent Maintenance and Minor
maintenance/Cleaning
• Ranking of repair work
• Administration of Special Transports (next phase)
• Price Book (next phase)
• Cost management
• Budget management (next phase)
• Archive (next phase)
40
First menu – [System – Menu] –
Modules view the various available modules
41
Modules
Inventory
Selections – bridges,
chronology,
drawings/sketches,
create
bridge/passage
Registers – routes &
rives, interested
parties
Reports – inventory
data, list of bridges,
number & area of
bridges
42
You can see the construction data in the inventory module
43
Modules Principal Inspection
Selections – inspection, standard repair works
Reports – inspection report, standard repair works,
inspections in a given year, 5-year budgets
44
In the Principal Inspection module you have data on the
components and condition rating
45
In the Principal Inspection module you also have photos
from your latest inspection
46
CARTA ALIRAN MAKLUMAT PEMERIKSAAN UNTUK
SISTEM PENGURUSAN JAMBATAN (BMS)
CHECKING/SORTING REPORT
BMS CONFIRMATORY
Inspection
YES IS IT IN INVENTORY? NO
UPDATE DATA NEW DATA ENTRY
REPLACEMENT DETAIL
REHABILITATION INSPECTION
MAINTENANCE ( If needed )
47
Material Condition Rating Card
48
Performance Condition Rating of Components
49
Condition Rating System for Structures
The performance of the structure is directly related to
the performance of the primary components. The worst
condition rating of the primary components shall be the
rating of the structure.
51
INSPECTION - Practical Training
INSPECTION ABOVE
THE BRIDGE
INSPECTION
UNDER THE BRIDGE
52
BRIDGE INSPECTION : -
INVENTORY
ROUTINE
CONDITION
CONFIRMATORY
DETAILED
53
Pemeriksaan Manditori
Tahunan
54
Laporan Pemeriksaan
55
PELAPORAN PEMERIKSAAN PENYERAHAN PROJEK
• Mengikut SPK-Sistem Pengurusan Kualiti, JKR Negeri/JKR
Daerah /Pegawai Penguasa/ HOPT perlu memanggil
mesyuarat pra-penyerahan dengan semua pihak
terlibat/Kontraktor/Perunding.
• Menganjurkan ’Joint Inspection’ 3 bulan sebelum
pengeluaran Sijil Praktikal Siap Kerja(CPC) dan sebelum
Tamat Tempoh Liabiliti Kecacatan (DLP).
• Keperluan untuk menjalankan pemeriksaan jambatan
adalah berikut :-
i. Prosedur Pengambilan Projek Jambatan Siap
ii. Format ‘Routine Bridge Condition Inspection’(sediakan
Laporan Pemeriksaan Inventori) :
– Summary Report Form
– Structural Condition Checklist
(Bridge/Culvert)
iii. Format Laporan Pemeriksaan Kecacatan Jambatan
Sambung……
56
PELAPORAN PEMERIKSAAN PRA PENYERAHAN PROJEK
iv. Criteria For Classification of Severity of Damage
v. Condition Rating Guide Based On Damage
vi. Metodologi dan prosedur pemeriksaan jambatan
berdasarkan ’Annual Bridge Inspection Manual’.
vii. Inspektor jambatan perlu kompeten dan berpengalaman
untuk perolehan data maklumat sahih dan konsisten secara
sistematik dan efektif.
57
Keperluan dikemukakan/hantarkan ke Cawangan Senggara
Fasiliti Jalan, IPJKR dalam tempoh 1 bulan :
i. Laporan Pemeriksaan Inventori Jambatan
ii. Laporan Pemeriksaan Kecacatan Jambatan (dengan
laporan bergambar kecacatan)
iii. Dokumen kontrak atau Maklumat Ringkasan Projek
iv. ’As built drawing’
v. Kad inventori
vi. Jaminan (Warranty) pemasangan elemen (expansion
joint, bearing dsb.)
vii. Gambarfoto kerja-kerja projek baru atau projek
pembaikan ( hard copy & softcopy dalam bentuk CD)
menunjukkan keadaan/aktiviti struktur untuk :
- Permulaan/Sebelum Kerja.
- Semasa Kerja
- Selepas Siap
viii. Pemasangan papan tanda Nombor Struktur Jambatan
ix. Maklumat penting kontrak seperti: Alamat Perunding,
Kontraktor, Pembekal, tarikh siap, tarikh tamat
kecacatan dsb.
58
KRITERIA PENERIMAAN
(i) Prestasi Kondisi (Condition Rating) :
- CR 1 dan CR 2 BOLEH TERIMA (MEMUASKAN)
- CR 3 TIDAK BOLEH TERIMA
(Melainkan selepas dijalankan pemeriksaan dan kerja
pembaikan susulan)
- CR 4 dan CR 5 TIDAK BOLEH (Perlu siasatan lanjut)
(ii) Rekabentuk : Pematuhan Bridge Loading BD 37/01,
Clearance > 5.4m high, bridge restrictions etc.
(iii) Pematuhan Kontrak: Kualiti, Spesifikasi, Perincian lukisan
‘as - built drawing’, Waranti dsb.
(iv) Audit Keselamatan: Pematuhan peraturan/papan tanda
trafik (Traffic Management System) dan Features affecting
safety/security)seperti access provision/ hole cover
(v) Lain-lain: Pemasangan kabel utiliti/kelengkapan jambatan
memuaskan dan dibekal maintenance manual.
59
KEROSAKAN LAZIM YANG DIKENALPASTI SEMASA
PENYERAHAN PROJEK SIAP
Bil. Masalah Jenis Kerosakan / Kegagalan Punca Masalah
I Kerosakan • Kecacatan ’honeycomb & • Pengawasan kerja
Struktur surface defects’ pada binaan tidak rapi dan
parapet, abutment, beam kurang pengalaman
etc. oleh S.O dan
• Keretakan wingwall & r.c. Kontraktor.
parapet
• Keretakan 'shrinkage' • Tidak cukup perincian
permukaan Box Girder rekabentuk /
• Kecacatan pemasangan pembinaan tidak
precast r.c parapet panels mengikuti perincian
secara ’cast in situ’ yang struktur.
tidak mengikut lukisan.
• Keretakan r.c abutments,
headwall
• Kecacatan r.c diaphragms
• Kecacatan kerb, ballast
wall, deck
• R .E wall precast panel at
ramp of approach - gap
opening melebar, keretakan
pada R.E wall & abutment.
60
Common Structural Defects
Honeycombing & surface defects to parapet, abutment, beams etc
62
KEROSAKAN LAZIM YANG DIKENALPASTI SEMASA
PENYERAHAN PROJEK SIAP
Bil. Masalah Jenis Kerosakan / Kegagalan Punca Masalah
II Kerosakan • Jalan tuju mendap/tidak rata • Pengawasan tidak ikut
Bukan • Pavemen jalan beralun/retak spesifikasi, kerja tidak
Struktur • Bearing shelf tidak bersih rapi/tidak bersih dan S.O
• Hakisan slope tebing. dan Kontraktor kurang
• Inlet/Outlet pembentung mahir.
tersumbat sampah dan tanah
(debris & silting) • Perincian rekabentuk tidak
cukup dan tidak praktikal
dengan environmen
tapakbina
63
Common Non Structural Defects
Settlement To Bridge Approach
65
KEROSAKAN LAZIM YANG DIKENALPASTI SEMASA
PENYERAHAN PROJEK SIAP
66
Failure In Construction Conformance
No Epoxy Mortar to Railing Base Plate
67
Failure In Construction Conformance
No Provision or Insufficient Protruding Length of UPVC Pipes
69
KELEMAHAN ATAU KETIDAKCUKUPAN PENYERAHAN PROJEK
PROJEK JAMBATAN
i. Kurangnya penumpuan pemantauan rapi projek dari segi kualiti
pembinaan, penyeliaan kerja dan aktiviti pemeriksaan kecacatan
(misalnya masalah kelemahan ’structural detailings’) bermula
dari peringkat awalan untuk mengurangkan gejala
kecacatan/kerosakan.
ii. HOPT/Penyelaras Projek/PP/WPP bertanggungjawab
menguruskan proses penyerahan projek serta memastikan
supaya projek siap dengan berkualiti dan tanpa kecacatan
sebelum diserahkan untuk pengambialihan oleh CSFJ.
iii. Perlu disertakan lengkap dengan bukti/laporan bergambar
Selepas Kerja Pembaikan kecacatan. Juga latar
belakang/ringkasan projek, maklumat kontrak, ’as built
drawings’, kad inventori, waranti dan lain- lain laporan
mengikut keperluan Prosedur Pengambilan Projek Jambatan
Siap.
iv. Projek yang dikendalikan oleh ’Special Teamworks’ dan
ditubuhkan di bawah IPJKR atau JKR Negeri yang kemudianya
telah dibubarkan selepas tersebut projek siap.
Sambung……
70
CADANGAN DAN PENGESYORAN
i. Pihak JKR Negeri, JKR Daerah, HOPT/Jabatan Pemilik
Projek meningkatkan pemantapan sistem kawalseliaan
dan pemantauan serta bertanggungjawab dengan
memberi keutamaan kepada pengurusan, penyerahan
projek dan penyenggaraan aset jambatan selepas
pengambilalihan projek.
ii. Meningkatkan kepekaan dan tindakan aktiviti
pemeriksaan, pelaporan dan pembaikan jambatan secara
efektif dan berterusan.
iii. Menyimpan, mengemaskini rekod projek, inventorisasi
jambatan dan menyegerakan sistem penyaluran
maklumat dan tindakan susulan semasa di antara
peringkat Ibu Pejabat JKR, JKR Negeri dan JKR Daerah.
iv. Mengkaji dan melaksanakan sebarang keperluan kerja
tambahan, kelengkapan fasiliti atau kerja perubahan (yang
tiada dalam kontrak projek).
Sambung……
71
CADANGAN DAN PENGESYORAN
v. Mendapatkan kerjasama CKASJ, Unit Keselamatan Jalan,
Unit Geologi, JPS dan pihak-pihak utiliti
awam/Kontraktor/Perunding dll. untuk kajisemula bagi
menangani dan menyelesaikan masalah rekabentuk
struktur, keselamatan dan kelancaran sistem trafik bagi
tujuan/sebelum penyerahan projek.
vi. Menentukan langkah-langkah berkesan berdasarkan
keperluan pencapaian prestasi pengurusan aset menerusi
pematuhan kualiti pelaksanaan kerja serta kriteria
penerimaan penyerahan projek siap disamping
meminimakan berlakunya masalah kecacatan/kerosakan
struktur serta kos penyenggaran efektif.
vii. Menambahkan tahap kompetensi dan kemahiran tenaga
kerja pengawasan projek, perekabentuk dan inspektor
jambatan.
72
Conclusions
• To help the districts with the systematic
bridge inspection and rehabilitation
• To improve the understanding of bridge
structures and their long term durability
and serviceability
• To give guidance on the basic concept of
non-destructive testing and scour
protection
• To improve the quality of bridge project
and project documentation process
through proper handing over procedure.
73
THE END
74