BQ With Price

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 89

BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT

INTERIOR NEW WORKS


1 BEDROOM 1

a Floor Finishing (20.9 sqm)


- Vinyl Flooring
Subcon Fees : /sqft sqft 225 10.00 2249.70

b Wall Finishing (46.6 sqm)


- Paint: Nippon in code Brilliant White 1001
- Paint: Nippon in code Puritan Black N 1982 D
Subcon Fees : /sqft sqft 502 12.00 6024.00

c Ceiling Finishing (20.9 sqm)


- Plaster Ceiling
Subcon Fees : /sqft sqft 225 6.00 1350.00

d Doors
- Solid Timber Door pcs 1 500.00 500.00
900mm (W) x 2400mm (H)

e Window & Glass Panel


- 1330mm (W) x Full Height Glass Louvers Type pcs 3 1677.00 5031.00
with Powder Coated Frame in Bronze
- 600mm (H) x 1800mm (H) Fixed Glass pcs 1 456.00 456.00
with Powder Coated Frame in Bronze

f Accessories
- Air Conditioner: Wall Mounted (Haier) pcs 1 900.00 900.00
- Ceiling Fan pcs 1 400.00 400.00
- Plug Point pcs 5 80.00 400.00
- Switch pcs 5 80.00 400.00
- Lighting: Downlight pcs 5 40.00 200.00
Subcon Fees : /sqft sqft 0.00 0.00

g Extra/ Optional
- Lighting: Wall Light pcs 2 0.00 0
- Curtains/ Blinds pcs 4 0.00 0
- Loose Furniture

TOTAL 17910.70
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
2 BATH 1

a Floor Finishing (5.3 sqm)


- Tiles 300mm x 300mm pcs 60 5.00 300.00
Subcon Fees : /sqft sqft 57 5.30 302.10

b Wall Finishing (28.5 sqm)


- Tiles 300mm x 300mm pcs 5.00 0.00
Subcon Fees : /sqft sqft 307 12.00 3684.00

c Ceiling Finishing (5.3 sqm)


- Plaster Ceiling
Subcon Fees : /sqft sqft 57 6.00 342.00

d Doors
- Solid Timber Door pcs 1 500.00 500.00
750mm (W) x 2400mm (H)
Subcon Fees : /sqft sqft 0.00 0.00

e Window & Glass Panel


- 1200mm (W) x 600mm (H) Top Hung Window pcs 1 295.00 295.00
with Powder Coated Frame in Bronze

f Sanitary & Plumbing


- Sink 1 400.00 400.00
- Water Closet 1 800.00 800.00
- Hand Bidet 1 200.00 200.00
- Water Tap 1 200.00 200.00
- Floor Trap 1 100.00 100.00
- Shower 1 400.00 400.00
Subcon Fees : /sqft 0.00 0.00

g Accessories
- Lighting: Downlight pcs 2 40.00 80.00
Subcon Fees : /sqft 0.00 0.00

h Extra/ Optional
- Soap Dispenser pcs 1 0.00 0.00
- Towel Rack pcs 1 0.00 0.00
- Wall Mounted Toilet Paper Holder pcs 1 0.00 0.00

TOTAL 7603.10
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
3 PASSAGE 5

a Floor Finishing (17.9 sqm)


- 600mm x 600mm Tiles
Subcon Fees : /sqft sqft 192.7 10.00 1927.00

b Wall Finishing (10.3 sqm)


- Paint: Nippon in code Brilliant White 1001
Subcon Fees : /sqft sqft 111 12.00 1332.00

c Ceiling Finishing (17.9 sqm)


- Plaster Ceiling
Subcon Fees : /sqft sqft 193 6.00 1158.00

d Window & Glass Panel


- 2150mm (W) x 3000mm (H) Fixed Glass 1 2637.00 2637.00
with Powder Coated Frame in Bronze
- 1700mm (W) x 3150mm (H) Fixed Glass 1 2185.00 2185.00
with Powder Coated Frame in Bronze

e Accessories
- Lighting: Downlight 5 40.00 200.00
- Plug Point 2 80.00 160.00
- Switch 2 80.00 160.00
Subcon Fees : /sqft 0.00 0.00

TOTAL 9759.00
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
4 MAID ROOM

a Floor Finishing (9.3 sqm)


- Cement Render Flooring
Subcon Fees : /sqft sqft 100 5.30 530.00

b Wall Finishing (34.7 sqm)


- Paint: Nippon in code Brilliant White 1001
Subcon Fees : /sqft sqft 374 12.00 4488.00

c Ceiling Finishing (9.3 sqm)


- Plaster Ceiling
Subcon Fees : /sqft sqft 100 6.00 600.00

d Doors
- Solid Timber Door 1 500.00 500.00
900mm (W) x 2400mm (H)
Subcon Fees : /sqft 0.00 0.00

e Window & Glass Panel


- 600mm (W) x 1800mm (H)) Glass Window 1 456.00 456.00
with Powder Coated Frame in Bronze

f Accessories
- Ceiling Fan pcs 1 400.00 400.00
- Plug Point pcs 2 80.00 160.00
- Switch pcs 4 80.00 320.00
- Lighting: Downlight pcs 4 40.00 160.00
Subcon Fees : /sqft 0.00 0.00

TOTAL 7614.00
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
5 DRIVER ROOM

a Floor Finishing (9.3 sqm)


- Cement Render Flooring
Subcon Fees : /sqft sqft 100 5.30 530.00

b Wall Finishing (34.7 sqm)


- Paint: Nippon in code Brilliant White 1001
Subcon Fees : /sqft sqft 374 12.00 4488.00

c Ceiling Finishing (9.3 sqm)


- Plaster Ceiling
Subcon Fees : /sqft sqft 100 6.00 600.00

d Doors
- Solid Timber Door 1 500.00 500.00
900mm (W) x 2400mm (H)
Subcon Fees : /sqft 0.00 0.00

e Window & Glass Panel


- 1200mm (W) x 1800mm (H)) Glass Window 1 882.00 882.00
with Powder Coated Frame in Bronze

f Accessories
- Ceiling Fan 1 400.00 400.00
- Plug Point 2 80.00 160.00
- Switch 4 80.00 320.00
- Lighting: Downlight 4 40.00 160.00
Subcon Fees : /sqft 0.00 0.00

TOTAL 8040.00
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
6 BATH 2 ( MAID ROOM )

a Floor Finishing (4.6 sqm)


- Cement Render Flooring ( only Shower Area )
- Tiles 300mm x 300mm
Subcon Fees : /sqft sqft 49.5 10.00 495.00

b Wall Finishing (28.5 sqm)


- Paint: Nippon in code Brilliant White 1001
Subcon Fees : /sqft sqft 307 12.00 3684.00

c Ceiling Finishing (4.6 sqm)


- Plaster Ceiling
Subcon Fees : /sqft sqft 49.5 6.00 297.00

d Doors
- Solid Timber Door pcs 1 500.00 500.00
750mm (W) x 2400mm (H)
Subcon Fees : /sqft sqft 0.00 0.00

e Window & Glass Panel


- 1200mm (W) x 600mm (H) Top Hung Window pcs 1 295.00 295.00
with Powder Coated Frame in Bronze

f Sanitary & Plumbing


- Sink 1 400.00 400.00
- Water Closet 1 800.00 800.00
- Hand Bidet 1 200.00 200.00
- Water Tap 1 200.00 200.00
- Floor Trap 1 100.00 100.00
- Shower 1 400.00 400.00
Subcon Fees : /sqft 0.00 0.00

g Accessories
- Lighting: Downlight 2 40.00 80.00
Subcon Fees : /sqft 0.00 0.00

h Extra/ Optional
- Soap Dispenser pcs 1 0.00 0.00
- Towel Rack pcs 1 0.00 0.00
- Wall Mounted Toilet Paper Holder pcs 1 0.00 0.00

TOTAL 6956.00
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
7 BATH 3 ( DRIVER ROOM )

a Floor Finishing (4.6 sqm)


- Cement Render Flooring ( only Shower Area )
- Tiles 300mm x 300mm (4.6 sqm)
Subcon Fees : /sqft sqft 49.5 10.00 495.00

b Wall Finishing (28.5 sqm)


- Paint: Nippon in code Brilliant White 1001
Subcon Fees : /sqft sqft 307 12.00 3684.00

c Ceiling Finishing (4.6 sqm)


- Plaster Ceiling
Subcon Fees : /sqft sqft 49.5 6.00 297.00

d Doors
- Solid Timber Door pcs 1 500.00 500.00
750mm (W) x 2400mm (H)
Subcon Fees : /sqft sqft 0.00 0.00

e Window & Glass Panel


- 1200mm (W) x 600mm (H) Top Hung Window pcs 1 295.00 295.00
with Powder Coated Frame in Bronze

f Sanitary & Plumbing


- Sink 1 400.00 400.00
- Water Closet 1 800.00 800.00
- Hand Bidet 1 200.00 200.00
- Water Tap 1 200.00 200.00
- Floor Trap 1 100.00 100.00
- Shower 1 400.00 400.00
Subcon Fees : /sqft 0.00 0.00

g Accessories
- Lighting: Downlight 2 40.00 80.00
Subcon Fees : /sqft 0.00 0.00

h Extra/ Optional
- Soap Dispenser pcs 1 0.00 0.00
- Towel Rack pcs 1 0.00 0.00
- Wall Mounted Toilet Paper Holder pcs 1 0.00 0.00

TOTAL 7451.00
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
8 OUTDOOR UTILITIES

a Floor Finishing (5.7 sqm)


- Cement Render Flooring
Subcon Fees : /sqft sqft 61.4 5.30 325.42

b Wall Finishing (30.04 sqm)


- Paint: Nippon in code Brilliant White 1001
Subcon Fees : /sqft sqft 323 12.00 3876.00

c Ceiling Finishing (5.7 sqm)


- Plaster Ceiling
Subcon Fees : /sqft sqft 61.4 6.00 368.40

d Doors
- Solid Timber Door 1 500.00 500.00
900mm (W) x 2400mm (H)
Subcon Fees : /sqft 0.00 0.00

e Accessories
- Lighting: Downlight 1 40.00 40.00
Subcon Fees : /sqft 0.00 0.00

TOTAL 5109.82
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
9 UTILITIES ( FITNESS AREA )

a Floor Finishing (5.2 sqm)


- Cement Render Flooring
Subcon Fees : /sqft sqft 56 5.30 296.80

b Wall Finishing (30.02 sqm)


- Paint: Nippon in code Brilliant White 1001
Subcon Fees : /sqft sqft 323 12.00 3876.00

c Ceiling Finishing (5.2 sqm)


- Plaster Ceiling
Subcon Fees : /sqft sqft 56 6.00 336.00

d Doors
- Solid Timber Door 1 500.00 500.00
900mm (W) x 2400mm (H)
Subcon Fees : /sqft 0.00 0.00

e Accessories
- Lighting: Downlight 2 40.00 80.00
Subcon Fees : /sqft 0.00 0.00

TOTAL 5088.80
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
10 FITNESS/ MULTIPURPOSE AREA

a Floor Finishing (29.3 sqm)


- Cement Render Flooring
Subcon Fees : /sqft sqft 315 5.30 1669.50

b Wall Finishing (53.4 sqm)


- Paint: Nippon in code Brilliant White 1001
Subcon Fees : /sqft sqft 574 12.00 6888.00

c Ceiling Finishing (29.3 sqm)


- Plaster Ceiling
Subcon Fees : /sqft sqft 315 6.00 1890.00

d Doors
- Metal Framed Sliding Glass Door 1 1178.00 1178.00
1200mm (W) x 2400mm (H)

e Accessories
- Lighting: Downlight 7 40.00 280.00
- Plug Point 4 80.00 320.00
- Switch 4 80.00 320.00
Subcon Fees : /sqft 0.00 0.00

TOTAL 12545.50
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
11 LIVING AREA 1

a Floor Finishing (26.3 sqm)


- 600mm x 600mm Tiles
Subcon Fees : /sqft sqft 283 10.00 2830.00

b Wall Finishing (37.1 sqm)


- Paint: Nippon in code Brilliant White 1001
- Cement Render Finishes Paint: Suzuka in code
SCT-305 Iron Grey
Subcon Fees : /sqft sqft 399 12.00 4788.00

c Ceiling Finishing (26.3 sqm)


- Plaster Ceiling
Subcon Fees : /sqft sqft 283 6.00 1698.00

d Window & Glass Panel


- 2600mm (W) x Full Height Glass Louvers Type 1 3828.50 3828.50
Powder Coated Frame in Bronze

e Accessories
- Air Conditioner: Wall Mounted (Haier) 1 900.00 900.00
- Plug Point 3 80.00 240.00
- Switch 3 80.00 240.00
- Lighting: Wall Light 5 150.00 750.00
Subcon Fees : /sqft 0.00 0.00

TOTAL 15274.50
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
12 DINING 1

a Floor Finishing (26.3 sqm)


- 600mm x 600mm Tiles
Subcon Fees : /sqft sqft 283 10.00 2830.00

b Wall Finishing (20.3 sqm)


- Paint: Nippon in code Brilliant White 1001
Subcon Fees : /sqft sqft 219 12.00 2628.00

c Ceiling Finishing (26.3 sqm)


- Plaster Ceiling
Subcon Fees : /sqft sqft 283 6.00 1698.00

d Doors
- Solid Timber Door pcs 1 500.00 500.00
750mm (W) x 2400mm (H)
Subcon Fees : /sqft sqft 0.00 0.00

e Window & Glass Panel


- 2750mm (W) x Full Height Fixed Glass with 1 4050.80 4050.80
Powder Coated Frame in Bronze

f Accessories
- Air Conditioner - Wall Mounted ( Haier ) pcs 1 900.00 900.00
- Ceiling Fan pcs 1 400.00 400.00
- Switch pcs 3 80.00 240.00
- Lighting: Downlight pcs 8 40.00 320.00
Subcon Fees : /sqft sqft 0.00 0.00

TOTAL 13566.80
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
13 ENTRANCE 3

a Floor Finishing (13.1 sqm)


- Cement Render Flooring
Subcon Fees : /sqft sqft 141 5.30 747.30

b Wall Finishing (21.2 sqm)


- Paint: Nippon in code Brilliant White 1001
Subcon Fees : /sqft sqft 228 12.00 2736.00

c Ceiling Finishing (13.1 sqm)


- Plaster Ceiling
Subcon Fees : /sqft sqft 141 6.00 846.00

d Doors
- 1500mm (W) x 3450mm (H) Metal Framed Single pcs 1 2116.60 2116.60
Leaf Powder Coated Aluminium Glass Door

e Window & Glass Panel


- 2713mm (W) x 3000mm (H) Fixed Glass with 1 3328.80 3328.80
Powder Coated Frame in Bronze

f Accessories
- Switch pcs 1 80.00 80.00
- Lighting:
i) Downlight pcs 2 40.00 80.00
ii) Wall Light pcs 1 150.00 150.00
Subcon Fees : /sqft sqft 0.00 0.00

TOTAL 10084.70
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
14 LIVING AREA 2

a Floor Finishing (39.5 sqm)


- Tiles 600mm x 300mm
Subcon Fees : /sqft sqft 425 10.00 4250.00

b Wall Finishing (27.5 sqm)


- Paint: Nippon in code Brilliant White 1001
- Cement Render Finishes Paint: Suzuka in code
SCT-305 Iron Grey
Subcon Fees : /sqft sqft 296 12.00 3552.00

c Ceiling Finishing (39.5 sqm)


- Plaster Ceiling
Subcon Fees : /sqft sqft 425 6.00 2550.00

d Doors
- 2713mm x 3000mm Metal Framed Glass pcs 2 3328.80 6657.60
Sliding Door
- 2413mm x 3000mm Metal Framed Glass pcs 1 2960.20 2960.20
Sliding Door

e Accessories
- Air Conditioner: Wall Mounted ( Haier ) pcs 1 900.00 900.00
- Ceiling Fan pcs 1 400.00 400.00
- Plug Point pcs 5 80.00 400.00
- Switch pcs 3 0.00 0.00
- Lighting:
i) Downlight pcs 12 40.00 480.00
ii) Wall Light pcs 2 150.00 300.00
Subcon Fees : /sqft sqft 0.00 0.00

f Built-in
- Partition & TV Backdrop Design

Subcon Fees : /sqft sqft 0.00 0.00


TOTAL 22449.80
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
15 BATH 4

a Floor Finishing (6.9 sqm)


- Tiles 300mm x 300mm
Subcon Fees : /sqft sqft 74 10.00 740.00

b Wall Finishing (40.4 sqm)


- Paint: Nippon in code Brilliant White 1001
Subcon Fees : /sqft sqft 435 12.00 5220.00

c Ceiling Finishing (6.9 sqm)


- Plaster Ceiling
Subcon Fees : /sqft sqft 74 6.00 444.00

d Doors
- Solid Timber Door pcs 1 500.00 500.00
750mm (W) x 2400mm (H)
Subcon Fees : /sqft sqft 0.00 0.00

e Window & Glass Panel


- 1800mm (W) x 450mm (H) Top Hung Window pcs 1 331.36 331.36
with Powder Coated Frame in Bronze

f Sanitary & Plumbing


- Sink 1 400.00 400.00
- Water Closet 1 800.00 800.00
- Hand Bidet 1 200.00 200.00
- Water Tap 1 200.00 200.00
- Floor Trap 1 100.00 100.00
- Shower 1 400.00 400.00
Subcon Fees : /sqft 0.00 0.00

g Accessories
- Lighting: Downlight 2 40.00 80.00
Subcon Fees : /sqft 0.00 0.00

h Extra/ Optional
- Soap Dispenser pcs 1 0.00 0.00
- Towel Rack pcs 1 0.00 0.00
- Wall Mounted Toilet Paper Holder pcs 1 0.00 0.00

TOTAL 9415.36
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
16 DRY KITCHEN

a Floor Finishing (13.8 sqm)


- Tiles 600mm x 300mm
Subcon Fees : /sqft sqft 148.5 10.00 1485.00

b Wall Finishing (42.5 sqm)


- Paint: Nippon in code Brilliant White 1001
Subcon Fees : /sqft sqft 457 12.00 5484.00

c Ceiling Finishing (13.8 sqm)


- Plaster Ceiling
Subcon Fees : /sqft sqft 149 6.00 894.00

d Doors
- Solid Timber Door pcs 1 500.00 500.00
750mm (W) x 2400mm (H)
Subcon Fees : /sqft sqft 0.00 0.00

e Window & Glass Panel


- 1200mm (W) x 1500mm (H) Glass Window pcs 1 737.20 737.20
with Powder Coated Frame in Bronze

f Built-in Furniture
- Kitchen Cabinet

Subcon Fees : /sqft sqft 0.00 0.00

g Sanitary & Plumbing


- Sink pcs 1
Subcon Fees : /sqft sqft 0.00 0.00

e Accessories
- Plug Point pcs 4 80.00 320.00
- Switch pcs 6 80.00 480.00
- Lighting: Downlight pcs 3 40.00 120.00
Subcon Fees : /sqft sqft 0.00 0.00

TOTAL 10020.20
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
17 WET KITCHEN

a Floor Finishing (23.0 sqm)


- Tiles 600mm x 600mm
Subcon Fees : /sqft sqft 248 10.00 2480.00

b Wall Finishing (132.3 sqm)


- Paint: Nippon in code Brilliant White 1001
Subcon Fees : /sqft sqft 1424 12.00 17088.00

c Ceiling Finishing (23.0 sqm)


- Plaster Ceiling
Subcon Fees : /sqft sqft 248 6.00 1488.00

d Doors
- Solid Timber Door pcs 1 500.00 500.00
750mm (W) x 2400mm (H)
Subcon Fees : /sqft sqft 0.00 0.00

e Window & Glass Panel


- 1200mm (W) x 1500mm (H) Glass Window pcs 1 737.20 737.20
with Powder Coated Frame in Bronze

f Built-in Furniture
- Kitchen Cabinet

Subcon Fees : /sqft sqft 0.00 0.00

g Sanitary & Plumbing


- Sink pcs 1 0.00 0.00

Subcon Fees : /sqft sqft 0.00 0.00

e Accessories
- Ceiling Fan pcs 1 400.00 400.00
- Plug Point pcs 4 80.00 320.00
- Switch pcs 5 80.00 400.00
- Lighting: Downlight pcs 6 40.00 240.00
Subcon Fees : /sqft sqft 0.00 0.00

TOTAL 23653.20
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
18 LAUNDRY 1

a Floor Finishing (7.2 sqm)


- Tiles 300mm x 300mm
Subcon Fees : /sqft sqft 78 10.00 780.00

b Wall Finishing (44.47 sqm)


- Paint: Nippon in code Brilliant White 1001
Subcon Fees : /sqft sqft 478.6 12.00 5743.20

c Ceiling Finishing (7.2 sqm)


- Plaster Ceiling
Subcon Fees : /sqft sqft 78 6.00 468.00

d Doors
- 900mm (W) x 2400mm (H) Solid Timber pcs 2 500.00 1000.00
Door
Subcon Fees : /sqft sqft 0.00 0.00

e Window & Glass Panel


- 1200mm (W) x 1500mm (H) Glass Window pcs 1 737.20 737.20
with Powder Coated Frame in Bronze

f Sanitary & Plumbing


- Floor Trap pcs 1 100.00 100.00

g Accessories
- Plug Point pcs 2 80.00 160.00
- Switch pcs 2 80.00 160.00
- Lighting: Downlight pcs 2 40.00 80.00
Subcon Fees : /sqft sqft 0.00 0.00

TOTAL 9228.40
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
19 STAIRCASE & STORE (UNDER STAIRCASE)

a Floor Finishing (11.2 sqm)


- Cement Render Flooring
Subcon Fees : /sqft sqft 120.6 10.00 1206.00

b Wall Finishing (69.8 sqm)


- Paint: Nippon in code Brilliant White 1001
Subcon Fees : /sqft sqft 751.3 12.00 9015.60

c Ceiling Finishing (11.2 sqm)


- Plaster Ceiling
Subcon Fees : /sqft sqft 121 6.00 726.00

d Doors
- 900mm (W) x 2400mm (H) Solid Timber pcs 1 500.00 500.00
Door
Subcon Fees : /sqft sqft 0.00 0.00

e Window & Glass Panel


- 450mm (W) x 2100mm (H) Fixed Glass pcs 3 387.60 1162.80
with Powder Coated Frame in Bronze
- 1200mm (W) x 3000mm (H) Fixed Glass pcs 1 1474.40 1474.40
with Powder Coated Frame in Bronze

f Accessories
- Switch pcs 1 80.00 80.00
Subcon Fees : /sqft sqft 0.00 0.00

TOTAL 14164.80
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
20 STORE/ GENSET ROOM

a Floor Finishing (8.0 sqm)


- Cement Render Flooring
Subcon Fees : /sqft sqft 86 5.30 455.80

b Wall Finishing (38.3 sqm)


- Cement Render
Subcon Fees : /sqft sqft 412 12.00 4944.00

c Ceiling Finishing (8.0 sqm)


- Plaster Ceiling
Subcon Fees : /sqft sqft 86 6.00 516.00

d Doors
- 1500mm (W) x 2400mm (H) Solid Timber pcs 1 500.00 500.00
Door
Subcon Fees : /sqft sqft 0.00 0.00

e Window & Glass Panel


- 1200mm (W) x 1800mm (H) Glass Window pcs 1 885.40 885.40
with Powder Coated Frame in Bronze

f Sanitary & Plumbing


- Floor Trap pcs 1 100.00 100.00
Subcon Fees : /sqft sqft 0.00 0.00

g Accessories
- Switch pcs 1 80.00 80.00
Subcon Fees : /sqft sqft 0.00 0.00

TOTAL 7481.20

From Collection :-

Page 1 of 20 17910.70
Page 2 of 20 7603.10
Page 3 of 20 9759.00
Page 4 of 20 7614.00
Page 5 of 20 8040.00
Page 6 of 20 6956.00
Page 7 of 20 7451.00
Page 8 of 20 5109.82
Page 9 of 20 5088.80
Page 10 of 20 12545.50
Page 11 of 20 15274.50
Page 12 of 20 13566.80
Page 13 of 20 10084.70
Page 14 of 20 22449.80
Page 15 of 20 9415.36
Page 16 of 20 10020.20
Page 17 of 20 23653.20
Page 18 of 20 9228.40
Page 19 of 20 14164.80
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
Page 20 of 20 7481.20

GRAND TOTAL 223416.88


BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
INTERIOR NEW WORKS
21 MASTER BEDROOM

a Floor Finishing (36.4 sqm)


- Vinyl Flooring
Subcon Fees : /sqft sqft 392 10.00 3920.00

b Wall Finishing (64.3 sqm)


- Paint: Nippon in code Brilliant White 1001
Subcon Fees : /sqft sqft 692 12.00 8304.00

c Ceiling Finishing (36.4 sqm)


- Plaster Ceiling
Subcon Fees : /sqft sqft 392 6.00 2352.00

d Doors
- 1800mm (W) x 2400mm (H) Double Leaf Glass pcs 3 1767.00 5301.00
Door with Frame Powder Coated Frame in Bronze
- 900mm (W) x 2400mm (H) Solid Timber Door pcs 1 500.00 500.00
- 1525mm (W) x 2400mm (H) Pocket Glass Door pcs 1 1497.20 1497.20

e Window & Glass Panel


- 1200mm (W) x 1800mm (H) Glass Louvers Type pcs 2 885.40 1770.80
with Powder Coated Frame in Bronze
- 1200mm (W) x 2400mm (H) Fixed Glass pcs 1 1178.00 1178.00
with Powder Coated Frame in Bronze

f Accessories
- Air Conditioner: Wall Mounted (Haier) pcs 1 900.00 900.00
- Ceiling Fan pcs 1 400.00 400.00
- Plug Point pcs 5 80.00 400.00
- Switch pcs 5 80.00 400.00
- Lighting: Downlight pcs 11 40.00 440.00
Subcon Fees : /sqft sqft 0.00 0.00

g Extra/ Optional
- Lighting: Pendant Light pcs 2 0.00 0
- Curtains/ Blinds pcs 4 0.00 0

TOTAL 27363.00
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
22 MASTER BATHROOM

a Floor Finishing (14.0 sqm)


- 300mm x 300mm Tiles
- Cement Render Flooring
Subcon Fees : /sqft sqft 151 10.00 1510.00

b Wall Finishing (39.6 sqm)


- Paint: Nippon in code
Subcon Fees : /sqft sqft 426 12.00 5112.00

c Ceiling Finishing (14.0 sqm)


- Plaster Ceiling
Subcon Fees : /sqft sqft 151 6.00 906.00

d Doors
- 750mm (W) x 2400mm (H) Glass Door Powder pcs 1 737.20 737.20
Coated Frame in Bronze
- 750mm (W) x 2400mm (H) Tempered Glass pcs 1 737.20 737.20
Door

e Window & Glass Panel


- 1800mm (W) x1500mm (H) Fixed Glass pcs 1 1105.80 1105.80
with Powder Coated Frame in Bronze
- 1850mm (W) x 2400mm (H) Casement Window pcs 1 1816.40 1816.40
with Frame Powder Coated Frame in Bronze
- 1800mm (W) x 600mm (H) Sliding Glass Window pcs 1 445.00 445.00

f Sanitary & Plumbing


- Sink 2 400.00 800.00
- Water Closet 1 800.00 800.00
- Hand Bidet 1 200.00 200.00
- Water Tap 1 200.00 200.00
- Floor Trap 3 100.00 300.00
- Shower 1 400.00 400.00
Subcon Fees : /sqft 0.00 0.00

g Accessories
- Plug Point pcs 1 80.00 80.00
- Lighting: Downlight pcs 6 40.00 240.00
Subcon Fees : /sqft 0.00 0.00

h Extra/ Optional
- Soap Dispenser pcs 1 0.00 0.00
- Towel Rack pcs 1 0.00 0.00
- Wall Mounted Toilet Paper Holder pcs 1 0.00 0.00
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
TOTAL 15389.60
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
23 BALCONY

a Floor Finishing (9.3 sqm)


- Cement Render Flooring
Subcon Fees : /sqft sqft 101 5.30 535.30

b Wall Finishing (13.5 sqm)


- Paint: Nippon in code Brilliant White 1001
Subcon Fees : /sqft sqft 145 12.00 1740.00

c Ceiling Finishing (9.3 sqm)


- Plaster Ceiling
Subcon Fees : /sqft sqft 101 6.00 606.00

d Railing
1 0.00 0.00

Subcon Fees : /sqft 0.00 0.00

e Accessories
- Lighting: Wall Light pcs 3 150.00 450.00
Subcon Fees : /sqft 0.00 0.00

TOTAL 3331.30
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
24 WALK-IN WARDROBE

a Floor Finishing (18.3 sqm)


- Cement Render Flooring
Subcon Fees : /sqft sqft 100 5.30 530.00

b Wall Finishing (50.1 sqm)


- Paint: Nippon in code Brilliant White 1001
Subcon Fees : /sqft sqft 540 12.00 6480.00

c Ceiling Finishing (18.3 sqm)


- Plaster Ceiling
Subcon Fees : /sqft sqft 100 6.00 600.00

d Doors
- Solid Timber Door 1 500.00 500.00
900mm (W) x 2400mm (H)
Subcon Fees : /sqft 0.00 0.00

e Window & Glass Panel


- 600mm (W) x 1800mm (H) Glass Window pcs 1 445.00 445.00
with Powder Coated Frame in Bronze

f Built-In
- Wardrobe

Subcon Fees : /sqft 0.00 0.00

g Accessories
- Ceiling Fan pcs 1 400.00 400.00
- Switch pcs 4 80.00 320.00
- Lighting: Downlight pcs 4 40.00 160.00
Subcon Fees : /sqft 0.00 0.00

TOTAL 9435.00
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
25 OFFICE & LOUNGE AREA

a Floor Finishing (30.3 sqm)


- 600mm x 300mm Tiles
Subcon Fees :/sqft sqft 327 10.00 3270.00

b Wall Finishing
- Paint: Nippon in code Brilliant White 1001
Subcon Fees : /sqft sqft 0 12.00 0.00

c Ceiling Finishing (30.3 sqm)


- Plaster Ceiling
Subcon Fees : /sqft sqft 327 6.00 1962.00

d Doors
- Solid Timber Door 1 500.00 500.00
900mm (W) x 2400mm (H)
Subcon Fees : /sqft 0.00 0.00

e Window & Glass Panel


1 0.00 0.00

Subcon Fees : /sqft 0.00 0.00

f Accessories
- Air Conditioner: Wall Mounted (Haier) pcs 1 900.00 900.00
- Ceiling Fan pcs 1 400.00 400.00
- Plug Point pcs 5 80.00 400.00
- Switch pcs 3 80.00 240.00
- Lighting: Downlight pcs 10 40.00 400.00
Subcon Fees : /sqft 0.00 0.00

TOTAL 8072.00
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
26 BEDROOM 6

a Floor Finishing (20.2 sqm)


- Tiles 600mm x 600mm
Subcon Fees : /sqft sqft 218 10.00 2180.00

b Wall Finishing
- Paint: Nippon in code Brilliant White 1001
Subcon Fees : /sqft sqft 12.00 0.00

c Ceiling Finishing (20.2 sqm)


- Plaster Ceiling
Subcon Fees : /sqft sqft 218 6.00 1308.00

d Doors
- Solid Timber Door pcs 1 500.00 500.00
900mm (W) x 2400mm (H)
Subcon Fees : /sqft sqft 0.00 0.00

e Window & Glass Panel


- 1000mm (W) x 1800mm (H) Glass Window pcs 1 737.20 737.20
with Powder Coated Frame in Bronze

f Accessories
- Air Conditioner: Wall Mounted (Haier) pcs 1 900.00 900.00
- Ceiling Fan pcs 1 400.00 400.00
- Plug Point pcs 6 80.00 480.00
- Switch pcs 6 80.00 480.00
- Lighting: Downlight pcs 6 40.00 240.00
Subcon Fees : /sqft 0.00 0.00

h Extra/ Optional
- Lighting: Pendant Light pcs 1 0.00 0.00
- Lighting: Wall Light pcs 1 0.00 0.00
- Loose Furniture pcs 1 0.00 0.00

TOTAL 7225.20
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
27 PASSAGE 6

a Floor Finishing (39.5 sqm)


- 600mm x 600mm Tiles
Subcon Fees : /sqft sqft 426 10.00 4260.00

b Wall Finishing
- Paint: Nippon in code Brilliant White 1001
Subcon Fees : /sqft sqft 0.00 0.00

c Ceiling Finishing (39.5 sqm)


- Plaster Ceiling
Subcon Fees : /sqft sqft 426 6.00 2556.00

d Window & Glass Panel


- 1200mm (W) x Full Height Glass Louvers Type pcs 6 1474.40 8846.40
with Powder Coated Frame in Bronze

e Accessories
- Plug Point pcs 2 80.00 160.00
- Lighting: Downlight pcs 6 40.00 240.00
Subcon Fees : /sqft 0.00 0.00

TOTAL 16062.40
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
28 STUDY AREA

a Floor Finishing (17.1 sqm)


- 600mm x 600mm Tiles
Subcon Fees : /sqft sqft 185 10.00 1850.00

b Wall Finishing
- Paint: Nippon in code Brilliant White 1001
Subcon Fees : /sqft sqft 12.00 0.00

c Ceiling Finishing (17.1 sqm)


- Plaster Ceiling
Subcon Fees : /sqft sqft 185 6.00 1110.00

d Doors
- Solid Laminated Door 1 500.00 500.00
900mm (W) x 2400mm (H)
Subcon Fees : /sqft 0.00 0.00

e Accessories
- Air Conditioner: Wall Mounted (Haier) pcs 1 900.00 900.00
- Ceiling Fan pcs 1 400.00 400.00
- Plug Point pcs 7 80.00 560.00
- Switch pcs 3 80.00 240.00
- Lighting: Downlight pcs 3 40.00 120.00
Subcon Fees : /sqft 0.00 0.00

TOTAL 5680.00
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
29 RUMPUS AREA

a Floor Finishing (26.3 sqm)


- 600mm x 600mm Tiles
Subcon Fees : /sqft sqft 283 10.00 2830.00

b Wall Finishing
- Paint: Nippon in code Brilliant White 1001
Subcon Fees : /sqft sqft 12.00 0.00

c Ceiling Finishing (26.3 sqm)


- Plaster Ceiling
Subcon Fees : /sqft sqft 283 6.00 1698.00

d Accessories
- Ceiling Fan pcs 1 400.00 400.00
- Plug Point pcs 3 80.00 240.00
- Switch pcs 4 80.00 320.00
- DB pcs 1 0.00 0.00
- Lighting: Downlight pcs 6 40.00 240.00
Subcon Fees : /sqft sqft 0.00 0.00

TOTAL 5728.00
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
30 BEDROOM 5

a Floor Finishing (18.3 sqm)


- Tiles 600mm x 600mm
Subcon Fees : /sqft sqft 197 10.00 1970.00

b Wall Finishing (58.9 sqm)


- Paint: Nippon in code Brilliant White 1001
Subcon Fees : /sqft sqft 634 12.00 7608.00

c Ceiling Finishing (18.3 sqm)


- Plaster Ceiling
Subcon Fees : /sqft sqft 197 6.00 1182.00

d Doors
- 900mm (W) x 2400mm (H) Solid Timber Door 1 500.00 500.00
Subcon Fees : /sqft 0.00 0.00

e Window & Glass Panel


- 1200mm (W) x 1800mm (H) Glass Window pcs 1 885.40 885.40
with Powder Coated Frame in Bronze

f Accessories
- Air Conditioner: Wall Mounted ( Haier) pcs 1 900.00 900.00
- Ceiling Fan pcs 1 400.00 400.00
- Plug Point pcs 5 80.00 400.00
- Switch pcs 5 80.00 400.00
- Lighting: Downlight pcs 5 40.00 200.00
Subcon Fees : /sqft 0.00 0.00

h Extra/ Optional
- Lighting: Pendant/ Wall Light pcs 1 0.00 0.00
- Loose Furniture pcs 2 0.00 0.00

TOTAL 14445.40
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
31 BATH 8 (BEDROOM 5)

a Floor Finishing (4.6 sqm)


- 300mm x 150mm Tiles
Subcon Fees : /sqft sqft 50 10.00 500.00

b Wall Finishing (26.6 sqm)


- Paint: Nippon in code Brilliant White 1001
Subcon Fees : /sqft sqft 287 12.00 3444.00

c Ceiling Finishing (4.6 sqm)


- Plaster Ceiling
Subcon Fees : /sqft sqft 50 6.00 300.00

d Window & Glass Panel


- 1200mm (W) x 600mm (H) Top Hung Window pcs 1 295.00 295.00
Powder Coated Frame in Bronze
Subcon Fees : /sqft 0.00 0.00

f Sanitary & Plumbing


- Sink pcs 1 400.00 400.00
- Water Closet pcs 1 800.00 800.00
- Hand Bidet pcs 1 200.00 200.00
- Water Tap pcs 1 200.00 200.00
- Floor Trap pcs 1 100.00 100.00
- Shower pcs 1 400.00 400.00
Subcon Fees : /sqft 0.00 0.00

g Accessories
- Plug Point pcs 1 80.00 80.00
- Lighting: Downlight pcs 2 40.00 80.00
Subcon Fees : /sqft 0.00 0.00

h Extra/ Optional
- Soap Dispenser pcs 1 0.00 0.00
- Towel Rack pcs 2 0.00 0.00
- Wall Mounted Toilet Paper Holder pcs 1 0.00 0.00

TOTAL 6799.00
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
32 BATH 7 (BEDROOM 4)

a Floor Finishing (4.6 sqm)


- 300mm x 150mm Tiles
Subcon Fees : /sqft sqft 50 10.00 500.00

b Wall Finishing (26.6 sqm)


- Paint: Nippon in code Brilliant White 1001
Subcon Fees : /sqft sqft 287 12.00 3444.00

c Ceiling Finishing (4.6 sqm)


- Plaster Ceiling
Subcon Fees : /sqft sqft 50 6.00 300.00

d Window & Glass Panel


- 1200mm (W) x 600mm (H) Top Hung Window pcs 1 295.00 295.00
Powder Coated Frame in Bronze
Subcon Fees : /sqft 0.00 0.00

f Sanitary & Plumbing


- Sink pcs 1 400.00 400.00
- Water Closet pcs 1 800.00 800.00
- Hand Bidet pcs 1 200.00 200.00
- Water Tap pcs 1 200.00 200.00
- Floor Trap pcs 1 100.00 100.00
- Shower pcs 1 400.00 400.00
Subcon Fees : /sqft 0.00 0.00

g Accessories
- Plug Point pcs 1 80.00 80.00
- Lighting: Downlight pcs 2 40.00 80.00
Subcon Fees : /sqft 0.00 0.00

h Extra/ Optional
- Soap Dispenser pcs 1 0.00 0.00
- Towel Rack pcs 2 0.00 0.00
- Wall Mounted Toilet Paper Holder pcs 1 0.00 0.00

TOTAL 6799.00
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
33 BEDROOM 4

a Floor Finishing (18.3 sqm)


- Tiles 600mm x 600mm
Subcon Fees : /sqft sqft 197 10.00 1970.00

b Wall Finishing (58.9 sqm)


- Paint: Nippon in code Brilliant White 1001
Subcon Fees : /sqft sqft 634 12.00 7608.00

c Ceiling Finishing (18.3 sqm)


- Plaster Ceiling
Subcon Fees : /sqft sqft 197 6.00 1182.00

d Doors
- 900mm (W) x 2400mm (H) Solid Timber Door 1 500.00 500.00
Subcon Fees : /sqft 0.00 0.00

e Window & Glass Panel


- 2400mm (W) x 2400mm (H) Glass Louvers Type pcs 1 2356.00 2356.00
with Powder Coated Frame in Bronze

f Accessories
- Air Conditioner: Wall Mounted ( Haier) pcs 1 900.00 900.00
- Ceiling Fan pcs 1 400.00 400.00
- Plug Point pcs 5 80.00 400.00
- Switch pcs 5 80.00 400.00
- Lighting: Downlight pcs 5 40.00 200.00
Subcon Fees : /sqft 0.00 0.00

h Extra/ Optional
- Lighting: Pendant/ Wall Light pcs 1 0.00 0.00
- Loose Furniture pcs 2 0.00 0.00

TOTAL 15916.00
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
34 LAUNDRY 2

a Floor Finishing (3.6 sqm)


- Cement Render Flooring
Subcon Fees : /sqft sqft 38.8 5.30 205.64

b Wall Finishing (22.5 sqm)


- Paint: Nippon in code Brilliant White 1001
Subcon Fees : /sqft sqft 243 12.00 2916.00

c Ceiling Finishing (3.6 sqm)


- Plaster Ceiling
Subcon Fees : /sqft sqft 38.8 6.00 232.80

d Doors
- 1700mm (W) x 2400mm (H) Sliding Panel Door 1 500.00 500.00
Subcon Fees : /sqft 0.00 0.00

e Window & Glass Panel


- 600mm (W) x 1800mm (H) Glass Louvers Type pcs 1 445.00 445.00
with Powder Coated Frame in Bronze

f Accessories
- Plug Point pcs 1 80.00 80.00
- Switch pcs 1 80.00 80.00
- Lighting: Downlight pcs 1 40.00 40.00
Subcon Fees : /sqft 0.00 0.00

TOTAL 4499.44
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
35 PANTRY

a Floor Finishing (10.5 sqm)


- 600mm x 600mm Tiles
Subcon Fees : /sqft sqft 114 10.00 1140.00

b Wall Finishing (40.3 sqm)


- Paint: Nippon in code Brilliant White 1001
Subcon Fees : /sqft sqft 434 12.00 5208.00

c Ceiling Finishing (10.5 sqm)


- Plaster Ceiling
Subcon Fees : /sqft sqft 114 6.00 684.00

d Built-in
-Kitchen Cabinet 0.00 0.00

e Accessories
- Plug Point pcs 1 80.00 80.00
- Lighting: Downlight pcs 2 40.00 80.00
Subcon Fees : /sqft 0.00 0.00

TOTAL 7192.00
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
36 PASSAGE 7

a Floor Finishing (11.1 sqm)


- Cement Render Flooring
Subcon Fees : /sqft sqft 120 10.00 1200.00

b Wall Finishing (38.4 sqm)


- Paint: Nippon in code Brilliant White 1001
Subcon Fees : /sqft sqft 414 12.00 4968.00

c Ceiling Finishing (11.1 sqm)


- Plaster Ceiling
Subcon Fees : /sqft sqft 120 6.00 720.00

d Sanitary & Plumbing


- Water Tap (for Ablution Area) pcs 2 200.00 400.00
Subcon Fees : /sqft 0.00 0.00

e Accessories
- Switch pcs 1 80.00 80.00
- Lighting: Downlight pcs 2 40.00 80.00
Subcon Fees : /sqft 0.00 0.00

TOTAL 7448.00
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
37 STAIRCASE

a Floor Finishing (11.2 sqm)


- Cement Render Flooring
Subcon Fees : /sqft sqft 120 10.00 1200.00

b Wall Finishing (69.8 sqm)


- Paint: Nippon in code Brilliant White 1001
Subcon Fees : /sqft sqft 751 12.00 9012.00

c Ceiling Finishing (11.2 sqm)


- Plaster Ceiling
Subcon Fees : /sqft sqft 120 6.00 720.00

d Window & Glass Panel


- 450mm (W) x 2100mm (H) Fixed Glass pcs 3 387.60 1162.80
with Powder Coated Frame in Bronze
- 1200mm (W) x 2400mm (H) Fixed Glass pcs 1 1178.00 1178.00
with Powder Coated Frame in Bronze

e Accessories
- Lighting
i) Downlight pcs 4 40.00 160.00
ii) Wall Light pcs 4 150.00 600.00
Subcon Fees : /sqft 0.00 0.00

TOTAL 14032.80

From Collection :-

Page 1 of 17 27363.00
Page 2 of 17 15389.60
Page 3 of 17 3331.30
Page 4 of 17 9435.00
Page 5 of 17 8072.00
Page 6 of 17 7225.20
Page 7 of 17 16062.40
Page 8 of 17 5680.00
Page 9 of 17 5728.00
Page 10 of 17 14445.40
Page 11 of 17 6799.00
Page 12 of 17 6799.00
Page 13 of 17 15916.00
Page 14 of 17 4499.44
Page 15 of 17 7192.00
Page 16 of 17 7448.00
Page 17 of 17 14032.80
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
GRAND TOTAL 175418.14
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
INTERIOR NEW WORKS
38 LIVING AREA 3

a Floor Finishing (35.2 sqm)


- 150mm x 300mm Timber Tiles
Subcon Fees : /sqft sqft 379 10.00 3790.00

b Wall Finishing (51.2 sqm)


- Paint: Nippon in code Brilliant White 1001
Subcon Fees : /sqft sqft 552 12.00 6624.00

c Ceiling Finishing (35.2 sqm)


- Plaster Ceiling
Subcon Fees : /sqft sqft 379 6.00 2274.00

d Window & Glass Panel


- 2400mm (W) x 1800mm (H) Fixed Glass pcs 1 1767.00 1767.00
with Powder Coated Frame in Bronze
- 4700mm (W) x 1800mm (H) Fixed Glass pcs 1 3461.80 3461.80
with Powder Coated Frame in Bronze

e Accessories
- Air Conditioner: Wall Mounted (Haier) pcs 1 900.00 900.00
- Ceiling Fan pcs 1 400.00 400.00
- Plug Point pcs 3 80.00 240.00
- Lighting: Downlight pcs 8 40.00 320.00
Subcon Fees : /sqft sqft 0.00 0.00

g Extra/ Optional
- Lighting: Pendant Light pcs 2 0.00 0
- Curtains/ Blinds pcs 4 0.00 0

TOTAL 19776.80
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
39 BEDROOM 2

a Floor Finishing (17.0 sqm)


- Vinyl Flooring
Subcon Fees : /sqft sqft 183 10.00 1830.00

b Wall Finishing (42.6 sqm)


- Paint: Nippon in code Brilliant White 1001
Subcon Fees : /sqft sqft 459 12.00 5508.00

c Ceiling Finishing (17.0 sqm)


- Plaster Ceiling
Subcon Fees : /sqft sqft 183 6.00 1098.00

d Doors
- 1000mm (W) x 2400mm (H) Single Leaf Glass pcs 1 988.00 988.00
Door

e Accessories
- Air Conditioner: Wall Mounted (Haier) pcs 1 900.00 900.00
- Ceiling Fan pcs 1 400.00 400.00
- Plug Point pcs 6 80.00 480.00
- Switch pcs 4 80.00 320.00
- Lighting: Downlight pcs 4 40.00 160.00
Subcon Fees : /sqft 0.00 0.00

f Extra/ Optional
- Lighting: Pendant/ Wall Light pcs 1 0.00 0.00
- Loose Furniture pcs 2 0.00 0.00

TOTAL 11684.00
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
40 WARDROBE 1

a Floor Finishing (6.0 sqm)


- 600mm x 600mm Tiles
Subcon Fees : /sqft sqft 65 10.00 650.00

b Wall Finishing (26.7 sqm)


- Paint: Nippon in code Brilliant White 1001
Subcon Fees : /sqft sqft 288 12.00 3456.00

c Ceiling Finishing (6.0 sqm)


- Plaster Ceiling
Subcon Fees : /sqft sqft 65 6.00 390.00

D Accessories
- Lighting: Downlight pcs 1 40.00 40.00
- Plug Point pcs 1 80.00 80.00
- Switch pcs 2 80.00 160.00
Subcon Fees : /sqft 0.00 0.00

TOTAL 4776.00
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
41 BATH 5

a Floor Finishing (5.9 sqm)


- 300mm x 300mm Tiles
Subcon Fees : /sqft sqft 64 10.00 640.00

b Wall Finishing (29.3 sqm)


- Paint: Nippon in code Brilliant White 1001
Subcon Fees : /sqft sqft 316 12.00 3792.00

c Ceiling Finishing (5.9 sqm)


- Plaster Ceiling
Subcon Fees : /sqft sqft 64 6.00 384.00

d Doors
- 750mm x 2400mm Solid Timber Door pcs 1 700.00 700.00
Subcon Fees : /sqft 0.00 0.00

e Window & Glass Panel


- 1200mm (W) x 600mm (H) Top Hung Window pcs 1 295.00 295.00
with Powder Coated Frame in Bronze

f Sanitary & Plumbing


- Sink pcs 1 400.00 400.00
- Water Closet pcs 1 800.00 800.00
- Hand Bidet pcs 1 200.00 200.00
- Water Tap pcs 1 200.00 200.00
- Floor Trap pcs 1 100.00 100.00
- Shower pcs 1 400.00 400.00
Subcon Fees : /sqft 0.00 0.00

f Accessories
- Plug Point pcs 1 80.00 80.00
- Lighting: Downlight pcs 2 40.00 80.00
Subcon Fees : /sqft 0.00 0.00

TOTAL 8071.00
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
42 STAIRCASE & STORE 2 (UNDER STAIRCASE)

a Floor Finishing (11.0 sqm)


- Cement Render Flooring
Subcon Fees : /sqft sqft 118 10.00 1180.00

b Wall Finishing
- Paint: Nippon in code Brilliant White 1001
Subcon Fees : /sqft 0 12.00 0.00

c Ceiling Finishing (11.0 sqm)


- Plaster Ceiling
Subcon Fees : /sqft sqft 118 6.00 708.00

d Doors
- 900mm (W) x 2400mm (H) Solid Timber Door 1 500.00 500.00
Subcon Fees : /sqft 0.00 0.00

e Window & Glass Panel


- 1200mm (W) x 1800mm (H) Glass Window 1 885.40 885.40
with Powder Coated Frame in Bronze
Subcon Fees : /sqft 0.00 0.00

f Accessories
- Plug Point pcs 1 80.00 80.00
- Switch pcs 2 80.00 160.00
- Lighting: Downlight pcs 1 40.00 40.00
Subcon Fees : /sqft 0.00 0.00

TOTAL 3553.40
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
43 DRY KITCHEN

a Floor Finishing (13.5 sqm)


- 600mm x 600mm Tiles
Subcon Fees : /sqft sqft 146 10.00 1460.00

b Wall Finishing (41.5 sqm)


- Paint: Nippon in code Brilliant White 1001
Subcon Fees : /sqft sqft 447 12.00 5364.00

c Ceiling Finishing (13.5 sqm)


- Plaster Ceiling
Subcon Fees : /sqft sqft 146 6.00 876.00

d Doors
- 900mm (W) x 2400mm (H) Solid Timber Door pcs 1 500.00 500.00
Subcon Fees : /sqft sqft 0.00 0.00

e Window & Glass Panel


- 1800mm (W) x 1200mm (H) Glass Window pcs 1 885.40 885.40
with Powder Coated Frame in Bronze

f Sanitary & Plumbing


- Sink pcs 1 400.00 400.00
- Water Tap pcs 1 200.00 200.00
- Floor Trap pcs 1 100.00 100.00
Subcon Fees : /sqft 0.00 0.00

g Accessories
- Ceiling Fan pcs 1 400.00 400.00
- Plug Point pcs 4 80.00 320.00
- Switch pcs 4 80.00 320.00
- Lighting: Downlight pcs 2 40.00 80.00
Subcon Fees : /sqft 0.00 0.00

TOTAL 10905.40
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
44 WET KITCHEN

a Floor Finishing (4.6 sqm)


- Cement Render Flooring ( only Shower Area )
- Tiles 300mm x 300mm (4.6 sqm) pcs 35 5.00 175.00
Subcon Fees : RM 16.50/sqft sqft 49.5 16.50 816.75

b Wall Finishing
- Paint: Nippon in code Brilliant White 1001
( sqm)
Subcon Fees : RM 18.00/sqft sqft 0.00 0.00

c Ceiling Finishing
- Plaster Ceiling
Subcon Fees : RM /sqft sqft 0.00 0.00

d Doors
- Solid Laminated Door pcs 1 700.00 700.00
750mm (W) x 2400mm (H)
Subcon Fees : RM /sqft sqft 0.00 0.00

e Window & Glass Panel


- 600mm (W) x 600mm (H)) Glass Window pcs 2 0.00 0.00
with Powder Coated Frame in Bronze
Subcon Fees : RM /sqft sqft 0.00 0.00

f Sanitary & Plumbing


- Sink 1 400.00 400.00
- Water Closet 1 800.00 800.00
- Hand Bidet 1 200.00 200.00
- Water Tap 1 200.00 200.00
- Floor Trap 1 100.00 100.00
- Shower 1 400.00 400.00
Subcon Fees : RM /sqft 0.00 0.00

g Accessories
- Lighting: Downlight 2 0.00 0.00
Subcon Fees : RM /sqft 0.00 0.00

h Extra/ Optional
- Soap Dispenser pcs 1 0.00 0.00
- Towel Rack pcs 1 0.00 0.00
- Wall Mounted Toilet Paper Holder pcs 1 0.00 0.00

TOTAL 3791.75
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
45 LAUNDRY

a Floor Finishing
- Cement Render Flooring (5.7 sqm)
Subcon Fees : RM 16.50/sqft sqft 61.4 16.50 1013.10

b Wall Finishing
- Paint: Nippon in code Brilliant White 1001
( sqm)
Subcon Fees : RM 18.00/sqft sqft 0.00 0.00

c Ceiling Finishing
- Plaster Ceiling
Subcon Fees : RM /sqft sqft 0.00 0.00

d Doors
- Solid Laminated Door 1 700.00 700.00
900mm (W) x 2400mm (H)
Subcon Fees : RM /sqft 0.00 0.00

e Accessories
- Lighting: Downlight 1 0.00 0.00
Subcon Fees : RM /sqft 0.00 0.00

TOTAL 1713.10
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
46 PASSAGE 3

a Floor Finishing
- Cement Render Flooring (5.2 sqm)
Subcon Fees : RM 16.50/sqft sqft 56 16.50 924.00

b Wall Finishing
- Paint: Nippon in code Brilliant White 1001
( sqm)
Subcon Fees : RM 18.00/sqft sqft 0.00 0.00

c Ceiling Finishing
- Plaster Ceiling
Subcon Fees : RM /sqft sqft 0.00 0.00

d Doors
- Solid Laminated Door 1 700.00 700.00
900mm (W) x 2400mm (H)
Subcon Fees : RM /sqft 0.00 0.00

e Accessories
- Lighting: Downlight 2 0.00 0.00
Subcon Fees : RM /sqft 0.00 0.00

TOTAL 1624.00
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
47 BEDROOM 3

a Floor Finishing (17.0 sqm)


- Vinyl Flooring
Subcon Fees : /sqft sqft 183 10.00 1830.00

b Wall Finishing (41.6 sqm)


- Paint: Nippon in code Brilliant White 1001
Subcon Fees : /sqft sqft 448 12.00 5376.00

c Ceiling Finishing (17.0 sqm)


- Plaster Ceiling
Subcon Fees : /sqft sqft 183 6.00 1098.00

d Doors
- 1200mm (W) x 2400mm (H) Double Leaf pcs 1 1178.00 1178.00
Glass Door

e Accessories
- Air Conditioner: Wall Mounted (Haier) pcs 1 900.00 900.00
- Ceiling Fan pcs 1 400.00 400.00
- Plug Point pcs 5 80.00 400.00
- Switch pcs 4 80.00 320.00
- Lighting: Downlight pcs 3 0.00 0.00
Subcon Fees : /sqft 0.00 0.00

TOTAL 11502.00
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
48 WARDROBE 2

a Floor Finishing (6.0 sqm)


- 300mm x 300mm Tiles
Subcon Fees : /sqft sqft 65 10.00 650.00

b Wall Finishing (23.8 sqm)


- Paint: Nippon in code Brilliant White 1001
Subcon Fees : /sqft sqft 256 12.00 3072.00

c Ceiling Finishing (6.0 sqm)


- Plaster Ceiling
Subcon Fees : /sqft sqft 65 6.00 390.00

d Accessories
- Switch pcs 1 80.00 80.00
- Lighting: Downlight pcs 32 40.00 1280.00
Subcon Fees : /sqft 0.00 0.00

TOTAL 5472.00
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
49 STAIRCASE

a Floor Finishing (11.0 sqm)


- Cement Render Flooring
Subcon Fees : /sqft sqft 118 5.30 625.40

b Wall Finishing (36.7 sqm)


- Paint: Nippon in code Brilliant White 1001
Subcon Fees : /sqft sqft 395 12.00 4740.00

c Ceiling Finishing (11.0 sqm)


- Plaster Ceiling
Subcon Fees : /sqft sqft 118 6.00 708.00

d Accessories
- Switch pcs 1 700.00 700.00
- Lighting: Downlight pcs 4 40.00 160.00
Subcon Fees : /sqft sqft 0.00 0.00

TOTAL 6933.40

From Collection :-

Page 1 of 12 19776.80
Page 2 of 12 11684.00
Page 3 of 12 4776.00
Page 4 of 12 8071.00
Page 5 of 12 3553.40
Page 6 of 12 10905.40
Page 7 of 12 3791.75
Page 8 of 12 1713.10
Page 9 of 12 1624.00
Page 10 of 12 11502.00
Page 11 of 12 5472.00
Page 12 of 12 6933.40

GRAND TOTAL 89802.85


BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
INTERIOR NEW WORKS
19 MASTER BEDROOM

a Floor Finishing
- Vinyl Flooring (36.4 sqm) sqft 392 10.00 3920.00
Subcon Fees : RM 16.50/sqft sqft 392 16.50 6468.00

b Wall Finishing
- Paint: Nippon in code Brilliant White 1001 0.00
( sqm)
Subcon Fees : RM 18.00/sqft sqft 18.00 0.00

c Ceiling Finishing
- Plaster Ceiling
Subcon Fees : RM /sqft sqft 392 0.00

d Doors
- 1800mm (W) x 2400mm (H) Double Leaf Glass pcs 3 2500.00 7500.00
Door with Powder Coated Frame in Bronze
- 900mm (W) x 2400mm (H) Solid Laminated Door
Subcon Fees : RM /sqft sqft 0.00 0.00

e Window & Glass Panel


- 1200mm (W) x 1800mm (H) Glass Louvers Type pcs 2 0.00 0.00
with Powder Coated Frame in Bronze
- 1200mm (W) x 2400mm (H) Fixed Glass pcs 1 0.00 0.00
with Powder Coated Frame in Bronze
Subcon Fees : RM /sqft sqft 0.00 0.00

f Accessories
- Air Conditioner: Wall Mounted (Haier) pcs 1 900.00 900.00
- Ceiling Fan pcs 1 400.00 400.00
- Plug Point pcs 0.00 0.00
- Switch pcs 0.00 0.00
- Lighting: Downlight pcs 11 0.00 0.00
Subcon Fees : RM /sqft sqft 0.00 0.00

g Extra/ Optional
- Lighting: Wall Light pcs 2 0.00 0
- Curtains/ Blinds pcs 4 0.00 0

TOTAL 19188.00
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
20 MASTER BATHROOM

a Floor Finishing (14.0 sqm)


- 300mm x 300mm Tiles pcs 85 5.00 425.00
- Cement Render Flooring
Subcon Fees : RM 16.50/sqft sqft 151 16.50 2491.50

b Wall Finishing
- Paint: Nippon in code
( sqm)
Subcon Fees : RM 18.00/sqft sqft 0.00 0.00

c Ceiling Finishing
- Plaster Ceiling
Subcon Fees : RM /sqft sqft 151 0.00 0.00

d Doors
- 750mm (W) x 2400mm (H) Single Leaf Glass pcs 2 800.00 1600.00
Door
Subcon Fees : RM /sqft sqft 0.00 0.00

e Window & Glass Panel


- 600mm (W) x 1800mm (H)) Glass Window pcs 2 0.00 0.00
with Powder Coated Frame in Bronze
Subcon Fees : RM /sqft sqft 0.00 0.00

f Sanitary & Plumbing


- Sink 1 400.00 400.00
- Water Closet 1 800.00 800.00
- Hand Bidet 1 200.00 200.00
- Water Tap 1 200.00 200.00
- Floor Trap 1 100.00 100.00
- Shower 1 400.00 400.00
Subcon Fees : RM /sqft 0.00 0.00

g Accessories
- Lighting: Downlight 0.00 0.00
Subcon Fees : RM /sqft 0.00 0.00

h Extra/ Optional
- Soap Dispenser pcs 1 0.00 0.00
- Towel Rack pcs 1 0.00 0.00
- Wall Mounted Toilet Paper Holder pcs 1 0.00 0.00

TOTAL 3700.00
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT

3 PASSAGE 5

a Floor Finishing
- 600mm x 600mm Concrete Tiles (17.9 sqm) pcs 36 33.00 1188.00
Bauhaus rendezvous in Code V2
Subcon Fees : RM 16.50/sqft sqft 192.7 16.50 3179.55

b Wall Finishing
- Paint: Nippon in code Brilliant White 1001
Subcon Fees : RM 18.00/sqft sqft 0 18.00 0.00

c Ceiling Finishing
- Plaster Ceiling
Subcon Fees : RM /sqft sqft 0 0.00 0.00

d Window & Glass Panel


- 2150mm (W) x 3000mm (H) Fixed Glass 1 0.00 0.00
with Powder Coated Frame in Bronze
Subcon Fees : RM /sqft 20 0.00 0.00

e Accessories
- Lighting: Downlight 5 0.00 0.00
- Plug Point 0.00 0.00
- Switch 0.00 0.00
Subcon Fees : RM /sqft 0.00 0.00

TOTAL 8067.55
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
4 MAID ROOM

a Floor Finishing
- Cement Render Flooring (9.3 sqm)
Subcon Fees : RM 16.50/sqft sqft 100 16.50 1650.00

b Wall Finishing
- Paint: Nippon in code Brilliant White 1001
Subcon Fees : RM 18.00/sqft 0 18.00 0.00

c Ceiling Finishing
- Plaster Ceiling
Subcon Fees : RM /sqft 0.00 0.00

d Doors
- Solid Laminated Door 1 700.00 700.00
900mm (W) x 2400mm (H)
Subcon Fees : RM /sqft 0.00 0.00

e Window & Glass Panel


- 600mm (W) x 1800mm (H)) Glass Window 1 0.00 0.00
with Powder Coated Frame in Bronze
Subcon Fees : RM /sqft 0.00 0.00

f Accessories
- Ceiling Fan 1 400.00 400.00
- Plug Point 0.00 0.00
- Switch 0.00 0.00
- Lighting: Downlight 4 0.00 0.00
Subcon Fees : RM /sqft 0.00 0.00

TOTAL 2750.00
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
5 DRIVER ROOM

a Floor Finishing
- Cement Render Flooring (9.3 sqm)
Subcon Fees : RM 16.50/sqft sqft 100 16.50 1650.00

b Wall Finishing
- Paint: Nippon in code Brilliant White 1001
Subcon Fees : RM 18.00/sqft 0 18.00 0.00

c Ceiling Finishing
- Plaster Ceiling
Subcon Fees : RM /sqft 0.00 0.00

d Doors
- Solid Laminated Door 1 700.00 700.00
900mm (W) x 2400mm (H)
Subcon Fees : RM /sqft 0.00 0.00

e Window & Glass Panel


- 1200mm (W) x 1800mm (H)) Glass Window 1 0.00 0.00
with Powder Coated Frame in Bronze
Subcon Fees : RM /sqft 0.00 0.00

f Accessories
- Ceiling Fan 1 400.00 400.00
- Plug Point 0.00 0.00
- Switch 0.00 0.00
- Lighting: Downlight 4 0.00 0.00
Subcon Fees : RM /sqft 0.00 0.00

TOTAL 2750.00
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
6 BATH 2 ( MAID ROOM )

a Floor Finishing (4.6 sqm)


- Cement Render Flooring ( only Shower Area )
- Tiles 300mm x 300mm pcs 35 5.00 175.00
Subcon Fees : RM 16.50/sqft sqft 49.5 16.50 816.75

b Wall Finishing
- Paint: Nippon in code Brilliant White 1001
( sqm)
Subcon Fees : RM 18.00/sqft sqft 0.00 0.00

c Ceiling Finishing
- Plaster Ceiling
Subcon Fees : RM /sqft sqft 0.00 0.00

d Doors
- Solid Laminated Door pcs 1 700.00 700.00
750mm (W) x 2400mm (H)
Subcon Fees : RM /sqft sqft 0.00 0.00

e Window & Glass Panel


- 600mm (W) x 600mm (H)) Glass Window pcs 2 0.00 0.00
with Powder Coated Frame in Bronze
Subcon Fees : RM /sqft sqft 0.00 0.00

f Sanitary & Plumbing


- Sink 1 400.00 400.00
- Water Closet 1 800.00 800.00
- Hand Bidet 1 200.00 200.00
- Water Tap 1 200.00 200.00
- Floor Trap 1 100.00 100.00
- Shower 1 400.00 400.00
Subcon Fees : RM /sqft 0.00 0.00

g Accessories
- Lighting: Downlight 2 0.00 0.00
Subcon Fees : RM /sqft 0.00 0.00

h Extra/ Optional
- Soap Dispenser pcs 1 0.00 0.00
- Towel Rack pcs 1 0.00 0.00
- Wall Mounted Toilet Paper Holder pcs 1 0.00 0.00

TOTAL 2800.00
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT

7 BATH 3 ( DRIVER ROOM )

a Floor Finishing (4.6 sqm)


- Cement Render Flooring ( only Shower Area )
- Tiles 300mm x 300mm (4.6 sqm) pcs 35 5.00 175.00
Subcon Fees : RM 16.50/sqft sqft 49.5 16.50 816.75

b Wall Finishing
- Paint: Nippon in code Brilliant White 1001
( sqm)
Subcon Fees : RM 18.00/sqft sqft 0.00 0.00

c Ceiling Finishing
- Plaster Ceiling
Subcon Fees : RM /sqft sqft 0.00 0.00

d Doors
- Solid Laminated Door pcs 1 700.00 700.00
750mm (W) x 2400mm (H)
Subcon Fees : RM /sqft sqft 0.00 0.00

e Window & Glass Panel


- 600mm (W) x 600mm (H)) Glass Window pcs 2 0.00 0.00
with Powder Coated Frame in Bronze
Subcon Fees : RM /sqft sqft 0.00 0.00

f Sanitary & Plumbing


- Sink 1 400.00 400.00
- Water Closet 1 800.00 800.00
- Hand Bidet 1 200.00 200.00
- Water Tap 1 200.00 200.00
- Floor Trap 1 100.00 100.00
- Shower 1 400.00 400.00
Subcon Fees : RM /sqft 0.00 0.00

g Accessories
- Lighting: Downlight 2 0.00 0.00
Subcon Fees : RM /sqft 0.00 0.00

h Extra/ Optional
- Soap Dispenser pcs 1 0.00 0.00
- Towel Rack pcs 1 0.00 0.00
- Wall Mounted Toilet Paper Holder pcs 1 0.00 0.00
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
TOTAL 2800.00

8 OUTDOOR UTILITIES

a Floor Finishing
- Cement Render Flooring (5.7 sqm)
Subcon Fees : RM 16.50/sqft sqft 61.4 16.50 1013.10

b Wall Finishing
- Paint: Nippon in code Brilliant White 1001
( sqm)
Subcon Fees : RM 18.00/sqft sqft 0.00 0.00

c Ceiling Finishing
- Plaster Ceiling
Subcon Fees : RM /sqft sqft 0.00 0.00

d Doors
- Solid Laminated Door 1 700.00 700.00
900mm (W) x 2400mm (H)
Subcon Fees : RM /sqft 0.00 0.00

e Accessories
- Lighting: Downlight 1 0.00 0.00
Subcon Fees : RM /sqft 0.00 0.00

TOTAL 4513.10
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT

9 UTILITIES ( FITNESS AREA )

a Floor Finishing
- Cement Render Flooring (5.2 sqm)
Subcon Fees : RM 16.50/sqft sqft 56 16.50 924.00

b Wall Finishing
- Paint: Nippon in code Brilliant White 1001
( sqm)
Subcon Fees : RM 18.00/sqft sqft 0.00 0.00

c Ceiling Finishing
- Plaster Ceiling
Subcon Fees : RM /sqft sqft 0.00 0.00

d Doors
- Solid Laminated Door 1 700.00 700.00
900mm (W) x 2400mm (H)
Subcon Fees : RM /sqft 0.00 0.00

e Accessories
- Lighting: Downlight 2 0.00 0.00
Subcon Fees : RM /sqft 0.00 0.00

TOTAL 1624.00
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT

10 FITNESS/ MULTIPURPOSE AREA

a Floor Finishing
- Cement Render Flooring (29.3 sqm)
Subcon Fees : RM 16.50/sqft sqft 315 16.50 5197.50

b Wall Finishing
- Paint: Nippon in code Brilliant White 1001
( sqm)
Subcon Fees : RM 18.00/sqft sqft 0.00 0.00

c Ceiling Finishing
- Plaster Ceiling
Subcon Fees : RM /sqft sqft 0.00 0.00

d Doors
- Metal Framed Sliding Glass Door 1 2000.00 2000.00
1200mm (W) x 2400mm (H)
Subcon Fees : RM /sqft 0.00 0.00

e Accessories
- Lighting: Downlight 7 0.00 0.00
Subcon Fees : RM /sqft 0.00 0.00

TOTAL 7197.50
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT

11 LIVING AREA 1

a Floor Finishing
- 600mm x 600mm Concrete Tiles (26.3 sqm) pcs 72 33.00 2376.00
Bauhaus rendezvous in Code V2
Subcon Fees : RM 16.50/sqft sqft 283 16.50 4669.50

b Wall Finishing
- Paint: Nippon in code Brilliant White 1001
- Cement Render Finishes Paint: Suzuka in code
SCT-305 Iron Grey
( sqm)
Subcon Fees : RM 18.00/sqft sqft 18.00 0.00

c Ceiling Finishing
- Plaster Ceiling
Subcon Fees : RM /sqft sqft 0.00 0.00

d Window & Glass Panel


- 2600mm (W) x 2400mm (H) Fixed Glass with 1 0.00 0.00
Powder Coated Frame in Bronze
Subcon Fees : RM /sqft 0.00 0.00

f Accessories
- Air Conditioner: Wall Mounted (Haier) 1 900.00 900.00
- Plug Point 0.00 0.00
- Switch 0.00 0.00
- Lighting: Wall Light 5 0.00 0.00
Subcon Fees : RM /sqft 0.00 0.00

TOTAL 7945.50
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT

12 DINING 1

a Floor Finishing
- 600mm x 600mm Concrete Tiles (26.3 sqm) pcs 80 33.00 2640.00
Bauhaus rendezvous in Code V2
Subcon Fees : RM 16.50/sqft sqft 283 16.50 4669.50

b Wall Finishing
- Paint: Nippon in code Brilliant White 1001
( sqm)
Subcon Fees : RM 18.00/sqft sqft 18.00 0.00

c Ceiling Finishing
- Plaster Ceiling
Subcon Fees : RM /sqft sqft 0.00 0.00

d Doors
- Solid Laminated Door pcs 1 700.00 700.00
750mm (W) x 2400mm (H)
Subcon Fees : RM /sqft sqft 0.00 0.00
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT

13 ENTRANCE 3

a Floor Finishing
- Cement Render Flooring (13.1 sqm)
Subcon Fees : RM 16.50/sqft sqft 141 16.50 2326.50

b Wall Finishing
- Paint: Nippon in code Brilliant White 1001
( sqm)
Subcon Fees : RM 18.00/sqft sqft 18.00 0.00

c Ceiling Finishing
- Plaster Ceiling
Subcon Fees : RM /sqft sqft 0.00 0.00

d Doors
- 1500mm (W) x 3450mm (H) Metal Framed Single pcs 1 700.00 700.00
Leaf Powder Coated Aluminium Glass Door
Subcon Fees : RM /sqft sqft 0.00 0.00

e Window & Glass Panel


- 2713mm (W) x 3000mm (H) Fixed Glass with 1 0.00 0.00
Powder Coated Frame in Bronze
Subcon Fees : RM /sqft sqft 0.00 0.00

f Accessories
- Switch pcs
- Lighting:
i) Downlight pcs 2 0.00 0.00
ii) Wall Light pcs 1 0.00 0.00
Subcon Fees : RM /sqft sqft 0.00 0.00
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT

14 LIVING AREA 2

a Floor Finishing
- Tiles 600mm x 300mm (13.8 sqm) pcs 216 9.00 1944.00
Subcon Fees : RM 16.50/sqft sqft 425 16.50 7012.50

b Wall Finishing
- Paint: Nippon in code Brilliant White 1001
( sqm)
Subcon Fees : RM 18.00/sqft sqft 18.00 0.00

c Ceiling Finishing
- Plaster Ceiling
Subcon Fees : RM /sqft sqft 0.00 0.00

d Doors
- 2713mm x 3000mm Metal Framed Glass pcs 2 0.00 0.00
Sliding Door
- Metal Framed Sliding Glass Door c/w Fixed pcs 1 2000.00 2000.00
Glass Above
Subcon Fees : RM /sqft sqft 0.00 0.00
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT

15 BATH 4

a Floor Finishing
- Tiles 300mm x 300mm (6.9 sqm) pcs 0.00 0.00
Subcon Fees : RM 16.50/sqft sqft 74 16.50 1221.00

b Wall Finishing
- Paint: Nippon in code Brilliant White 1001
( sqm)
Subcon Fees : RM 18.00/sqft sqft 18.00 0.00

c Ceiling Finishing
- Plaster Ceiling
Subcon Fees : RM /sqft sqft 0.00 0.00

d Doors
- Solid Laminated Door pcs 1 700.00 700.00
750mm (W) x 2400mm (H)
Subcon Fees : RM /sqft sqft 0.00 0.00

e Window & Glass Panel


- 1800mm (W) x 450mm (H) Powder Coated pcs 2 0.00 0.00
Aluminium Framed
Subcon Fees : RM /sqft sqft 0.00 0.00

f Sanitary & Plumbing


- Sink 1 400.00 400.00
- Water Closet 1 800.00 800.00
- Hand Bidet 1 200.00 200.00
- Water Tap 1 200.00 200.00
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
- Floor Trap 1 100.00 100.00
- Shower 1 400.00 400.00
Subcon Fees : RM /sqft 0.00 0.00

g Accessories
- Lighting: Downlight 2 0.00 0.00
Subcon Fees : RM /sqft 0.00 0.00

h Extra/ Optional
- Soap Dispenser pcs 1 0.00 0.00
- Towel Rack pcs 1 0.00 0.00
- Wall Mounted Toilet Paper Holder pcs 1 0.00 0.00

TOTAL 2800.00

16 DRY KITCHEN

a Floor Finishing
- Tiles 600mm x 300mm (13.8 sqm) pcs 80 9.00 720.00

Subcon Fees : RM 16.50/sqft sqft 148.5 16.50 2450.25

b Wall Finishing
- Paint: Nippon in code Brilliant White 1001
( sqm)
Subcon Fees : RM 18.00/sqft sqft 18.00 0.00

c Ceiling Finishing
- Plaster Ceiling
Subcon Fees : RM /sqft sqft 0.00 0.00

d Doors
- Solid Laminated Door pcs 1 700.00 700.00
750mm (W) x 2400mm (H)
Subcon Fees : RM /sqft sqft 0.00 0.00

e Window & Glass Panel


- 1200mm (W) x 1500mm (H) Casement Window 1
with Powder Coated Frame in Bronze
Subcon Fees : RM /sqft sqft 0.00 0.00

f Built-in Furniture
- Kitchen Cabinet
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT

Subcon Fees : RM /sqft sqft 0.00 0.00

g Sanitary & Plumbing


- Sink pcs 1

Subcon Fees : RM /sqft sqft 0.00 0.00

e Accessories
- Plug Point
- Switch
- Lighting:
i) Downlight
ii) Wall Light
Subcon Fees : RM /sqft sqft 0.00 0.00

17 WET KITCHEN

a Floor Finishing
- Tiles 600mm x 600mm (23.0 sqm) pcs 0.00 0.00
Subcon Fees : RM 16.50/sqft sqft 248 16.50 4092.00

b Wall Finishing
- Paint: Nippon in code Brilliant White 1001
( sqm)
Subcon Fees : RM 18.00/sqft sqft 18.00 0.00

c Ceiling Finishing
- Plaster Ceiling
Subcon Fees : RM /sqft sqft 0.00 0.00

d Doors
- Solid Laminated Door pcs 1 700.00 700.00
750mm (W) x 2400mm (H)
Subcon Fees : RM /sqft sqft 0.00 0.00

e Window & Glass Panel


- 1200mm (W) x 1500mm (H) Casement Window 1
with Powder Coated Frame in Bronze
Subcon Fees : RM /sqft sqft 0.00 0.00

f Built-in Furniture
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
- Kitchen Cabinet

Subcon Fees : RM /sqft sqft 0.00 0.00

g Sanitary & Plumbing


- Sink pcs 1

Subcon Fees : RM /sqft sqft 0.00 0.00

e Accessories
- Plug Point
- Switch
- Lighting:
i) Downlight
ii) Wall Light
Subcon Fees : RM /sqft sqft 0.00 0.00

18 LAUNDRY 1

a Floor Finishing
- Tiles 300mm x 300mm (7.2 sqm) pcs 0.00 0.00
Subcon Fees : RM 16.50/sqft sqft 78 16.50 1287.00

b Wall Finishing
- Paint: Nippon in code Brilliant White 1001
( sqm)
Subcon Fees : RM 18.00/sqft sqft 18.00 0.00

c Ceiling Finishing
- Plaster Ceiling
Subcon Fees : RM /sqft sqft 0.00 0.00

d Doors
- 900mm (W) x 2400mm (H) Solid Laminated pcs 1 700.00 700.00
Door
Subcon Fees : RM /sqft sqft 0.00 0.00

e Window & Glass Panel


- 1200mm (W) x 1500mm (H) Casement Window 1
with Powder Coated Frame in Bronze
Subcon Fees : RM /sqft sqft 0.00 0.00
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
TOTAL 700.00

From Collection :-

Page 1 of 12 0.00
Page 2 of 12 0.00
Page 3 of 12 0.00
Page 4 of 12 0.00
Page 5 of 12 0.00
Page 6 of 12 0.00
Page 7 of 12 0.00
Page 8 of 12 0.00
Page 9 of 12 0.00
Page 10 of 12 0.00
Page 11 of 12 1287.00
Page 12 of 12 0.00

GRAND TOTAL 1287.00


BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
INTERIOR NEW WORKS
19 MASTER BEDROOM

a Floor Finishing
- Vinyl Flooring (36.4 sqm) sqft 392 10.00 3920.00
Subcon Fees : RM 16.50/sqft sqft 392 16.50 6468.00

b Wall Finishing
- Paint: Nippon in code Brilliant White 1001 0.00
( sqm)
Subcon Fees : RM 18.00/sqft sqft 18.00 0.00

c Ceiling Finishing
- Plaster Ceiling
Subcon Fees : RM /sqft sqft 392 0.00

d Doors
- 1800mm (W) x 2400mm (H) Double Leaf Glass pcs 3 2500.00 7500.00
Door with Powder Coated Frame in Bronze
- 900mm (W) x 2400mm (H) Solid Laminated Door
Subcon Fees : RM /sqft sqft 0.00 0.00

e Window & Glass Panel


- 1200mm (W) x 1800mm (H) Glass Louvers Type pcs 2 0.00 0.00
with Powder Coated Frame in Bronze
- 1200mm (W) x 2400mm (H) Fixed Glass pcs 1 0.00 0.00
with Powder Coated Frame in Bronze
Subcon Fees : RM /sqft sqft 0.00 0.00

f Accessories
- Air Conditioner: Wall Mounted (Haier) pcs 1 900.00 900.00
- Ceiling Fan pcs 1 400.00 400.00
- Plug Point pcs 0.00 0.00
- Switch pcs 0.00 0.00
- Lighting: Downlight pcs 11 0.00 0.00
Subcon Fees : RM /sqft sqft 0.00 0.00

g Extra/ Optional
- Lighting: Wall Light pcs 2 0.00 0
- Curtains/ Blinds pcs 4 0.00 0

TOTAL 19188.00
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
20 MASTER BATHROOM

a Floor Finishing (14.0 sqm)


- 300mm x 300mm Tiles pcs 85 5.00 425.00
- Cement Render Flooring
Subcon Fees : RM 16.50/sqft sqft 151 16.50 2491.50

b Wall Finishing
- Paint: Nippon in code
( sqm)
Subcon Fees : RM 18.00/sqft sqft 0.00 0.00

c Ceiling Finishing
- Plaster Ceiling
Subcon Fees : RM /sqft sqft 151 0.00 0.00

d Doors
- 750mm (W) x 2400mm (H) Single Leaf Glass pcs 2 800.00 1600.00
Door
Subcon Fees : RM /sqft sqft 0.00 0.00

e Window & Glass Panel


- 600mm (W) x 1800mm (H)) Glass Window pcs 2 0.00 0.00
with Powder Coated Frame in Bronze
Subcon Fees : RM /sqft sqft 0.00 0.00

f Sanitary & Plumbing


- Sink 1 400.00 400.00
- Water Closet 1 800.00 800.00
- Hand Bidet 1 200.00 200.00
- Water Tap 1 200.00 200.00
- Floor Trap 1 100.00 100.00
- Shower 1 400.00 400.00
Subcon Fees : RM /sqft 0.00 0.00

g Accessories
- Lighting: Downlight 0.00 0.00
Subcon Fees : RM /sqft 0.00 0.00

h Extra/ Optional
- Soap Dispenser pcs 1 0.00 0.00
- Towel Rack pcs 1 0.00 0.00
- Wall Mounted Toilet Paper Holder pcs 1 0.00 0.00

TOTAL 3700.00
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT

3 PASSAGE 5

a Floor Finishing
- 600mm x 600mm Concrete Tiles (17.9 sqm) pcs 36 33.00 1188.00
Bauhaus rendezvous in Code V2
Subcon Fees : RM 16.50/sqft sqft 192.7 16.50 3179.55

b Wall Finishing
- Paint: Nippon in code Brilliant White 1001
Subcon Fees : RM 18.00/sqft sqft 0 18.00 0.00

c Ceiling Finishing
- Plaster Ceiling
Subcon Fees : RM /sqft sqft 0 0.00 0.00

d Window & Glass Panel


- 2150mm (W) x 3000mm (H) Fixed Glass 1 0.00 0.00
with Powder Coated Frame in Bronze
Subcon Fees : RM /sqft 20 0.00 0.00

e Accessories
- Lighting: Downlight 5 0.00 0.00
- Plug Point 0.00 0.00
- Switch 0.00 0.00
Subcon Fees : RM /sqft 0.00 0.00

TOTAL 8067.55
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
4 MAID ROOM

a Floor Finishing
- Cement Render Flooring (9.3 sqm)
Subcon Fees : RM 16.50/sqft sqft 100 16.50 1650.00

b Wall Finishing
- Paint: Nippon in code Brilliant White 1001
Subcon Fees : RM 18.00/sqft 0 18.00 0.00

c Ceiling Finishing
- Plaster Ceiling
Subcon Fees : RM /sqft 0.00 0.00

d Doors
- Solid Laminated Door 1 700.00 700.00
900mm (W) x 2400mm (H)
Subcon Fees : RM /sqft 0.00 0.00

e Window & Glass Panel


- 600mm (W) x 1800mm (H)) Glass Window 1 0.00 0.00
with Powder Coated Frame in Bronze
Subcon Fees : RM /sqft 0.00 0.00

f Accessories
- Ceiling Fan 1 400.00 400.00
- Plug Point 0.00 0.00
- Switch 0.00 0.00
- Lighting: Downlight 4 0.00 0.00
Subcon Fees : RM /sqft 0.00 0.00

TOTAL 2750.00
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
5 DRIVER ROOM

a Floor Finishing
- Cement Render Flooring (9.3 sqm)
Subcon Fees : RM 16.50/sqft sqft 100 16.50 1650.00

b Wall Finishing
- Paint: Nippon in code Brilliant White 1001
Subcon Fees : RM 18.00/sqft 0 18.00 0.00

c Ceiling Finishing
- Plaster Ceiling
Subcon Fees : RM /sqft 0.00 0.00

d Doors
- Solid Laminated Door 1 700.00 700.00
900mm (W) x 2400mm (H)
Subcon Fees : RM /sqft 0.00 0.00

e Window & Glass Panel


- 1200mm (W) x 1800mm (H)) Glass Window 1 0.00 0.00
with Powder Coated Frame in Bronze
Subcon Fees : RM /sqft 0.00 0.00

f Accessories
- Ceiling Fan 1 400.00 400.00
- Plug Point 0.00 0.00
- Switch 0.00 0.00
- Lighting: Downlight 4 0.00 0.00
Subcon Fees : RM /sqft 0.00 0.00

TOTAL 2750.00
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
6 BATH 2 ( MAID ROOM )

a Floor Finishing (4.6 sqm)


- Cement Render Flooring ( only Shower Area )
- Tiles 300mm x 300mm pcs 35 5.00 175.00
Subcon Fees : RM 16.50/sqft sqft 49.5 16.50 816.75

b Wall Finishing
- Paint: Nippon in code Brilliant White 1001
( sqm)
Subcon Fees : RM 18.00/sqft sqft 0.00 0.00

c Ceiling Finishing
- Plaster Ceiling
Subcon Fees : RM /sqft sqft 0.00 0.00

d Doors
- Solid Laminated Door pcs 1 700.00 700.00
750mm (W) x 2400mm (H)
Subcon Fees : RM /sqft sqft 0.00 0.00

e Window & Glass Panel


- 600mm (W) x 600mm (H)) Glass Window pcs 2 0.00 0.00
with Powder Coated Frame in Bronze
Subcon Fees : RM /sqft sqft 0.00 0.00

f Sanitary & Plumbing


- Sink 1 400.00 400.00
- Water Closet 1 800.00 800.00
- Hand Bidet 1 200.00 200.00
- Water Tap 1 200.00 200.00
- Floor Trap 1 100.00 100.00
- Shower 1 400.00 400.00
Subcon Fees : RM /sqft 0.00 0.00

g Accessories
- Lighting: Downlight 2 0.00 0.00
Subcon Fees : RM /sqft 0.00 0.00

h Extra/ Optional
- Soap Dispenser pcs 1 0.00 0.00
- Towel Rack pcs 1 0.00 0.00
- Wall Mounted Toilet Paper Holder pcs 1 0.00 0.00

TOTAL 2800.00
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT

7 BATH 3 ( DRIVER ROOM )

a Floor Finishing (4.6 sqm)


- Cement Render Flooring ( only Shower Area )
- Tiles 300mm x 300mm (4.6 sqm) pcs 35 5.00 175.00
Subcon Fees : RM 16.50/sqft sqft 49.5 16.50 816.75

b Wall Finishing
- Paint: Nippon in code Brilliant White 1001
( sqm)
Subcon Fees : RM 18.00/sqft sqft 0.00 0.00

c Ceiling Finishing
- Plaster Ceiling
Subcon Fees : RM /sqft sqft 0.00 0.00

d Doors
- Solid Laminated Door pcs 1 700.00 700.00
750mm (W) x 2400mm (H)
Subcon Fees : RM /sqft sqft 0.00 0.00

e Window & Glass Panel


- 600mm (W) x 600mm (H)) Glass Window pcs 2 0.00 0.00
with Powder Coated Frame in Bronze
Subcon Fees : RM /sqft sqft 0.00 0.00

f Sanitary & Plumbing


- Sink 1 400.00 400.00
- Water Closet 1 800.00 800.00
- Hand Bidet 1 200.00 200.00
- Water Tap 1 200.00 200.00
- Floor Trap 1 100.00 100.00
- Shower 1 400.00 400.00
Subcon Fees : RM /sqft 0.00 0.00

g Accessories
- Lighting: Downlight 2 0.00 0.00
Subcon Fees : RM /sqft 0.00 0.00

h Extra/ Optional
- Soap Dispenser pcs 1 0.00 0.00
- Towel Rack pcs 1 0.00 0.00
- Wall Mounted Toilet Paper Holder pcs 1 0.00 0.00
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
TOTAL 2800.00

8 OUTDOOR UTILITIES

a Floor Finishing
- Cement Render Flooring (5.7 sqm)
Subcon Fees : RM 16.50/sqft sqft 61.4 16.50 1013.10

b Wall Finishing
- Paint: Nippon in code Brilliant White 1001
( sqm)
Subcon Fees : RM 18.00/sqft sqft 0.00 0.00

c Ceiling Finishing
- Plaster Ceiling
Subcon Fees : RM /sqft sqft 0.00 0.00

d Doors
- Solid Laminated Door 1 700.00 700.00
900mm (W) x 2400mm (H)
Subcon Fees : RM /sqft 0.00 0.00

e Accessories
- Lighting: Downlight 1 0.00 0.00
Subcon Fees : RM /sqft 0.00 0.00

TOTAL 4513.10
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT

9 UTILITIES ( FITNESS AREA )

a Floor Finishing
- Cement Render Flooring (5.2 sqm)
Subcon Fees : RM 16.50/sqft sqft 56 16.50 924.00

b Wall Finishing
- Paint: Nippon in code Brilliant White 1001
( sqm)
Subcon Fees : RM 18.00/sqft sqft 0.00 0.00

c Ceiling Finishing
- Plaster Ceiling
Subcon Fees : RM /sqft sqft 0.00 0.00

d Doors
- Solid Laminated Door 1 700.00 700.00
900mm (W) x 2400mm (H)
Subcon Fees : RM /sqft 0.00 0.00

e Accessories
- Lighting: Downlight 2 0.00 0.00
Subcon Fees : RM /sqft 0.00 0.00

TOTAL 1624.00
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT

10 FITNESS/ MULTIPURPOSE AREA

a Floor Finishing
- Cement Render Flooring (29.3 sqm)
Subcon Fees : RM 16.50/sqft sqft 315 16.50 5197.50

b Wall Finishing
- Paint: Nippon in code Brilliant White 1001
( sqm)
Subcon Fees : RM 18.00/sqft sqft 0.00 0.00

c Ceiling Finishing
- Plaster Ceiling
Subcon Fees : RM /sqft sqft 0.00 0.00

d Doors
- Metal Framed Sliding Glass Door 1 2000.00 2000.00
1200mm (W) x 2400mm (H)
Subcon Fees : RM /sqft 0.00 0.00

e Accessories
- Lighting: Downlight 7 0.00 0.00
Subcon Fees : RM /sqft 0.00 0.00

TOTAL 7197.50
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT

11 LIVING AREA 1

a Floor Finishing
- 600mm x 600mm Concrete Tiles (26.3 sqm) pcs 72 33.00 2376.00
Bauhaus rendezvous in Code V2
Subcon Fees : RM 16.50/sqft sqft 283 16.50 4669.50

b Wall Finishing
- Paint: Nippon in code Brilliant White 1001
- Cement Render Finishes Paint: Suzuka in code
SCT-305 Iron Grey
( sqm)
Subcon Fees : RM 18.00/sqft sqft 18.00 0.00

c Ceiling Finishing
- Plaster Ceiling
Subcon Fees : RM /sqft sqft 0.00 0.00

d Window & Glass Panel


- 2600mm (W) x 2400mm (H) Fixed Glass with 1 0.00 0.00
Powder Coated Frame in Bronze
Subcon Fees : RM /sqft 0.00 0.00

f Accessories
- Air Conditioner: Wall Mounted (Haier) 1 900.00 900.00
- Plug Point 0.00 0.00
- Switch 0.00 0.00
- Lighting: Wall Light 5 0.00 0.00
Subcon Fees : RM /sqft 0.00 0.00

TOTAL 7945.50
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT

12 DINING 1

a Floor Finishing
- 600mm x 600mm Concrete Tiles (26.3 sqm) pcs 80 33.00 2640.00
Bauhaus rendezvous in Code V2
Subcon Fees : RM 16.50/sqft sqft 283 16.50 4669.50

b Wall Finishing
- Paint: Nippon in code Brilliant White 1001
( sqm)
Subcon Fees : RM 18.00/sqft sqft 18.00 0.00

c Ceiling Finishing
- Plaster Ceiling
Subcon Fees : RM /sqft sqft 0.00 0.00

d Doors
- Solid Laminated Door pcs 1 700.00 700.00
750mm (W) x 2400mm (H)
Subcon Fees : RM /sqft sqft 0.00 0.00
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT

13 ENTRANCE 3

a Floor Finishing
- Cement Render Flooring (13.1 sqm)
Subcon Fees : RM 16.50/sqft sqft 141 16.50 2326.50

b Wall Finishing
- Paint: Nippon in code Brilliant White 1001
( sqm)
Subcon Fees : RM 18.00/sqft sqft 18.00 0.00

c Ceiling Finishing
- Plaster Ceiling
Subcon Fees : RM /sqft sqft 0.00 0.00

d Doors
- 1500mm (W) x 3450mm (H) Metal Framed Single pcs 1 700.00 700.00
Leaf Powder Coated Aluminium Glass Door
Subcon Fees : RM /sqft sqft 0.00 0.00

e Window & Glass Panel


- 2713mm (W) x 3000mm (H) Fixed Glass with 1 0.00 0.00
Powder Coated Frame in Bronze
Subcon Fees : RM /sqft sqft 0.00 0.00

f Accessories
- Switch pcs
- Lighting:
i) Downlight pcs 2 0.00 0.00
ii) Wall Light pcs 1 0.00 0.00
Subcon Fees : RM /sqft sqft 0.00 0.00
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT

14 LIVING AREA 2

a Floor Finishing
- Tiles 600mm x 300mm (13.8 sqm) pcs 216 9.00 1944.00
Subcon Fees : RM 16.50/sqft sqft 425 16.50 7012.50

b Wall Finishing
- Paint: Nippon in code Brilliant White 1001
( sqm)
Subcon Fees : RM 18.00/sqft sqft 18.00 0.00

c Ceiling Finishing
- Plaster Ceiling
Subcon Fees : RM /sqft sqft 0.00 0.00

d Doors
- 2713mm x 3000mm Metal Framed Glass pcs 2 0.00 0.00
Sliding Door
- Metal Framed Sliding Glass Door c/w Fixed pcs 1 2000.00 2000.00
Glass Above
Subcon Fees : RM /sqft sqft 0.00 0.00
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT

15 BATH 4

a Floor Finishing
- Tiles 300mm x 300mm (6.9 sqm) pcs 0.00 0.00
Subcon Fees : RM 16.50/sqft sqft 74 16.50 1221.00

b Wall Finishing
- Paint: Nippon in code Brilliant White 1001
( sqm)
Subcon Fees : RM 18.00/sqft sqft 18.00 0.00

c Ceiling Finishing
- Plaster Ceiling
Subcon Fees : RM /sqft sqft 0.00 0.00

d Doors
- Solid Laminated Door pcs 1 700.00 700.00
750mm (W) x 2400mm (H)
Subcon Fees : RM /sqft sqft 0.00 0.00

e Window & Glass Panel


- 1800mm (W) x 450mm (H) Powder Coated pcs 2 0.00 0.00
Aluminium Framed
Subcon Fees : RM /sqft sqft 0.00 0.00

f Sanitary & Plumbing


- Sink 1 400.00 400.00
- Water Closet 1 800.00 800.00
- Hand Bidet 1 200.00 200.00
- Water Tap 1 200.00 200.00
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
- Floor Trap 1 100.00 100.00
- Shower 1 400.00 400.00
Subcon Fees : RM /sqft 0.00 0.00

g Accessories
- Lighting: Downlight 2 0.00 0.00
Subcon Fees : RM /sqft 0.00 0.00

h Extra/ Optional
- Soap Dispenser pcs 1 0.00 0.00
- Towel Rack pcs 1 0.00 0.00
- Wall Mounted Toilet Paper Holder pcs 1 0.00 0.00

TOTAL 2800.00

16 DRY KITCHEN

a Floor Finishing
- Tiles 600mm x 300mm (13.8 sqm) pcs 80 9.00 720.00

Subcon Fees : RM 16.50/sqft sqft 148.5 16.50 2450.25

b Wall Finishing
- Paint: Nippon in code Brilliant White 1001
( sqm)
Subcon Fees : RM 18.00/sqft sqft 18.00 0.00

c Ceiling Finishing
- Plaster Ceiling
Subcon Fees : RM /sqft sqft 0.00 0.00

d Doors
- Solid Laminated Door pcs 1 700.00 700.00
750mm (W) x 2400mm (H)
Subcon Fees : RM /sqft sqft 0.00 0.00

e Window & Glass Panel


- 1200mm (W) x 1500mm (H) Casement Window 1
with Powder Coated Frame in Bronze
Subcon Fees : RM /sqft sqft 0.00 0.00

f Built-in Furniture
- Kitchen Cabinet
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT

Subcon Fees : RM /sqft sqft 0.00 0.00

g Sanitary & Plumbing


- Sink pcs 1

Subcon Fees : RM /sqft sqft 0.00 0.00

e Accessories
- Plug Point
- Switch
- Lighting:
i) Downlight
ii) Wall Light
Subcon Fees : RM /sqft sqft 0.00 0.00

17 WET KITCHEN

a Floor Finishing
- Tiles 600mm x 600mm (23.0 sqm) pcs 0.00 0.00
Subcon Fees : RM 16.50/sqft sqft 248 16.50 4092.00

b Wall Finishing
- Paint: Nippon in code Brilliant White 1001
( sqm)
Subcon Fees : RM 18.00/sqft sqft 18.00 0.00

c Ceiling Finishing
- Plaster Ceiling
Subcon Fees : RM /sqft sqft 0.00 0.00

d Doors
- Solid Laminated Door pcs 1 700.00 700.00
750mm (W) x 2400mm (H)
Subcon Fees : RM /sqft sqft 0.00 0.00

e Window & Glass Panel


- 1200mm (W) x 1500mm (H) Casement Window 1
with Powder Coated Frame in Bronze
Subcon Fees : RM /sqft sqft 0.00 0.00

f Built-in Furniture
BIL DESCRIPTION UNIT QTY UNIT PRICE AMOUNT
- Kitchen Cabinet

Subcon Fees : RM /sqft sqft 0.00 0.00

g Sanitary & Plumbing


- Sink pcs 1

Subcon Fees : RM /sqft sqft 0.00 0.00

e Accessories
- Plug Point
- Switch
- Lighting:
i) Downlight
ii) Wall Light
Subcon Fees : RM /sqft sqft 0.00 0.00

18 LAUNDRY 1

a Floor Finishing
- Tiles 300mm x 300mm (7.2 sqm) pcs 0.00 0.00
Subcon Fees : RM 16.50/sqft sqft 78 16.50 1287.00

b Wall Finishing
- Paint: Nippon in code Brilliant White 1001
( sqm)
Subcon Fees : RM 18.00/sqft sqft 18.00 0.00

c Ceiling Finishing
- Plaster Ceiling
Subcon Fees : RM /sqft sqft 0.00 0.00

d Doors
- 900mm (W) x 2400mm (H) Solid Laminated pcs 1 700.00 700.00
Door
Subcon Fees : RM /sqft sqft 0.00 0.00

e Window & Glass Panel


- 1200mm (W) x 1500mm (H) Casement Window 1
with Powder Coated Frame in Bronze
Subcon Fees : RM /sqft sqft 0.00 0.00

You might also like