Danfoss Warnings and Alarms
Danfoss Warnings and Alarms
Safety note:
To avoid electrical shock hazard- even after the power is disconnected- wait at
least as follows before doing service on the frequency converter:
(380-500V: 0.25-7.5 kW: 4 Min. / 11-75 kW: 15 Min./ 90-200 kW: 20 Min./ 250-400 kW: 40 Min.)
..\FC300\Alarm-Warn\English\Alarms & Warnings FC 300 SW 5.5x 18.08.2008 MC Page 1 / 27
VLT® AutomationDrive FC 300
61 Display Message
Tracking error Possible cause(s)
(X) (X) Possible solution(s)
4-30 21
62 Output frequency limit X 4-19 22
63 Mechanical brake low X 2-20 22
64 Voltage limit X 23
65 Controlcard temperature X X X 23
66 Low temperature X 23
67 Option change X 24
68 Safe stop (X) (X) 5-19 24
69 FC Overtemp X X 24
70 Illegal FC-config (X) (X) (X) 5-19 25
71 PTC1 Safe Stop X 25
72 Dangerous Failure X 25
79 Illegal PS config X 26
80 Drive initialized (X) (X) 17-61 26
90 Feedback monitoring X Switch A-54 26
91 Analog input set wrong 27
- Display dark 27
(X) Parameter dependent
General advice
²Live zero error [W2] ³Live zero error [A2] ³Mains ph. loss [A4]
Auto Remote Running Auto Remote Trip Auto Remote Trip lock
The operation values shown on the display give detailed information about the status of the drive
and the connected peripherals. With the LCP 102 you can choose these values freel in the Parameter
group 0-2*. These values are accessible also when warning and alarm messages are shown.
Alarm Reset
The reset of an Alarm is possible in either way
- The [Reset] Key on the LCP (The [Off] Key is activated simultaneously)
- Terminal control (Parameter setting in Group 5-1*)
- The automatic reset function (Parameter setting in Group 14-2*)
- Reset signal via serial communication (e.g. RS-485 or Profibus)
After a mains Off/On it is possible to reset an Alarm on the VLT® FC 300 as mentioned above.
Safety note:
To avoid electrical shock hazard- even after the power is disconnected- wait at
least as follows before doing service on the frequency converter:
(380-500V: 0.25-7.5 kW: 4 Min. / 11-75 kW: 15 Min./ 90-200 kW: 20 Min./ 250-400 kW: 40 Min.)
..\FC300\Alarm-Warn\English\Alarms & Warnings FC 300 SW 5.5x 18.08.2008 MC Page 2 / 27
VLT® AutomationDrive FC 300
Status ²@ Note:
The internal 10V Voltage supply A change of the signal type
150RPM 1.52A 2.121
is overloaded. (Voltage/Current) via the DIP
switch S201/S202 A-53/A-54
¢¥µ¹%
¡¡¡¡¢¢¢¡¡¡bin is effective only after a mains off.
3. The chosen signal type on the 3. Make sure that he DIP switch
input does not match the position on S201(A-53) or
connected signal (U or I) S202(A-54) matches the
connected signal type (U or I)
¡µ¡Hz 1. The signal lead is interrupted 1. Check the signal cables for
¡% breaks
³ Live zero error [A2] 2. The limits that are set for the 2. Check the limits:
Auto Remote Trip terminals are not optimised Terminal 53: Par. 6-10 & 6-12
The type of the signal (Current or Terminal 54: Par. 6-20 & 6-22
Voltage) and the scale of the ter-
minals 53 & 54 can be shown on 3. Make sure that the installation
3. The signal is disturbed
the Display.
(e.g. EMC- influence) is EMC-correct
4. The chosen signal type of the 4. Make sure that he DIP switch
analog input does not match position on S201(A-53)/
the connected signal type S202(A-54) matches the
(Current or Voltage) connected signal type (U or I)
2 Live zero error
Reset
via [Reset], Terminal or Bus
Safety note:
To avoid electrical shock hazard- even after the power is disconnected- wait at
least as follows before doing service on the frequency converter:
(380-500V: 0.25-7.5 kW: 4 Min. / 11-75 kW: 15 Min./ 90-200 kW: 20 Min./ 250-400 kW: 40 Min.)
..\FC300\Alarm-Warn\English\Alarms & Warnings FC 300 SW 5.5x 18.08.2008 MC Page 3 / 27
VLT® AutomationDrive FC 300
Status ²@ In Par. 1-80 Motor check was Make sure that the motor is
activated as a stop function. connected properly to the output
0RPM 0.00A 2.121
of the FC 300
The FC 300 cannot detect a
¡µ¡Hz
¢¡¡% motor on the converter output.
Attention: Reset
The deactivation of the (with ext. 24V supply during
Mains phase loss detection Mains-Off)
(Par. 14-12≠ Alarm) can lead via [Reset], Terminal or Bus
to warranty loss.
Safety note:
To avoid electrical shock hazard- even after the power is disconnected- wait at
least as follows before doing service on the frequency converter:
(380-500V: 0.25-7.5 kW: 4 Min. / 11-75 kW: 15 Min./ 90-200 kW: 20 Min./ 250-400 kW: 40 Min.)
..\FC300\Alarm-Warn\English\Alarms & Warnings FC 300 SW 5.5x 18.08.2008 MC Page 4 / 27
VLT® AutomationDrive FC 300
Status ²@ The intermediate circuit voltage Switch the mains supply Off and
is lower then the DC-low limit. On.
150RPM 1.52A 2.121
The under voltage limit is not
yet reached.
¶¡µ£Hz
¢¡¡%
1. Check the connections of the
²DC voltage low [W6] 1. The mains supply was discon- VLT® AutomationDrive FC 300
Auto Remote Running nected (see Note)
2. Check the mains for imbalance
6 DC voltage low 2. The supply voltage does not (the voltage difference of the
match the VLT® three phases must not exceed
± 3% of the nominal supply
voltage)
3. The mains supply is not stable
or overloaded. Eventually 3. Check the system/application
loads with high starting cur- on the motor side for cyclic
rents are connected in parallel loads or load imbalances
with the VLT®.
Note: Reset
When the mains are discon- (with ext. 24V supply during
nected, warning 6 is shortly Mains-Off)
shown on the display of the VLT®. via [Reset], Terminal or Bus
Safety note:
To avoid electrical shock hazard- even after the power is disconnected- wait at
least as follows before doing service on the frequency converter:
(380-500V: 0.25-7.5 kW: 4 Min. / 11-75 kW: 15 Min./ 90-200 kW: 20 Min./ 250-400 kW: 40 Min.)
..\FC300\Alarm-Warn\English\Alarms & Warnings FC 300 SW 5.5x 18.08.2008 MC Page 5 / 27
VLT® AutomationDrive FC 300
²DC over volt [W7] 1. Generating operation: 1. Reduce the generative energy:
Auto Remote Running a) The down ramps are too a) Set longer down ramps
short b) Reduce the load, activate
Status ³@ b) The inertia of the load is Over Voltage Control (Par.
0RPM 0.00A 2.121 too big 2-17) resp. AC Brake (Par.
c) The brake electronics of 2-10) (see Note) or use a
¡µ¡Hz the VLT® is defective or VLT® with a brake resistor
¢¡¡% overloaded c) Please contact your local
Danfoss supplier
³DC over volt [A7] 2. Mains transients in the supply
Auto Remote Trip voltage
The DC link voltage can be shown 2. Check the mains for possible
on the Display (UDC). 3. Over voltage in the power transients
supply
3. Check the mains for possible
4. Interaction between the VLT® over voltage
7 DC over voltage and the idle current compen-
sation device 4. Check mains conditions even-
tually use idle current compen-
Note: sation devices with chokes
Over voltage control can lead to
prolonged ramp times and AC- Reset
Brake can lead to additional via [Reset], Terminal or Bus
warming of the motor.
Status ³@ 1. The supply voltage does not 1. Check the supply to the VLT®
®
0RPM 0.00A 2.121 match the VLT (see name plate)
¡µ¡Hz 2. The mains supply was inter- 2. Check the connections of the
¢¡¡% rupted VLT® AutomationDrive FC 300
³DC under volt [A8] 3. The mains supply is not stable 3. Check the dimensioning of the
Auto Remote Trip or overloaded. Eventually mains supply
The DC link voltage can be shown loads with high starting cur-
on the Display (UDC). rents are connected in parallel
with the VLT®. Reset
8 DC under voltage via [Reset], Terminal or Bus
NOT on drives with
ext. 24 V DC supply
Safety note:
To avoid electrical shock hazard- even after the power is disconnected- wait at
least as follows before doing service on the frequency converter:
(380-500V: 0.25-7.5 kW: 4 Min. / 11-75 kW: 15 Min./ 90-200 kW: 20 Min./ 250-400 kW: 40 Min.)
..\FC300\Alarm-Warn\English\Alarms & Warnings FC 300 SW 5.5x 18.08.2008 MC Page 6 / 27
VLT® AutomationDrive FC 300
Status ³@ 1. The current input is too high 1. Make sure that the input
0RPM 0.00A 2.121 because of: current of the motor matches
the output current of the
¡µ¡Hz VLT®:
¢¡¡% a) Wrong motor data a) Set correct motor data
(Over compensation) Group 1-2* (1-5* / 1-6*)
³Inverter overld. [A9] b) Defect motor b) Check the motor
Auto Remote Trip c) The VLT® is too small c) Use a bigger VLT®
The thermal load of the inverter d) The motor is overloaded d) Check load conditions
(in %) can be shown on the dis- e) The motor cable is too long e) Reduce the length of motor
play. cables or use a LC-Filter
²Motor ETR over [W10] ² Par. 1-90 = ETR Warning A Reset of the alarm is possi-
Auto Remote Running ³ Par. 1-90 = ETR Alarm ble only with 0% of thermal
stops the motor (Coasting) and load.
Status ³@ triggers the alarm
0RPM 0.00A 2.121
1. The motor is thermally 1. Check the load:
¡µ¡Hz overloaded:
¢¡¡% a) The permanent load is too a) Check the load conditions
high b) Adjust the load for low RPM
³Motor ETR over [A10] b) Low RPM with relatively conditions, use a motor with
Auto Remote Trip high load (reduced self- external ventilation
The thermal load of the inverter ventilation of the motor) c) remove the blockage of the
(in %) can be shown on the c) Motor blocked motor
display.
Safety note:
To avoid electrical shock hazard- even after the power is disconnected- wait at
least as follows before doing service on the frequency converter:
(380-500V: 0.25-7.5 kW: 4 Min. / 11-75 kW: 15 Min./ 90-200 kW: 20 Min./ 250-400 kW: 40 Min.)
..\FC300\Alarm-Warn\English\Alarms & Warnings FC 300 SW 5.5x 18.08.2008 MC Page 7 / 27
VLT® AutomationDrive FC 300
³Torque limit [A12] 3. Wrong motor data resp. 3. Check motor data (Group
Auto Remote Trip wrong motor connection (Y/Δ) 1-2*) and motor connection
If in Par. 14-25 the time is set to
0s, the VLT® will immediately
trigger an alarm when reaching
the Torque limit.
4. Over compensation of the 4. Check the compensation pa-
motor rameters (Group 1-5* & 1-6*)
12 Torque limit 5. The value set in Par. 4-16 / 4- 5. Adjust Par. 4-16 and Par. 4-17
17 is too low
Reset
via [Reset], Terminal or Bus
Safety note:
To avoid electrical shock hazard- even after the power is disconnected- wait at
least as follows before doing service on the frequency converter:
(380-500V: 0.25-7.5 kW: 4 Min. / 11-75 kW: 15 Min./ 90-200 kW: 20 Min./ 250-400 kW: 40 Min.)
..\FC300\Alarm-Warn\English\Alarms & Warnings FC 300 SW 5.5x 18.08.2008 MC Page 8 / 27
VLT® AutomationDrive FC 300
Reset
via [Reset], Terminal or Bus
Safety note:
To avoid electrical shock hazard- even after the power is disconnected- wait at
least as follows before doing service on the frequency converter:
(380-500V: 0.25-7.5 kW: 4 Min. / 11-75 kW: 15 Min./ 90-200 kW: 20 Min./ 250-400 kW: 40 Min.)
..\FC300\Alarm-Warn\English\Alarms & Warnings FC 300 SW 5.5x 18.08.2008 MC Page 9 / 27
VLT® AutomationDrive FC 300
Status ³@ An installed Option is not sup- Use a drive with a newer software
ported from the control card version or a option with an older
0RPM 0.00A 2.121
(Hardware or Software). software version.
15 Inkompatible Hardware
¡µ¡Hz
¢¡¡% Please contact your local Danfoss
supplier!
³Incomp.HW [A15]
Auto Remote Trip lock
®
16Status Short circuit ²@ The VLT detected a short circuit, Disconnect mains, regarding all
that means a short circuit current Safety precautions (e.g. secure
0RPM 0.00A 2.121
flows between two output phases. mech. brake), disconnect the
Motor and connect mains again.
¶¡µ£Hz
¢¡¡%
Reset
³Short Circuit [A16] (with ext. 24V during Mains-off)
Auto Remote Trip lock. via [Reset], Terminal or Bus
Safety note:
To avoid electrical shock hazard- even after the power is disconnected- wait at
least as follows before doing service on the frequency converter:
(380-500V: 0.25-7.5 kW: 4 Min. / 11-75 kW: 15 Min./ 90-200 kW: 20 Min./ 250-400 kW: 40 Min.)
..\FC300\Alarm-Warn\English\Alarms & Warnings FC 300 SW 5.5x 18.08.2008 MC Page 10 / 27
VLT® AutomationDrive FC 300
¡µ¡Hz
¢¡¡% Reset
(with ext. 24V during Mains-off)
³Internal Fans [A23] via [Reset], Terminal or Bus
Auto Remote Trip
Safety note:
To avoid electrical shock hazard- even after the power is disconnected- wait at
least as follows before doing service on the frequency converter:
(380-500V: 0.25-7.5 kW: 4 Min. / 11-75 kW: 15 Min./ 90-200 kW: 20 Min./ 250-400 kW: 40 Min.)
..\FC300\Alarm-Warn\English\Alarms & Warnings FC 300 SW 5.5x 18.08.2008 MC Page 11 / 27
VLT® AutomationDrive FC 300
25 Brake resistor
The Brake Power Monitoring If necessary, use a 40% work
Status ²@
(Par. 2-13) was activated. The cycle brake resistor.
150RPM 1.52A 2.121
Power (average) applied to the
Brake resistor in the last 120s
¶¡µ£Hz
¢¡¡% was too high:
Switch mains off and on again.
²Brake overload [W26] ² Warning on 90% load
Auto Remote Running ³ Alarm on 100% load
Par. 2-13 = Warning/Alarm or
Status ³@ Alarm stops the Motor and trig-
0RPM 0.00A 2.121 gers the alarm
¡µ¡Hz
¢¡¡% 1. Faulty Brake resistor data 1. Check brake resistor data in
Par. 2-11 and Par. 2-12
³Brake overload [A26]
Auto Remote Trip 2. Too short down ramps 2. Adjust ramp times
(Group 3-**)
26 Brake overload
3. Faulty Motor data 3. Check Motor data
(Overcompensation) (Group 1-2*)
Reset
(with ext. 24V during Mains-off)
via [Reset], Terminal or Bus
The VLT® has detected a short Switch off the VLT® and interrupt
Status ²@
circuit in the Brake-IGBT and the line to the brake resistor.
150RPM 1.52A 2.121
turned off the brake function.
¶¡µ£Hz
¢¡¡% The VLT® can still be driven, but Warning
because of the short circuit, a big When a short circuit of the
²Brake IGBT [W27] load is applied to the brake resis- Brake-IGBT occurs, there is a risk
Auto Remote Running tor, although no brake process is of overheating the brake resistor
27 Brake IGBT fault realized. and other equipment near by.
Safety note:
To avoid electrical shock hazard- even after the power is disconnected- wait at
least as follows before doing service on the frequency converter:
(380-500V: 0.25-7.5 kW: 4 Min. / 11-75 kW: 15 Min./ 90-200 kW: 20 Min./ 250-400 kW: 40 Min.)
..\FC300\Alarm-Warn\English\Alarms & Warnings FC 300 SW 5.5x 18.08.2008 MC Page 12 / 27
VLT® AutomationDrive FC 300
The temperature on the heat sink Switch the mains Off and On
Status ²@
of the VLT® has reached the max. again
150RPM 1.52A 2.121
limit. Beware:
The alarm can be reset only
¶¡µ£Hz
¢¡¡% ³ The switch-off limit of 95°C for when the temperature of the
IP20/IP21 was reached (Toler- heat sink has dropped to
²Heatsink temp [W29] ance ± 5°C) ca. 70°C.
Auto Remote Running
1. The ambient temperature is 1. Try to reduce the ambient
Status ³@ too high temperature (check the design
0RPM 0.00A 2.121 and ventilation of the cabinet)
³ Heatsink temp [A29] 3. Ventilation vents or the filter 3. Clean the ventilation vents and
Auto Remote Trip lock pads are dirty the change the filter pads
4. The motor cable is too long 4. Check the length of the Motor
cable. Consider the use of an
LC filter.
29 Power card thermal overload
5. Switching frequency set in 5. Reduce the switching
Par 14-01 is too high frequency (Par. 14-10)
and pattern (Par. 14-00);
eventually use a bigger VLT®
Reset
(with ext. 24V during Mains-off)
via [Reset], Terminal or Bus
Safety note:
To avoid electrical shock hazard- even after the power is disconnected- wait at
least as follows before doing service on the frequency converter:
(380-500V: 0.25-7.5 kW: 4 Min. / 11-75 kW: 15 Min./ 90-200 kW: 20 Min./ 250-400 kW: 40 Min.)
..\FC300\Alarm-Warn\English\Alarms & Warnings FC 300 SW 5.5x 18.08.2008 MC Page 13 / 27
VLT® AutomationDrive FC 300
¶¡µ£Hz
¢¡¡% 1. The VLT® was switched Off/On 1. Reduce the power ups accord-
too often in a short time ing to the power of the drive
³Inrush Fault [A33]
Auto Remote trip lock. 2. The external 24 V supply 2. Check the external 24 V power
(D-Option) is defect supply (D-Option)
Note Reset
The max. power ups in 1minute (with ext. 24V during Mains-off)
for the AutomationDrive FC 300 via [Reset], Terminal or Bus
depends on the power of the
drive:
≤ 7,5 kW max. 2x per Minute
11-75 kW max. 1x per Minute
≥ 90 kW max. 1x in 2 Minutes
Safety note:
To avoid electrical shock hazard- even after the power is disconnected- wait at
least as follows before doing service on the frequency converter:
(380-500V: 0.25-7.5 kW: 4 Min. / 11-75 kW: 15 Min./ 90-200 kW: 20 Min./ 250-400 kW: 40 Min.)
..\FC300\Alarm-Warn\English\Alarms & Warnings FC 300 SW 5.5x 18.08.2008 MC Page 14 / 27
VLT® AutomationDrive FC 300
The mains failure function Check the power supply and the
Status ²@ (Par. 14-10 ≠ Deactivated) was fuses ahead of the VLT®.
150RPM 1.52A 2.121 activated.
Safety note:
To avoid electrical shock hazard- even after the power is disconnected- wait at
least as follows before doing service on the frequency converter:
(380-500V: 0.25-7.5 kW: 4 Min. / 11-75 kW: 15 Min./ 90-200 kW: 20 Min./ 250-400 kW: 40 Min.)
..\FC300\Alarm-Warn\English\Alarms & Warnings FC 300 SW 5.5x 18.08.2008 MC Page 15 / 27
VLT® AutomationDrive FC 300
One of the internal power sup- Please contact your local Danfoss
Status ²@ plies (+/-18V, 24V, and 5V) supplier!
150RPM 1.52A 2.121 of the power card was longer
then 5 seconds outside the
¶¡µ£Hz specified tolerance.
¢¡¡%
Status ²@ The internal 24V power supply is Switch the mains Off and On
overloaded. again.
150RPM 1.52A 2.121
1. Too many external devices are 1. The load of the 24V power
¶¡µ£Hz
¢¡¡% powered by the 24V supply. supply (Terminal 12 & 13) is
not allowed to exceed the
46²24V supply
Power card
lowsupply
[W47] max. load current:
Auto Remote Running FC 301: 130mA
FC 302: 200mA
Status ³@
0RPM 0.00A 2.121 2. The internal 24V power supply 2. Please contact your local Dan-
is defective. foss supplier!
¡µ¡Hz
¢¡¡% Reset
(with ext. 24V during Mains-off)
³24V supply low [A47] via [Reset], Terminal or Bus
Auto Remote triplock.
Status ²@ A fault occured in the internal Please contact your local Danfoss
1,8 V Switch Mode Power Supply supplier!
0RPM 0.00A 2.121
(SMPS).
47 24V supply low
¡µ¡Hz
¢¡¡%
Safety note:
To avoid electrical shock hazard- even after the power is disconnected- wait at
least as follows before doing service on the frequency converter:
(380-500V: 0.25-7.5 kW: 4 Min. / 11-75 kW: 15 Min./ 90-200 kW: 20 Min./ 250-400 kW: 40 Min.)
..\FC300\Alarm-Warn\English\Alarms & Warnings FC 300 SW 5.5x 18.08.2008 MC Page 17 / 27
VLT® AutomationDrive FC 300
51 AMA-Unom, Inom
Status ³@ When performing the Automatic 1. Check the programmed motor
Motor Adaptation AMA a fault data (Group 1-2*)
0RPM 0.00A 2.121
occured.
¡µ¡Hz 2. Determine the motor data via
¢¡¡% The combination of the pro- external measurements or use
grammed motor data is probably the data from the motor
³AMA Unom, Inom [A51] wrong. manufacturer.
Auto Remote Trip
Safety note:
To avoid electrical shock hazard- even after the power is disconnected- wait at
least as follows before doing service on the frequency converter:
(380-500V: 0.25-7.5 kW: 4 Min. / 11-75 kW: 15 Min./ 90-200 kW: 20 Min./ 250-400 kW: 40 Min.)
..\FC300\Alarm-Warn\English\Alarms & Warnings FC 300 SW 5.5x 18.08.2008 MC Page 18 / 27
VLT® AutomationDrive FC 300
Status ³@ When performing the Automatic 1. Check the motor current set in
Motor Adaptation AMA a fault Par. 1-24
0RPM 0.00A 2.121
occured.
2. Ensure the correct wiring of
¡µ¡Hz
¢¡¡% the motor (Star or Delta).
There is a conflict between the
³AMA low Inom [A52] current demand of the motor and Reset
Auto Remote Trip the chosen motor data via [Reset], Terminal or Bus
52Status AMA-low Inom ³@ When performing the Automatic 1. Check the motor power set in
Motor Adaptation AMA a fault Par. 1-20
0RPM 0.00A 2.121
occured.
¡µ¡Hz
¢¡¡% There is a conflict between the 2. Check if the VLT® is suitable
calculated power size and the for the motor.
³AMA big motor [A53] programmed motor data
Auto Remote Trip 3. Try and change the wiring of
The motor is probably too big for the motor from Star to Delta
the VLT®. (Program the motor data
again!).
Status ³@ When performing the Automatic 1. Check the motor power set in
Motor Adaptation AMA a fault Par. 1-20
0RPM 0.00A 2.121
occured.
53 AMA-Big motor
¡µ¡Hz 2. Check if the VLT® is suitable
¢¡¡% There is a conflict between the for the motor.
calculated power size and the
³AMA small mot [A54] chosen motor data 3. Try and change the wiring of
Auto Remote trip the motor from Star to Delta
If the motor is several power (Program the motor data
sizes smaller then the drive, the again!).
AMA can NOT be performed.
Reset
via [Reset], Terminal or Bus
54 AMA-Small motor
55 AMA-Parameter range
Safety note:
To avoid electrical shock hazard- even after the power is disconnected- wait at
least as follows before doing service on the frequency converter:
(380-500V: 0.25-7.5 kW: 4 Min. / 11-75 kW: 15 Min./ 90-200 kW: 20 Min./ 250-400 kW: 40 Min.)
..\FC300\Alarm-Warn\English\Alarms & Warnings FC 300 SW 5.5x 18.08.2008 MC Page 19 / 27
VLT® AutomationDrive FC 300
Status ³@ The AMA was interrupted by the To run a complete AMA, it must
user. be programmed again in Par.
0RPM 0.00A 2.121
1-29 and started with the [Hand
on] Key.
¡µ¡Hz
¢¡¡%
Reset
³AMA interrupt[A56] via [Reset], Terminal or Bus
Auto Remote Trip
Status ³@ The AMA function was activated To run a complete AMA, it must
0RPM 0.00A 2.121 via Par. 1-29, but cannot deter- be programmed again in Par.
mine any stable and reliable val- 1-29 and started with the [Hand
¡µ¡Hz ues. on] Key.
¢¡¡%
³AMA timeout [A57] 1. The AMA function was not star- 1. Start via the [Hand On] key is
Auto Remote Trip ted with the [Hand On] key. possible only when no stop si-
The internal timeout was rea- gnals (e.g. Coasting inverse)
ched. are active
2. The motor cables are too long 2. Check the length of the motor
or the screening of the cables cables and their screening.
is done badly Eventually Ggfs. An AMA is not
possible
3. The motor was too warm when 3. Wait until the motor has
the AMA started cooled down
Safety note:
To avoid electrical shock hazard- even after the power is disconnected- wait at
least as follows before doing service on the frequency converter:
(380-500V: 0.25-7.5 kW: 4 Min. / 11-75 kW: 15 Min./ 90-200 kW: 20 Min./ 250-400 kW: 40 Min.)
..\FC300\Alarm-Warn\English\Alarms & Warnings FC 300 SW 5.5x 18.08.2008 MC Page 20 / 27
VLT® AutomationDrive FC 300
Reset
via [Reset], Terminal or Bus
Safety note:
To avoid electrical shock hazard- even after the power is disconnected- wait at
least as follows before doing service on the frequency converter:
(380-500V: 0.25-7.5 kW: 4 Min. / 11-75 kW: 15 Min./ 90-200 kW: 20 Min./ 250-400 kW: 40 Min.)
..\FC300\Alarm-Warn\English\Alarms & Warnings FC 300 SW 5.5x 18.08.2008 MC Page 21 / 27
VLT® AutomationDrive FC 300
²Output freq. lim. [W62] 1. Par. 4-19 is set too small 1. Check Par. 4-19
Auto Remote Running
The actual reference, feedback and 2. The reference is too high 2. Check the reference sources
the corresponding signal levels and their scaling
can be shown on the display.
3. In Par. 1-00, PID-Process is 3. Check the sensor and the set-
activated: tings of the controller
62 Output frequency limit a) the feedback signal is not a) check the scaling of the
processed correctly feedback range and the in-
put
b) the sensor is defective b) check the sensor
c) process regulation of the c) optimize the controller set-
output frequency is not tings. Consider the regula-
stable tion principle (Par. 7-30)!
Note
The monitoring is active only Reset
when in Par. 1-71 the time is set via [Reset], Terminal or Bus
to > 0s.
Safety note:
To avoid electrical shock hazard- even after the power is disconnected- wait at
least as follows before doing service on the frequency converter:
(380-500V: 0.25-7.5 kW: 4 Min. / 11-75 kW: 15 Min./ 90-200 kW: 20 Min./ 250-400 kW: 40 Min.)
..\FC300\Alarm-Warn\English\Alarms & Warnings FC 300 SW 5.5x 18.08.2008 MC Page 22 / 27
VLT® AutomationDrive FC 300
²Voltage limit [W64] If the connected PM motor is Run the motor with a lower
Auto Remote Running driven with a frequency, where frequency
the drive is not able to supply the
motor with enough voltage, W64
64 Voltage limit apears.
Notes:
• The VLT® is able to supply the
motor, depending on the mains
condition, up to +10% mains
voltage.
Note:
In the moment the warning is • If the drive is fitted apropriately
displayed, the drive is not able to to the motor, the warning
control the motor with the proper apears, when the motor goes in
U/f characteristic. to the field weakening area.
¡µ¡Hz 2. The ventilation holes or the 2. Clean the ventilation holes and
¢¡¡%
filter pad of the VLT® are dirty change the filter pads
66 Low temperature
Safety note:
To avoid electrical shock hazard- even after the power is disconnected- wait at
least as follows before doing service on the frequency converter:
(380-500V: 0.25-7.5 kW: 4 Min. / 11-75 kW: 15 Min./ 90-200 kW: 20 Min./ 250-400 kW: 40 Min.)
..\FC300\Alarm-Warn\English\Alarms & Warnings FC 300 SW 5.5x 18.08.2008 MC Page 23 / 27
VLT® AutomationDrive FC 300
Status ³@ One or more options were moun- Note: After mounting an option, a
ted/demounted during the last reset to factory settings should
0RPM 0.00A 2.121
mains off/on of the VLT® . be done. Save your parameteri-
sation before (e.g. via Par. 0-50
¡µ¡Hz
¢¡¡% LCP-Copy)!
Note
³Option change [A67] You can check detailed informa- 1. Par. 14-22 = Initialise
Auto Remote Trip tion about the installed Options in 2. Switch mains off and on
Par. Group 15-6*. again
Status ³@ The temperature on the power- Switch the mains Off and On
card of the VLT® has reached the again
0RPM 0.00A 2.121
allowed max. limit.
1. Try to reduce the ambient
¶¡µ£Hz
¢¡¡% 1. The ambient temperature is temperature (check the design
too high and ventilation of the cabinet)
³Pwr. Card Temp [A69]
Auto Remote Triplock 2. Internal fans failure 2. Ensure the correct function of
the cooling vents
3. Ventilation vents or the filter
pads are dirty 3. Clean the ventilation vents and
the change the filter pads
4. The motor cable is too long
4. Check the length of the Motor
cable. Consider the use of an
5. Switching frequency set in LC filter.
Par 14-01 is too high 5. Reduce the switching
frequency (Par. 14-10)
Beware: and pattern (Par. 14-00);
The alarm can be reset only eventually use a bigger VLT®
when the temperature of the Reset
power card has dropped. (with ext. 24V during Mains-off)
. via [Reset], Terminal or Bus
Safety note:
To avoid electrical shock hazard- even after the power is disconnected- wait at
least as follows before doing service on the frequency converter:
(380-500V: 0.25-7.5 kW: 4 Min. / 11-75 kW: 15 Min./ 90-200 kW: 20 Min./ 250-400 kW: 40 Min.)
..\FC300\Alarm-Warn\English\Alarms & Warnings FC 300 SW 5.5x 18.08.2008 MC Page 24 / 27
VLT® AutomationDrive FC 300
Status ³@ Terminal 37 (Par. 5-19) set to Switch mains off and on again
PTC monitoring of the option
0RPM 0.00A 2.121
(MCB 112) and a digital input is
programmed to PTC Card 1. • Check the switching of the in-
¡µ¡Hz
72 Dangerous¢¡¡%
Failure puts or eventually the wiring
A difference between the PTC op-
³Dangerous Failure [A72] tion signal and the programming • If an additional safety relay is
Auto Remote Triplock occured. connected between terminal 12
of the MCB 112 option and
Only with an PTC MCB 112 option Note terminal 37 of the drive, change
If the digital input is set to PTC 1, the setting of terminal 37
®
the VLT AutomationDrive (Par. 5-19) to PTC 1 & Relay
expects, that the digital input is
activated simultaneously with the
safe stop.
Safety note:
To avoid electrical shock hazard- even after the power is disconnected- wait at
least as follows before doing service on the frequency converter:
(380-500V: 0.25-7.5 kW: 4 Min. / 11-75 kW: 15 Min./ 90-200 kW: 20 Min./ 250-400 kW: 40 Min.)
..\FC300\Alarm-Warn\English\Alarms & Warnings FC 300 SW 5.5x 18.08.2008 MC Page 25 / 27
VLT® AutomationDrive FC 300
79 Illegal PS-config
The frequency converter was
Status ³@
initialised via Par. 14-22 or
0RPM 0.00A 2.121
manually directly on the Local
Operation Panel Reset
¡µ¡Hz
¢¡¡% LCP 101: „1-Finger reset“ via [Reset], Terminal or Bus
LCP 102: „3-Finger reset“
³Drive initialised [A80]
Auto Remote Trip The drive was set to factory
setup.
80 Drive initialized
3. The inertia of the load is too 3. Check the mechanical and dy-
high (the mechanical system namical conditions of the drive
is too idle) system
Safety note:
To avoid electrical shock hazard- even after the power is disconnected- wait at
least as follows before doing service on the frequency converter:
(380-500V: 0.25-7.5 kW: 4 Min. / 11-75 kW: 15 Min./ 90-200 kW: 20 Min./ 250-400 kW: 40 Min.)
..\FC300\Alarm-Warn\English\Alarms & Warnings FC 300 SW 5.5x 18.08.2008 MC Page 26 / 27
VLT® AutomationDrive FC 300
3. Short circuit of the control vol- 3. Check the control voltage sup-
tage (T. 12 or T. 50) or of the plies
Display dark control terminals
24V: T. 12/13 to 20/39
10V: T. 50 to 55
Safety note:
To avoid electrical shock hazard- even after the power is disconnected- wait at
least as follows before doing service on the frequency converter:
(380-500V: 0.25-7.5 kW: 4 Min. / 11-75 kW: 15 Min./ 90-200 kW: 20 Min./ 250-400 kW: 40 Min.)
..\FC300\Alarm-Warn\English\Alarms & Warnings FC 300 SW 5.5x 18.08.2008 MC Page 27 / 27