06 - Part 5 - Asphalt Works
06 - Part 5 - Asphalt Works
06 - Part 5 - Asphalt Works
5 ASPHALT WORKS.................................................................................................. 3
5.1 GENERAL ............................................................................................................... 3
5.1.1 Scope 3
5.1.2 References 3
5.1.3 Definitions 7
5.1.4 Submittals 7
5.1.5 Quality Assurance 8
5.2 MATERIALS ............................................................................................................ 8
ST
5.2.1 Unacceptable Materials 8
5.2.2 Fine Aggregate 9
EA
5.2.3 Coarse Aggregate 9
5.2.4 Recycled Aggregate 10
5.2.5 Mineral Filler 10
LE
5.2.6 Asphalt Binder 11
5.2.7 Prime Coat 13
D
5.2.8 Tack Coat 13
ID
5.2.9 Delivery, Storage and Handling 13
5.2.10 Inspection and Control M 14
5.3 MARSHALL MIX DESIGN ..................................................................................... 14
5.3.1 General 14
G
ST
5.11.2 Transverse Evenness 33
5.11.3 Evenness and Rideability 33
EA
5.12 PAVEMENT EVALUATION TECHNIQUES ........................................................... 35
5.13 PRODUCTION OF ASPHALT CONCRETE COURSES ........................................ 35
5.13.1 Weather Limitations 35
LE
5.13.2 Equipment Required 35
5.13.3 Survey and Preparation 35
D
5.13.4 Heating of Asphalt Binder 36
ID
5.13.5 Heating of Mineral Aggregate 36
5.13.6 Proportioning and Mixing M 36
5.14 HAULING EQUIPMENT......................................................................................... 37
G
5.15 OTHER EQUIPMENT ............................................................................................ 37
5.15.1 Spreading and Finishing Equipment 37
IN
5 ASPHALT WORKS
5.1 GENERAL
5.1.1 Scope
1 Materials, equipment, and construction of bituminous paving works including prime coating
and tack coating.
ST
2 Related Parts
EA
Part 3, ............. Earthworks
Part 4, ............. Unbound Pavement Materials.
LE
5.1.2 References
D
1 The following standards and other documents are referred to in this Part:
ID
ASTM C40 ..................Standard Test Method for Organic Impurities in Fine Aggregates for
M
Concrete
ASTM C50 ..................Standard Practice for Sampling, Sample Preparation, Packing and
G
Marking of Lime and Limestone Products
IN
ASTM C51 ..................Terminology Relating to Lime and Limestone (as used by the industry)
ASTM C88 .................Standard Test Method for Soundness of Aggregates by Use of Sodium
LT
ASTM C128 ...............Standard Test Method for Density, Relative Density (Specific Gravity),
O
ASTM C131 ...............Standard Test Method for Resistance to Degradation of Small Size
Coarse Aggregate by Abrasion and Impact in the Los Angeles
ER
Machine
ASTM C136 ...............Standard Test Method for Sieve Analysis of Fine and Coarse
YD
Aggregates
ASTM C142 ...............Standard Test Method for Clay Lumps and Friable Particles in
Aggregates
H
ST
(Bituminous) Products
ASTM D546 ................Standard Test Method for Sieve Analysis of Mineral Filler for
EA
Bituminous Paving Mixtures
ASTM D946 ...............Standard Specification for Penetration Graded Asphalt Cement for
Use in Pavement Construction
LE
ASTM D977 ................Standard Specification for Emulsified Asphalt
ASTM D979 ................Standard Practice for Sampling Bituminous Paving Mixtures
D
ASTM D995-95...........Standard Specification for Mixing Plants for Hot-Mixed, Hot-Laid
ID
Bituminous Paving Mixtures
ASTM D1188: ............Standard Test Method for Bulk Specific Gravity and Density of
M
Compacted Bituminous Mixtures Using Coated Samples
ASTM D2027 ..............Standard Specification for Cutback Asphalt (Medium-Curing Type)
G
ASTM D2041 .............Standard Test Method for Theoretical Maximum Specific Gravity and
IN
Trichloroethylene
ASTM D2172 .............Standard Test Methods for Quantitative Extraction of Bitumen from
SU
Aggregate
ASTM D2726 .............Standard Test Method for Bulk Specific Gravity and Density of Non
O
ASTM D2872 .............. Standard Test Method for Effect of Heat and Air on a Moving Film of
Asphalt (Rolling Thin Film Oven Test)
ER
ASTM D2950 ..............Standard Test Method for Density of Bituminous Concrete in Place by
Nuclear Methods
YD
ASTM D5361 ..............Standard Practice for Sampling Compacted Bituminous Mixtures for
Laboratory Testing
ASTM D5444 ..............Standard Test Method for Mechanical Size Analysis of Extracted
Aggregate
ASTM D5546 .............Standard Test Method for Solubility of Asphalt Binders in Toluene by
Centrifuge
ASTM D5581 ..............Standard Test Method for Resistance to Plastic Flow of Bituminous
Mixtures Using Marshall Apparatus (6 inch-Diameter Specimen)
ST
ASTM D5821 .............Standard Test Method for Determining the Percentage of Fractured
Particles in Coarse Aggregate
ASTM D6307 ..............Standard Test Method for Asphalt Content of Hot-Mix Asphalt by
EA
Ignition Method
ASTM D6373 ..............Standard Specification for Performance Graded Asphalt Binder
LE
ASTM D6521 .............Standard Practice for Accelerated Aging of Asphalt Binder Using a
Pressurized Aging Vessel (PAV)
D
ASTM D6648 .............Standard Test Method for Determining the Flexural Creep Stiffness of
Asphalt Binder Using the Bending Beam Rheometer (BBR)
ID
ASTM D6723 ..............Standard Test Method for Determining the Fracture Properties of
M
Asphalt Binder in Direct Tension (DT)
ASTM D6926 .............Standard Practice for Preparation of Bituminous Specimens Using
G
Marshall Apparatus
ASTM D6927 ..............Standard Test Method for Marshall Stability and Flow of Bituminous
IN
Mixtures
LT
ASTM D6931 ..............Standard Test Method for Indirect Tensile (IDT) Strength of
Bituminous Mixtures
SU
ASTM D7405 .............Standard Test Method for Multiple Stress Creep and Recovery
(MSCR) of Asphalt Binder Using a Dynamic Shear Rheometer
C
ASTM E11 .................Standard Specification for Woven Wire Test Sieve Cloth and Test
ER
Sieves
ASTM E274 ................Standard Test Method for Skid Resistance of Paved Surfaces Using a
Full-Scale Tire
YD
ASTM E303 ................Standard Test Method for Measuring Surface Frictional Properties
Using the British Pendulum Tester
H
ASTM E950................. Standard Test Method for Measuring the Longitudinal Profile of
Travelled Surfaces with an Accelerometer Established Inertial Profiling
Reference
ASTM E965 ................Standard Test Method for Measuring Pavement Macrotexture Depth
Using a Volumetric Technique
ASTM E1926............... Standard Practice for Computing International Roughness Index of
Roads from Longitudinal Profile Measurements
ST
Publication
AASHTO R28 .............Standard Practice for Accelerated Aging of Asphalt Binder Using a
EA
Pressurized Aging Vessel (PAV)
AASHTO R35 ............ Standard Practice for Superpave Volumetric Design for Hot-Mix Asphalt
(HMA)
LE
AASHTO T44 .............Standard Method of Test for Solubility of Bituminous Materials
AASHTO T48 .............Standard Method of Test for Flash and Fire Points by Cleveland Open
D
Cup
ID
AASHTO T240 ...........Standard Method of Test for Effect of Heat and Air on a Moving Film of
Asphalt Binder (Rolling Thin-Film Oven Test)
M
AASHTO T313 ...........Standard Method of Test for Determining the Flexural Creep Stiffness
of Asphalt Binder Using the Bending Beam Rheometer (BBR)
G
AASHTO T283 ........... Standard Method of Test for Resistance of Compacted Asphalt Mixtures
IN
to Moisture-Induced Damage
AASHTO T314 ...........Standard Method of Test for Determining the Fracture Properties of
LT
AASHTO T350 ...........Standard Method of Test for Multiple Stress Creep Recovery (MSCR)
O
AASHTO PP60 ........... Standard Practice for Preparation of Cylindrical Performance Test
Specimens Using the Superpave Gyratory Compactor (SGC)
ER
AASHTO PP61 .......... Standard Practice for Developing Dynamic Modulus Master Curves for
Hot Mix Asphalt (HMA) Using the Asphalt Mixture Performance Tester
(AMPT)
YD
AASHTO TP79 .......... Standard Method of Test for Determining the Dynamic Modulus and
Flow Number for Hot Mix Asphalt (HMA) Using the Asphalt Mixture
H
5.1.3 Definitions
2 Base Course: One or more bituminous layers beneath Wearing Course and above the
unbound Road Base Layer. It usually consists of a mixture of aggregates and bituminous
materials and functions as a structural portion of pavement.
3 Wearing Course: Top surface bituminous course, which resists skidding, traffic abrasion, and
ST
the disintegrating effects of climate.
5.1.4 Submittals
EA
1 The Contractor shall submit for approval a proposed Job Mix Formula (JMF) together with all
applicable design data at least one month before beginning the work. The JMF shall give a
LE
combined gradation showing a single definite percentage passing each sieve as well as a
percentage of each material to be used in the mix. The JMF shall also establish the mixing
and compaction temperature values and a compaction reference density. The Engineer will
D
test samples of the materials proposed for use in order to check their quality and to check the
ID
proposed mix design. The Contractor shall report all the values obtained in the laboratory
design and shall submit these together with a copy of the plotted curves resulting from the
M
tests in an approved form to the Engineer. The Engineer may require verification of the
submitted design before giving approval. The Engineer shall approve the optimum binder
G
content based upon the design values submitted by the Contractor and shall notify the
Contractor of the value. No asphalt works will be allowed to commence before the
IN
Contractor receives written approval from the Engineer for his JMF.
LT
2 The asphalt mix design submission shall include a copy of valid calibration certificates from a
calibration service agency approved by the Laboratories and Standardization Affairs (LSA) for
SU
the batching plant and the relevant laboratory equipment such as but not limited to balances,
proving rings, and load devices. Approval certificates for mix designs will not be issued if the
above requirements have not been complied with.
N
O
3 Based on the Engineer request, the Contractor shall submit the pertinent certifications of
materials, equipment, plants, personnel and processes in relation to the project. Certificates
C
4 The contractor shall submit to the Engineer for approval method statements for the following:
(a) Bituminous and asphalt materials production, storage, transportation, identification and
YD
activities.
(c) Quality control testing plan.
(d) Equipment and its suitability to fulfil all construction activities to the required quality.
(e) Personnel capability.
(f) Safety and environment preservation measures.
5 The Contractor shall provide the Engineer with a complete report on the origin and
composition of all stone and/or gravel aggregates to be used in the work (Aggregate
Resources Report). All materials shall comply with the specified requirements for the various
aggregates.
QCS 2014 Section 06: Roadworks Page 8
Part 05: Asphalt Works
7 After receiving the approval of specific sources of material the Contractor cannot change
these sources without prior written approval of the Engineer.
1 The Contractor shall notify the Engineer of the sources of materials and the Engineer shall
ST
approve the sources. All materials shall be tested and approved before use.
2 Where the quality of material from a source of material does not comply with the designated
EA
requirements, the Contractor shall furnish material that does comply from other sources.
Delivery of materials produced from commercial manufacturing processes shall be
accompanied by the manufacturer's certification and test report showing that the materials
LE
comply with the designated requirements.
D
3 No change shall be permitted in the source of any of the materials until the technical
submissions listed in the specification have been made and approved by the Engineer.
4
ID
All processed materials shall be tested and approved before being stored at the site or
M
incorporated in the works and may be inspected and tested at any time during the progress
of their preparation and use. Questionable materials, pending laboratory testing subsequent
G
approval shall not be unloaded and incorporated with materials previously approved and
IN
accepted.
LT
5 It is the full responsibility of both the asphalt mixture producer and the Contractor to obtain a
certificate which proves that the asphalt binder complies with the specifications. Furthermore,
SU
both the asphalt mixture producer and the Contractor shall perform all the required tests in an
approved private laboratory to make sure that the asphalt binder being purchased complies
with the specifications. The LSA will, at any time, take samples from the asphalt mixtures
N
5.2 MATERIALS
C
1 Materials that do not conform to the designated requirements shall be rejected and
immediately removed from the site of the works unless otherwise instructed by the Engineer.
YD
No rejected material, the defects of which have been corrected, shall be used until approval
has been given by the Engineer.
H
2 Bituminous paving courses shall consist of coarse aggregate, fine aggregate, filler material,
and bitumen binder. Mixture of two different types of rocks, e.g. igneous and sedimentary
having different engineering properties shall not be permitted.
3 During execution of works, variations in the specific gravity of any individual fraction of
aggregates used in the asphalt mixes by more than 1% shall cause the Engineer to request
for evaluation of aggregates consistency and compliance and/or mix design validation.
QCS 2014 Section 06: Roadworks Page 9
Part 05: Asphalt Works
1 Fine aggregate is that portion of the mineral aggregate passing the 2.36mm ASTM sieve for
the Marshall mix design and passing the 4.75mm sieve for the Superpave mix design.
2 Fine aggregate shall consist of crushed hard durable rock and shall be of such gradation that
when combined with other aggregates in proper proportions, the resultant mixture will meet
the required gradation. Fine aggregate shall be non-plastic and chemically stable.
ST
3 The source of natural fine aggregate is considered to be the crusher site at which it is
produced. Crushed fine aggregate shall be produced by crushing clean coarse aggregate
and shall not be thin, flaky or elongated. Sampling of fine aggregate shall be in accordance
EA
with ASTM D75.
4 Fine aggregate shall be clean and free from organic matter, clay, cemented particles and
LE
other extraneous or detrimental materials.
5 Unless permitted elsewhere in the contract, the aggregate type for wearing course shall be
D
Gabbro. The aggregate type for Base Course shall be either Gabbro or Limestone.
ID
6 The Contractor shall ensure that the sources of all fine aggregates have been approved by
M
the Municipality concerned.
G
7 The specifications of fine aggregates for asphalt mixtures are listed in Table 5.1.
IN
Table 5.1
Fine Aggregate Specifications for Marshall Mixes
LT
4% max. (stockpile)
Plasticity index ASTM D 4318
Non Plastic (hot bins)
Sand equivalent value ASTM D2419 45% min.
N
- Each source
Soundness by magnesium
O
1 Coarse aggregate is that portion of the mineral aggregate retained on the 2.36mm ASTM
sieve for the Marshall mix design and retained on the 4.75mm ASTM sieve for the
Superpave mix design. Coarse aggregate shall consist of crushed natural stones and gravel.
Crushed particles shall be cubic and angular in shape and shall not be thin, flaky or
elongated. The gradation shall be such that when combined with other aggregate fraction in
proper proportions, the resultant mixture will meet the required gradation.
2 The source of crushed aggregate is considered to be the crushing site from which it is
produced. Sampling of coarse aggregate shall be in accordance with ASTM D75.
QCS 2014 Section 06: Roadworks Page 10
Part 05: Asphalt Works
3 Coarse aggregate shall be clean and free from organic matter, clay, cemented particles and
other extraneous or detrimental material.
4 The specifications of coarse and combined aggregates for asphalt mixtures are listed in
Table 5.2.
5 Unless permitted elsewhere in the contract, the aggregate type for wearing course shall be
Gabbro. The aggregate type for Base Course shall be either Gabbro or Limestone.
ST
6 If directed by the Engineer, the polished stone value (PSV) should be determined for wearing
course aggregates of main lane as per ASTM D3319. The PSV shall not be less than 45.
EA
5.2.4 Recycled Aggregate
1 Recycled aggregate produced from excavating natural ground can be used in asphalt
LE
mixtures for temporary roads and for roads, which serve agricultural areas provided that the
specifications stated in Section 6 - Part 9 are complied.
D
Table 5.2
ID
Coarse and Combined Aggregate Specifications for Marshall Mixes
Specification Limits
Minimum
Parameter Standard
M
Base Course Base Course Wearing Frequency
(Class A) (Class B) Course
G
One or more Fractured
ASTM D5821 100% min. 100% min. 100% min.
Faces
IN
1
Two or more Fractured
ASTM D5821 85% min. 85% min. 85% min.
Faces
LT
(5 cycles by MgSO4) 3
2000m
ASTM C131
O
Water absorption ASTM C127 2.0% max. 2.0% max. 1.5% max.
Aggregate Crushing BS 812
25 % max. 25 % max. 20% max.
ER
1 Mineral filler when separately supplied from an external source shall consist of finely ground
mineral matter in accordance with ASTM D242 such as rock dust, hydrated lime, cement or
H
other material which can satisfy the Engineer will produce asphalt mixes of at least equal
quality. It shall be free from organic substances and clay, shall be thoroughly dry and free
from agglomerations, shall be non-plastic and shall meet the grading requirements shown in
Table 5.3.
2 Hydrated lime shall conform to the definitions given in ASTM C51. Sampling, packaging and
marking of hydrated lime shall be in accordance with ASTM C50. Storage and use of the
hydrated lime shall at all times be such as to protect the material from the weather.
QCS 2014 Section 06: Roadworks Page 11
Part 05: Asphalt Works
Table 5.3
ASTM Sieve % Mass Passing
600 µm 100
300 µm 95 - 100
150 µm 90 – 100
75 µm 70 – 100
3 The grading of mineral filler shall be carried out in accordance with ASTM D546.
ST
4 When cement is used as mineral filler, it shall meet the requirements of ASTM C150.
EA
5.2.6 Asphalt Binder
LE
1 The asphalt binder specified for use in the asphalt mixes shall be either of the following:
(a) Penetration grade 60-70: This binder type shall be graded in accordance with ASTM
D
D946. The 60-70 binder specifications are listed in Table 5.4. Sampling shall be in
accordance with ASTM D140. The 60-70 penetration graded binder is generally
ID
equivalent to PG 64-10 performance graded binder.
(b)
M
PG 76-10: Based on the Engineer approval, the PG76-10 binder can be used in
asphalt mixes. This binder type shall be a polymer-modified binder (PMB) meeting
AASHTO M320 and ASTM D6373 specifications in addition to separation test criteria
G
as listed in Table 5.5. Sampling shall be in accordance with ASTM D140.
IN
2 Prior to the commencement of the mix design, the Contractor shall provide a certificate
indicating conformance of binder with the specifications stated above. This certificate shall be
LT
3 The asphalt binder shall be prepared by the refining of petroleum and shall be uniform in
character. Blending of asphalt binders from different refineries will be permitted only with the
written approval of the Engineer.
N
Table 5.4
O
60 – 70 Pen
Parameter Standard Minimum Frequency
Min. Max.
ER
Cup, C
Ductility at 25 C, cm ASTM D113 100 - - Each source
Solubility Trichloroethylene, % ASTM D2042 99 -
- Visible change in material
Loss on heating, % ASTM D6 - 0.2
Penetration of Residue of - 1 test per 450t of asphalt
ASTM D5 52 -
original after TFOT, % binder per layer
Ductility of Residue after
ASTM D113 50 -
TFOT at 25 C, 5cm/min, cm
QCS 2014 Section 06: Roadworks Page 12
Part 05: Asphalt Works
Table 5.5
Specifications of Performance Graded Binders / Polymer Modified Binders (PMB)
Standard Minimum
Parameter Specification
AASHTO ASTM Frequency
Tests on Original Binder
Average 7 days maximum pavement
o - - < 76
design temperature, ( C)
Minimum pavement design - - - Each source
>-10
ST
o
temperature,( C)
o
- Visible change in
Flash Point Temperature, Minimum ( C) T48 D92 230 material
Rotational Viscosity, Maximum 3 Pa.s,
EA
o T316 D4402 135 - 1 test per 450t of
Test Temperature ( C)
asphalt binder per
Dynamic Shear, G*/sinδ, Minimum, 1.00
o T315 D7175 76 layer
kPa , Test Temperature ( C) at 10 rad/s
LE
Solubility, min, % T44 D5546 99
1
Separation Test: Absolute Difference
D
o
between G* @ 76 C and 10 rad/s of Top - D7173 20
ID
and Bottom Specimens, Maximum, %
Requirements of the Rolling Thin Film Oven Residue ( T240 / D2872)
M
Mass Loss, Maximum, Percent T240 D2872 1
Dynamic Shear, G*/sinδ, Minimum, 2.20
G
o T315 D7175 76
kPa , Test Temperature ( C) at 10 rad/s
- Each source
IN
2
Direct Tension , Failure Strain, Minimum,
O
1
Absolute Difference = Abs(100x(top-bottom)/top).
2
If the creep stiffness is below 300 MPa, the direct tension test is not required. If the creep stiffness is
ER
between 300 and 600 MPa, the direct tension failure strain requirement can be used in lieu of the creep
stiffness requirement. The m-value requirement must be satisfied both cases.
YD
4 Based on the Engineer approval, when bitumen grades PG76-10 H, V or E are specified for
heavy, very heavy, and extra heavy loading, the bitumen shall meet the requirements of
H
AASHTO M332 and will be required to indicate elastic response in percent recovery when
tested in accordance with AASHTO T350 / ASTM D7405.
5 Binders modified using Crumb Rubber and other binders containing particulate materials,
which are graded according to AASHTO M320 and/or AASHTO M332, shall not include
particles with longest dimensions of more than 250μm. In addition, the requirements listed in
Table 5.5 shall be satisfied.
QCS 2014 Section 06: Roadworks Page 13
Part 05: Asphalt Works
1 Liquid asphalt for use as prime coat shall be MC-70 medium curing cutback asphalt in
accordance with ASTM D2027 or AASHTO M82.
2 The prime coat shall be a cutback consisting of a 60/70 penetration grade bitumen and
kerosene. The residue from the distillation test, carried out to 360 C in accordance with
ASTM D402, shall be a minimum of 55 % (by volume), as determined by the difference
method. Sampling shall be in accordance with ASTM D140. One sample shall be tested
ST
every 5 tons.
EA
1 Emulsified asphalt for use as tack coat in asphalt works may be CSS 1h or CRS-2 cationic
emulsified asphalt in accordance with AASHTO M 208 or SS 1h anionic emulsified asphalt in
LE
accordance with ASTM D977 or AASHTO M140 unless otherwise designated.
D
2 Emulsified asphalt shall be of the slow-setting cationic or anionic type of the CSS-1h or SS-
1h grades respectively and shall conform to the designated requirements. Sampling shall be
ID
in accordance with ASTM D140. One sample shall be tested every 5 tons.
2 Stored material shall be located so as to facilitate their prompt inspection. All storage
locations on land not owned by the Contractor shall be restored to their original condition at
SU
3 Handling and stockpiling of aggregates shall at all times be such as to eliminate segregation
N
Stockpiles shall be kept flat and the formation of high cone-shaped piles shall not be
permitted. When conveyor belts are used for stockpiling aggregates, the Engineer may
C
4 Where trucks are used to construct stockpiles, the stockpiles shall be constructed one layer
at a time with trucks depositing their loads as close to the previous load as possible. The use
YD
of tractors or loaders to push material deposited at one location to another location in the
stockpile shall not be allowed during the construction of the stockpile, and their use shall be
limited to levelling the deposited material only.
H
5 Stockpiles of aggregate located at permanent asphalt plant sites shall be separated by bin
walls and shall be constructed on asphalt or concrete floors. Stockpile locations and
procedures at temporary asphalt plant sites shall be as approved by the Engineer.
6 Intermediate storage of hydrated lime and commercial mineral filler for equipment feeding the
asphalt plant shall be silos of adequate size to ensure a minimum of one day's continuous
operation.
QCS 2014 Section 06: Roadworks Page 14
Part 05: Asphalt Works
2 The Engineer shall have authority to instruct sampling and testing of any material supplied to
the site from any source whatsoever in order to establish their compliance and to accept or
ST
reject as he deems necessary. Samples shall also be taken from completed work to
determine compliance. The frequency of all sampling and testing shall be as designated.
EA
3 The Contractor shall arrange for obtaining specimens of materials, asphalt mixes and
samples cut from the paving courses after compaction, including the provision of necessary
equipment and plant for obtaining these specimens and samples. This work shall be
LE
performed in the presence of the Engineer. The Engineer shall take possession of the
samples upon their removal from the roadway unless the Contractor is authorised otherwise
D
4 In particular, the Contractor shall provide a portable coring machine and bits for taking 150
ID
mm diameter full depth cores of all bituminous paving courses. The coring machine shall be
available to the Engineer upon request. M
5 In addition to the foregoing, one set of three laboratory compacted specimens and one
G
uncompacted coated sample for each mix type and mixer plant for each day’s production,
shall be delivered to LSA no later than 12 hours after compaction of the specimens together
IN
6 Upon the first erection of the batching plant and at least once every three months thereafter,
the plant shall be calibrated by a calibration service organisation approved by the LSA.
SU
5.3.1 General
O
C
1 The types of bituminous paving mixes shall be as designated on the project drawings or in
the contract documents.
ER
2 The LSA shall act as the engineer for the approval of asphalt mix designs and materials
submitted by the Contractor.
YD
3 The contractor shall prepare the mix design with all necessary supporting documentation
which shall include the results of the Contractor’s own laboratory procedures.
H
4 The Contractor shall carry out a trial batching and trial laying of the particular mix design.
5 The testing and sampling of the mix design by the LSA will take place for both the laboratory
verification and the trial batching and laying.
6 Based on the results of the trial batching and laying the contractor may be required to make
amendments to the mix design. Providing the mix design conforms to the specification the
mix shall be approved by the LSA.
7 The LSA shall issue a certification for the job standard mix to the Contractor.
QCS 2014 Section 06: Roadworks Page 15
Part 05: Asphalt Works
8 The approved Job Mix Formula may be amended as a result of experience in the execution
and performance of the permanent asphalt works. Such an amendment may be submitted by
the Contractor for the Engineer's approval in which case the Contractor shall submit full
details of the proposed amendment together with such data as is necessary to support his
submittal. Amendment may also be directed by the Engineer.
9 Approval by the Engineer of the Job Mix Formula or amendments thereto shall in no way
relieve the Contractor of his obligations under the Contract, and the Contractor shall be
responsible for the soundness of the asphalt paving mixes and the satisfactory execution and
ST
performance of the asphalt paving courses.
EA
1 The Asphalt Institute MS-2 “Mix Design Methods for Asphalt Concrete and Other Hot-Mix
Types” shall be used in designing the bituminous mixtures using Marshall design method.
LE
2 The recommended compacted layer thicknesses are shown in Table 5.6.
D
Table 5.6
ID
Recommended Compacted Layer Thicknesses
Base Course Base Course
M Wearing
(Class A) (Class B) Course(WC)
G
80 to 100 mm 60 to 80 mm 45 to 55 mm
IN
3 When tested according to ASTM C136, the combined mineral aggregate shall conform to
Table 5.7 for asphalt concrete mixes.
LT
Table 5.7
SU
(Class A) (Class B)
37.5 mm 100 - -
C
12.5 mm - 63 - 85 69 - 87
9.5 mm 45 - 75 57 - 77 58 - 78
YD
4.75 mm 30 - 55 40 - 60 40 - 60
2.36 mm 20 - 40 25 - 45 25 - 45
0.850 mm 15 - 30 15 - 30 15 - 30
H
0.425 mm 10 - 22- 10 - 22 10 - 22
0.180 mm 6 - 15 6 - 15 6 - 15
0.075 mm 2-8 2-8 2-8
4 The "Laboratory Designed Mixture" for all types of bituminous coated courses shall comply
with the requirements given in Table 5.8. Note that any deviation from these requirements
shall be approved by LSA.
QCS 2014 Section 06: Roadworks Page 16
Part 05: Asphalt Works
Table 5.8
Design Criteria for Marshall Design Mixes
Base Course Base Course
Parameter Wearing Course
(Class A) (Class B)
Aggregate Properties Tables 5.1 and 5.2
Aggregate Grading Table 5.7
Number of Compaction blows at each
75 75 75
end of specimen (see paragraph 5)
Binder Content (% of total mix)
ST
3.2 – 4.4 3.4 – 4.4 3.4 – 4.4
inclusive of tolerances
Stability minimum (kN) 9.5 min. 9.5 min. 11.5 min.
EA
Flow (mm) 2 to 4 2 to 4 2 to 4
Marshall Quotient (Stability/Flow)
4.75 min. 4.75 min. 4.75 min.
(kN/mm)
LE
Voids in Mix (Air Voids) (%) 4 to 8 4.5 to 8 5 to 8
Voids in Mineral Aggregate VMA (%) Table No.5.9
D
Voids Filled with Asphalt VFA (%) 50 to 70 50 to 75 50 to 75
ID
Voids in Marshall Specimen at 400
Blows per face at optimum binder 3.2 min. 3.4 min. 4.0 min.
M
content (%)
Retained Stability (%) 75 min. 75 min. 75 min.
G
Marshall apparatus in accordance with ASTM D6926 and ASTM D6927, respectively, while
Base Course (Class A) samples shall be prepared and tested in accordance with ASTM
SU
D5581. However, based on the Engineer approval, samples having aggregate sizes larger
than 25mm can be prepared and tested according to ASTM D6926 and ASTM D6927 by
substituting all aggregate sizes over 25mm with an equal weight of aggregate sizes in the
N
6 Upon the request of the Engineer, the Tensile Strength Ratio (TSR) in accordance with
C
ASTM D6931 shall be obtained for the mix for quality control purposes. The TSR acceptance
limits shall be determined at mix design stage and approved by the Engineer.
ER
Table 5.9
Minimum Percent Voids in Mineral Aggregate (VMA)
YD
ST
Base Course Base Course Wearing
(Class A) (Class B) Courses
Description
EA
Aggregate retained on 4.75mm sieve
5% 4% 4%
or larger
LE
Aggregate passing 4.75mm sieve
4% 3% 3%
and retained on 850m sieve
D
Aggregate passing 850m sieve and
3% 2% 2%
retained on 75m sieve
8 The ‘Job Standard Mix Density’ shall be obtained by making six standard Marshall specimens
IN
from samples of the approved ‘Job Standard Mixture’ determining the bulk specific gravity of
each and comparing them with the mean value of the six. Any individual result which differs
LT
from the mean by more than 0.015 shall be rejected, and provided that not more than two
results are so rejected the mean of the remaining result shall be designated the ‘Job
SU
Standard Mixture Density’. The absolute density shall be considered as the theoretical
specific gravity calculated in accordance with ASTM D2041.
N
1 The Contractor shall submit a testing plan to the Engineer for approval that demonstrates
C
how he shall prove compliance with the requirements for compaction, mix composition, level,
evenness and all other requirements of Section 6. Each lot shall be approved by the
ER
Engineer before placing any subsequent asphalt concrete course. In cases where the asphalt
course is laid in more than one layer, each layer shall be tested and approved before placing
YD
and one uncompacted coated sample for each mix type and mixer plant for each day’s
production shall be delivered to the LSA no later than 12 h after compaction of the
specimens. Details of compaction date, time and temperature of mix shall be provided with
the specimens together with mix type and project details.
3 The Contractor shall cut samples from each completed asphalt course during the progress of
the work and before final acceptance as directed by the Engineer. The Engineer shall
determine the location of the samples.
4 When testing for compaction at joints the edge of the core shall not be more than 50 mm or
less than 25 mm from the joint.
QCS 2014 Section 06: Roadworks Page 18
Part 05: Asphalt Works
5 Compacted samples shall be taken by coring in accordance with ASTM D5361, for testing by
an approved laboratory. The core diameter shall be 150 mm. where the Contractor fails to
provide cores as required by the Engineer, the Engineer may arrange for the taking of cores
on behalf of the Contractor at his cost. Samples shall be taken of the asphalt mix for the full
depth of the course. A sample shall comprise a pair of adjacent cores and the average
density of these shall be the density of the sample.
6 Whenever deficiencies are noted in loose mix samples or core samples, the Engineer may
direct the taking of additional cores at the Contractor's expense in order to define the area of
ST
pavement involved.
7 Hot asphalt mix of the same type shall be placed and compacted in holes left by sampling.
EA
The mixture shall be compacted to the percentage compaction required for the layer using a
vibrating hammer.
LE
8 Quality control testing of the asphalt mixtures during construction shall follow the frequencies
shown in Table 5.12 for Marshall Mixtures:
D
9 Base Course (Class B) and Wearing Course samples shall be prepared and tested using
ID
Marshall apparatus in accordance with ASTM D6926 and ASTM D6927, respectively, while
Base Course (Class A) samples shall be prepared and tested in accordance with ASTM
M
D5581. However, based on the Engineer approval, samples having aggregate sizes larger
than 25mm can be prepared and tested according to ASTM D6926 and ASTM D6927 by
G
substituting all aggregate sizes over 25mm with an equal weight of aggregate sizes in the
next lower grading sizes.
IN
10 Upon the request of the Engineer, the Tensile Strength Ratio (TSR) in accordance with
LT
ASTM D6931 shall be tested for quality control purposes. The TSR acceptance limits shall be
based on the mix design obtained limits approved by the Engineer.
SU
11 If it appears from the analysis of samples of loose mix or cores that the asphalt content or
aggregate gradation are beyond the permissible tolerances specified for the Job Mix Formula
N
(established for each respective asphalt course mix) and that, such variation affects the
O
12 The density of the compacted mixes shall be related to the daily Marshall density determined
by making minimum four Marshall specimens from samples collected from behind the paver.
YD
The density of each sample shall be determined and compared with the mean value. Any
3
individual result, which varies from the mean by more than 0.015gm/cm shall be rejected.
The daily Marshall density shall not differ from the Job Mix Design Density by more than
H
1.0%.
13 The field density, as determined from each core sample and related to the daily Marshall
Density, obtained as shown above, shall be as follows:
Table 5.11
14 The finished road surface shall be inspected visually techniques and if directed by the
Engineer the structural ability of the pavement in terms of layer modulus shall be assessed
by using the Falling Weight Deflectometer (FWD) and Light weight Deflectometer (LWD).
15 For safety purposes the pavement surface friction shall be measured by the pendulum
portable tester or locked wheel tester in accordance with ASTM E303.
Table 5.12
Quality Control Testing of the Marshall Mixtures
ST
Item / Parameter Standard Specification Limits Minimum Frequency
EA
Mineral Filler conformance Section 5.2.5 Every 300t
Prime Coat conformance Section 5.2.7
LE
Tack Coat conformance Section 5.2.8
Asphalt Binder conformance Section 5.2.6
D
2
0.45 – 0.75 kg/m 2
Rate of application for Prime Coat ASTM D2995 - 1 per 250 m
ID
at 60 – 85 C
2 - 1 every 75m per
0.15 – 0.38 kg/m
Rate of application for Tack Coat ASTM D2995 lane
at 10 – 60 C
M
Sampling of bituminous mixtures ASTM D979 - Test based
G
10 C of JMF
IN
temperature in truck
BS EN 12697
135 C min. at paver
1
Temperature of bituminous mixture Each truck
Part 13
120 C min. prior
LT
rolling
2
ASTM D2726 1.0% of Job
SU
ASTM C117
5.10 tolerances
O
ST
ASTM D5361 layer for Wearing
Thickness Section 5.11.1 Course
ASTM D3549
EA
Evenness of surface Section 5.11.2 & 5.11.3
1
As per polymer manufacturer recommendation and mix design for polymer modified binders
2
If water absorption ≤ 2%
3
If water absorption > 2%
LE
4
For samples containing more than 25mm size aggregates
5
For acceptance of in-situ compaction
D
16 The Retained Stability is the percentage of the average stability of 3 samples conditioned for
ID
24 hours at 60 1C water bath and the average stability of 3 samples conditioned for 4
hours in 60 1C air bath. These two sets of samples shall be prepared at the optimum
M
binder content by applying 75 blows and kept at ambient temperature for 17 – 20 hours and
shall have similar average densities.
G
IN
17 Each day the produced mixes shall be tested for checking their compliance with the approved
Job Standard Mix criteria. When unsatisfactory results or changed conditions make it
LT
necessary, a new job-standard following approval of new mix design shall be established.
1 The mix properties for Dense Bitumen Macadam are listed in Table 5.13.
N
Table 5.13
O
Specification Limits
Parameter Base Wearing
ER
Course Course
Number of Compaction blows at each end of specimen 75 75
YD
Binder Content (% of total mix) inclusive of tolerances 3.2 – 4.0 3.5 – 4.1
Stability minimum (kN) 7.5 10.0
2–4
H
2 When tested according to ASTM C136, the combined mineral aggregate shall conform to
Tables 5.14, 5.15 and 5.16.
QCS 2014 Section 06: Roadworks Page 21
Part 05: Asphalt Works
Table 5.14
Aggregate Gradation for Dense Bitumen Macadam Road Base (Unbound)
B.S Sieve Aggregate, Crushed Rock or Gravel
(mm) Percentage by mass passing
50.0 mm 100
37.5 mm 95 - 100
28.0 mm 70 - 94
14.0 mm 56 - 76
ST
6.3 mm 44 - 60
3.35 mm 32 - 46
0.300 mm 7 - 21
EA
0.075 mm 2- 8
Table 5.15
LE
Aggregate Gradation for Dense Bitumen Macadam Asphalt Base Course
D
B.S Sieve
(mm) Percentage by Mass Passing for Finished Thickness of Base Course
ID
80 - 100 mm 70 - 90 mm 50 - 70 mm
50.0 100 - -
M
37.5 95 - 100 100 -
28.0 70 - 94 95 - 100 100
G
20.0 - 71 - 95 95 - 100
IN
14.0 56 - 76 58 - 82 65 - 85
10.0 - - 52 - 72
LT
6.3 44 - 60 44 - 60 39 - 55
3.35 32 - 46 32 - 46 32 - 46
SU
0.300 7 - 21 7 - 21 7 - 21
0.075 2 - 8 2 - 8 2 - 8
N
Table 5.16
O
10.0 55 - 75 70 - 90 95 - 100
6.3 40 - 60 45 - 65 55 - 75
3.35 25 - 40 30 - 45 30 - 45
1.18 15 - 30 15 - 30 15 - 30
0.075 2 - 6 2 - 6 2 - 6
QCS 2014 Section 06: Roadworks Page 22
Part 05: Asphalt Works
1 Based on the Engineer approval, the Superpave Mix Design Method can be used to design
the asphalt mixtures for Wearing Course and Base Course layers. The design of the
Superpave asphalt mixtures shall follow the method outlined in AASHTO R35 and SP-2
“Asphalt Institute Superpave Mix Design Method” in liaison with LSA.
2 The contractor shall prepare the mix design with all necessary supporting documentation
which shall include materials production and handling specifications, plant quality procedures,
ST
construction quality control and quality assurance procedures, quality control tests, mix
acceptance criteria and performance evaluation testing program. All documentations shall be
submitted to LSA for review and approval.
EA
3 Based on the Engineer approval, the PG76-10 binder can be used in asphalt mixes. This
binder type shall be a polymer-modified binder (PMB) meeting AASHTO M320 and ASTM
LE
D6373 specifications and the criteria listed in Table 5.5.
D
4 Based on the Engineer approval, when bitumen grades PG76-10 H, V or E are specified for
heavy, very heavy, and extra heavy loading, the bitumen shall meet the requirements of
ID
AASHTO M332 and will be required to indicate elastic response in percent recovery when
tested in accordance with AASHTO T350.
M
5 Based on the Engineer approval, the guidelines shown in the Appendix can be used for the
G
mix design. Note that software (ePAVE3) shall be validated prior use.
IN
6 The recent editions of the references shown in the Appendix are recommended to be used
LT
7 Table 5.17 can be used as a guide for sampling and testing frequency for quality control of
SU
Superpave mixtures.
8 Performance tests shown in Table 5.18 can be used to evaluate performance of Superpave
N
9 Before producing bituminous concrete mixtures, the Contractor shall submit in writing to the
C
Engineer for approval, detailed information for each mix which he proposes to furnish. The
information shall include, but not be limited to the following:
ER
(a) Copy of mix certificate approval obtained from LSA and the mix design report.
YD
(b) The source(s) of the aggregate for each mix as well as the pertinent test data and a
written certification that the aggregates conform to all of the quality requirements.
H
(c) Type of Asphalt modifier intended to be used in the project along with the Certificate of
Conformity of the modified asphalt binder to the required grade according to the
Superpave Performance Based Grading System.
(d) Pertinent test data on the type and properties of the aggregates, asphalt binder,
modified asphalt binder, mineral filler, and chemical admixtures/asphalt modifiers to be
furnished.
(e) The type and location of plant to be used for mixing each mix.
(f) Any other support data and information special to the project (e.g. technical data
sheets of a polymer in case it was used).
QCS 2014 Section 06: Roadworks Page 23
Part 05: Asphalt Works
Table 5.17
Sampling and Testing Frequency of Superpave Field Mixtures
Item / Parameter Standard Specification Minimum Frequency
Aggregate Conformance Sections 5.2.1, 5.2.2, 5.2.3 and Table 6 - Appendix
Mineral Filler conformance Section 5.2.5 Every 300t
Prime Coat conformance Section 5.2.7
Tack Coat conformance Section 5.2.8
Asphalt Binder conformance Section 5.2.6
2
0.45 – 0.75 kg/m 2
Rate of application for Prime Coat ASTM D2995 - 1 per 250 m
at 60 – 85 C
ST
2 - 1 every 75m per
0.15 – 0.38 kg/m
Rate of application for Tack Coat ASTM D2995 lane
at 10 – 60 C
EA
Sampling of bituminous mixtures ASTM D979 - Test based
±10 C of JMF
temperature in truck
Min. JMF compaction
LE
Temperature of bituminous mixture
BS EN 12697 temperature +20 C at Each truck
Part 13 paver
Min. JMF compaction
D
temperature prior rolling
ID
(sec. 1.5.4 – Appendix)
ASTM D2172
Binder content (%) JMF value ±0.40
ASTM D6307
M
Table 9
Gradation of extracted aggregates ASTM D5444
Appendix
G
Appendix
ASTM D6307
ASTM D5444
C
ASTM D6931
Sec. 1.5.8
Moisture Sensitivity (Retained IDT) Sec. 1.5.8 Weekly
Appendix
Appendix
YD
1 Based on the Engineer request, the asphalt mixture performance properties can be
determined.
2 The performance properties of asphalt mixtures shall be measured for every asphalt
concrete layer at least on the following frequencies:
(a) Prior asphalt laying on a laboratory prepared sample at the asphalt binder content
ST
specified in the JMF.
(b) Asphalt mix sampled from behind the paver every 10000t of mix.
EA
3 The purpose of the performance testing is to allow for pavement performance evaluation and
verification of pavement structural design through the AASHTO Mechanistic-Empirical
Pavement Design Guide. Performance models, references, test conditions are shown in table
LE
5.18 below:
D
Table 5.18
ID
Performance Models Criteria
Performance Test
Test Conditions
M Applications / Use
Model Reference
G
100X150mm cylindrical
The E* is used in mechanistic
AASHTO PP60, sample under uniaxial
Dynamic Modulus analysis to evaluate the structural
IN
deviator stress
SU
Aging Model ASTM D7175 measure G* and in impact of binder aging on the E*
accordance with ASTM property of the asphalt mix at
D7175 at multiple various stages of the pavement
temperatures life
4 Modelling methods adopted by Asphalt Institute and Shell or equivalent shall be used. The
contractor shall submit a proposal includes performance modelling testing and interpretation
procedures to the Engineer for approval.
QCS 2014 Section 06: Roadworks Page 25
Part 05: Asphalt Works
1 Sufficient plant capacity, haul vehicles and storage shall be provided so that adequate
supplies of mixture are delivered to site to ensure that continuous paving can be achieved.
2 The dispatching of the hauling vehicles to the job site shall be so scheduled that all material
delivered may be placed in daylight, unless the Engineer has approved the use of artificial
ST
light. Delivery of material shall be at a uniform rate and in an amount well within the capacity
of the paving and compacting equipment.
EA
3 All precautions shall be taken to protect the mix from the weather during transit and while
waiting to discharge.
LE
4 Hauling vehicles shall not be permitted to carry out tight turns on the laying surface.
The mixture at delivery to the paver shall be within 10 C of the Job Mix Formula temperature
D
5
and above an absolute minimum temperature of 135 C. Material which has fallen below the
ID
minimum temperature of 135 C before discharge shall be rejected and immediately removed
M
from site. Delivery temperature shall not exceed the maximum temperature specified for
mixing at the plant
G
6 Should a significant proportion of the mixture delivered to the paver fail to meet this
IN
requirement, or should cold lumps be found in the mixture, the Engineer shall order that
LT
paving operations be suspended until measures are taken, to the approval of the Engineer, to
ensure compliance.
SU
1 The Contractor shall prepare a paving plan and obtain approval of the Engineer to ensure
N
2 Based on the approved paving plan and prior to the commencement of delivery of the mix the
C
Contractor shall erect and maintain an approved reference guide wire for controlling the
levels of the laid mix. The reference guide wire shall be supported at intervals of not more
ER
than 5m.
YD
3 The mix shall be laid upon an approved surface and only when weather conditions are
suitable and as designated. Upon arrival at the point of use, the asphalt mix shall be spread
and struck off to the grade, elevation and cross-section shape intended, either over the entire
H
width or over such partial width as may be required. If the material does not conform to the
requirements, it shall not be used and shall be discarded.
4 The laid material shall be compacted as soon as rolling can be effected without causing
undue displacement and while the temperature does not fall below 120 C for unmodified
asphalt mixes. Materials still uncompacted and below this temperature shall be rejected.
5 The compaction temperature for the laid polymer-modified asphalt binder mixes shall be
selected based on one of the following:
(a) As specified in the JMF.
QCS 2014 Section 06: Roadworks Page 26
Part 05: Asphalt Works
6 The Contractor shall supply accurate calibrated thermometers suitable for measuring the
inner and surface temperature of the material. The material temperature shall be checked
immediately before rolling and at least every 30 minutes thereafter during forward progress.
A record of these temperatures shall be passed to the Engineer at the end of each day’s
work.
7 While paving is in progress, the output of the batching plant shall be exclusively reserved for
ST
the operations and no mixture shall be supplied to other sites or projects.
8 If during laying, the paver is repeatedly delayed because of lack of mixture or if the paver
EA
stands at one location for more than thirty minutes (for any reason), a transverse joint shall
be constructed. Paving shall not recommence until the Engineer is satisfied that paving will
proceed uninterrupted and until at least four loaded vehicles have arrived at the paving site.
LE
9 The asphalt course shall be constructed to proposed levels and shall be homogeneous,
D
providing after compaction an even surface free from undulations, rises or depressions and
within the tolerances stipulated.
10
ID
In no case shall construction of a new asphalt concrete course begin until the previously laid
course has been tested and approved.
M
G
11 When the same asphalt course is to be laid in more than one layer the second layer shall be
placed as soon as practicable after the first layer has been finished, rolled and cooled, and
IN
the Engineer may at his discretion request cleaning of the first layer and the application of a
tack coat thereon if he so deems necessary.
LT
12 Transverse joints in succeeding layers shall be offset at least 2 m. Longitudinal joints shall
SU
13 The use of motor grader or hand spreading of the asphalt mix shall not be permitted except
N
in places where it is impractical to use pavers and shall be only with the specific permission
O
of the Engineer. The asphalt mix shall comply with all conditions regarding trueness of level,
thickness, and homogeneity of the mix.
C
14 Automatic electronic screed controls shall be required on all pavers and shall be used with a
ER
9 m long articulated averaging beam or grade wire control as approved by the Engineer.
YD
1 At least three rollers shall be required at all times, one self-propelled pneumatic-tire and two
H
2 Before beginning construction of the permanent works, unless otherwise agreed with the
Engineer, the Contractor shall carry out compaction trials for each type and thickness of
asphalt course to establish an approved compaction procedure which shall then be used as a
minimum requirement for the compaction of the permanent works unless otherwise directed
or agreed by the Engineer.
QCS 2014 Section 06: Roadworks Page 27
Part 05: Asphalt Works
3 The compaction trials shall involve all procedures specified for the permanent works
including testing as specified for the asphalt course under consideration and any equipment,
processes or procedures proposed by the Contractor which are not designated. Construction
of the permanent works shall not commence until a compaction procedure has been
approved in writing by the Engineer. Such approval shall in no way relieve the Contractor of
his responsibilities and obligations stipulated in the Contract.
4 Immediately after the asphalt mix has been spread and struck off, the surface shall be
checked and any irregularities adjusted and then compacted thoroughly and uniformly by
ST
rolling.
5 To prevent adhesion of the mix to steel-wheeled rollers, the wheels shall be kept properly
EA
moistened but excess water shall not be permitted.
6 After the longitudinal joints and edges have been compacted, rolling shall start longitudinally
LE
at the sides of the road and shall gradually progress towards the centre. On super elevated
sections, rolling shall begin on the low side and progress to the high side, overlapping on
D
successive trips by at least one-half the width of tandem rollers and uniformly lapping each
proceeding track. The rollers shall move at a slow but uniform speed with the drive wheels
ID
nearest the paver. The speed shall not exceed 4-5 km/h for steel-wheeled rollers or 8 km/h
M
for Pneumatic-tire rollers. The operating speed shall be approved by the Engineer.
7 The line of rolling shall not be changed suddenly or the direction of rolling reversed suddenly.
G
If rolling causes displacement of the material, the affected areas shall be loosened at once
IN
with hand tools and restored to the original grade of the loose material before being rerolled.
Heavy equipment or rollers shall not be permitted to stand on the finished surface before it
LT
8 When paving in a single width, the first lane placed shall be rolled in the following order:
SU
(d) Initial or breakdown rolling, beginning on the low side and progressing towards the high
side.
ER
1 When paving in echelon, 50 mm to 100 mm of the edge which the second paver is following
shall be left unrolled. When paving in echelon the edges between the first and the second
H
paver shall not be exposed more than 15 minutes nor 50m by distance without being rolled.
Particular attention shall be given to the construction of the transverse and longitudinal joints
in all courses.
2 If the joint has been distorted by traffic or by other means, it shall be trimmed to line and the
face shall be painted with thin coating of emulsified asphalt before the fresh material is
placed against it. To obtain thorough compaction of these joints the material placed against
the joint shall be tightly pushed against the vertical face with a steel-wheeled roller.
3 The roller shall be placed on the previously compacted material transversely so that not more
than 150 mm of the rear rolling wheel rides on the edge of the joint. The roller shall be
operated to pinch and press the mix into place at the transverse joint. The roller shall
continue to roll along this line, shifting its position gradually across the joint, in 150 to 200 mm
ST
increments, until the joint has been rolled with the entire width of the roller wheel. Rolling
shall be continued until a thoroughly compacted, neat joint is obtained.
EA
5.7.5 Longitudinal Joints
1 Longitudinal joints shall be rolled directly behind the paving operations. The first lane placed
LE
shall be true to line and grade and have a vertical face. The material being placed in the
abutting lane shall then be tightly pushed against the face of the previously placed lane.
D
Rolling shall be done with a steel-wheeled roller.
ID
2 The roller shall be shifted over onto the previously placed lane so that not more than 150 mm
of the roller wheel rides on the edges of the newly laid lane. The rollers shall then be
M
operated to pinch and press the fine material gradually across the joint. Rolling shall be
continued until a thoroughly compacted, neat joint is obtained.
G
3 When the abutting lane is not placed in the same day, or the joint is distorted during the day's
IN
work by traffic or by other means, the edge of the lane shall be carefully trimmed to line,
cleaned and painted with a thin coating of emulsified asphalt before the adjacent lane is
LT
placed.
SU
4 The longitudinal joints in the surface course shall be along the same line as the traffic lane
markers.
N
1 The edges of the asphalt course shall be rolled concurrently with or immediately after rolling
C
2 Care shall be exercised in consolidating the course along the entire length of the edges.
Before it is compacted, the material along the unsupported edges shall be slightly elevated
YD
with hand tools. This will permit the full weight of the roller wheel to bear on the material to
the extreme edges of the mat.
H
1 Breakdown rolling shall immediately follow the rolling of the longitudinal joints and edges.
Rollers shall be operated as close to the paver as possible to obtain adequate density without
causing undue displacement. In no case shall the mix temperature be allowed to drop below
120 C before breakdown rolling.
2 If the breakdown roller is steel wheeled, it shall be operated with the drive wheel nearest the
finishing machine. Pneumatic-tire rollers may be used as breakdown rollers.
QCS 2014 Section 06: Roadworks Page 29
Part 05: Asphalt Works
1 Pneumatic-tire rollers or Steel wheeled rollers shall be used for the intermediate rolling.
2 The intermediate rolling shall follow the breakdown rolling as closely as possible and while
the paving mix is still hot. Rollers shall be used continuously after the initial rolling until all of
the mix placed has been thoroughly compacted. Turning of rollers on the hot paving mix
which causes undue displacement shall not be permitted.
ST
5.7.9 Finish Rolling
1 The finish rolling shall be performed with three-axle tandem rollers unless otherwise
EA
permitted by the Engineer. Finish rolling shall be accomplished while the material is still warm
enough for the removal of roller marks.
LE
2 All rolling operations shall be conducted in close sequence.
3 In places inaccessible for the operation of standard rollers as specified, compaction shall be
D
performed by manual or mechanical tampers of such design as to give the desired density.
ID
4 After final rolling, the smoothness, levels, crossfalls, density and thickness shall be checked
M
and any irregularity of the surface exceeding the specified limits and any areas defective in
texture, density or composition shall be corrected as directed by the Engineer, including
G
removal and replacement as directed by the Engineer.
IN
1 Sections of the newly finished work shall be protected from traffic of any kind until the mix
has been properly compacted and cooled. In no case shall traffic be permitted less than 24 h
SU
after completion of the asphalt course unless a shorter period is authorised by the Engineer.
2 Cold planing plant shall have sufficient power, traction and stability to maintain the required
depth of cut and slope. The control of the depth of cut and the slope shall be by an automatic
ER
3 Cold planing shall be carried out to straight crossfalls to the designated thickness. Planing
shall be to a tolerance of 5 mm of the designated amount. The average thickness of
planing achieved shall be at least the thickness designated.
H
4 In areas where there is severe deformation of the existing pavement, it may be necessary to
vary the depth of planing.
5 Existing kerbs, gullies, manholes and other features shall not be disturbed by the planing
process. This may require the use of smaller plant or removal by hand tools.
6 Any joints at the edge of planed areas shall be cut vertically and straight using asphalt saws.
8 After planing the prepared surface shall be thoroughly brushed and suction swept by
mechanical means to the satisfaction of the Engineer. The surface shall be free from
gouges, ridges, continuous grooves and shall have a reasonably uniform finish.
9 Cold planing shall be performed so that at the end of a day’s work the termination line does
not present a hazard to traffic that may use the road.
10 Any cracks noted in the pavement shall be blown clean with compressed air. The Engineer
will inspect the planed surface and may instruct that further work is carried out for treating
ST
cracks in the pavement.
EA
5.9.1 General
LE
1 The work shall consist of furnishing and applying liquid asphalt and blotter material, if
required, to a previously prepared and approved subgrade or granular base/sub-base course
D
as designated and to the full designated width.
ID
2 Prime coat shall not be applied when the ambient temperature is less than 13 C nor during
rain, fog, dust storms or other unsuitable weather.
M
5.9.2 Equipment Required
G
IN
1 The equipment used by the Contractor shall include a liquid asphalt distributor as described
in clause 5.17.3.
LT
2 If the surface is covered in wind-blown dust or fine aggregate then a power broom shall be
provided. The power broom shall be self-propelled and equipped with a cylindrical, rotating
SU
nylon bristle brush of not less than 760 mm in diameter and not less than 1800 mm in length.
The brush shall be capable of being angled to the right and left with adjustable ground
N
pressure. Where necessary for the proper preparation of the surface, motor graders, rollers
and water trucks shall also be provided.
O
C
1 Immediately before applying the prime coat, all loose dirt, earth and other objectionable
material shall be removed from the surface with a power broom of approved design and/or a
power blower as required, and any ruts, soft spots or unacceptable irregularities in the
YD
surface shall be repaired in accordance with the instructions of the Engineer. If the Engineer
so requires, the surface shall be lightly bladed and rolled immediately before the application
of the prime coat, in which case brooming or blowing may not be required.
H
2 Priming will not be permitted when there is free water present on the surface.
5.9.4 Application
1 After preparing the road surface as above, the prime coat shall be applied by means of the
distributor at the temperature and rate shown in Table 5.12. Hand-spraying of restricted,
inaccessible areas is permitted, subject to the approval of the Engineer.
2 The surface of structures, kerbstones and other appurtenances adjacent to areas being
treated shall be protected in such a manner as to prevent their being spattered or marred.
QCS 2014 Section 06: Roadworks Page 31
Part 05: Asphalt Works
3 The prime coat shall usually be applied to 1/3 or 1/2 of the road width at a time. When
applied in two or more lanes, there shall be a slight overlap of asphalt material along
adjoining edges of the lanes. It should be noted that no overlapping is allowed at the
transverse joints and that thick paper shall be used at the joint to protect the previous
application and the joining application shall begin on the paper. The paper used shall be
removed and satisfactorily disposed of by the Contractor after use. Care shall be taken that
the application of prime coat material at the junctions of spread is not in excess of the
specified amount. Excess bituminous material shall be removed from the surface.
ST
5.9.5 Maintenance and Traffic
1 Traffic shall not be permitted on the primed surface until the asphalt material has penetrated
EA
and dried and, in the judgement of the Engineer, will not be picked up under traffic. If it
becomes necessary to permit traffic before that time, but in no case sooner than 48 hours
after the application of the asphalt material, blotter material shall be applied as directed by
LE
the Engineer and traffic shall be permitted to use the lanes so treated.
D
2 Blotter material shall be spread from trucks operated backward so that the wheels will not
travel in uncovered wet asphalt material. When applying blotter material to an asphalt treated
ID
lane that adjoins a lane that has not been treated, a strip at least 200 mm wide along the
adjoining edge shall be left devoid of blotter material in order to permit an overlap of asphalt
M
material.
G
3 The Contractor shall maintain the primed surface in good clean condition and before the
application of the next course, any surface irregularities shall be corrected and all excessive
IN
5.10.1 General
N
1 This work shall consist of furnishing and applying diluted emulsified asphalt to a previously
prepared Base or Wearing courses, to provide bond for a superimposed course to the full
O
designated width.
C
2 Tack coat shall not be applied when the ambient temperature is less than 13C nor during
ER
1 The equipment used by the Contractor shall include liquid asphalt distributor as well as a
power broom and a power blower. Power broom shall be self-propelled and equipped with a
H
cylindrical, rotating nylon bristle Brush of not less than 760 mm in diameter and not less than
1800 mm in length. The brush shall be capable of being angled to the right and left with
adjustable ground pressure. In addition, the Contractor shall supply and use efficient and
approved equipment for diluting the emulsified asphalt with water.
QCS 2014 Section 06: Roadworks Page 32
Part 05: Asphalt Works
1 The full width of the surface to be treated shall be cleaned with a power broom or power
blower to remove dust, dirt or other objectionable materials. All faulty or unsuitable patches,
excess cracks or joint filler and all surplus bituminous material shall be corrected in
accordance with the instructions of the Engineer. The surface shall be dry when treated.
5.10.4 Application
ST
1 Immediately after cleaning the surface, the tack coat shall be applied by means of the
distributor at the temperature and rate directed by the Engineer. Hand spraying of restricted,
inaccessible areas is permitted, subject to the approval of the Engineer.
EA
2 The diluted emulsion shall be applied at a rate shown in Table 5.12. The Contractor shall
ensure that excessive application of tack coat is avoided.
LE
3 The surface of structures, kerbstones and other fixed objects adjacent to areas being treated
shall be protected in such a manner as to prevent their being spattered or marred.
D
ID
5.10.5 Maintenance and Traffic
1
M
After application, the surface shall be allowed to dry until it is in a proper condition of
tackiness to receive the superimposed course. Tack coat shall be applied only so far in
G
advance of the superimposed course placement as is necessary to obtain this proper
condition of tackiness.
IN
2 Until the superimposed course is placed, the Contractor shall protect the tack coat from
LT
damage.
SU
3 If the tack coat is unavoidably damaged by rain or dust, it shall be allowed to dry, shall be
cleaned again by a power broom or power blower and, if required by the Engineer, a
subsequent light application of tack applied to the surface. Where, in the opinion of the
N
Engineer, a tack coat is not necessary between layers of freshly placed courses, he may give
O
instructions in writing to omit the tack coat. Any cleaning required in these areas shall be
carried out before the application of the next course.
C
5.11.1 Thickness
YD
1 Cores shall be taken to determine the thickness of asphalt paving courses. As determined
from each core, the thickness of a paving course shall not be less than that specified by more
H
2 In addition, the variations in the falls to cross sections of the road shall not vary from the
required value by more than 0.3 %. Any asphalt paving course containing deviations or
variations exceeding these tolerances shall be corrected or removed and replaced by the
Contractor, in accordance with the instructions and to the satisfaction of the Engineer.
QCS 2014 Section 06: Roadworks Page 33
Part 05: Asphalt Works
3 Where any individual course is marginally out of tolerance on the low side, the Engineer may
allow adjustment in the succeeding course to correct the overall thickness of the pavement.
4 The tolerances herein specified shall not invalidate the tolerances set forth for the evenness
of surface of the asphalt paving course.
5 As directed by the engineer the laid thickness shall be checked by cutting test pits and/or
using Ground Penetrating Radar (GPR) for the determination of the structural capacity of the
pavement.
ST
5.11.2 Transverse Evenness
EA
1 The Engineer shall test the evenness of surface for each course of the various asphalt
paving courses to determine compliance.
LE
2 The Contractor shall put at the disposal of the Engineer a 3m long straight edge and a crown
template of sturdy and approved design and enough labour to assist in the checking
operations. The maximum allowable differences between the pavement surface and the
D
straight edge shall be 3mm. Transverse measurements shall be carried out every 20m of
ID
road length for each lane.
3
M
Any layer containing deviations or variations exceeding the tolerances specified here shall be
corrected or removed and replaced in accordance with the instructions of the Engineer and to
G
his satisfaction.
IN
1 Smoothness is a measure of the evenness and rideability of the pavement surface. It shall be
measured on the driving surface of the completed pavement for all major roads before
SU
2 Any section containing deviations or variations exceeding the criteria specified here or by the
N
Engineer shall be corrected or removed and replaced in accordance with the instructions of
O
4 All rectified segments shall be re-tested following the completion of rectification work at no
additional cost to the client.
YD
(a) Evenness
5 The evenness of the driving surface of road pavements shall be measured with a 3m rolling
H
straight edge along any line or lines parallel to the center line of the pavement on sections of
300m selected by the Engineer, whether or not it is constructed in shorter lengths. Sections
shorter than 300m forming part of a longer pavement shall be assessed using the number of
irregularities for a 300m length prorated to the nearest whole number. Where the total length
of pavement is less than 300m the measurements shall be taken in 75m lengths.
6 The number of deviations (from the bottom face of the straight edge) over the length of the
section greater than or equal to 4mm shall be counted. None of the measured deviations
shall exceed 6mm. The evenness of the driving surface of the tested section shall be within
the relevant limits given in Table 5.19.
QCS 2014 Section 06: Roadworks Page 34
Part 05: Asphalt Works
Table 5.19
Evenness of Driving Surface
Section Length (m) Allowed number of deviations ≥4mm
300 20
75 9
(b) Rideability
ST
7 For major roads the International Roughness Index (IRI) shall be used to monitor the
roughness and condition of the pavement surface. The acceptable IRI for ride quality shall be
decided by the Engineer.
EA
8 The rideability of the driving surface of the completed pavement shall be measured in terms
of the International Roughness Index (IRI) which shall be tested with a certified and
LE
calibrated Inertial Profiler meeting the requirements of ASTM E950–Class 1.
D
9 The testing method shall be in accordance with ASTM E950. The IRI shall be calculated
according to ASTM E1926.
10
ID
Calibration checks on the inertial profiler shall be conducted using test methods in
M
accordance with the manufacturer’s recommendations, at the beginning of the day of
operation and at any other time the operator may suspect changes of system performance
G
since the last calibration.
IN
11 Calibration checks on the inertial profiler and all other quality checks shall be submitted in a
method statement to the Engineer for approval.
LT
12 The selected measuring speed shall be the posted speed and within the range
SU
recommended by the manufacturer and shall remain nearly constant during testing, not to
exceed +/-5 km/h of the selected speed.
N
13 The profiler system shall stabilize at the test speed prior to entering the test sections. This
O
requires bringing the profiler vehicle to the desired test speed at least 100 m prior to the
beginning of the test location. Any Features along the test section such as bridges, culverts,
C
milepost or other pertinent information shall be identified. The test shall be conducted in the
paving direction.
ER
14 The start and end point of the test section shall be automatically identified by using a photo
YD
detector. The coordinates of the test section shall be identified by using a GPS.
15 Three runs of data collection (both wheel tracks in each lane) shall be conducted. The
H
processing of the data for IRI shall include calculating the average IRI value of the three runs
for the two wheel tracks. The processed data shall be reported on 25m and 400m sub-
sections calculated using the Moving Average statistical method and applying a 250mm
filtering.
QCS 2014 Section 06: Roadworks Page 35
Part 05: Asphalt Works
1 Pavement evaluation tests shall be carried out for the completed pavement structure at any
point of the road as directed by the Engineer to assess the serviceability condition of the
pavement and verify compliance with specifications.
2 Pavement evaluation methods can be grouped into two main categories, destructive and
non-destructive.
ST
3 The Contractor shall allow and provide all necessary arrangements for the execution of all
pavement evaluation test required by the Engineer.
EA
4 As directed by the Engineer the structural ability of the pavement in terms of load-deflection
response and layer modulus shall be assessed by using the Falling Weight Deflectometer
(FWD).
LE
5 The pavement surface friction shall be measured based on the Engineer request using the
D
portable pendulum tester (ASTM E303), locked wheel tester (ASTM E274) or the sand patch
method (ASTM E965).
1 Production and spreading of asphalt Concrete mix shall not be permitted when the ambient
temperature is less than 8 C, nor during rain, fog, dust-storms or other unsuitable weather.
LT
1 The equipment required for construction of the asphalt concrete courses shall include but not
be limited to the equipment mentioned in Clauses 5.3 to 5.6 of this Part, together with such
N
miscellaneous equipment and tools as required for the satisfactory preparation and
O
2 All equipment shall be checked, calibrated and approved by the Engineer before use. The
equipment shall be satisfactorily maintained and shall be used in an approved manner.
ER
3 Adequate equipment and labour shall be used so that there is continual production and
distribution of the asphalt course being constructed.
YD
1 The area to be paved shall be true to line and grade and shall have a properly prepared
surface before the start of paving operations.
4 The surface of kerbs, vertical faces of existing pavements and all structures in actual contact
with asphalt mixes shall be painted with a thin and complete coating of tack coat as
instructed by the Engineer to provide a closely bonded, watertight joint.
5 All openings or structures in the road for water, drainage and other specified utilities shall be
constructed and their positions and levels determined before the start of paving operations.
ST
1 The 60/70 penetration grade bitumen shall be heated to a temperature of between 150 to 165
degrees centigrade.
EA
2 Bitumen of other penetration grade shall be heated to yield viscosity's in the range of 150 to
300 centistokes (175 to 150 seconds Saybolt-Furol) when delivered to the mixer, as
determined from the Temperature Viscosity Chart of the product used.
LE
3 Penetration Graded Asphalt Binders shall not be used if foaming occurs or shall it be heated
above 175 C at any time.
D
ID
4 Polymer-modified binder shall be heated to a temperature specified by the supplier.
M
5.13.5 Heating of Mineral Aggregate
G
1 When using 60/70 penetration grade asphalt binder the materials shall be thoroughly dried
IN
2 When using asphalt binder of other penetration grade the materials shall be thoroughly dried
LT
and heated so that their temperature is within ± 8 C of the temperature needed to satisfy the
SU
3 The moisture content of the heated and dried materials shall not exceed 1%.
N
4 The quantity of materials fed through the drier shall in all cases be held to an amount which
O
5 The heated materials shall be screened into sizes such that they may be combined into a
ER
gradation meeting the requirements of the Job Mix Formula and the hot aggregate storage
bins shall be such as to minimise segregation and loss of temperature of aggregate.
YD
6 Hot bins shall be drawn and cleaned of material at the end of each day's operation.
1 The heated ingredients together with the mineral filler and bitumen shall be combined in such
a manner so as to produce a mixture which complies with the requirements of the Job Mix
Formula. Plant settings, once established, shall not be changed without the approval of the
Engineer.
2 Mineral filler, in a cool dry state, shall be proportioned into the mixer either with the aggregate
or after the introduction of the bitumen to avoid loss of fines that may occur in dry mixing as a
result of turbulence in the mixer.
QCS 2014 Section 06: Roadworks Page 37
Part 05: Asphalt Works
3 In batch type plants a dry mixing period of not less than four seconds shall precede the
addition of the bitumen to the mix. Excess wet mixing shall be avoided. Wet mixing shall
continue as long as it is necessary to obtain a thoroughly blended mix but shall not exceed 75
seconds nor be less than 30 seconds.
4 Once approved, mixing times shall not be altered unless so ordered or further approved by
the Engineer.
ST
1 Vehicles used for the transport of aggregates or bituminous mix shall have tight, clean and
smooth insulated metal bodies and shall be free from dust, screenings, petroleum oil and
EA
volatile or other mineral spirits which may affect the material being hauled. The vehicle metal
bed shall, if required, be sprayed with a minimum amount of soapy water or lime solution to
prevent the bituminous mix from adhering to the bed. After spraying, the truck shall be raised
LE
and thoroughly drained and no excess solution shall be permitted. Use of diesel or other
solvents to spray in the truck bed is prohibited.
D
2 Provision shall be made for covering truck loads with canvas or other suitable material of
ID
such size that the bituminous mix is fully covered.
M
3 Any truck causing excessive segregation of material by its spring suspension or other
contributing factors, or that shows oil leaks in detrimental amounts, or that causes undue
G
delays, shall, upon the instruction of the Engineer, be removed from the work until such faults
IN
are corrected.
LT
4 End dump trucks shall be equipped with chains on the tail gates for control when dumping
the mix into the paving machine. Hauling trucks shall not be routed over wet or muddy
access ways such that tires accumulate dirt that is deposited on the laying surface.
SU
5 The Contractor shall provide an adequate number of trucks of such size, speed and condition
N
to ensure orderly and continuous progress of the work all to the approval of the Engineer.
O
1 The asphalt mixture shall be fed to the paver by end tipping of the truck or by means of a
windrow elevator. The equipment for spreading and finishing the asphalt mixtures shall be of
YD
2 The pavers shall be self-propelled and equipped with hoppers and distributing screws of the
reversing type to place the mixture uniformly in front of adjustable electronic controlled
screeds. The pavers shall be so designed to allow a minimum paving width of 2 m, although
paving in widths of less than 3 m will require the approval of the Engineer.
3 Pavers shall be equipped with such provisions and attachments to suit paving widths
specified for road widening as well to as to suit paving on sloped sections. They shall be
equipped with fast and efficient steering devices and shall have reverse as well as forward
travelling speeds. The operational speed of the pavers shall be adjustable from 3 to 6 m/min
in accordance with the instructions of the Engineer.
QCS 2014 Section 06: Roadworks Page 38
Part 05: Asphalt Works
4 The pavers shall employ mechanical devices as equalising runners, straight edge runners,
evener arms or other compensating devices to maintain trueness of grade and to confine the
edges of the pavement to true lines without the use of stationary side forms. The equipment
shall include blending or joint levelling devices for smoothing and adjusting longitudinal joints
between lanes. The assembly shall be designed and operated in such a manner that it will
place the material at the required compacted thickness.
5 Electronic screeds shall include automatic feed controls to maintain a constant level of
material along the full length of the screed, automatic grade control and automatic slope
ST
control. Unless waived by the engineer, on projects with smoothness (IRI) requirements, the
paver shall carry minimum 9.0m long average beam equipped with an ultrasonic sensors
capable of sensing a pavement section at several spatially separated spots. The automatic
EA
slope control shall be equipped with a proportioning manual override to enable smooth
transition of changing slope rate. Automatic screed controls shall be approved by the
Engineer before use.
LE
6 Screeds shall be provided with devices for heating the screeds to the temperature required
D
for the laying of the mixture without pulling or marring. Pavers shall also be provided with the
standard attachable screed extensions. All screeds shall be of the vibrating type that permits
ID
material to be tamped into position.
7
M
The term "screed" includes any cutting, crowning or other physical action that is effective in
producing a finished surface of the evenness and texture specified, without tearing, shoving,
G
or gouging.
IN
8 If, during construction, it is found that the spreading and finishing equipment in operation
leaves in the pavement surface tracks or indented areas or other objectionable irregularities
LT
that are not satisfactorily corrected by scheduled operations, the use of such equipment shall
be discontinued and other satisfactory spreading and finishing equipment shall be provided
SU
by the Contractor.
1 Rolling equipment shall consist of vibratory steel-wheeled rollers, dead weight steel-wheeled
rollers and pneumatic-tire rollers as required for proper compaction and finishing of the
C
asphalt surface. Unless otherwise permitted, rollers shall be equipped with reversible or dual
ER
controls to allow operation both forward and backward with the operator always facing in the
direction of movement.
YD
2 Steel-wheeled rollers shall be two-axle tandem rollers or three-axle tandem rollers. These
rollers shall be self-propelled and equipped with power units of not less than four cylinders
and under working conditions shall develop contact pressures under the compression wheels
H
of 45 to 65 kg/cm of width. Each two-axle roller shall have a minimum weight of 10,000 kg
each and three-axle roller shall have a minimum weight of 13,000 kg. Vibrating steel-wheeled
rollers shall have dual drums with a minimum weight of 7000 kg. Vibrating frequency shall be
between 2000 and 3000 cycles per minute with individual controls for each tandem drum.
Rollers shall be in good working condition and shall be equipped with a reversing clutch.
Rollers shall be equipped with adjustable scrapers to keep the wheel surface clean and with
efficient means of keeping them wet to prevent mixes from sticking. These surfaces shall
have no flat areas or projections which will mark the surface of the asphalt courses. The
three-axle rollers shall be equipped with a centre axle which may be operated either fixed or
floating. The three-axle tandem roller shall be so constructed that when locked in a position
QCS 2014 Section 06: Roadworks Page 39
Part 05: Asphalt Works
for all treads to be in one plane, the roller wheels are held with such rigidity that, if either front
or centre wheel is unsupported the other two wheels will not vary from the plane by more than
6 mm. All steel-wheeled rollers shall be in good condition and the Contractor shall furnish to
the Engineer the manufacturer’s technical data for each roller and no roller shall be used
except after approval of the Engineer.
3 Pneumatic-tire rollers shall be self-propelled. The rollers shall be equipped with pneumatic
tires of equal size and diameter which are capable of exerting varying average contact
pressure. Pneumatic-tire rollers shall be in good condition and with enough ballast space to
ST
provide uniform wheel loading as may be required. The Contractor shall furnish to the
Engineer charts or tabulations showing the contact areas and contact pressures for the full
EA
range of tire inflation pressures and for the full range of tire loading for each type and size
compactor tire furnished and used in pneumatic-tire rollers. The total operating weight and
tire pressure may be varied by the order of the Engineer to obtain contact pressures which
will result in the required asphalt course density.
LE
5.15.3 Liquid Asphalt Distributor
D
ID
1 The liquid asphalt distributor truck shall be of the pressure type with insulated tanks. The use
of gravity distributors will not be permitted. The distributor shall have pneumatic tires of such
M
width and number that the load produced on the road surface shall not exceed 100 kg/cm tire
width.
G
2 Spray bars shall have a minimum length of 2.4 m and shall be of the full circulating type.
IN
Spray bar extensions shall also be of the full circulating type. The spray bar shall be
adjustable to maintain a constant height above the surface to be treated.
LT
3 The spray bar nozzles shall be slotted and shall be of such design so as to provide a uniform
SU
unbroken spread of asphalt material on the surface. The valves shall be operated by levers
so that one or all valves may be quickly opened or closed in one operation. The distributor
shall be equipped with a hose and nozzle attachment to be used for spotting areas
N
inaccessible to the distributor. The distributor and booster tanks shall be so maintained at all
times as to prevent dripping of liquid asphalt material from any part of the equipment.
O
C
4 The distributor shall be equipped with devices and charts to provide for accurate and rapid
determination and control of the amount of liquid asphalt material being applied and with a
ER
tachometer of the auxiliary wheel type reading speed in m/min. The spreading equipment
shall be provided with a separate power unit for the pump or a variable displacement pump
driven by a hydrostatic transmission so that a uniform application of liquid asphalt material, in
YD
2
controlled amounts, may be made ranging from 0.15 to 5.0 kg/m . The distributor shall have
satisfactory heating equipment and thermometers in order to provide the full range of
application temperatures for the liquid asphalt material being used.
H
5 Before commencing the work and as required by the Engineer, the liquid asphalt distributor
shall be checked and calibrated such that the rate of transverse spread or longitudinal spread
shall not vary more than 10 % from the required rate of application.
QCS 2014 Section 06: Roadworks Page 40
Part 05: Asphalt Works
ST
EA
LE
D
APPENDIX
ID
M
G
IN
LT
SU
N
O
C
ER
YD
H
QCS 2014 Section 06: Roadworks Page 41
Part 05: Asphalt Works
ST
1.4 SELECTION OF HMA PROPERTIES & REQUIREMENTS ................................... 46
1.5 OVERVIEW OF SUPERPAVE MIX DESIGN PROCESS....................................... 47
EA
1.5.2 Step1: Selection of Materials 47
1.5.3 Step2: Selection of a Design Aggregate Structure (DAS) 48
1.5.4 Work Instructions of Step 2 Selection of DAS 50
LE
1.5.5 Step 3: Selection of the Design Asphalt Content 51
1.5.6 Work Instruction of Step 3- Selection of DAC 52
D
1.5.7 Nmax and Ndes Verification 52
ID
1.5.8 Step 4: Evaluation of the Strength and the Moisture Sensitivity of the Mixture 53
1.5.9 Work Instructions of Step 4 Evaluation of Strength and the Moisture Sensitivity 54
M
1.6 JOB MIX DESIGN PROPOSAL ............................................................................. 54
1.6.2 Acceptance of Job Mix Formula 55
G
1.1 DEFINITIONS
ST
(b) Performance-Based Specifications of Materials & HMA.
(c) Test methods and practices for material selection & mix design.
EA
(d) Performance prediction of HMA.
2 Asphalt Binder Content (Pb): the percent by weight of asphalt binder in the total mixture.
LE
3 Initial Trial Asphalt Binder (Pbi): the percent by weight of the asphalt binder in the total
D
mixture for each trial blend in the selection of the Design Aggregate Structure (DAS).
ID
4 Bulk Specific Gravity (G1, 2, to n; … Gsb, Gmb): the ratio of the weight in air of a unit volume
of a permeable material (including both permeable and impermeable voids connected to
M
the surface of the aggregate particle) at a stated temperature relative to the weight in air of
an equal volume of gas-free distilled water at the stated temperature. This definition
G
generally applies to individual aggregate stockpiles (Gl through Gn), the blended
IN
aggregate (Gsb, AASHTO T84, T85 and T100) or the compacted mix (Gmb, AASHTO T166 or
T275).
LT
5 Effective Binder Content (Pbe): the volume of the asphalt binder that is not absorbed into
the aggregate but remains in the mixture to coat the aggregate particles.
SU
6 Effective Specific Gravity (Gse): the ratio of the weight in air of a unit volume of a
N
7 Maximum Specific Gravity (Gmm): the ratio of the weight of a given volume of voidless
(Va=0) loose HMA at a stated temperature (usually 77 °F (25°C)) to a weight of an equal
ER
8 Voids in Mineral Aggregate (VMA): It is the total space between the aggregate particles
YD
in the compacted paving mixture which includes 1) the air voids (Va) and 2) the effective
binder volume . The VMA is defined as the volume of void space between the aggregate
particles before adding the binder. Note: mineral aggregate is the aggregate which does not
H
include any or organic material but it is the material that consists of minerals and compounds
such as calcium, silicon, etc ….
9 Air Voids (Va): The total volume of the small pockets of air between the coated aggregate
particles throughout a compacted paving mixture, expressed as percent of the bulk
volume of the compacted paving mixture.
10 Voids Filled with Asphalt (VFA): the percentage portion of the volume of intergranular void
space between the aggregate particles (i.e. VMA) that is occupied by the effective asphalt
binder volume. It is expressed as the ratio of (VMA-Va) to the VMA.
QCS 2014 Section 06: Roadworks Page 43
Part 05: Asphalt Works
11 Volume of Absorbed Binder (Vba): the volume of binder absorbed into the aggregate (equal
to the difference in aggregate volume when calculate with the bulk specific gravity and
effective specific gravity).
12 Dust to Binder Ratio (P0.075/Pbe): ratio by weight of the percentage of the aggregate
passing the 0.075 mm sieve (P200) to the effective binder content (Pbe).
13 Standard Axle: is 8.2 ton (18,000 lb) single axle with dual wheels; the center to center
distance of dual wheels is 34.29 cm (13.5 in); the tire pressure is 0.517 MPa (75 psi).
ST
14 ESAL's: is an abbreviation of Equivalent Single Axle Load. The equivalency factor is the
number of repetition of the standard axle required to induce the same damage as the given
EA
axle. AASHTO Road Test has shown that an equivalent number of the standard axle
can represent the damaging effect of the passage of an axle of any mass. This means that
the ESAL is the number of applications of the standard axle that is equivalent in the damage
LE
to the pavement to an axle of any mass. The relationship is non-linear and is a fourth
degree. For example, one application of a 16.2 ton single axle (36,000 lb twice as the
D
standard axel) was found to cause damage equal to approximately sixteen applications of
the standard axle; or one application of a 16.2 tons axle were required to cause the same
ID
damage or reduction in the pavement serviceability as sixteen applications of the
standard axle. Also, one application of a 5.47 ton single axle (12,000 lb two thirds of the
M
standard axel) was found to cause damage equal to approximately 0.2 applications of the
standard axle; or five applications of a 5.47 tons axle were required to cause the same
G
axle.
LT
15 Standard Sieves: Superpave standard sieve sizes are 50.0, 37.5, 25.0, 19.0, 12.5, 9.5,
4.75, 2.36, 1.18, 0.6, 0.3, 0.15 and 0.075 mm
SU
16 Maximum Aggregate Size (MS): one standard size larger than the nominal maximum
aggregate size (This definition applies only to Superpave mix design.)
N
17 Nominal maximum aggregate size (NMAS): one standard size larger than the first sieve
O
that retains more than 10 percent of the aggregate (this definition applies only to Superpave
C
mix design).
ER
18 Nini, Ndes and Nmax: These are the number of gyrations of the gyratory compactor at
three compaction levels simulating the construction traffic for N ini, the design traffic for Ndes
and the maximum anticipated densification by the highest traffic for Nmax
YD
19 Design Aggregate Structure (DAS): the aggregate blend meeting all Superpave
requirements.
H
20 Design Asphalt Content (DAC): the percent by weight of the asphalt binder in the total mix
selected at 4.0 % air voids in the mix meeting all Superpave requirements.
21 ePAVE3: is a user-friendly menu driven Excel program for the Superpave mix design
system. It is a decision making program that includes all the computations, requirements
and comparisons to design hot mix asphalt for a given project. ePAVE3 includes Superpave
requirements based on the latest (to date) Asphalt Institute Superpave Mix Design –
Superpave Series No. 2 (SP-2), third Edition 2001 and last edition of AASTO 2005
including M323 specification "Standard Practice for Designing Superpave HMA", and R35.
QCS 2014 Section 06: Roadworks Page 44
Part 05: Asphalt Works
22 Polymer: An organic substance that is originated from petroleum gases. It is the product of
a complicated chemical process. The word “polymer” originally consists of two words
“poly” which means numerous and “meros” which means parts; therefore, polymer means
the substance with many parts. Polymers can be either copolymers or homopolymers. The
most common polymers that are used to modify the asphalt binder for road applications are
either “Elastomers” such as SBS or “Plastomers” such as EVA and Polyethylene.
23 Neat and Polymer Modified Binder (PMB): neat binder is a black or dark brown material
produced from refining of petroleum oil in petroleum refineries. The polymer modified binder
ST
is a neat binder that has been modified by the addition of polymers. The purpose of blending
polymer and other chemical substances is to improve the neat binder Rheological properties
to achieve the Performance Grade (PG) requirements of Superpave grading system. This
EA
process is complicated and involves accurate control of the process parameters such as
mixing mechanism, temperature, time, concentration and blending details
LE
1.2 INTRODUCTION
D
1 This guide, which is based on ref. 1, should be considered as a guide to assist Engineers,
consultants and contractors to design Hot-Mix Asphalt (HMA) using Superpave system. It is
ID
the contractor full responsibility to select the applicable parameters for his project in liaison
M
with the Engineer and LSA. This system was developed using the last editions of the Asphalt
institute “Superpave Mix Design”, 2001, and AASHTO, 2005.
G
1 Before starting any HMA design using Superpave system for any project, the mixture and
LT
materials specifications and requirement must be identified. Superpave mix design system
requires three parameters in order to design a mix. These Parameters are:
SU
2 The contract documents shall specify and define the design parameters for the project. A
C
brief description of the basic design parameters is given in the following sections.
ER
1.3.2 Traffic
YD
1 In Superpave, Traffic is defined as the total anticipated project level equivalent single
axle load (ESALs) on the design lane for a period of 20 years. To simplify the design
process, traffic class designations for each ESALs that appears in the Superpave system is
H
specified herein. If the contract documents do not specify the ESALs applicable to the
project, the Engineer can use the information provided in Table 1 to select the traffic classes
needed to establish Superpave criteria.
QCS 2014 Section 06: Roadworks Page 45
Part 05: Asphalt Works
Table 1
ESAL and Traffic Designation
ST
M Medium 3 million to 10 million Main roads and city streets
EA
H Heavy 10 million to 30 million Highways and Expressway
LE
areas ...
D
1 Six Nominal Maximum Aggregate Sizes (NMAS) are identified in the Superpave system;
ID
these are 37.5, 25.0, 19.0, 12.5, 9.5 and, 4.75 mm as specified in Table 2.
M
Table 2
SUAERPAVE Standard NMAS mixtures
G
IN
37.5 mm 50.0 mm
SU
25.0 mm 37.5 mm
19.0 mm 25.0 mm
N
12.5 mm 19.0 mm
O
9.5 mm 12.5 mm
C
4.75 mm 9.5 mm
ER
2 The selection of design NMAS for a specific layer is based on the general rule that the
NMAS does not exceed half to one-third (1/2 to 1/3) the layer thickness. If the
contract documents do not specify the NMAS for the project, the Engineer can use the above
YD
criteria and the information provided in Table 3 to select the NMAS of the project.
Table3
H
Table 4
Superpave Gyratory Compactive Effort (SGCE)
ST
Traffic Gyrations
(ESAL, million)
EA
Nini Ndes Nmax
VL (< 0.3) 6 50 75
LE
L (0.3 to 3) 7 75 115
D
M to H (3 to < 30) 8 100 160
ID
VH (> 30) 9 M 125 205
G
Table 5
Superpave Criteria for the Mixture Design
IN
Criteria million)
VL L M H VH
SU
Ndesign
N
< 98.0
C
37.5 11.0 %
Voids in the Mineral 25.0
Aggregate (VMA %min) 12.0 %
ER
Nominal
Maximum 19.0 13.0 %
Important Note: mixtures Size, mm
with VMA greater than 2.0% 12.5
YD
4.75 16.0%
37.5 64-80 64-78 64-75
VL L M H VH
Dust Proportion (DP) Ratio, if gradation line is For all NMAS DP = 0.6 - 1.2, for NMAS 4.75
above the PCS DP = 0.9 - 2.0
ST
Average Indirect Tensile Strength of the Dry Set Report
in the Moisture Sensitivity Evaluation, kPa
EA
1.5 OVERVIEW OF SUPERPAVE MIX DESIGN PROCESS
LE
1 According to SP-2 and AASHTO R 35, there are four major steps in the volumetric mix
design process. These steps consist of
D
(a) Material Selection, (Type of binder and aggregate).
ID
(b) Selection of Design Aggregate Structure (DAS).
M
(c) Selection of Design Asphalt Content (DAC).
(d) Evaluation of Strength and Moisture Sensitivity of the Mix.
G
IN
Step 4:
LT
Step 3:
Selection of DAC
N
O
Step 2:
C
Selection of DAS
ER
Step 1:
Selection of Materials
YD
2 ePAVE3 program should be used to assist in the preparation of the mix design and obtain the
H
mix deign report summarizing the computations and test results. ePAVE3 mix design report
shall be submitted to the Engineer for acceptance then to LSA for approval.
1 This process includes the selection of the asphalt binder PG (ABPG) and the aggregates that
meet all Superpave criteria.
QCS 2014 Section 06: Roadworks Page 48
Part 05: Asphalt Works
3 To account for traffic volume and speed or both, adjustments should be made to the selected
ABPG using AASHTO M332.
4 The requirements of the aggregate are selected based on the anticipated traffic and position
ST
of the layer within the pavement. The quality criteria for Superpave aggregates are
summarized in Table 6. In order to be used in Superpave mixtures, the aggregate blends
must meet two sets of criteria known as source properties and consensus properties. Source
EA
property requirements apply to each aggregate stockpile, but consensus properties apply
to the combined blend of multiple stockpiles. The consensus properties are mandatory
for all Superpave aggregate blends while; source properties are left to the contracts.
LE
(a) Consensus Properties (Superpave Requirements):
D
i. Coarse Aggregate Angularity, (CAA) ASTM D5821
ii. Fine Aggregate Angularity, (FAA) AASHTO T304-Method A
ID
iii. Flat and Elongated Particles (F&E) ASTM D4791
iv. Sand Equivalent, (SE) AASHTO T176
M
(b) Source Properties (QCS Requirements):
G
QCS General Specifications, source properties are considered specific to the geology
IN
iv. Others.
Table 6
N
min.
100/100 80/75 60/- 50/- -/- > 100 mm
min.
45 40 40 40 - > 100 mm
50 45 45 40 40 SE, % min
H
10 10 10 10 - F&E, % max
Note: CAA values (X/Y) denotes that X% of the coarse aggregate has one fractured face and Y%
has two or more fractured faces
1 Once a group of aggregates has been identified, these aggregates are combined at
different percentages to produce at least three distinct blends conforming to Superpave
gradation requirements presented in Table 7 according to designed NMAS.
QCS 2014 Section 06: Roadworks Page 49
Part 05: Asphalt Works
Table 7
Aggregate Gradation Requirements – Control Points
Min. Max. Min. Max. Min. Max. Min. Max. Min. Max. Min. Max.
50.0 mm 100 - - - - - - - - - - -
ST
37.5 mm 90 100 100 - - - - - - - - -
EA
19.0 mm - - - 90 90 100 100 - - - - -
LE
9.5 mm - - - - - - - 90 90 100 95 100
4.75 mm - - - - - - - - - 90 90 100
D
2.36 mm 15 41 19 45 23 49 28 58 32 67 - -
ID
1.18 - - - - - - - - - - 30 60
0.075 mm 0 6 1 7 2 8
M 2 10 2 10 6 12
G
2 Primary Control Sieve (PCS) shown in Table 8 can be used to determine if the nominated
blend is fine or coarse gradation. If the gradation line passes below the PCS, it is considered
IN
as coarse graded and it is considered fine gradation if the line passes above the PCS.
LT
Table 8
Gradation Classification - PCS Control Points
SU
3 Typically, three blends are developed ranging from the coarse to the fine side of the
Superpave control points for a given nominal maximum size (note: control points and PCS
ER
differ for different NMAS). After selecting a blend (i.e. from the three trial blends), the
aggregate consensuses properties must be confirmed to meeting Superpave criteria by
actual testing.
YD
4 The most difficult part of designing an aggregate structure is the creation of the VMA
necessary to meet the volumetric criteria. The procedure is typically a trial and error
H
process; however, there are some general guidelines that will assist in obtaining the
VMA. The following recommendations may be tried to increase VMA:
(a) Move the gradation away from the maximum density line;
(b) Use highly angular particles;
(c) Use particles with a rough surface texture;
(d) Reduce the percent of natural sand and use more percent of the crushed sand;
(e) Reduce the amount of P200 used in the HMA; and
QCS 2014 Section 06: Roadworks Page 50
Part 05: Asphalt Works
5 A good design aggregate structure is one that is economical and meets Superpave
volumetric criteria.
ST
(b) Determine the consensus properties, water absorption, bulk and apparent specific
gravities for each aggregate fraction.
EA
(c) Grade the specimens using Superpave standard sieve set.
(d) Input the values from two and three into ePAVE3 or combine manually. to
LE
develop three blends that meet the Superpave criteria (i.e. within the control points for
the design NMAS)
D
(e) Estimate the initial trial asphalt binder content using ePAVE3 or by using formulas
presented in ASSHTO R35.
ID
(f) For unmodified asphalt binders, determine the mixing and compacting temperature for
M
the proposed asphalt binder as follows:
G
(i) Measure the rotational viscosity using AASHTO T316 or ASTM D4402 at 135 C
and 165 C.
IN
(ii) Input the measured viscosities into ePAVE3. ePAVE3 will generate the viscosity-
LT
temperature relationship.
(iii) From the graph, determine:
SU
(g) For modified asphalt binders, determine the mixing and compaction temperature in
O
(h) Prepare enough hot mix to make two 150 mm (or 100 mm) gyratory specimens and
two specimens to measure the Maximum Specific Gravity (Gmm) for each blend at the
ER
(i) Leave the mix in the oven for two hours at the compaction temperature then
compact two 150.0 mm (or 100 mm) specimens for each blend using the Superpave
H
(m) Check the results given by ePAVE3 for the three blends and select the most
conforming blend as the DAS; in case none of the three blends meets Superpave
criteria, repeat the design by developing additional aggregate blends from the same
source ; if the criteria is not met change the sources.
2 Preparation of the binder and aggregate mixtures for the gyratory compactor (SGC) should
be timed such that a minimum of 20 minutes is allowed between batches. Batched
specimens should be conditioned in a closed draft oven for a minimum of 2 hours ± 5
minutes prior to compacting them in the SGC. Refer to AASHTO R30 for more details. The
short time oven aging is performed to permit time for the aggregate to absorb the
ST
binder. All specimens including those for SGC and maximum specific gravity tests, should
be cured the same amount of time.
EA
1.5.5 Step 3: Selection of the Design Asphalt Content
LE
1 The selected aggregate blend (DAS) will then be mixed with four different proportions of the
binder as follows:
D
(a) Estimated asphalt binder content corrected to give 4.0% air voids.
ID
(b) Estimated asphalt binder content corrected to give 4.0% air voids minus 0.5 %.
(c)
M
Estimated asphalt binder content corrected to give 4.0% air voids plus 0.5 %.
(d) Estimated asphalt binder content corrected to give 4.0% air voids plus 1.0 %.
G
permit two specimens to be compacted in the SGC according to Superpave system for
gyrations equal (Ndes), and the maximum specific gravity to be determined at each of the
LT
3 Preparation of the binder and aggregate mixtures for the SGC specimens should be timed
such that a minimum of 20 minutes is allowed between batches. Batched specimens should
be conditioned in a closed draft oven for a minimum of 2 hours ± 5 minutes prior to
N
compacting them in the SGC. Refer to AASHTO R30 for more details. The short time oven
O
aging is performed to permit time for the aggregate to absorb the binder. All
specimens including those for SGC and maximum specific gravity tests, should be cured the
C
4 The procedure used for design in the laboratory will need to closely match the field conditions
at the time of construction. Failure to consistently test the materials at the same time interval
may result in a highly erratic all specific gravity values and possibly failure to achieve the
YD
required VMA. After the necessary testing has been accomplished, the calculation of the
volumetric parameters can begin. The averaged results of the various volumetric calculations
H
need to be plotted relative to the corresponding binder content. The design binder content is
selected as that which satisfies the specified volumetric criteria at 4 percent air voids (refer to
AASHTO R35 for more details).
QCS 2014 Section 06: Roadworks Page 52
Part 05: Asphalt Works
(a) After selecting the most conforming blend (DAS) from step 2, prepare enough
hot mix to make two 150 mm (or 100 mm) gyratory specimen and two specimens to
measure the Maximum Specific Gravity (Gmm) for four trial mixes using DAS of the
selected blend and four asphalt binder levels as specified in item (5.5.4) herein.
(b) Compact two 150.0 mm (or 100 mm) specimens for each mix using the Superpave
ST
Gyratory compactor to Ndes according to AASHTO T312 (total number of specimens
are eight)
EA
(c) For the specimens that were compacted to Ndes, measure the bulk specific gravity
(Gmb), and obtain the specimen height at Nini and Ndes from the gyratory compactor
that is automatically recording the specimen height for each gyration.
LE
(d) Input the measured values into ePAVE3. The program will perform all calculations,
produce the results and compare the results with required mix design properties for the
D
project.
ID
(e) ePAVE3 will generate the design curves, these are:
(i) % air voids vs. asphalt content.
M
(ii) % VMA vs. asphalt content.
G
(f) From the percentage, air voids vs. asphalt content curve determine the design asphalt
content (DAC) which corresponds to 4.0 % air voids.
SU
(g) Use the %VMA vs. asphalt content, %VFA vs. asphalt content % and %Gmm vs.
asphalt content graphs to obtain the VMA, FVA and the % Gmm @ Nini values at the
design asphalt content.
N
O
(h) Input the DAC, %VMA, %VFA % and Gmm @ Nini into the appropriate cells in
ePAVE3. ePAVE3 will perform the computations, display results, and check them
C
(i) If the mix properties at the design asphalt content conform to the Superpave criteria
then go to the Nmax verification; if not then analyze, evaluate and modify the
design as needed until the mix properties at the design asphalt content (DAC)
YD
(a) Prepare enough hot mix at the selected gradation from (DAS) step 2 and the selected
design asphalt content (DAC) from step 3, to compact two 150 mm (or 100 mm)
specimens and two Gmm specimens.
(b) Compact the specimens to Nmax using the gyratory compactor according to AASHTO
T312.
(c) Measure the Gmb at Nmax for the two specimens that were prepared using SGC and
measure the Gmm.
QCS 2014 Section 06: Roadworks Page 53
Part 05: Asphalt Works
(d) Input the values into ePAVE3, which will perform the computations, provide the results,
and compare them with the Superpave criteria.
(e) Check the results of ePAVE3, if acceptable then the design is concluded if not
then redesign the mix.
2 After conforming that the mix properties at Nmax meet Superpave criteria, then do the Ndes
verification as follows:
(a) Prepare enough hot mix at the selected gradation from (DAS) step 2 and the selected
ST
design asphalt content (DAC) from step 3, to compact two 150 mm (or 100 mm)
specimens and two Gmm specimens.
EA
(b) Compact the specimens to Ndes using the gyratory compactor according to AASHTO
T312.
(c) Measure the Gmb at Ndes for the two specimens that were prepared using SGC and
LE
use the Gmm from the previous step. Obtain the specimen height at Ndes and Nini from
the gyratory compactor that is automatically recording the specimen height for each
D
gyration.
ID
(d) Input the values into ePAVE3, which will perform the computations, provide the results,
and compare them with the Superpave criteria.
M
(e) Check the results of ePAVE3, if acceptable then the design is concluded if not
then redesign the mix.
G
IN
1.5.8 Step 4: Evaluation of the Strength and the Moisture Sensitivity of the Mixture
LT
1 The identification of the combination of a design aggregate structure and design binder
content is now complete. The mixture now needs to demonstrate that it is capable of
resisting the moisture induced damage. This evaluation is performed in accordance with
SU
AASHTO T283.
2 Moisture sensitivity evaluation requires that a total of six specimens consisting of the
N
proposed aggregate blend and binder at the design binder content, be prepared and
O
compacted to approximately 7 ± 0.5% air voids. This group of specimens is divided into
C
two subsets with three of the specimens being identified as the control specimens and
the other three being identified as conditioned specimens.
ER
3 At the end of the conditioning period all of the specimens are loaded to failure in indirect
tension. Report the average Indirect Tensile Strength (IDT) of the dry subset in the mix
YD
design report (see Table 5); and if the ratio of the average strength of the conditioned subset
to the control subset (retained strength) is more than or equal to 80% , then the mixture
passes the test. If the retained strength is less than 80%, then the mixture fails. The retained
H
strength can be increased by substituting part of the material finer than 0.075 mm by
mineral admixtures or by using chemical anti-stripping agents. Prepare another six (6)
specimens and test them as previously described. If this procedure does not improve the
retained strength to more than 80%, then the design process should be repeated using
different source.
QCS 2014 Section 06: Roadworks Page 54
Part 05: Asphalt Works
1.5.9 Work Instructions of Step 4 Evaluation of Strength and the Moisture Sensitivity
1 To check the Strength and the moisture sensitivity of the designed mix, do the following:
(a) Prepare enough hot mix to make six 150 mm (or 100 mm) gyratory compactor
specimens using the selected gradation (DAS) and the design asphalt content (DAC).
(b) Use the Nmax verification densification data to identify the number of gyrations required
to achieve 7.0 ± 0.5% % air voids (i.e. %Gmm = 92.5 to 93.5 %).
ST
(c) Compact six 150.0 mm (or 100 mm) specimens using the Superpave Gyratory
Compactor according to AASHTO T312 compactor (total number of specimens are
six) to a number of gyrations that will provide approximately 7.0 ± 0.5 % air voids.
EA
(d) Use ASSHTO T283 to test the six specimens.
(e) Input the measured values into ePAVE3. ePAVE3 will perform the computations and
LE
provide the results and compare them with the Superpave criteria
(f) Check the results given by ePAVE3. Report the average IDT of the Dry group in the
D
mix design report (see Table 5). If the ratio of the average IDT of the conditioned
ID
subset to the control subset is 80% or more, then the mixture passes the test if not
consider redesigning the mix and use some additives.
M
1.6 JOB MIX DESIGN PROPOSAL
G
1 A proposed Job Mix Formula (JMF) shall be formulated by the Contractor and submitted to
IN
the Engineer and LSA for approval. The JMF shall be prepared by the Contractor in precise
compliance with Superpave system. The Contractor shall select his sources of aggregate
LT
and bituminous material and, after sufficient quantities have been stockpiled or are available
for use, obtain representative specimens of the materials and test to determine if they
SU
2 Before producing bituminous concrete mixtures, the Contractor shall submit in writing to the
N
Engineer, detailed information for each mix which he proposes to furnish. The information
O
(c) Pertinent test data and a written certification that the aggregates conform to all of the
quality requirements specified herein and in section 5.2.
YD
(d) Type of Asphalt modifier intended to be used in the project. The Asphalt binder
modifier shall be an approved modifier; along with the Certificate of Conformity of the
H
modified asphalt binder to the required grade according to the Superpave Performance
Based Grading System.
(e) Pertinent test data on the type and properties of the asphalt binder, modified asphalt
binder, mineral filler, and chemical admixtures/asphalt modifiers to be furnished.
(f) Superpave mix design report in ePAVE3 format.
(g) The type and location of plant to be used for mixing each mix.
QCS 2014 Section 06: Roadworks Page 55
Part 05: Asphalt Works
(h) Type of Asphalt modifier intended to be used in the project. The Asphalt binder
modifier shall be an approved modifier; along with the Certificate of Conformity of the
modified asphalt binder to the required grade according to the Superpave Performance
Based Grading System.
(i) Pertinent test data on the type and properties of the asphalt binder, modified asphalt
binder, mineral filler, and chemical admixtures/asphalt modifiers to be furnished.
(j) Superpave mix design report in ePAVE3 format.
(k) The type and location of plant to be used for mixing each mix.
ST
(l) The proposed beginning date for producing bituminous concrete mixtures.
EA
(m) Any other support data and information special to the project (e.g. technical data
sheets of a polymer in case it was used).
3 The Engineer shall be provided access to the materials sampling and testing operations at all
LE
times.
D
4 At the same time that the above information is provided, the Engineer shall obtain one
ID
hundred (100) kilogram specimens of each individual aggregate size, eight (8) liters of
bituminous material and, when used, sufficient quantities of the mineral filler and the
M
chemical admixture/asphalt modifier to complete two (2) proposed mix design checks,
all representing the materials which the Contractor proposes to furnish. The final job
mix formula shall be made by using hot-bins aggregate.
G
IN
1 The Engineer shall review the JMF to determine that it contains all required information. If it
does not contain all required information, it shall be returned within seven (7) days to the
SU
2 If the proposed JMF contains all required information but fails to meet all of the requirements
N
specified, it shall not be accepted by the Engineer and will be returned to the Contractor
within fourteen (14) days. The Contractor shall prepare and submit to the Engineer a new
O
JMF conforming to the requirements specified and propose a new date for beginning
C
3 When the Engineer is satisfied that the JMF proposed by the Contractor conforms to all the
requirements of the specifications, he shall order the Contractor to construct a minimum of
two hundred (200) meter long field test strip; but, not exceeding one day's production. The
YD
(a) To check the contractor ability to produce the approved mix within tolerances.
H
(b) To check the contractor ability to construct and compact the mix to satisfy job
specifications.
(c) To check the riding quality according to project specifications.
4 The Engineer shall evaluate the test strip as to its constructability and compactability and the
mix for conformance to the laboratory tested JMF within the tolerances listed in Table 9. Five
(5) specimens shall be obtained from the test strip and tested.
5 If the Engineer is not satisfied with the results of the test strip, he shall state his
objections in writing and request a revised JMF and a new test strip.
QCS 2014 Section 06: Roadworks Page 56
Part 05: Asphalt Works
6 When the Engineer is satisfied that the JMF proposed by the Contractor conforms to all
requirements of the specifications and the test strip results are acceptable, he will issue
written acceptance to the Contractor to begin producing the proposed mixes. Production of
bituminous concrete mixtures shall not begin until the Engineer has given written acceptance
of the Job Mix Formula.
7 Acceptance of the JMF by the Engineer does not relieve the Contractor of his obligation to
produce bituminous concrete mixtures conforming to all specified requirements.
ST
1.6.3 Construction Quality Control:
1 Testing to control the quality of bituminous concrete mixtures produced shall be the
EA
responsibility of the Contractor.
2 For each class of bituminous concrete produced and each day's production, the Contractor
LE
shall perform one (1) complete Superpave analysis at Ndes including gradation and asphalt
binder content, air voids, %VMA, %VFA, DP ratio, Indirect tensile strength on a specimen
D
obtained from the discharge gate or hauling vehicle. In addition, the Contractor shall
evaluate on a weekly basis the strength and moisture sensitivity of the mix from a specimen
ID
obtained from the discharge gate or hauling vehicle.
Table 9
LT
±4
±1.2
1.7 REFERENCES
1) Hot Asphalt Mix Design System Using Superpave System Detailed in Asphalt Institute
SP-2 and the AASHTO 2005 Standards – MOT – Saudi Arabia, 2006.
2) AASHTO M323: Standard Specification for Superpave Volumetric Mix Design.
3) (NCHRP) Report 567: Volumetric Requirements for Superpave Mix Design.
4) (NCHRP) Report 409: Quality Control and Acceptance of Superpave-Designed Hot
Mix Asphalt.
ST
5) (NCHRP) Report 539: Aggregate Properties and the Performance of Superpave-
Designed Hot-Mix Asphalt.
EA
6) (NCHRP) Report 513: Simple Performance Tester for Superpave Mix Design.
7) (NCHRP) Report 648: Mixing and Compaction Temperatures of Asphalt Binders in
Hot-Mix Asphalt.
LE
8) AASHTO T320: Standard Method of Test for Determining the Permanent Shear Strain
and Stiffness of Asphalt Mixtures Using the Superpave Shear Tester (SST).
D
9) AASHTO T321: Standard Method of Test for Determining the Fatigue Life of
ID
Compacted Hot-Mix Asphalt (HMA) Subjected to Repeated Flexural Bending.
10) AASHTO T322: Standard Method of Test for Determining the Creep Compliance and
M
Strength of Hot-Mix Asphalt (HMA) Using the Indirect Tensile Test Device.
11) AASHTO T340: Standard Method of Test for Determining the Rutting Susceptibility of
G
Hot Mix Asphalt (APA) Using the Asphalt Pavement Analyzer (APA).
IN
LT
SU
N
O
END OF PART
C
ER
YD
H